Sumur Bor 2 Titik
Sumur Bor 2 Titik
Kegiatan
Pekerjaan
Lokasi
Tahun Anggaran
: 2015
NO
URAIAN PEKERJAAN
VOLUME
SATUAN
1
A
2
Honor Tim Pelaksana Kegiatan
1 Ketua
2 Sekretaris
3 Anggota
Honorarium Tenaga Teknis ADK
B
1.00
1.00
1.00
1.00
Ok
Ok
Ok
Ok
777.84
Kg
2 Pasir Urug
0.26
M3
3 Kerikil
1.82
M3
4 Pasir Beton
1.30
M3
9.02
Kg
6 Papan Bekisting
0.33
M3
0.33
M3
8 Besi Dia 10
25.00
Btg
9 Besi Dia 8
11.00
Btg
10 Batu Bata
2,122.00
Bh
11 Pintu
1.68
M2
12 Kawat Ikat
1.00
ikat
512.99
Ltr
Bahan
1 Semen
13 Air Bersih
14 Minyak Bekisting
1.92
Liter
1.00
Lsm
Alat
1 Ember Cor
2 Kuas Biasa
3 Sendok Semen
4 Cangkul
5 Riskam
6 Benang Bangunan
2 Bh
2 Bh
2 Bh
2 Bh
2 Bh
1 Glung
Upah
1 Tukang
2 Pekerja
Pekerjaan Lain-lain
1 Papan Nama Plank Kegiatan
2 Laporan dan Dokumentasi
Dikeahui Oleh :
Ka. UPTD Bina Marga & Pengairan
Kec. Minas
Hudy Raharjo, ST
NIP. 19590401 1989111 1 001
10.00
40.00
OH
OH
1
1
Bh
Ls
Dis
Pj. Penghulu K
16-Nov-15
JUMLAH (Rp)
180,000.00
170,000.00
160,000.00
1,000,000.00
Sub Total
180,000.00
170,000.00
160,000.00
1,000,000.00
1,510,000.00
1,568.00
1,219,646.85
160,000.00
41,920.00
300,000.00
545,439.60
220,000.00
285,031.56
23,000.00
207,414.00
2,240,000.00
737,311.68
1,500,000.00
493,735.50
80,000.00
2,000,000.00
52,000.00
572,000.00
450.00
954,900.00
400,000.00
672,000.00
28,000.00
28,000.00
56.00
28,727.44
11,000.00
21,120.00
12,000,000.00
Sub Total
12,000,000.00
19,807,246.63
35,000.00
22,500.00
35,000.00
55,000.00
35,000.00
10,000.00
Sub Total
70,000.00
45,000.00
70,000.00
110,000.00
70,000.00
10,000.00
375,000.00
120,000.00
80,000.00
Sub Total
1,200,000.00
3,200,000.00
4,400,000.00
500,000.00
1,000,000.00
Sub Total
JUMLAH
DIBULATKAN
500,000.00
1,000,000.00
1,500,000.00
27,592,246.63
27,592,000.00
Disetujui Oleh :
Pj. Penghulu Kampung Minas Timur
(Anas)
JADWAL PELAKSANAAN
Kegiatan
Pekerjaan
Lokasi
Tahun
NO.
:
:
:
:
URAIAN PEKERJAAN
BOBOT
Agustus
September
03 09 10 16 17 23 24 30 31 06 07 13 14 20
(%)
A.
B.
C.
BAHAN
1 Beton Ready Mix (K-225)
2 Pasir Beton
3 paku 2" - 5"
4 Papan Bekisting
5 kayu perancah / bekisting dalam
6 Minyak Bekisting
7 Aspal drum
8 Kayu Bakar
UPAH
1 Pekerja
2 Tukang
0.00
0.00
0.00
0.00
0.00
Err:509
0.00
Err:509
REALISASI
CEPAT / LAMBAT
28 04
05 11
PEKERJAAN LAINNYA
1 Pek. Persiapan
Err:509
PER HARI
AKUMULASI
PER HARI
AKUMULASI
TERCEPAT
TERLAMBAT
21 27
0.00
0.00
0.00
JUMLAH
JUMLAH
Okto
2.4
7.3
16.4
12.0
2.4
7.3
16.4
12.0
12.8
5.3
1.1
4.1
13.2
8.8
1.1
4.1
13.2
8.8
9.6
1.3
Diverifikasi Oleh :
Konsultan Manajemen Wilayah (KMW)
PT. CALVINDAM JAYA EC
Diperiksa Oleh :
Tenaga Pendamping Masyarakat
(TPM)
Ahaddin, ST
Supervisi Engineer
L PELAKSANAAN
BULAN
Oktober
12 18
KETERANGAN
19 25
November
Desember
26 01 02 08 09 15 16 22 23 29 30 06 07 13 14 20 21 27
28 31
100
75
50
25
13.3
15.1
9.3
10.7
Diperiksa Oleh :
Tenaga Pendamping Masyarakat
(TPM)
Bambang Siswanto, SE
TPM
Dibuat Oleh :
Organisasi Masyarakat Setempat (OMS)
Kec. Marpoyan Damai
:
:
:
:
NO
URAIAN PEKERJAAN
HARGA SATUAN
1 M3 URUGAN PASIR
TENAGA
0.3000 OH Pekerja
BAHAN
1.2000 M3 Pasir urug
1 M2 SOSOTAN ASPAL
TENAGA
0.002 OH Tukang Aspal
0.020 OH Pekerja
BAHAN
1.5 Kg Aspal drum
0.02 Ikat Kayu Bakar
70,000.00
70,000.00
115,000.00
75,000.00
70,000.00
13,000.00
25,000.00
70,000.00
140,000.00
Menghamparkan
BAHAN
1.0000 m
TENAGA
2.0000 OH
0.2500 OH
650,000.00
70,000.00
75,000.00
1,700,000.00
15,000.00
6,000.00
1,650,000.00
TENAGA
0.2000
0.1000
7
OH Pekerja
OH Tukang
Memasang 1 m
BAHAN
0.088 lbr
0.050 kg
TENAGA
0.114 OH
0.114 OH
70,000.00
75,000.00
wire mesh M8
Menghamparkan
BAHAN
326.000 Kg
0.543 M3
0.762 M3
215.000 Liter
TENAGA
1.650 Oh
0.083 Oh
550,000.00
17,000.00
70,000.00
75,000.00
UPAH
4
52,500.00
52,500.00
JUMLAH
BAHAN
5
TOTAL
6
52,500.00
21,000.00
21,000.00
138,000.00
138,000.00
159,000.00
19,500.00
500.00
20,000.00
21,550.00
1,400.00
1,400.00
2,800.00
150.00
1,400.00
1,550.00
1,400.00
1,400.00
7,000.00
7,000.00
7,000.00
650,000.00
140,000.00
18,750.00
158,750.00
650,000.00
12,410.00
3,000.00
600.00
12,045.00
808,750.00
14,000.00
7,500.00
21,500.00
28,055.00
49,555.00
48,400.00
850.00
7,992.28
8,563.16
16,555.45
49,250.00
65,805.45
:
:
:
:
NO.
JENIS BAHAN
SATUAN
TENAGA KERJA
1 tukang
2 Pekerja
BAHAN
BAHAN PASANGAN
1 pasir urug
2 pasir pasang
3 Pasir Beton
4 Tanah urug
5 Batu pecah
6 Koral Beton
7 Batu Bata Press
8 Semen Portland
9 Buis beton bertulang
10 aspal drum
11 Beton Ready Mix K.175
Hari / Orang
Hari / Orang
II
A.
B.
C.
D.
E.
BAHAN KAYU
1 Kayu Kelas II
2 kayu kelas III
3 papan meranti
4 kayu cerocok / kayu ubar / mahang
5 kayu perancah / bekisting dalam
6 kayu bakar
M3.
M3.
M3.
M3.
M3.
M3.
Bh.
Kg.
Kg.
Kg.
M3.
M3.
M3.
M3.
Batang
M3.
Ikat.
BAHAN BESI
1 besi beton polos
2 kawat ikat beton (bandrat)
3 wire mesh
Kg.
Kg.
Lbr
BAHAN PAKU
1 paku seng
2 paku 2" - 5"
Kg.
Kg.
BAHAN FINISHING
1 minyak cat
2 residu
3 minyak bekisting
4 cat minyak
5 Minyak Tanah
Diverifikasi Oleh :
Konsultan Manajemen Wilayah (KMW)
PT. CALVINDAM JAYA EC
Ahaddin, ST
Supervisi Engineer
Liter
Kg.
Liter
Liter
Liter
Dibuat
Organisasi Masyara
Kec. Marpo
Muhammad Ag
Ke
Ahaddin, ST
Supervisi Engineer
Diperiksa Oleh :
Tenaga Pendamping Masyarakat
(TPM)
Muhammad Ag
Ke
Diper
Tenaga Penda
(
Bambang
JUMLAH HARGA
BAHAN / UPAH
4
75,000.00
70,000.00
115,000.00
115,000.00
140,000.00
75,000.00
250,000.00
170,000.00
500.00
1,275.00
12,000.00
13,000.00
650,000.00
2,300,000.00
1,650,000.00
1,700,000.00
35,000.00
1,550,000.00
25,000.00
12,000.00
17,000.00
650,000.00
26,000.00
15,000.00
25,000.00
11,000.00
6,000.00
58,000.00
11,000.00
Dibuat Oleh :
Organisasi Masyarakat Setempat (OMS)
Kec. Marpoyan Damai
Diperiksa Oleh :
Tenaga Pendamping Masyarakat
(TPM)
Bambang Siswanto , SE
TPM
NO
URAIAN PEKERJAAN
I.
1
PEKERJAAN PENDAHULUAN
Pembersihan lokasi
II.
1
PEKERJAAN BETON
Pemasangan Papan Bekisting
PANJANG
2.50
LEBAR TEBAL/TINGGI
###
1.20
0.90
7.84
0.65
1.80
2.40
3.00
3.00
4.00
Dinding
2.00
4.00
0.09
1.18
0.05
0.09
0.08
2.50
Pondasi Bata
Pasir Urug
Lantai Kerja
1.4
0.262
0.262
Besi
Dia8 133.333333
Dia10
302.4
TEBAL/TINGGI
VOLUME
KET
6.25
M2
Sisi
Sisi
bh
14.40
10.80
7.84
0.65
1.80
9.60
45.09
M2
M2
M2
M2
M2
M2
M2
8.00
M2
0.36
1.18
0.20
0.35
0.30
2.39
5.60
0.26
0.26
M3
M2
M2
M2
133.33 M
11.11 Btg
302.4 M
25.2 Btg