MELTER TANK STEEL STRUCTURE INSTALLATION

Preparation work
- checking column base plate levelling
Steel Installation
- install 1st layer
- install 2nd layer
- install ramp
- crane inside
- install buckstay base plate
- install buckstay (R)
- install underport gangway (R)
- install port base (R)
- install tuckstone support (R)
- install crown support (R)
- install gangway crown level (R)
- install steelstructure cooling duct (R)
- install buckstay (L)
- install underport gangway (L)
- install port base (L)
- install tuckstone support (L)
- install crown support (L)
- install gangway crown level (L)
- install steelstructure cooling duct (L)
- install tierod
- install backwall buckstay
MELTER TANK REFRACTORIES INSTALLATION
Preparation work
- centerline marking
- 1st port centerline marking
Installation