Risks Associated with this ProjectTechnical Perspective


 Risk in a project is inevitable
 Following are the risks (technical) associated with this

project:

 Network Analyst Abhishek


 Responsible for Designing the whole Network
 Network Analyst Shah
 Responsible for Configuration and Installation of devices
 Couple of Support Analysts
 Supporting Network Analysts
 Couple of Junior Network Analysts
 Helping Network and Support Analysts

 Will client not able to operate normally if internet

Redundancy in Design A solution


to the Risks Identified

Redundancy in Design A solution


to the Risks Identified (contd..)

 Loss of internet connection from the Internet Service

Provider (ISP)
 Loss of power at site

connection is lost?
 Will client not able to operate in event of power

outage?

 Redundancy in the Network Design


 Designing two circuits Primary and Disaster

Recovery (from different ISPs). Why? Importance?


 Primary circuit Connectivity to everybody in the office
 Disaster Recovery circuit limited connectivity to

important servers and services

 Every workstations will be switched to the DR circuit,

if primary circuit went down


 Client can operate normally even in disastrous
situation.

What we will be doing?


How we will be doing?

 We would be installing UPSs (Uninterrupted Power

Supply)
 Each floor gets one UPS with two batteries
 Worth 20 hours of power backup
 In event of power outage, all the network devices will

be fed by UPSs until power is restored


 Importance? Client will not suffer with network outage

in event of power outage

When we will be doing what?


Brief Schedule

 Conducting Site Surveys - We will survey the sites to

determine what equipments are needed and how


many?
 Preparing specifications Based on site surveys result
we will prepare asset list and types
 Design Primary Circuit We will be designing the
primary circuit
 Design Disaster Recovery (DR) Circuit We will be
designing the DR circuit.