Wy
ES emmerbcas stems |
25 DEC 2915
a
Evie Vasil a Sub
| Amina AlShamet |
Al Ain Distribution Company
Ref : AADC/EOMD-PDD/16 [2 FF 2-
Date 5/12/2016
To : Projects Delivery Division Manager
Project: 2000 Government Villa with Associated Infrastructure Works at
Ain Al Fayda
Subject_: Relay Settings Cale for Subst: Loop 8
This is in reference to your letter AADC/PRI/P-2964 dated 19” December 2016.
Please note the following comments, for incorporation and resubmission.
1. Chapter 1, Page 1-4: LV side fuse/MCCB /MCB shall be coordinated with O/C &
E/F protection. Thermal OL settings shall be clarified in detail and necessary
supporting document shall be produced from Manufacturer.
2. Chapter 2 and 3, Page 1: a) Page 2: Breaker operating time shall be verified and
accordingly grading time shall be ensured. b) All fault scenarios shall be verified
with all possible operating condition.
3. Chapter 4, page 1: Clarification with relevant document required for remote end
settings changes including relevant network impact.
4, NOP shall be verified as per the network arrangement and accordingly, protection
model shall be prepared,
5. Overall diagram with connection arrangement shall be submitted.
6. The entire relay setting calculation soft copy native files such as ETAP, Auto
CAD, MS office, ete. shall be submitted including hard copy.
7. Relay setting adaptation shall be done in presence of AADC.
8. Relay settings file from all relay shall be submitted, including necessary software
and communication cable.
9. Any settings adjustment at site shall be notified to AADC and accordingly revised
document shall be submitted for approval.
10. Any scheme/drawing modification shall be done, after only approval by
concerned Section (T&PS).
11. Fault calculation shall consider up to LV i.e. 0.415 kV with L-G, L-L, L-L-L, L-
L-G and L-L-L-G faults and setting calculation shall be updated accordingly.
Manual calculation shall be submitted for verification purpose.
‘This is for your information and further action. ‘Aisin Distibaton Company
Projects Deivary Dison Manager
Regards, .
ren - Z > ; 25 DEC m6
f owt _[wofea pe |