You are on page 1of 1
Wy ES emmerbcas stems | 25 DEC 2915 a Evie Vasil a Sub | Amina AlShamet | Al Ain Distribution Company Ref : AADC/EOMD-PDD/16 [2 FF 2- Date 5/12/2016 To : Projects Delivery Division Manager Project: 2000 Government Villa with Associated Infrastructure Works at Ain Al Fayda Subject_: Relay Settings Cale for Subst: Loop 8 This is in reference to your letter AADC/PRI/P-2964 dated 19” December 2016. Please note the following comments, for incorporation and resubmission. 1. Chapter 1, Page 1-4: LV side fuse/MCCB /MCB shall be coordinated with O/C & E/F protection. Thermal OL settings shall be clarified in detail and necessary supporting document shall be produced from Manufacturer. 2. Chapter 2 and 3, Page 1: a) Page 2: Breaker operating time shall be verified and accordingly grading time shall be ensured. b) All fault scenarios shall be verified with all possible operating condition. 3. Chapter 4, page 1: Clarification with relevant document required for remote end settings changes including relevant network impact. 4, NOP shall be verified as per the network arrangement and accordingly, protection model shall be prepared, 5. Overall diagram with connection arrangement shall be submitted. 6. The entire relay setting calculation soft copy native files such as ETAP, Auto CAD, MS office, ete. shall be submitted including hard copy. 7. Relay setting adaptation shall be done in presence of AADC. 8. Relay settings file from all relay shall be submitted, including necessary software and communication cable. 9. Any settings adjustment at site shall be notified to AADC and accordingly revised document shall be submitted for approval. 10. Any scheme/drawing modification shall be done, after only approval by concerned Section (T&PS). 11. Fault calculation shall consider up to LV i.e. 0.415 kV with L-G, L-L, L-L-L, L- L-G and L-L-L-G faults and setting calculation shall be updated accordingly. Manual calculation shall be submitted for verification purpose. ‘This is for your information and further action. ‘Aisin Distibaton Company Projects Deivary Dison Manager Regards, . ren - Z > ; 25 DEC m6 f owt _[wofea pe | Eng. Fatima Al Dhahe 2. aoe Electricity O&M D: TOW Ce: T&PSIFite ial ; [npecs [wa a 13.76 ‘ax. 49713 7117555 | PO Box 1065, Al Ain, United Arab Emirat wwwaadeae gD Fie

You might also like