Professional Documents
Culture Documents
Temp Scribb
Temp Scribb
e geoscientists, the operator and the drilling contractor are all working on the
same map system on the same datum as the shift in position can be enormous and
frequently far bigger than the well target tolerance.
main consideration here is that it is essential that when positioning a well, th
e geoscientists, the operator and the drilling contractor are all working on the
same map system on the same datum as the shift in position can be enormous and
frequently far bigger than the well target tolerance.