Professional Documents
Culture Documents
MEP As Built-Model
MEP As Built-Model
600
200
Plot 19
A = 4,020
600
Plot 18
A = 1,169
Plot 17
A = 900
Plot 15
A = 1,235
Plot 16
A = 1,213
Flat1
BEACH ACCESS
Plot 13
A = 700
Plot 12
A = 600
Plot 11
A = 2,000
Plot 10
A = 1,150
Plot 9
A = 1,125
Plot 8
A = 1,100
Plot 7
A = 1,450
200
Plot 21
A = 777
Plot 20
A = 825
Plot 22
A =1,015
Plot 23
A =1,018
Plot 24
A = 764
Plot 25
A = 840
Plot 4
A = 1,600
Plot 26
A = 867
Plot 27
A = 901
Plot 5
A = 1,814
Plot 2
A = 1,400
Plot 6
A = 1,200
BEACH ACCESS
PIPE DRAWING
CABLE DRAWING
Plan
Plan
Skala 1: 50
Skala 1: 50
300
400
: Sub-Division Panel
Sand
Sand
: Water/Pipe Installation
Teluk Gerupuk
Plot 3
A = 1,550
JALAN
Plot 1
: Electrical Installation
Gravel + Rocks
Gravel + Rocks
LEGEND :
N
A
Water Tank
L
JA
PANEL (3 PHASE)
300
U
Lalu Mambo
Fill Soil
Fill Soil
: Water Valve
JA
LA
N