Karabatan Utility Solutions LLP

T-14211-7341-CV-ACC-0001-000

Doosan Heavy Industries &

Rev D02, DATE 18.APR.16

Page 1 / 6Vi

Construction

1. DESIGN SUMMARY
1.1. FOUNDATION SUMMARY

FDN.
NO.

FOUNDATION
GEOMETRY
(m)

REINFORCEMENT
TABLETOP FOUNDATION
LOCATION

REBAR

PILE REACTION CHECK


VERTICAL

UPLIFT

LATERAL

Long Term (Allowable vs Actual)


Refer to Section
1.3 Foundation
Details

CF1

Refer to Section
3.3.2.2.
Reinforcement
Sketch

501.9 > 389.4

152.8 > 0.0

44.1 > 0.4

OK

OK

OK

Short Term (Allowable vs Actual)


602.3 > 510.9

183.4 > 0.0

52.9 > 2.0

OK

OK

OK

Long Term (Allowable vs Actual)


Refer to Section
1.3 Foundation
Details

CF2

Refer to Section
3.3.2.2.
Reinforcement
Sketch

501.9 > 148.3

152.8 > 0.0

44.1 > 0.9

OK

OK

OK

Short Term (Allowable vs Actual)


602.3 > 260.5

183.4 > 21.9

52.9 > 37.4

OK

OK

OK

Long Term (Allowable vs Actual)


Refer to Section
1.3 Foundation
Details

CF3

Refer to Section
3.3.2.2.
Reinforcement
Sketch

ACC FDN
(MAIN)

501.9 > 147.0

152.8 > 0.0

44.1 > 0.7

OK

OK

OK

Short Term (Allowable vs Actual)


602.3 > 258.1

183.4 > 19.8

52.9 > 38.8

OK

OK

OK

Long Term (Allowable vs Actual)


Refer to Section
1.3 Foundation
Details

CF4

Refer to Section
1.3 Foundation
Details

P1

Refer to Section
1.3 Foundation
Details

P2

Refer to Section
1.3 Foundation
Details

P3

Refer to Section
1.3 Foundation
Details

P4

Refer to Section
3.3.2.2.
Reinforcement
Sketch

Refer to Section
3.3.2.2.
Reinforcement
Sketch

Refer to Section
3.3.2.2.
Reinforcement
Sketch

501.9 > 170.4

152.8 > 0.0

44.1 > 0.7

OK

OK

OK

Short Term (Allowable vs Actual)


602.3 > 285.3

183.4 > 14.2

52.9 > 39.4

OK

OK

OK

N/A

N/A

N/A

N/A

Karabatan Utility Solutions LLP

T-14211-7341-CV-ACC-0001-000

Doosan Heavy Industries &

Rev D02, DATE 18.APR.16

Page 2 / 6Vi

Construction

FDN.
NO.

FOUNDATION
GEOMETRY
(m)

REINFORCEMENT
TABLETOP FOUNDATION
LOCATION

REBAR

PILE REACTION CHECK


VERTICAL

UPLIFT

LATERAL

Long Term (Allowable vs Actual)


Refer to Section
1.3 Foundation
Details
ACC FDN
(ESD)
Refer to Section
1.3 Foundation
Details

Pile Cap ESD

Refer to Section
4.3.2.2.
Reinforcement
Sketch

501.9 > 340.3

152.8 > 51.7

38.2 > 30.0

OK

OK

OK

Short Term (Allowable vs Actual)


602.3 > 581.4 183.4 < 216.4

OK
Pedestal ESD

Refer to Section
4.3.2.2.
Reinforcement
Sketch

OK
N/A

45.8 > 41.6


OK