You are on page 1of 1

PRIVATISATION OF SUNGAI BESI ULU KELANG ELEVATED EXPRESSWAY (SUKE)

CONSTRUCTION AND COMPLETION OF MAINLINE AND OTHER ASSOCIATED WORKS FROM CH.7800 TO CH.11000
PACKAGE CA4
SUMMARY OF CONCRETE CUBE COMPRESSIVE STRENGTH RESULTS FOR G40T3 (LAFARGE)

ITEM
NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50

DATE
CASTED

LOCATION /
STRUCTURE

DESCRIPTION

SLUMP
(mm)

7 DAYS STRENGTH (N/mm2)


RFI
NO.
(SUKE/CA

D.O.
NO.

CUBE REF.

DATE
TESTED

AGE
TESTED

28 DAYS STRENGTH (N/mm2)


1

STATUS

RFI
NO.
(SUKE/CA

Prepared by:

Approved by:

Name:
Designation:
Date:

Name:
Designation:
Date:

D.O.
NO.

CUBE REF.

DATE
TESTED

AGE
TESTED

REMARKS
1

AVG.

STATUS