You are on page 1of 1

CALCULATION OF CAPITAL COST (RULE 5.

15)

S.
no
1

Items to b taken

Rule

Cost /Value of sanitary

5.15

Cost of water supply

5.15

Cost of electric
installation & fitting
Cost of
construction/acquisition

5.15

5.15(
a)

Expenditure incurred
after
acquisition/construction
Expenditure on
compound
walls/boundary walls

5.15(
a)

5 Expenditure on
dressing of land

5.16
(a)

5.16ii
(a)

5.16
(b)

Expenditure on fencing
and gates
Approach roads within
compound
Culverts () and path
within compound

5.16ii
(a)
5.16ii
(b)

6 Construction of
revetments and
retaining walls
(unless in
connection wih
tennis court)
7 Storm water drains

7
8
9

10

Items Not to be
taken
Cost /Value of land
or site
Expenditure on
preparation of
above
Expenditure on
raising of land
Expenditure on
leveling of land/site

8 Boundary pillars
9 Charges on account
of tools and plant
not charged
directly to work.

Rule
5.15
5.15

5.16
(a)
5.16
(a)

5.16
(c)
5.16
(d)
5.19

You might also like