Professional Documents
Culture Documents
0]
[College details]
[Member 1] [Role]
[Member 2]- [Role]
Name
Contents
Comments
1.
2.
Introduction..............................................................................................................................3
1.1.
Problem Statement............................................................................................................3
1.2.
1.3.
1.4.
Additional Features...........................................................................................................3
2.2.
Technical Stack.................................................................................................................4
2.3.
2.4.
Implementation Architecture.............................................................................................4
3.
Delivery Plan............................................................................................................................5
4.
Commercials.............................................................................................................................5
Appendix A...................................................................................................................................6
1. Introduction
[This section explains the scope of your system/application in short.]
1.1. Problem Statement
[This section explains the scope of your system/application more elaborative and
Industry sector it focused.]
1.2. Current Issues / Constraints
[Insight on the existing state of the systems or products or processes and their
constraints]
1.3. Future Process Flow due to this Solution
[What are the improvement your solution brought in the existing systems / products /
processes?]
1.4. Additional Features
[Mention if any additional features]
Photo
capture
Json/https
Service
wrapper
Application layer
HTML5/CSS
. 3/CORDOV
Webserver &
DB
.Technical Stack
[Explain about the technical stack will be used and share why it is been chosen]
.Non Functional Coverage
[Explain about the Nonfunctional items covered in this solution]
.Implementation Architecture
3. Delivery Plan
Phase Name
Item description
Deliverable type
Planned Date of
Submission
Comments
4. Commercials
[Share high level of cost estimate on manpower and non-manpower efforts plus any other
aspects to be considered as an investment to the solution. Explain the ROI with details]
[Attach the detail estimation sheet.]
Appendix A
[This section include references and standards will be used in the application development]