Professional Documents
Culture Documents
PRACH Configuration Two Cells Must Be Different Within The PRACH Re
PRACH Configuration Two Cells Must Be Different Within The PRACH Re
Frequency (prachFreqOff)
Allocation of PRACH area should be next to PUCCH area either
at upper or lower
border of frequency band, however should not overlap with
PUCCH area
Avoid separation of PUSCH in two areas by PRACH (scheduler
can only handle one
PUSCH area)
For simplicity use same configuration for all cells