Professional Documents
Culture Documents
OWNER : Maryam Obaid Bakheet Obaid Al Matrooshi and Klaithem Obaid Bakheet Obaid Al Matrooshi
CONSULTANT : Mazaya Engineering Consultant
BILL OF QUANTITIES
S/NO
DESCRIPTION
QTY
1.00
LS
15,000.00
TOTAL
REMARKS
15,000
Site preparation and mobilization including office facilities and utilities, material
storing area fencing etc
15,000
2
SUB STRUCTURE
2-1
Excavation
1,316.00
M3
8.00
10,528
2-2
Back Filling
2,214.00
M3
8.00
17,712
2-3
1.00
LS
500.00
500
2-4
189.00
M3
80.00
15,120
2-5
24.60
M3
350.00
8,611
2-6
RCC Footing
51.00
M3
1,000.00
51,000
2-7
554.00
85.00
47,090
2-8
Neck Column
14.00
M3
1,050.00
14,700
2-9
1.00
LS
28,720.00
28,720
41.00
M3
1,000.00
41,000
1.00
LS
4,898.87
4,899
2-12
1.00
LS
1,800.00
1,800
2-13
62.00
M3
450.00
27,900
2-10
Tie Beams+STB
2-11
269,580
3
SUPER STRUCTURE
26.00
M3
1,050.00
27,300
162.00
M3
1,000.00
162,000
25.00
M3
1,000.00
25,000
RM
1,050.00
Purline
RM
1,050.00
3-6
M2
1,050.00
3-7
RM
1,050.00
3-4
61.40
M3
1,000.00
61,400
3-1
RCC Column
3-2
3-3
R.C.C BEAMS
3-4
Steel beam
3-5
275,700
4
BLOCK WORKS
4-1
Hollow Blocks
4-2
Lintels
4-3
641.00
M2
59.00
1.00
LS
3,025.00
3,025
652.00
M2
79.00
51,508
37,819
92,352
5
PLASTERING
5-1
Internal Plastering
1,563.00
M2
23.00
5-2
External Plastering
1,341.00
M2
28.00
35,949
37,548
73,497
6
A
FINISHING
FLOORING
A-1
117.00
M2
59.00
6,903
A-2
Porceline Ceramics (60*60 cm)for majlis,Sitting,Kids Play & Dress Room (Supply rate-
269.00
M2
74.00
19,906
A-3
13.00
M2
200.00
2,600
A-4
M2
70.00
A-4
M2
200.00
A-6
M2
70.00
A-7
M2
70.00
A-8
M2
A-9
Terrzzo floor
M2
M2
33.00
M2
59.00
1,947
131.00
M2
59.00
7,729
39,885
424.00
M2
59.00
A-10
A-5
A-6
B
B-1
4.00
800
-
70.00
WALL FINISH
Ceramics for Kitchen & Bathroom (Supply rate-20/m)
25,016
25,016
C
C-1
STAIR STEPS
RM
200.00
4,800
4,800
SKIRTING
D-1
D-2
D-3
D-4
24.00
168.00
RM
35.00
5,880
24.00
RM
35.00
840
165.73
RM
144.00
RM
22.00
15.50
RM
100.00
3,168
9,888
1,550
THRESHOLD
PAINT WORKS
F-1
F-2
Internal Ceiling For Bed,maid Room &Near lobby,Emultion paint System (National)
F-3
1,480.00
M2
16.00
119.00
M2
16.00
1,904
1,341.00
M2
26.00
34,866
23,680
60,450
G
G-1
D1 Wooden doors
G-2
M2
G-3
RM
By Owner
By Owner
By Owner
H-1
M2
By Owner
H-2
Aluminum/Steel Handrails-External
RM
By Owner
H-3
Aluminum Windows
M2
By Owner
H-4
M2
By Owner
H-5
Fixed glass
M2
By Owner
H-6
Kitchen Cabinet
RM
By Owner
H-7
Spiral Staircase
LS
By Owner
H-8
Cat Ladder
LS
By Owner
FALSE CEILING
I-1
117.00
M2
50.00
I-2
314.00
M2
5,850
-
By Owner
5,850
J
J-1
WATER PROOFING
Roof Water Proofing (Area)
644.40
M2
100.00
64,440
64,440
K
K-1
GRC Works/Stone
Stone cladding & GRC Cladding by OWNER
27.00
M2
7
A
SERVICES
SANITARY WORKS
1.00
A-1
Common Bathrooms
A-2
LS
12,372.00
Sets
1.00
12,372
-
Sets
12,372
B
WATER TANK
B-1
1.00
LS
4,000.00
B-2
2.00
LS
1,000.00
4,000
2,000
6,000
C
PLUMBING WORKS
C-1
1.00
LS
15,000.00
C-2
Plumbing
1.00
LS
35,000.00
15,000
35,000
50,000
ELECTRICAL
E-1
Electrical
E-2
E-3
Heaters
E-4
Pumps
1.00
LS
45,000.00
-
7.00
LS
350.00
2,450
2.00
LS
2,500.00
By Owner
5,000
53,000
TELEPHONE
1.00
LS
15,000.00
15,000
15,000
1,074,380
SUB-TOTAL 1
INTERLOCK WORKS (By Owner)
45,550
LS
8-1
M2
By Owner
8-2
INTERNAL Kerbstone
LM
By Owner
8-3
EXTERNAL Interlocks
M2
By Owner
8-4
EXTERNAL Kerbstone
LM
10
11
12
13
1.00
LS
5,000.00
30.48
LS
250.00
LS
130.00
LM
600.00
1.00
LS
3,000.00
By Owner
5,000 By Owner
7,620
By Owner
By Owner
3,000
15,620
1,090,000
AED