INR) FRAME Selection of component, creating component in 2500 1 Day OrCAD, and footprint creation OrCAD Schematic modification and verification OrCAD Layout Arduino Code modification 2500 1-2 days
To finish the project on time we required the following files:
- Current OrCAD Project (which consist of Schematic and Layout) - Arduino code - Application of the project which will help us to modify the Arduino as per the requirement. All Payment will be on basis of Millstone. Future extra modification will be charged which can be discussed. NDA will be signed after review of the NDA format.