DATE: 26-1-2017

An inspection has been carried out by POWER GRID and KEC to check the
ground clearance at various locations in 765KV D/C Kadapa-Chilakaluripeta line.
The ground clearance found from the lowest conductor has been follows-
1. The road clearance between 75/1 to 75/2 -
(a) Left phase -20.124 m
(b) Right phase-22.950 m

2. Clearance of Mango garden between 75/6 to 75/7-


(a) Left phase- 16.418m
(b) Right phase- 16.292m

3. Clearance of NH crossing between 76/0 to 77/0-


(a) Left phase- 22.570m
(b) Right phase- 22.567m

Signature of KEC Signature of Power Grid