Pu 8.09943 ton 8099.43 kg 80994.3 N 80.

9943
Mx 0.51277 tonm 51277 kgcm 5127.7 Nm 5.1277
My 0.51277 tonm 51277 kgcm 5127.7 Nm 5.1277

Pu = 21.2459 *Ag 0.005626 7.2


Ag = 0.003812

h= 0.061743 m Ag baru 0.0225


6.174327 cm Po = 0.478033
15 pumax 0.597541 MN
150 597.5409 KN

3.32 19.1022 29.1


0.173802

dim 50 50 500 500


fc 25
fy 240

P= 1.281925 kN
1281.925 N 1.281925 kN
128.1925 kg

d 445 mm

Vu 0.005761 Mpa > 0.5

ovs -0.494239 < 2

ovc 111250 111.25 kN

y -109.9681 -10996.81 mm Wu 1

As snkg -7636.672 As 2472.222


-3818.336 s 3560 356 cm
25

25 189.88 kg 1898.8 N 300


2712

v 0.034524 vc 0.625

0.3125

3.333333
KN 0.080994 MN fc 35
KNm fy 400
KNm fys 240

0.063309 6.330939
0.037241 0.012662 173.802
0.173802

13.33333 < 22
250000
22500
0.260615 > 0.1

0.89

222.5

78.5 31.49328
32
4000
0.09 222.5 125
275 82500
Project Pembangunan SD 3 Ca
Job Perhitungan Portal AS 4
Page 1/8

GAMBAR DENAH PLAT


1500
750

250 250 250 250

B1 B1 B1 B1

1 0 -2 5

1 0 -2 5
B1

B1

B1

B1
B1
360
1 0 -2 5

B2 B2 B2 B2

900
10-25
10-25
B1

B1

B1
B1

B1
360

10-25

B1 B1 B1 B1
B1

B1
B1

B1

B1
180

80 B1 B1 B1 B1

GAMBAR GAYA AKSIAL


Pembangunan SD 3 Canggu
Perhitungan Portal AS 4 & 7
1/8

1500
750

50 250 250 250 300

1 B1 B1 B1
B1

B1
B1

B1

2 B2 B2 B2
B3

-25
B1

B1
B1

B1

-25
B3

1 B1 B1 B1 B1
B1

B1

B1

B1

1 B1 B1 B1 B1

148
Project Pembangunan SD 3 C
Job Perhitungan Portal AS
Page 2/8

GAMBAR BIDANG MOMEN

GAMBAR BIDANG LINTANG


K1
Pu (Kg) 5464.32
Mx (Kgm) 761.35
My (Kgm) 761.35
D (Kg) 310.59
Pembangunan SD 3 Canggu
Perhitungan Portal AS 4 & 7
2/8
K2 K3 K4
53923.77 8673.52 4147.34
167.69 491.55 7.16
167.69 491.55 7.16
74.87 235.69 0.04071
Project Pembangunan SD 3 Ca
Job Perhitungan Portal AS
Page 3/8

DATA PERENCANAAN KOLOM 1

fy Tulangan (N/mm2) 400


fy Sengkang (N/mm2) 240
f'c Beton (N/mm2) 35
Selimut Beton (mm) 30
Pu (KN) 54.64
Mx (KNm) 7.61
My (KNm) 7.61
D (KN) 3.11
p (%) 3%

PERHITUNGAN DIMENSI KOLOM

Ag = 0.05464317
0.65 . 0.8 (0.85 . 35 (1 - 0.03) + 400 . 0.03)
= 0.00257 m2

Perhitungan ukuran kolom

h= 0.00257
= 0.051 m
= 5.07 cm

Gunakan b= 20 cm
h= 20 cm

PERHITUNGAN TULANGAN POKOK

e= 7.6135
54.64317
= 0.1393 m >

Gunakan Tulangan 2 Sisi

Pu 54643.17
Agr 0.85 f'c 0.65 . 40000 . 0.85 . 35
= 0.071 <= 0.1

Pu e 0.071 . 0.07
Agr 0.85 f'c h
= 0.0049

Dengan nilai Pu dan Pu


Agr 0.85 f'c Agr 0.85 f'c

Maka digunakan ukuran kolom b= 25


h= 25
Pembangunan SD 3 Canggu
Perhitungan Portal AS 4 & 7
3/8

Tulangan Pokok D 13 mm
Tulangan Sengkang 10 mm
p (decking) 3 cm

Ag baru = 0.04 m2

Pu max = 849.84 KN

d= 16.5 cm
d' = 3.5 cm

b = 0.2
2 2
= 0.1 m

e = 13.93
h 200
= 0.07

d' = 3.5
h 20
= 0.20

e Tidak didapat nilai


h

cm d= 21 cm
cm d' = 3.5 cm
Project Pembangunan SD 3 Ca
Job Perhitungan Portal AS
Page 4/8

As min = 0.01 . 250 . 250


= 625 mm2

As sisi = 625
2
= 312.5 mm2

PERHITUNGAN TULANGAN GESER

Vu = 3D
2bd
= 0.089 Mpa <=

Maka Tidak Diperlukan Tulangan Geser

As min = 250 . 1000


3 . 240
= 347.22 mm2

As sisi = 347.22
2
= 173.61 mm2

S maks = 210
2
= 105 mm

= 100 mm Digunakan

GAMBAR PENAMPANG KOLOM 1


6 D13
1
Pembangunan SD 3 Canggu
Perhitungan Portal AS 4 & 7
4/8

As sisi = 312.5
AD13 132.665
= 2.36 Batang

= 3 Batang

Vc = 0.75 . 1/6 . f'c

= 0.7395099729 Mpa

As sisi = 173.61
A8 78.5
= 2.21 Batang

= 3 Batang

S= 1000
3
= 250 mm

10 - 100 mm

R PENAMPANG KOLOM 1
D13
10 - 100
Project Pembangunan SD 3 Ca
Job Perhitungan Portal AS
Page 5/8

DATA PERENCANAAN PONDASI FOOTPLAT 1

fy Tulangan (N/mm2) 400


fy Sengkang (N/mm2) 240
f'c Beton (N/mm2) 35
Selimut Beton (mm) 30
Pu (KN) 54.64
Mx (KNm) 7.61
My (KNm) 7.61
D (KN) 3.11
p (decking) cm 5
Bv Tanah (kg/m3) 2000
Bv Beton (kg/m3) 2400

BEBAN KE TANAH

Pu = 5464.32 Kg
N tanah = 3000 Kg
N plat = 720 Kg

Nu total = 9184.32 Kg

KONTROL TEGANGAN TANAH BAWAH PONDASI

ft = 9184.32 456810
10000 1000000

ft max = 1.83 Kg/cm3 <=


ft min = 0.00 Kg/cm4 >=

Mu plat (L) = 1.82 . 100 ( 0.5 . 100 - 0.5 . 25)2


2
= 128816.14 Kgcm

Mu plat (B) = 1.82 . 100 ( 0.5 . 100 - 0.5 . 25)2


2
= 128816.14 Kgcm
KONTROL TEGANGAN GESER

Aksi Dua Arah


Keliling daerah kritis :
bo = 2 (25 + 23.05) + 2 (25 + 23.05)
= 192.2 cm

A gsr = (100 . 100) - ((25 + 23.05) . (25 + 23.05))


= 7691.20 cm
Pembangunan SD 3 Canggu
Perhitungan Portal AS 4 & 7
5/8

Tulangan Pokok D 13 mm
Tulangan Sengkang 10 mm
Dimensi Kolom
a 25 cm
b 25 cm
Dimensi Pondasi
B 1m
L 1m
T 1.9 m
t 0.3 m

T-t 1.6 m

456810
1000000

fti max = 2 Kg/cm3 Oke


fti min = 0 Kg/cm4 Oke
dL = 24.35 cm
dB = 23.05 cm

5 + 23.05))
Project Pembangunan SD 3 Ca
Job Perhitungan Portal AS
Page 6/8

Tegangan geser terjadi :


vu = 1.83 . 7691.2
= 14090.67 kg

Kemampuan beton menahan geser :


vc = 0.75 . 1/3 . 35 . 10 . 192.2 . 23.05
= 65523.69 kg

vu <= vc

Aksi Satu Arah


Lebar daerah kritis B :
bo = bw
= 100 cm
A gsr = ((100 - 25)/2 - 23.05) . 100
1445 cm

Tegangan geser terjadi :


vu = 1.83 . 1445
= 2647.31 kg

Kemampuan beton menahan geser


vc = 0.75 . 1/6 . 35 . 10 . 100 . 23.05
= 17045.70 kg

vu <= vc

Lebar daerah kritis L :


bo = lw
= 100 cm
A gsr = ((100 - 25)/2 - 24.35) . 100
= 1315 cm

Tegangan geser terjadi :


vu = 1.83 . 1315
= 2409.15 kg
Kemampuan beton menahan geser
0.75
vc =
. 1/6 . 35 . 10 . 100 . 24.35
= 18007.07 kg

vu <= vc
Pembangunan SD 3 Canggu
Perhitungan Portal AS 4 & 7
6/8

Oke

Oke
Oke
Project Pembangunan SD 3 Ca
Job Perhitungan Portal AS
Page 7/8

PENULANGAN PLAT PONDASI

Arah L dL = 30 - 5 - 1.3/2
= 24.35 cm

C= 6000 . 24.35
(6000 + 2400)
= 17.39 cm

a= 0.85 . 17.39
15 cm

As = 128816.14
0.8 . 2400 . (24.35 . 15/2)
= 3.96 cm2

As 3.96
A13 1.32665
= 3.0 Batang

= 3 Batang

S= 1000
3
= 330 mm

Arah B dB = 30 - 5 - 1.3 -1.3/2


= 23.05 cm

C= 6000 . 23.05
(6000 + 2400)
= 16.46 cm

a= 0.85 . 8.11
14 cm

As = 128816.14
0.8 . 2400 . (23.05 . 14/2)
= 4.18 cm2

As 4.18
A13 1.32665
= 3.2

= 4 Batang

S= 1000
4
= 250 mm
Pembangunan SD 3 Canggu
Perhitungan Portal AS 4 & 7
7/8

A min = 0.18% . 100 . 0.3

< = 5.40 cm2

As 5.40
A13 0.785
= 6.9 Batang

= 7 Batang

S= 1000
7
= 142 mm

A min = 0.18% . 100 . 0.3


< = 5.40 cm2

As 5.40
A13 0.785
= 6.9 Batang

= 7 Batang

S= 1000
7
= 142 mm
Project Pembangunan SD 3 Ca
Job Perhitungan Portal AS
Page 8/8

GAMBAR DETAIL TULANGAN PONDA

0
2

6
4

3-1
3-1

1
1

L L
13 - 142

13 - 140
B

GAMBAR DETAIL POTONGAN L-L POND


GAMBAR DETAIL POTONGAN B-B POND
Pembangunan SD 3 Canggu
Perhitungan Portal AS 4 & 7
8/8

ETAIL TULANGAN PONDASI 1

AIL POTONGAN L-L PONDASI 1


IL POTONGAN B-B PONDASI 1

You might also like