LAMPROS PRIFTAKIS SITE SURVEY REPORT (TETRA Repeater O.C) SWO - TETRA
5/8/2008 1.1
Date: 21-07-2011
Telecom Engineer
Civil Engineer
E/M Engineer
Customer Representative
Customer Representative
Customer Representative
Other
LAMPROS PRIFTAKIS SITE SURVEY REPORT (TETRA Repeater O.C) SWO - TETRA
5/8/2008 1.1
. General Information
1. Site Info:
Route instructions
(if required):
Possible Donor
Qasiuon_1019 (Az=176)
sites:
Comments:
LAMPROS PRIFTAKIS SITE SURVEY REPORT (TETRA Repeater O.C) SWO - TETRA
5/8/2008 1.1
I. Repeater Information
1. Site Infrastructure:
Existing / Required
Infrastructure:
Repeater Location Wall Metallic Fence Other
Mast location: Ground level for Server h=3m Rooftop level for Donor h=2m
Lightning
Existing Rod New Rod required
protection
Grounding
Bar/Point near the Existing grounding New grounding required
Mast
Existence of
sufficient Outdoor Yes read note below No
cable trays
- it could be replaced the cable tray from Donor to RP box by fixed the cable on
the wall (about 20m), and also it could be replaced the cable tray from RP box to
server by pass it under ground
- There are two Server antennas that means it required Splitter 2X1, but we will
Comments:
test the repeater with only one antenna to se if we achieve the objective
LAMPROS PRIFTAKIS SITE SURVEY REPORT (TETRA Repeater O.C) SWO - TETRA
5/8/2008 1.1
Antenna model /
Yagi_1(73 12 21)/ 2.5m Yagi_2(73 12 21)/ 2.5m
height:
Azimuth / Tilt
orientation: 38/-1 260/-1
/
Distance from the
Vertical: 3m Horizontal: 30m
Donor antenna:
LAMPROS PRIFTAKIS SITE SURVEY REPORT (TETRA Repeater O.C) SWO - TETRA
5/8/2008 1.1
3. Sketch of the Repeater Location, Mast Location and the required antenna attachments (Donor-Server):
LAMPROS PRIFTAKIS SITE SURVEY REPORT (TETRA Repeater O.C) SWO - TETRA
5/8/2008 1.1
LAMPROS PRIFTAKIS SITE SURVEY REPORT (TETRA Repeater O.C) SWO - TETRA
5/8/2008 1.1
3-4 Rp Box:
LAMPROS PRIFTAKIS SITE SURVEY REPORT (TETRA Repeater O.C) SWO - TETRA
5/8/2008 1.1
4. Layout sketch where the exact locations of the Repeater, UPS system, Main AC board, Mast, Antennas,
North direction, Cable trays, Ground Bars, etc are shown:
LAMPROS PRIFTAKIS SITE SURVEY REPORT (TETRA Repeater O.C) SWO - TETRA
5/8/2008 1.1
LAMPROS PRIFTAKIS SITE SURVEY REPORT (TETRA Repeater O.C) SWO - TETRA
5/8/2008 1.1
Horizon to the direction of the donor site from the point where the relevant donor antenna will
9
be installed
Panoramic view of the service area from the point where the relevant server antenna will be
10
installed
11 Other (state)
12 Other (state)
13 Other (state)
End of document.