You are on page 1of 6

Ron Long and Dan McGill & Jawed Umerani, S.E.

Project Description To assimilate the building with


The new headquarters for Pixar the City of Emeryvilles loft and
Animation Studios, located in warehouse context
Emeryville, California, is a two- Pixar produces animated feature
story 220,000 square foot exposed films, which often must be deliv-
steel frame structure with masonry ered in time for the holiday sea-
brick veneer facade. It is a state-of- sons. The down time due to a
the-art seismic base isolated build- seismic event was not acceptable.
ing, designed for the seismic The project site is about 5 kilome-
performance goal to remain opera- ters from the Hayward Fault, in a
Ron Long is with SME tional after the Maximum Consid- high seismic activity region. In
ered Earthquake (MCE). order to meet the Seismic Perfor-
Steel (formerly with
mance Goal to remain operational
AFCO Steel). Architecture and Engineering after the Maximum Considered
The Vision Earthquakes (MCE), seismic isola-
The Owner and the Architect en- tion systems were proposed. High
Dan McGill is with
visioned a building which would Damping Rubber Isolators, Lead
M&M Bros., Inc. emulate the circa 1920 construction Core Rubber Isolators and Friction
with state-of-the-art technologies. Pendulum Isolators were consid-
The building would invoke images ered. After meticulous studies,
Jawed Umerani, S.E.,
of exposed steel riveted construc- High Damping Rubber Isolator
is with Umerani Associates tion through highly-developed de- System, manufactured by Bridge-
and OneBuild (formerly with tails and finishes. From the onset, stone, was selected.
the guiding principles were:
Rutherford & Chekene).
To deploy classical framing con- Structural System
figurations Due to differential settlement
To evolve the design, such that nature of bay mud fill at the site,
building components could be deep foundation system, which re-
pre-fabricated in the shop as lied upon frictional resistance of
much as possible and bolted to- piles, was recommended by the ge-
gether in the field, thereby mini- otechnical engineer. Pile lengths
mizing the field welding vary from 30 to 70 feet, depending

Modern Steel Construction / May 2001


Interior entrance lobby.

on loading and soil conditions. The


foundation system consists of
groups of 14-inch square precast
prestressed concrete friction piles,
topped by pile caps. Pile caps, de-
signed to receive and support the
isolators, are interconnected with
concrete grade beam system to re-
sist flexural loading imposed by Pixar Animation Studios.
the structure, when it is displaced Site
during a seismic event. specific dynamic analysis was per- flanges are bolted together. Double
Over the building footprint of formed by utilizing seven time his- channels are utilized at columns
240 ft. x 480 ft., there are 120 High tories. These time histories are and connected to flanges. Wide
Damping Rubber Isolators and 92 recorded ground motions of actual flange girders bear on articulated
PTFE/Stainless Steel Sliders sup- seismic events. The average dis- WT built-up seats bolted to W10
ported over Pile Caps. The first placement at the Design Basis column flange. Girder web connec-
floor steel framed platform is sup- Earthquake (DBE) is 17 inches and tion to column is via double angle
ported over the isolation system. at the Maximum Considered Earth- bolted connection. Braces are back-
quake (MCE) is 23 inches. The clear to-back MC10 channels stitched to-
distance between first floor steel gether with bolts. Brace
and the perimeter moat wall is 30 connections to columns, beams and
inches, which is controlled by the girders, are exposed to view and
stability of the isolator. are articulated field bolted assem-
The two-story exposed steel blies. Finished wood decking was
framed structure is supported over integrated with floor and roof sys-
the first floor platform. W10 beams tems for appearance.
at the second floor and W8 beams Central atrium features saw-
at the roof are spaced at 6- 0 o.c. tooth roof and skylight, supported
First floor framed platform supported These beams are continuous over over triangular trusses. Two pedes-
over base isolator. girders for multiple bays and the trian bridges, cable suspended

May 2001 / Modern Steel Construction


from the roof trusses, connect sec- form). The entire structural system structural engineer in developing
ond floor of the east and west and all connections had to pass the such a non-standard and uncon-
wings of the building. The bridge rigor of architectural concerns of ventional system of framing and
features include built-up & bolted aesthetics. connection configurations.
girders, wood decking and rod The Owner being in the business Detailing production was un-
bracing below the deck. of developing the finest animation, derway simultaneously with the
believed in perfection. Such an ex- evolving nature of the framing and
Team Development traordinary expectation could only connection design. It was neces-
Bidding and Management be met by creating extensive mock- sary, for the entire duration of the
A project of this nature with the ups of rolled and built-up mem- project to maintain direct commu-
evolving design only 70% complete bers, and their connections. These nication with the structural engi-
and the given schedule, the con- mock-ups served several critical neer to understand the direction of
tractor chose a team concept ap- purposes: the evolving design and with the
proach to select a fabricator erector. Helped end users physically ob- fabricator for the special require-
Cost, although a factor, was not the serve and provide feedback on ments needed in shop fabrication.
governing issue in selecting the the structure and its connections
team. All members of the team had Became basis for the design and Effective Communication
to demonstrate their commitment a the aesthetics This project required team
project of this magnitude. Source of refinements in design meetings which were set-up and
of architectural aspects attended with a positive and pro-
Team Approach/Select Provided the opportunity to ad- ductive atmosphere. All partici-
Committed Players dress the constructability issues pants were collaborating with the
Early on in the project it was de- in the areas of limited access unified goal to deliver what any
termined that the fabricator, de- Helped determine that the paint owner would wantVALUE!
tailer, erector, engineer, architect had to be field applied Team Meetings enabled detailer,
and contractor would commit key The design modifications and fabricator, and erector to:
personnel to attend weekly de- refinements had to be managed Identify the alternatives to
sign/construction meetings to dis- early on, because of their repetition achieve the same design objec-
cuss RFIs, Value Engineering ideas, and interdependency in design and tives
and upcoming design modifica- fabrication through the project, as Propose modifications or varia-
tions that would save time and well as the impact on the schedule. tions of design to achieve unifor-
money. This collaborative process Since the detailer was engaged mity across the project and in
and the proactive approach to seek early, while the design was still due process, speed-up the de-
input and feedback from the entire evolving, issues related to shop tailing and the shop productions
design and construction team and field processes and capabilities Communicate the foreseeable
proved to be great of value to the that uniquely helped the project shop and field challenges of de-
finished product and the final cost. were identified and incorporated. tailing, fabrication and erection
Any new designs issued were This early involvement also helped Proactively, seek guidance and
priced within 5 days. These prioritize the detailing process and resolve issues
changes could then be discussed at releasing the design to minimize
weekly meetings and decisions re-detailing. Base Isolation
could be made as to what actions High Damping Rubber Isolators
were to take place. DETAILING have circular steel flange at top and
Understanding the Design bottom. Both flanges have a circu-
Uniqueness of the Project With first glance of the PIXAR lar pattern of twelve 1-1/2 diame-
The Pixar project is unique for Animation Studios Design Draw- ter A449 anchor bolts. The
its seamless integration of architec- ings, it was immediately and abun- anchoring of isolators presented in-
ture, structure and building sys- dantly evident that this project was teresting setting and placement
tems. The vision had been to build unique in its entirety. There ap- considerations and issues. Toler-
a circa 1920 building with the state- peared to be nothing conven- ances for the placement of individ-
of-the-art technologies (exposed tional about it. This project was ual anchor bolt as well as the
steel frame structure with articu- going to require an extraordinary circular anchor bolt pattern, as a
lated braced frame system, all effort by the detailer to understand whole, were very tight.
bolted together and erected over a the out-of-the-box thought The base plates of the Stainless
base isolated steel framed plat- process of the architect and the Steel Sliders are 6-6 square, with
headed studs shop welded to the
underside in a grid pattern. The
welded studs align with oversize
circular pockets created in the ex-
tended pile caps. When installed,
the studs are embedded in the
pockets and when the plate is
plumb and in its final position, the
grout is flooded to fill the pockets
and the underside of the base plate.

Templates and Setting Plans


Templates were provided to as-
sure bolt pattern fit-up with isola-
tors. The diameter of the bolt hole
and the circular bolt pattern re-
quired exact match to isolator pat-
tern. Bottom of isolator elevations
were critical, as well as rotation of
Interior framing and walkway bridge.
patterns. Anchor bolts with cou-
plers at the top were embedded in
extended pile caps receiving isola- fect of horizontal embedded Bolt Head Orientation for
tors. Once the isolator was in place plate into floor slab. Uniformity and Visual Impact
and bolt holes aligned with embed- Direction of bolt incursion was
ded couplers, it was secured with Built-up Braces and Bolting required for visual effect through-
headed bolts engaging the cou- of Multiple Items out all braces. Bolting required
plers. Vertical and horizontal plains Multiple pieces and excessive symmetry overall throughout
of these embedded items required connection material thickness cre- building. Stitch bolting was to be
special attention in field placement ated bolt alignment and fit-up con- located throughout vertical bracing
as well as continuous inspections. cerns. Considering bolt pattern system to maintain consistent ele-
alignment, hole pattern layout vation of bolting patterns.
Issues of the N-S Braced creation and minimal to no hole
Frames and Connections oversizing allowances, detail loca- Uniform Projection Bolt Thread
Steel framing clearances were to tion and shop fabrication drilling per Connection
be maintained throughout the locations were critical. Stick thru of all bolts was to be
braced frame detailing. Bolting pat- maintained. Each connection
terns were determined by girder Girder to Column Seated and within itself however required an
size depth connections. Work point Double Angle Connections exact/matching stick thru condi-
set-up of each brace was deter- To accommodate the rolling tol- tion. Shop bolted conditions (back
mined by bolt alignment and clear- erances of the wide flange steel to back vertical braces)and field
ance conditions. Each connection girders, affecting the actual depth connections had to be matched by
evolved and developed the con- of the member, it was decided to erector.
nection criteria. T.O.S. elevations maintain the top of steel elevation
were critical. Contrary to a stan- of the seat at column at constant el- INTERIOR FRAMING
dard set-up of work points creat- evation. This elevation was estab- AND WOOD DECKING
ing connection locations, an actual lished for the maximum variation Tolerances
evolution of connection created in depth, which made the punch- All tolerances were to be held to
the work point locations. ing of holes on columns uniform, absolute minimums. Due to multi-
all across the building. Shim plates tude of connected pieces of rolled
Issues of the E-W Braced were required for full bearing of material items, draws were not
Frames and Connections girders on the seats. realistic. Compacted or tight fit-
Connections of brace to column ting connections were to be ab-
and to girder, exposed to view, re- solutely maintained. Numerous
quired built up gusset & stiffener layers of material were aligned and
assemblies to accommodate the ef-
sharing common patterns and Welds needed to be aesthetically ERECTION
bolts. pleasing while maintaining Mounting/Installation
schedule. It was predetermined of Isolators
Clarity of Shop Drawings and that the shop would not meet the Due to tight tolerances imposed
Shop Notes architecturally exposed spec so it by the Isolators and its anchoring
Conveying unusual informa- was up to each individual system, surveying and double-
tion to shop fabricator was a con- welder to make each weld as checking played a crucial role.
stant concern and a necessity to clean and uniform as possible. Twelve-bolt circular pattern re-
insure owners satisfaction. (Steel Pieces needed to be shop assem- quired machined steel templates
fabricator to be commended for bled as much as possible. The as- (holes in isolators were metric) to
control and management of draw- sembly in the shop and previous be utilized for coupler placement.
ings throughout production and mock-ups showed that approxi- Rotation of isolator needed to
fabrication on this job.) mately 40 % of the tension-con- match connecting steel above as
trolled bolts had to be manually well as footing closure plates.
Clarity of Field Erection torqued utilizing a ratchet Welding of the first floor steel
Drawings and Field Notes wrench. beams to the cover plate at the iso-
Notifying field erector of numer- Handling needed to be in a man- lators required that the tempera-
ous field fit sequencing condi- ner that would not leave gouges ture could not exceed 500 degrees.
tions allowed erector to be aware of scuff marks or any other blem- Welding sequence and monitoring
creating inaccessible bolting condi- ishes. of temperature with temp sticks
tions prior to flying steel. Clearly Stick thru of the bolts was critical was part of the field quality assur-
communicating bolt head orienta- due to the architectural effects ance.
tions, and identifying specific un- and the erection tolerances (too Full bearing shims were re-
tightened bolts on shop little stick thru and the architect quired for tightening cover plates
assembled items. would not accept it and too to isolator. This was to make up for
much stick thru and you could any mill tolerances for the steel
Triangular Trusses and Interior not torque the opposite / oppos- above.
Walkway Bridges ing bolt)
Located in the center of the Material needed to be inspected Sequence of Erection
PIXAR Animation Studio is a 60- for mill marks or other normal Unique framing conditions ne-
0 wide, open, entrance lobby. Fif- damage that occurs prior to fab- cessitated breaks in erection se-
teen custom designed triangular rication. quencing. These members required
trusses (with camber), along with Bolts had to be installed making bolt up to occur as steel was
saw-tooth skylight framing and sure that the details were fol- erected. A complete understanding
two interior walkway bridges span lowed to the letter. Orientation of of these bolting conditions was re-
this impressive lobby. Numerous the bolts was a concern for the quired. As items were erected, bolt
architectural features were incor- architectural appearance. accessibility was lost. Side by side
porated into these items for visual Any piece that reached the field beams attached with horizontally
effects. and did not meet the architects rotated wide flange member and
approval was re-fabricated not- side-by-side column framing con-
FABRICATION ing the concerns that the archi- ditions created these challenges.
Production shop vs. tect had with the original piece. Some connections required bolts
Artist studio Shop inspection had to include going thru 9 of multiple layers of
Due to budget and schedule im- both structural concerns as well as material prior to final plumb up.
pacts, fabrication of this project had architectural concerns. Although, Due to the rigidity of the braced
to be based on production, while AESS requirements were not con- frames and thickness of the materi-
being sensitive to the architectural tractual obligation, the final prod- als barrel and bull pins proved to
requirements. This meant fabricat- uct proved that an architecturally be of minimal benefit.
ing an architectural exposed project exposed structured could be built Both sides of the building were
without utilizing the architectural without being tied to an AESS erected simultaneously. The en-
exposed specification. The shop su- specification (pride and good shop trance lobby was erected with
perintendent approached this proj- hands proves to be a better ally trusses thereby connecting the two
ect based on a pride in the finished than the specification) sides of the building.
product while maintaining the pro-
duction schedule.
Field Adjustment to excessive reaming. In these few structure during temperature
Due to the inability for alternate instances A325 bolts were replaced changes.
connections or field fixes each con- with A490 in order to increase the
nection had to fit. A moderate capacity of the altered connection. Field Bolting
amount of reaming was required Combining the rigidity of the Bolts had to be installed so that
but not to the extent that it would structure and the isolator design the bolt stick through matched the
diminish the design integrity of thermal expansion became a factor existing shop installed bolts. In
that connection. Larger bolts were but was most evident at braced many instances it was necessary to
not allowed due to architectural frame locations. At various times of remove the spline of the T.C. bolts
concerns. When reaming was re- the day it appeared that it would be prior to installation.
quired, the amount of reaming was impossible to install all the bolts In the middle of the project it
noted and forwarded to the engi- (up to 60 per connection) without was noticed that Nucor had
neer for approval. In some cases it major reaming or re-fabrication. changed the die casting for the but-
was determined that the connec- Bolts were installed in correlation ton head of the T.C. bolts. This was
tion was indeed compromised due of the natural movement of the noticeable in the flat at the top of
the button head. This difference
was only noticeable when both
types of bolts were in the same
connection. This required the coor-
dinating of bolts of the same type
in each connection.
It was important that the bolt
heads did not get scarred or had
any blemishes. Despite the situa-
tion, if one bolt was different it had
to be replaced or in some cases
when an A490 bolt was used then
all the remaining bolts needed to be
changed to match.

Field Welding
Although field welding was
kept to a minimum, field welding
was still required. At field welded
conditions special care was taken
to minimize grinding so that it
would not change the look of the
steel. Welding needed to be se-
quenced so that it would not ad-
versely affect the plumb up of the
building.

Photographs and images courtesy


of: Karl Backus, AIA; Sharon Rise-
dorph, Photographer; Jawed Umerani,
S.E.

Interior truss and bridge framing.