Introduction

The Dimensions of Safety Tool has been designed in response to a PSLG initiative, is supported by the ORR for use in conjunction with their RM3
model and includes the Safety Culture Maturity Model, widely recognised across the Industry.

We have identified 4 factors and associated maturity levels for each of the 6 Dimensions of Safety; in conjunction with an Industry wide Working
Group.

Instructions

Depending on your security settings, when you open this workbook, you may receive a message asking whether you want to enable or
Note disable macros. If you receive this message, please select "enable macros". If you have opened this workbook without enabling
macros, please close and reopen it selecting the correct option (enable macros) before continuing.

NOTE Each Dimension has its' own tab.

NOTE Saving frequently is recommended.

NOTE You may complete the tool in any order.

NOTE The tool has been designed to be completed during a workshop, meeting or on an individual basis to promote discussion.

NOTE Much of the tool self populates according to information input.

Each sheet may be printed on A3, the print areas are preset for you. The rows and columns have been set to autosize to fit contents. Whilst the
NOTE
contents and structure is locked, we have left the resizing options unlocked to assist.

Should you experience any issues with the use of this tool, please email both Philippa.Murphy@Networkrail.co.uk and
NOTE
Claudine.Smith@Networkrail.co.uk

1 Please read the 1-5 Safety Culture Maturity Level descriptions for each of the factors listed.

2 The yellow row underneath this detail contains a drop down selection of the word "yes".

3 Please only select one Safety Culture Maturity Level for each Factor i.e. one "yes" per row.

If you make a mistake, or change your mind regarding a selection, press the grey "reset" button in the same yellow row. Then make the correct
selection.
4 By clicking on the reset button(s) the original tool programming is restored. You may take advantage of this when revisiting the tool as intervention
plans are delivered or to review your progress at a later date. NOTE: If you type in your own interventions or actions in the Intervention Plan
Sheet, please back up your work or similar to avoid loosing this information when clicking on the reset buttons.
We are measuring Safety Culture Maturity and action planning. Should you find you are "between" levels it is suggested that you choose the
lower of the two i.e. if you establish that you can identify with some of calculative (level 3) and some of proactive (level 4) of Leadership - Level of
5
Investment in Safety, then place a "yes" under calculative (level 3). This will give you the best visibility of where you are doing well, and what your
opportunities for improvement are.

6 The Summary Sheet reflecting your results in a simple format is preset to round down

The Working Group identified particular actions or interventions that may be implemented to develop safety culture maturity i.e. develop from
pathological (level 1) to reactive (level 2). After placing your "yes" under the relevant maturity levels, the actions / interventions identified to assist
7
with this will appear to the right of the screen i.e. placing your "yes" under pathological (level 1) will result in the actions / interventions identified to
progress to reactive (level 2) will appear.
The "Intervention Plan" Sheet provided will be populated with these suggested actions / interventions for you. Left clicking on the shape shown
below (when in the "Intervention Plan" sheet) will allow you to edit the action / intervention suggestions. Please edit as required and add your own
activities to build your plan. You may add rows to the "Intervention Plan Sheet". This will allow you to allocate actions or interventions to multiple
owners.

8 Click Here to Allow


Editing of the
Suggested Actions /
Intervention

The "Intervention Admin" worksheet has been left visible for your reference. It contains all of the actions / interventions suggested to progress or
9 improve your safety culture maturity from one level to the next. The content is locked. However the sheet may be printed to help promote
discussion, identify areas for improvement or communicate current successes.
Maturity Rating
Leadership Pathological Reactive Calculative Proactive Generative Suggested Actions or Interventions
Level of Investment in Safety. Investment limited to provision of basic Management are interested in improving Management have an interest in including Behavioural safety programmes are Well managed and engaged behavioural
PPE and legislative minimum basic safety provisions. Safety tours are the workforces input into safety implemented within the company and based safety approach in place which is
requirements. Leadership visibility on conducted but rectifications not programmes as evidenced by the backing management provide consistent, visible primarily maintained by the workforce but
safety is limited to reacting when incidents completed by management in time of safety action groups. Workforce are leadership at events and continue to fund managed by visible, honest management
occur. agreed (or no timescales are set). included due to feedback from the programme. Rectification of actions. This workforce includes office
management. Near misses begin to be management controlled issues done based and design staff as there is a
reported. There is a recognition of the use consistently completed and closed out recognition they impact on safety.
and importance of a behavioural within timescales. Improving number of Communicated and maintained to
approach to safety but this is limited to near misses/close calls reported and schedule with measurement and
pockets of the organisation. investigated. scorecard tools in place. High levels of
ownership and engagement as evidenced
by consistently high percentage of
attendance at groups

Select One Of The Maturity


Ratings Per Factor using the
drop down option.
Engagement of Senior, Middle Supervisory management only engaged Management have visible interest in Senior Management interest in a Senior, Middle and Supervisory Senior, Middle and Supervisory
and Supervisory Management in in safety when reacting to incidents. safety programmes and in disseminating behavioural based approach to safety and Management training or awareness on Management are all trained in BBS and
Safety Programme. Middle management focus is on safety safety information. Listen to safety initial engagement of Front Line staff behavioural safety. All three levels of proactively involve themselves in safety
reporting data not rectifications. Senior concerns from front line staff but little interest, from those who volunteer. management are actively involved in meetings at all levels of the organisation.
management function is limited to action. Rectifications or changes to safety Management involved willingly in safety safety meetings. Visible communications Visible and engaging communications
receiving safety reports rather than on programmes only made in response to meetings. Visible communications from from senior managers and backed up by from senior managers throughout the
analysis and learning. safety incidents. Middle management senior managers on safety messages and actions and leads to proactive organisation regarding safety.
focus tries to balance safety and backed up with action. Best practice is interventions. Best practice identified and Management constantly strive for more
productivity but feel more pull to delivery identified and shared internally. Pockets shared internally. Consistent use of engaging ways to communicate.
and productivity. of usage of safety coaches from safety coaches from Communications from all levels is backed
workforce/supervision. workforce/supervision with support in up with immediate action on promises or
place for the sustainability of these. pledges. Best practice identified and
shared within organisation, Supply Chain
and Industry. Safety coaches are actively
engaged and workforce/supervision
throughout the organisation with
consistent sustainability of these.

Select One Of The Maturity


Ratings Per Factor using the
drop down option.
Safety Tours. In line with Network Rail guidelines, Management conduct more than the Management proactively seek to conduct Management proactively seek to conduct Management proactively conduct more
conduct a minimum of 6 Safety tours per minimum number of safety tours. Tours more than the minimum number. Their more than the minimum number, but there than the minimum number of tours Senior
year. are followed by action planning for closing safety tours usually include understanding is an understanding that the quality of the management from functions such as
out issues identified which management the behavioural elements of what is tour makes the difference. Their safety Finance, HR etc also conduct safety
follow up, mostly when prompted. causing unsafe acts or unsafe conditions tours always include understanding the tours. Their safety tours always include
and these are included in action planning behavioural elements of what is causing understanding the behavioural elements
to close out issues identified. Clear unsafe acts or unsafe conditions and of what is causing unsafe acts or unsafe
communication of management these are included in action planning to conditions and these are included in
commitment and participation at close out issues identified. Clear action planning to close out issues
Supervisory and Middle levels. Style of communication of management identified. Clear communication of
tour is more instructional and process commitment and active participation at all management commitment and active
orientated. levels of staff in the safety tour. Best participation at all levels of staff in the
practice is identified and used internally. safety tour. Best practice is identified and
Style of the safety tour is conversational used internally and shared with Supply
and focuses on listening, followed by Chain. Supply Chain actively involve
action. themselves in improvement plans. Style
of the safety tour is conversational and
focuses on listening, followed by action.

Select One Of The Maturity


Ratings Per Factor using the
drop down option.
Leadership Communications. The use of management Promises and Communication strategy under Clearly defined communication strategy. Clearly defined communication strategy. The vision / mission / purpose of the
Pledges is minimal and are not carried development. Communications to Leadership response to feedback / Leadership response to feedback / business is clearly displayed and all
through to action plans. Communications workforce is minimal; and feedback is comments from workforce delivered in a comments from workforce delivered in a employees are engaged in contributing to
to workforce is minimal; and no feedback sought with action planning being scoped. meaningful and honest manner. constructive and timely manner. achieving the safety vision of the
is sought from them. Safety Forums are Consistency of cascaded messages is Monitoring of consistency of cascaded business. Best practice is identified and
held as a one way communication tool. monitored. The safety vision of the messages. The safety vision of the shared with Industry. Active engagement
business is clearly displayed and business is clearly displayed. Leadership with stakeholders with their staff, cross
leadership communications are used in communications used in development of functionally and within Industry.
development of business strategy. business strategy. All employees are
made aware of their impact on achieving
the safety vision of the business.
Promises and Pledges and Action plans
are communicated, managed and
maintained. Best practice is identified
and shared internally.

Select One Of The Maturity


Ratings Per Factor using the
drop down option.

345348457.xls Leadership
Maturity Rating
Technologies Pathological Reactive Calculative Proactive Generative Suggested Actions or Interventions
Training Basic minimum technical training. Training requirements are understood and Inclusion of behavioural training / impacts New methods of training delivery explored Learning is package such that it can and
Training is task based and delivered in a designed with consideration to learning delivered as part of task specific training. and exploited. Behavioural Safety is fully is communicated into the Supply Chain
paper based or PowerPoint based style. styles and delivery requirements. It is Observable outcome based training integrated in all training packages for new and shared with Industry.
Training continues after implementation of task based training which is completed / methodology is used. The availability of starters and is also available as stand Training features in accident investigation
technology rolled out before technology is refresher training is clearly communicated alone packages where relevant. process and lessons learnt as a result;
Focus is on qualifying for competence / implemented in accordance with a clear and through continuous assessment, Post implementation of new technology these are fed back into the training
role. training delivery plan. Refresher training requirements are identified for this, there is continuous validation and delivery approach and continuous
is available but there is no mechanism in quickly followed by re-delivery of the verification of the specified learning improvement can be identified in strategy,
place to identify when this is required. training. requirements and of the observable delivery and observable outcomes.
outcome definitions.

Select One Of The Maturity


Ratings Per Factor using the
drop down option.
Usability Only Budget dictates what technology can Usability of the technology is only User Acceptance Testing in design and Dynamic feedback mechanism allows Commitment to continuous improvement
be used; not requirements or suitability for explored as a result of incident procurement is done in response to usability checks for current use / audience in design. Revisiting User Acceptance
purpose. investigation. competition in the market and client / after original approvals for use. Testing results and learning from them in
customer requests. Lessons learnt are Alternative technological solutions are new design. Knowledge, findings and
captured and shared internally as part of investigated internally and externally. The experiences are with Supply chain and
a commercially aware competing client is invited to and involved with the Industry.
business approach. User Acceptance Testing process.
Knowledge, findings and experiences are
shared internally and with supply chain.

Select One Of The Maturity


Ratings Per Factor using the
drop down option.
Innovation Product acceptance testing completed There is a cost restraint on decisions to Sustainability of technology is included in Leads Industry in terms of identifying and Supply chain and Industry are integral to
within timescales as required. be innovative. Innovation is also limited strategy / business approach. using new safety related technology. design and innovation processes. An
by lack of technological skill base and Methodologies like Six Sigma or similar to Integration of continuous improvement open culture of shared learning
lack of optimisation of new innovations. identify opportunities to innovate and processes. Open channel of knowledge is propagated and the
Implementation of Safety related improve are in regular use. Cost benefit communication / feedback from those that approach is shared with Industry via
technology is led by external analyses are done to represent long term use the product, service etc. external forums or similar in order to
expectations. advantages of innovating. Recommendations from feedback are contribute to Industry development.
picked up and integrated holistically.

Select One Of The Maturity


Ratings Per Factor using the
drop down option.
Safety in Design. End user requirements included in design In addition to CDM minimum compliance, Regular design review meetings which Actively publicising design, sharing Actively publicising design, sharing
of assets and equipment in a reactive reactive design changes utilised in include appropriate input from lessons learnt and best practice with lessons learnt and best practice with
manner i.e. in response to client request. response to client / customer construction, maintenance and end users Industry. Design review meetings have Industry and Supply Chain. Design
Reviews of designs are focussed on requirements. Reviews of designs are with discussion including safe use of the structured input on safety requirements review meetings have structured input on
technical compliance. essentially concerned with technical equipment/asset. Good communication from construction, maintenance and end safety requirements from construction,
compliance but include end users. with client. Red and green lists used by users. Constructability HAZOPs are maintenance and end users. Design risk
Design Risk Management is focused on designers. Constructability HAZOPs have embedded in the design process. Design log is reviewed periodically by line
producing a risk assessment as a design been introduced. This is done with risk log is reviewed periodically by line management.
deliverable. Safety risks included on sporadic application but management management. Staff proactively provides
drawings. commitment to improve is communicated feedback on equipment/asset design and
through the line. Safety and usage and this is formally registered and
environmental risks included on drawings. included in new product design or
acceptance. Consistent quality in each
design. Management commitment to
continually improve and learn is
acknowledged and visible through actions
as well as words.

Select One Of The Maturity


Ratings Per Factor using the
drop down option.

345348457.xls Technologies
Maturity Rating
Outputs Pathological Reactive Calculative Proactive Generative Suggested Actions or Interventions
Bench Marking Supply Chain. No benchmarking in place. Benchmarking in place with plans for Supply Chain benchmarked with primary Supply Chain benchmarked on costs, Supply Chain benchmarked on costs,
consistent usage being designed. focus on costs and process adherence. process and safety, with full management process and safety, with full management
Management engagement in the process engagement from company management engagement from company management
with planning for improvement as and Supply Chain management. Action and Supply Chain management. Action
evidenced by action plans in place and planning identified as a result with planning identified as a result with
being monitored. commitment to continuous improvement. commitment to continuous improvement
Good internal communication and sharing with close out within timescales identified.
of best practice internally as Good internal communication and
demonstrated by presence of process. sharing of best practice with Industry and
Supply Chain utilising culture of trust and
shared improvements. Information freely
shared throughout Supply Chain.

Select One Of The Maturity


Ratings Per Factor using the
drop down option.
Implementation of Continuous Continuous improvement process in place Data collated as required by 9001. The Data collated cross functionally. Two Data volunteered and collated as a The lessons learned process is clearly
Improvement. as per ISO 9001. Actions from outputs are focus is as a reactive process where distinct approaches exist - proactive and business-as-usual activity. Process joins established across all functional areas,
either non existent or are not followed learning is primarily focussed on negative reactive. Process and measures in place reactive and proactive interaction and goals are set, reviewed and updated
through. events and not looking for proactive to capture leading lagging indicators for activities seamlessly. Measures capturing regularly with clear action plans in place
learning opportunities. Only lagging improvement. Measurements lead to leading indicators for improvement with with effectiveness measured. Process is
indicators used to measure progress. action planning with regular use. associated action planning. Consistent proactive and communication of the best
Process is in place for information and embedded use, utilising a workable, practice and lessons learnt are visible
collation and measurement. Only usable system for data collection and internally. All management levels are
intermittent use of action planning. learning. This system is used across the engaged. Communication of best
company. practice and lessons learnt with Industry,
internally and with Supply Chain. There is
a very low level of repeat project or
delivery issues as the lessons learnt are
implemented consistently across the
business / Supply Chain.

Select One Of The Maturity


Ratings Per Factor using the
drop down option.
Balanced Score Card. Balanced scorecard under design. Balanced scorecard used with lagging Balanced score card used consistently Consistent balanced scorecard used Consistent balanced scorecard used
indicators. Some opportunities identified across business. Utilisation of 10% of across business which includes 20% across business which includes 30%
for improvement to scorecard format. score based on positive safety indicators. positive safety indicators as part of the positive safety indicators as part of the
All management levels engaged. score card. Opportunities identified with score card. Opportunities identified with
action planning, timescales and action planning, timescales and
management of close out used. management of close out used.
Communication of best practice visible Communication of best practice visible
internally. All management levels internally. All management levels
engaged. engaged. Communication of best
practice with Industry and Supply Chain.
All management levels engaged.

Select One Of The Maturity


Ratings Per Factor using the
drop down option.
Welfare. Basic compliance to Legislation and Reality and Strategy of Welfare facilities Reality and Strategy of Welfare facilities Proactive health management Campaigns, focus of Welfare facilities and
Industry Standards. 'Shell' of welfare in does not match; evidenced by front line match; evidenced by positive or programme in place for direct staff subsidised health initiatives. PPE is
place but not used as designed. staff raising concerns about the standard constructive feedback from staff via staff including health and wellness campaigns, readily available and fit for task and user.
of welfare facilities via staff forums ad forums and other channels. Suggestions focus of Welfare facilities and subsidised Staff feedback sought and acted upon to
other channels. PPE provision is on a for improvements are action planned and health initiatives. PPE is readily available make improvements. Level of take-up is
'One size fits all' basis i.e. one size of implemented where practicable. Task and fit for task and user. Staff feedback monitored and plans are in place to pro-
work gloves provided. In response to specific usable PPE provided and sought and acted upon to make actively raise awareness and engagement
Industry pressure, management usability verified by requesting feedback improvements. Level of take-up is with all direct and indirect staff. Support
awareness of Fatigue, Stress from staff. Fatigue management process monitored and plans are in place to pro- services for staff and families (i.e. Care
Management and other Occupational in place but not actively monitored. actively raise awareness and engagement first). Gym memberships and similar
Health issues encourages development of Stress awareness and Occupational with all direct staff. promotions. Effective and proactive
measurement and support processes. Health programmes etc. are in place for stress management, medical screening or
all direct staff. Level of take-up is not other Occupational Health and Safety
monitored. schemes in place.

Select One Of The Maturity


Ratings Per Factor using the
drop down option.
Maturity Rating
Workforce Pathological Reactive Calculative Proactive Generative Suggested Actions or Interventions
Activity Risk Assessment. The use of High level Generic Risk Specific risk assessment performed. Relevant supervisory or workforce staff Relevant supervisory or workforce staff Relevant supervisory or workforce staff
assessments with no regular review and Minimal engagement and involvement engaged in risk assessment process. consistently and proactively inputting into consistently and proactively inputting into
acceptance associated with it. Specific from workforce. Process is open to query, challenge and risk assessment process. Clear concise risk assessment process using various
risk assessment performed. Risk feedback. Clear concise and specific and specific Risk Assessments that are analysis techniques i.e. ETA, FTA. Clear
Assessment sufficient for the risk involved Risk Assessments that are focussed on focussed on the high risk tasks and site concise and specific Risk Assessments
and in compliance with legislative the high risk task and site specific Risks. specific risks. Risk profile regularly that are focussed on the high risk task
requirements. Learning is feedback to the wider reviewed and updated with capability built and site specific Risks. Risk profile
business. Competent delivery of briefing. in to capture last minute changes that regularly reviewed and updated with
Fully briefed and understood by all. occur. Competent delivery of briefing. capability built in to capture last minute
Questions and feedback included in Fully briefed and understood by all. changes that occur. Competent delivery
briefing process. Questions and feedback included. of briefing. Fully briefed and understood
Communication of best practice visible by all. Questions and feedback included.
internally. All management levels All management levels engaged.
engaged. Communication of best practice across
business; with Industry and Supply Chain.

Select One Of The Maturity


Ratings Per Factor using the
drop down option.
Competence Management (task Competency records exist. Competency records exist. Competency records. Competencies and Implementation plans for behavioural Competency matrix covering everything
and individual). Competencies needs are identified. Competencies and training needs are training needs are identified. Initial use of component (behavioural markers) to all from Machinery. Sentinel. Training and
identified. Assessing gaps and job profiling and Behavioural markers. competencies (trainers assessors and Key Safety requirements including Risk
opportunities to develop. Gap analysis and plans in place to verifiers) (behavioural markers) workforce Assessment, Behavioural Based Safety
develop. Job descriptions include supervisors and managers. 360 degree and Leadership. Personal Performance
behavioural attributes. involvement and review in organisation. Review 1:1 use, capabilities, behaviours
Competency matrix for all roles. part of the template. Identify training
Proactive management of competence requirements and behaviour based
decisions. improvements.

Select One Of The Maturity


Ratings Per Factor using the
drop down option.
Safety Action Groups. Compliance with law. Specific forums or Management led safety committee. Consistent attendance, led by workforce Outputs measured and managed Safety groups have funding and
meetings taking place. Running within Feedback led by management. with management engagement. Outputs excellence communicated internally. autonomy / decision making abilities.
the business on a minimum basis. Led by Workforce attendance. captured as actions in minutes and Workforce managed and maintained. Empowered by senior management to
management as they see at as a legal published. Actions closed and recorded Process for escalation and cascading of deliver for the workforce by the workforce.
obligation rather than as a forum for as such. key safety messages proposals visibly in Safety meetings held regularly on site,
improvement or communication. place driving changes within the business. review of all Safety Related information,
process for escalation and cascading of
key safety messages proposals visibly in
place driving changes within the business.

Select One Of The Maturity


Ratings Per Factor using the
drop down option.
Cultural / Climate Surveys. Development of cross functional non-role Development of cross functional non-role Both cross functional and role specific Both cross functional and role specific Both cross functional and role specific
specific survey. Minimal method of specific survey. Multiple methods of surveys used. Multiple methods of surveys used. Culture, Behaviours and surveys used. Culture, Behaviours and
completing and communicating (i.e. completing and communicating (i.e. completing and communicating (i.e. personal responsibility are included in personal responsibility are included in
paper, telephone). Central collation. 20% paper, internet, intranet, telephone). paper, internet, intranet, telephone). questions and scenarios. Multiple questions and scenarios. Multiple
max response rate. Clear context Central collation. 30% max response Central collation. 40% max response methods of completing and methods of completing and
identified by management - not rate. Clear context identified by rate. Clear context identified by communicating (i.e. paper, internet, communicating (i.e. paper, internet,
communicated to workforce. No evidence management - not communicated to management and communicated to intranet, telephone). Central collation. intranet, telephone). Central collation.
of local ownership or action planning. workforce. Central collation and action workforce. Local collation and ownership 60% max response rate. Clear context 60% max response rate. Clear context
planning with minimal cascade of actions within teams and functions to encourage identified by management and identified by management and
required through the organisation. participation. Central and local collation communicated to workforce. Local communicated to workforce. Local
and action planning. Good cascade of collation and ownership within teams and collation and ownership within teams and
actions required through the organisation, functions to encourage participation. functions to encourage participation.
without follow up to confirm completion. Central and local collation and action Central and local collation and action
planning. Good cascade of actions planning. Findings communicated back
required through the organisation, without through the business. Action plans in
follow up to confirm completion. place to address issues which are
reviewed for effectiveness. Employees
are engaged with the process and actively
encourage others to complete and assist
with local collation of responses to aid
ownership and local visibility of
participation. Min 75% response rate.
Measure against business level. Non
mandated name box - completing this is a
positive indicator of culture.

Select One Of The Maturity


Ratings Per Factor using the
drop down option.

345348457.xls Work Force


Maturity Rating
Companies Pathological Reactive Calculative Proactive Generative Suggested Actions or Interventions
Safety Culture Management. Initial interest from Senior Management Safety culture development programme is Management have a tangible plan for Management have a holistic plan for Management have a holistic plan for
based on external influence rather than underway. Scorecards and other tools improving safety culture. This primarily improving safety culture. This focuses on continually improving safety culture. This
proactive desire by management. are used to identify current safety culture. focuses on improving behaviour at the improving culture and behaviour of focuses on improving culture and
Engagement with workforce in terms of a front line workforce end. Scorecards and management and of the front line behaviour of management, front line
response rate is low and scepticism is other tools are used to identify current workforce. Scorecards and other tools workforce and Supply Chain. Scorecards
evident. safety culture, action plans are put in are used to identify current safety culture, and other tools are used on a strategic
place and next steps are identified. The action plans are put in place and next basis to identify current safety culture.
majority of actions are closed out within steps identified. These are closed out Action plans are put in place and next
the timescales stated. Results within the timescales stated. Results steps identified and are closed out within
intermittently communicated out to communicated out to organisation as part the timescales stated. Results
organisation. of feedback within the business at key communicated out to organisation as part
meetings and to increase the focus on of feed back within the business at key
continuous improvement in safety culture. meetings and to increase the focus on
Workforce feel comfortable speaking up continuous improvement in safety culture.
for safety. Front line workforce does not Front line workforces do not feel a conflict
feel a conflict between safety and between safety and delivery. Excellent
delivery. communication of safety priorities with
workforce. Best practice and lessons
learned are communicated with Industry
and Supply Chain.

Select One Of The Maturity


Ratings Per Factor using the
drop down option.
Audit. Audit process makes very limited or no Audit process includes some aspects or Audit process specifically includes Audit process specifically includes Audit process specifically includes
reference to Behavioural Based Safety. focus on Behavioural Based Safety. aspects of Behavioural Based Safety but Behavioural Based Safety at all levels of Behavioural Based Safety at all levels of
Leadership provided by Management best Clear communication and leadership this is focussed primarily on front line the organisation. Action planning for the organisation. Action planning for
practice. provided by Management to workforce. behaviours. Action planning for continuous improvement is used as both continuous improvement is used as both
continuous improvement is used as both input to and output from Audit. Clear input to and output from Audit. Clear
input to and output from Audit. Clear communication and leadership provided communication and leadership provided
communication and leadership provided by Management for workforce. Best by Management for workforce. Best
by Management to workforce. practice is identified internally. practice is identified, shared and
communicated to Industry and Supply
Chain.

Select One Of The Maturity


Ratings Per Factor using the
drop down option.
Sustainability. Compliance to Industry or legal Reactive adoption of sustainable working Researching carbon management and Proactively addressing sustainable Creating next-practice platforms. Full
requirements. policy. life-cycle assessments, and designing working throughout the Supply Chain, product and service review to determine
operations to use less energy and water. other companies, including rivals, to which ones are most harmful to the
Use of sustainable sources of raw develop Industry standards. Active environment, then work to improve the
materials, components and energy. measuring and monitoring of activities product or phase it out. Develop business
Development of KPI measurements. and achievements. Designing models that combine digital and physical
sustainable products and services. infrastructures. Engaging and motivating
workforce to adopt sustainable attitudes
to working practice. Monitored and
managed feedback system with action
planning.

Select One Of The Maturity


Ratings Per Factor using the
drop down option.
NCR Management. Majority of NCRs remain open without Majority of NCRs have action plans - All NCRs have actions plans, up to 50% All NCRs have actions plans, up to 75% All NCRs have actions plans, up to 100%
resolution. many remaining open. are closed within agreed timescales. are closed within agreed timescales. are closed within agreed timescales.
Data used and some trend analysis is Data used and trend analysis is done, Data used and trend analysis is done,
done, results not used to mitigate future also resulting in action planning and also resulting in action planning and
events. mitigation against future events. Best mitigation against future events. Best
practice identified with clear internal practice identified and communicated to
communication and visible management Industry and Supply Chain. Visible
engagement at all levels. management engagement with workforce
involved at all levels.

Select One Of The Maturity


Ratings Per Factor using the
drop down option.

345348457.xls Companies
Maturity Rating
Processes and Systems Pathological Reactive Calculative Proactive Generative Suggested Actions or Interventions
Process Improvement. Reactive process improvement led by Reactive process improvement led by Proactive process improvement led by Proactive process improvement led by Proactive process improvement led by
Industry changes to standards. Industry changes to standards, the internal auditing and reviews. Action internal auditing and reviews method such internal auditing and reviews method such
changing expectations from external planning and change management. as Six Sigma, Lean etc in use. Clear as Six Sigma, Lean etc in use. Clear
bodies and results of external auditing. Clear management engagement. action planning. Commitment from action planning and change management
management and clear communication in consistent use. Commitment from
360 degrees internally. Results of management and clear communication
process / system changes reviewed. 360 degrees internally. Results of
Best practice is identified and shared process / system changes reviewed.
internally. Best practice identified and
communicated to Industry and Supply
Chain.

Select One Of The Maturity


Ratings Per Factor using the
drop down option.
Near Miss and Close Call Near miss and Close Call reporting Near miss and Close Call reporting Near miss and Close Call reporting Near miss and Close Call reporting Near miss and Close Call reporting
Reporting. system in place. Management encourage systems in place. Management systems in place. Management systems in place. Consistent evidence systems in place. Consistent evidence
it, action planning is not yet taking place. encourage it, in response to external encourage it, evidenced by an increase in that staff are doing it, management that staff including Supply Chain are
Low levels of reporting, compared to pressure. Action planning has begun, Near Miss and Close Call Reports. encourage it, through visible action based doing it, management encourage it.
Industry trends. Awareness of worksafe however using these as a management Actions identified with resolution planning. rectification of themes identified from near Actions identified with resolution planning,
procedure and requirements, no usage. tool is not yet done. Reporting levels are Consistent reporting levels. Behavioural miss / close call reporting system. management and close out of actions.
inconsistent and trends cannot be and cultural issues associated with Near Changes are managed and implemented Clear and consistent downward trend in
identified. Some action planning as a Miss and Close Calls are identified. in response to valid work safe recurrent events. Best practice identified
result of reports. Awareness of worksafe Awareness of worksafe procedure and invocations, monitoring of types of work and shared with Industry and Supply
procedure and requirements. Patterns of requirements utilised with some success safe invocations is managed. Success is Chain. Organisation held up as leading
usage reflect level of management and positive reaction. Changes are evidenced by a reduction in identical and near miss and close call reporting and
engagement and support i.e. little use in managed and implemented in response similar invocations. Working toward demonstrated by benchmarking results.
some Delivery Units. to valid work safe invocations, monitoring removing risk at source. Actions
of types of work safe invocations is identified with resolution planning,
managed. Success is evidenced by a management and close out of actions.
reduction in identical invocations. Improvement made as a result of
reporting. Best practice identified and
shared internally. Worksafe procedure
and requirements utilised confidently with
positive feedback.

Select One Of The Maturity


Ratings Per Factor using the
drop down option.
Contract / Tender Process. Environmental Health and Safety aspects Some formal inclusion of Environmental Formal inclusion of Environmental Health Formal inclusion of Environmental Health Proactive inclusion in each Tender
of contracts not formally built into the Health and Safety requirements in and Safety requirements in Tendering and Safety requirements in Tendering activity. Business has implemented this
tender process. Tendering (invitation, bid, contract, award) (invitation, bid, contract, award). (invitation, bid, contract, award). holistic EHS approach - evidenced by
in each Tender activity reactively. Requirements are both client and Requirements are both client and lessons learnt being recorded and
Requirements are client led rather than business led. Business is developing this business led. Some proactive inclusion in incorporated in the next cycle of Tender
business led. Little evidence of business holistic EHS approach - evidence by each Tender activity. Business has activities. Specific leading and lagging
developing this holistic EHS approach. lessons learnt being recorded and implemented this holistic EHS approach - EHS KPIs used to actively measure
Development of specific lagging EHS incorporated in the next cycle of Tender evidenced by lessons learnt being performance. Validation and verification
KPIs to measure performance. activities. Specific lagging Environmental recorded and incorporated in the next processes are detailed and include
Health and Safety KPIs used to cycle of Tender activities. Specific leading delivery of "customer quality
retrospectively measure performance. and lagging EHS KPIs used to actively expectations". Qualitative record is
measure performance. maintained of bids and received tenders
and learning for improvement is captured
and communicated internally and with
Supply Chain.

Select One Of The Maturity


Ratings Per Factor using the
drop down option.
Risk Management. Risk registers are reviewed on a reactive Risk registers are reviewed and updated Risk registers are regularly reviewed and Behavioural risks are identified Risk registers are regularly reviewed and
basis. Mitigation plans in place to with detailed mitigation plans, as required. updated with detailed mitigation plans - Workforce engaged and participating in updated with detailed mitigation plans.
manage risk. Work force not actively These focus on process risks primarily proactively. Interfaces with other reviews. Best practice is identified and Interfaces with other business risk
engaged in risk mitigation by with some consideration behavioural business risk processes in place. Clear shared with Industry. processes in place. Clear engagement
management. safety risks. Management engaged in engagement and leadership from and leadership from management.
risk management. Workforce engaged management. Workforce engaged in Workforce engaged and participating in
and participating in reviews. review process. Best practice identified reviews. Best practice identified and
internally. shared with Industry and Supply Chain.

Select One Of The Maturity


Ratings Per Factor using the
drop down option.

345348457.xls Processes and Systems


Company Name: Please Complete
Completed By: Please Complete
Date (for baseline): Please Complete

Maturity
Dimensions and Associated Factors Culture Maturity Level
Rating

Leadership 0 0

Level of Investment in Safety. 0 0


Engagement of Senior, Middle and Supervisory Management in Safety
0 0
Programme.
Safety Tours. 0 0
Leadership Communications. 0 0
Technologies 0 0
Training 0 0
Usability 0 0
Innovation 0 0
Safety in Design. 0 0
Outputs 0 0
Bench Marking Supply Chain. 0 0
Implementation of Continuous Improvement. 0 0
Balanced Score Card. 0 0
Welfare. 0 0

Workforce 0 0
Activity Risk Assessment. 0 0
Competence Management (task and individual). 0 0
Safety Action Groups. 0 0
Cultural / Climate Surveys. 0 0

Companies 0 0
Safety Culture Management. 0 0
Audit. 0 0
Sustainability. 0 0
NCR Management. 0 0

Processes and Systems 0 0


Process Improvement. 0 0
Near Miss and Close Call Reporting. 0 0
Contract / Tender Process. 0 0
Risk Management. 0 0

Safety Culture Maturity Level 0 0


Click Here to Allow Editing of
Company Name: Please Complete the Suggested Actions /
Completed By: Please Complete Interventions
Date (for baseline): Please Complete

These are the Changes We Will Make


Now record your actions that will be taken Complete
Dimension Current Level Action / Intervention Suggestions Owner Review Date Due Date
forward in this column. You may use the Yes/No
Intervention Suggestions to assist.
Leadership 0
Level of Investment in Safety. 0
Engagement of Senior, Middle and Supervisory Management in Safety
0
Programme.
Safety Tours. 0
Leadership Communications. 0
Technologies 0
Training 0
Usability 0
Innovation 0
Safety in Design. 0
Outputs 0
Bench Marking Supply Chain. 0
Implementation of Continuous Improvement. 0
Balanced Score Card. 0
Welfare. 0
Workforce 0
Activity Risk Assessment. 0
Competence Management (task and individual). 0
Safety Action Groups. 0
Cultural / Climate Surveys. 0
Companies 0
Safety Culture Management. 0
Audit. 0
Sustainability. 0
NCR Management. 0
Processes and Systems 0
Process Improvement. 0
Near Miss and Close Call Reporting. 0
Contract / Tender Process. 0
Risk Management. 0
1 to 2 2 to 3 3 to 4 4 to 5
LEADERSHIP
Level of investment in safety Survey your workforce on current Managers set up Safety Action Implement and publicise behavioural Engage your supply chain with your
PPE provision and what could be Groups to meet regularly these safety programme across behavioural safety programme and
improved ensure you have budget must be supported by the management, supervision and front share. Set up best practice forums.
to make changes if they are management and active line staff
suggested! communication encouraged include designers, engineers etc in
Management to provide consistent behavioural safety programme
Create and stick to a plan of safety Feedback from managers on visibility into the BSP and engage with
tours for senior managers make progress made and regular staff on site to support and encourage Use of consistent and cohesive
sure you are prepared to make attendance by managers at these them positive performance indicators
changes meetings across business
Ensure there is a system in place to
Raise awareness of what near misses Create a near miss and close call record actions and improvements as Put safety action groups at all levels
and close calls are reporting system with input from suggested through the programme to of the organisation. These groups
workforce show visible backing should be coordinated in the content,
shared outputs and strategy.
Investigate behavioural safety Promote the near miss and close call
programme system with associated action
planning

Invest in a knowledge sharing tool to


learn from experience and put
learning culture in place

Engagement of management After conducting analysis of incidents, Implement safety suggestion box Provide behavioural safety training for Fully utilise Safety Coaches at all
make process / equipment changes middle managers as well as Senior levels of the organisation.
and monitor effectiveness of these Provide training in root cause analysis and front line staff.
for understanding accident causes Manage a process for engaging your
Engage senior managers in Put safety action groups at all levels Supply Chain fully into your
roadshows / electronic forums / safety Implement regular line management of the organisation. These groups behavioural safety programme.
tours meetings with Safety Coaches should be coordinated in the content,
shared outputs and strategy. Safety programme to include home /
Ask Project / Supervisory managers Publicise Safety Coaching general safety as well as work related
what safety performance measures opportunities Create best practice / knowledge safety issues
should be implemented / included share hub to enhance learning
Write a behavioural safety strategy to culture. Multi-modal but cohesive
coordinate works communications related the safety
Include learning from experience as programme
part of project management process
and audit this. Success continually celebrated and
learnt from
Full root cause analysis completed
after an incident, with behavioural
issues identified and managed.

Implement commensurate levels of


investigation for all levels of incident.

Sites and offices audited to confirm


behavioural safety programme is
having desired effect

Safety tours Coordinate safety tours in relation to Provide briefings or training to Include use of positive feedback to Include directors and senior
higher risk sites / areas. managers completing safety tours staff during and after safety tour. managers from other areas than the
line, safety or board i.e. finance, HR
Put action planning process in place Include necessity to look for positive Provide recognition to high performing etc. Provide them with training and
to follow safety tour performance on the safety tour. site / tours awareness sessions before going on
site
Provide a process for Senior Behavioural elements of work
Managers to follow explicitly included in safety tour Get involved with safety tours to your
supply chains site / other areas of
Provide a shared area where best work to enhance collaborative working
practice from safety tours can be
shared

Leadership communications Develop a communications strategy Refine your communications strategy Develop put in place a process to Engage your stakeholders and Supply
to develop from and build upon monitor the consistency of messages Chain with the communications
Ask your workforce to provide you progress made from the first version. across the organisation to check strategy.
with input or ask them to review it to cohesiveness.
check it is as appropriate and Enhance the use of feedback in the Check against best in class
complete as possible. strategy Involve all levels of the business in companies
developing / redeveloping the safety
Define and publicise your safety vision or mission to enhance
vision and use this to influence other engagement and impact
business strategies.
1 to 2 2 to 3 3 to 4 4 to 5
TECHNOLOGIES
Training Explore different methods of training Design in behavioural aspects to Provide stand alone behavioural Share your learning and audits with
and learning training i.e. identify the desired safety awareness course your Supply Chain
behaviours to fit with task.
Conduct a Training Needs Analysis Introduce new methods of training Include behavioural awareness in
for task based training As part of TNA define the observable other than classroom / PP i.e. skills accident investigation process
outcomes which are desired from the based or interactive.
training / using the technology Implement a lessons learnt process
Implement a process of post which includes a strong emphasis on
Put in place and monitor process for implementation validation of the use behavioural elements and human
refresher training of technologies, which includes an performance
audit of the observable outcomes

Usability Include a focus on usability of Design a process for integrating user Implement a technological or paper Share knowledge and strategy for
technologies in accident investigation acceptance testing into the based process to provide your new technologies with Supply Chain
process procurement / design process of new workforce with feedback on
technologies technologies make sure you have Knowledge share findings from UAT /
Design a process for getting feedback the ability to make amendments design process to influence new
from users on the usability / Set up a process to gain information technologies
usefulness of technologies / from your Supply chain / clients as to Use knowledge and procurement /
equipment the use of new technologies in your engineers etc to search out new
current process technologies to improve performance
and reduce error

Innovation Consider the implementation of an Investigate the use of sustainability Create and manage a knowledge Share the knowledge share area with
innovation group, to discuss the use for inclusion into the design / share area where the feedback on Supply Chain and Clients
and development of new technologies development process for new and innovation of new or current
technologies technologies can be shared

Implement the use of six sigma or


LEAN for the development of new
technologies or to understand where
innovation can be included

Safety In Design Introduce risk assessments as a Organise Periodic Design Review Review your internal communications Attend industry forums to present best
deliverable in the design process. meetings and arrange representation to capture usability feedback from practice and lessons learnt within your
from Construction, Maintenance and your end users. design process.
Consider end user requirements when End Users.
reviewing designs for approval / Introduce a design risk log (if not in Involve construction, maintenance
acceptance. Include safe usage of equipment use already) and table this at each and end users in design review
/asset in the design process. design review meeting, communicate meetings.
opportunities and mitigations with
Include Safety and Environment risks management to drive engagement. Integrate your risk mitigation and
on drawings and review meetings. continuous improvement processes
with design review meetings to build a
Review your constructability holistic approach to design work.
processes to include HAZOPs.
1 to 2 2 to 3 3 to 4 4 to 5
OUTPUTS
Benchmarking Supply Chain Begin benchmarking your Supply Implement a cyclic benchmarking Include safety and behaviours as Take the outputs from the
Chain, and yourself against your process. Look at costs and factors to be benchmarked against benchmarking and include in a
competitors. At this time this can be compliance to process and this will ensure you are looking at the knowledge share area for sharing with
done as a one off exercise procedures how not just the what Supply Chain

Implement process for making Make sure 100% of actions are


changes following on from the outputs followed up
of the process

Implementation of Continuous Improvement Review the information required Involve the rest of your business in Integrate all reactive and proactive Using your processes and systems in
according to ISO 9001. reviewing the methodology used for measurement systems. Include conjunction with Isa 9001
capturing ISO 9001 information. Lessons Learnt processes to capture requirements, use goal setting to
Review existing action planning learning and share cross-functionally. augment action planning.
processes and whether ISO 9001 Identify how your business may
activities may be captured using an approach implementing continuous Review the holistic use of any process Involve your cross-functional business
existing or new action planning improvement cross functionally. or system and identify how usage and Supply Chain in lessons learnt
approach. may be encouraged, the benefits of and celebrating success.
Expand your measurement or doing so and the communications
Review business performance performance criteria to cover required to achieve this. Review relevant systems to identify
indicators to identify opportunities for proactive and reactive indicators. opportunities to improve or develop
measurement and management of Communicate your successes, (regularity may be informed by
relevant information. Use your action planning process to challenges and lessons learnt with business type or consistent
measure how embedded these Industry to contribute to Industry wide achievement in this category).
processes are and to gain visibility of evolution.
end-to-end commitment.

Balanced Scorecard Design and introduce a balanced Take the learning from the feedback Include greater number of positive Increase number of positive indicators
scorecard in the most mature units on the design or content of the score indicators. used to drive and sustain positive
or parts of your business card and make improvements safety culture on site
Include action planning as part of the
This should focus on the current Include some easy to measure score card and implement a Share scorecard, the results and
lagging indicators and on your high positive indicators such as safety consistent process to manage this. action planning with supply chain.
risk areas tours.
Share learning from the action
Ask for feedback after a couple of Brief all other areas of your business planning with other areas of your
months use to see how it can be on the use of and need for balanced business. This could be done through
improved scorecards. Roll out to these areas a knowledge sharing / learning from
experience forum

Welfare Provide forum for front line staff to Use PGIs and audits to check welfare Complete and roll out strategy for well Refresh well being strategy to stay at
raise issues including welfare this facilities are installed, maintained to being and proactive health a best in class level in your industry.
can be through the use of a safety and do meet the standard required or management for direct staff This re-write should take into account
rep, suggestions box or through that you expect breaking trends and future directions
response to safety tours Provide high quality PPE and monitor
Monitor feedback on forum for its provision to understand trends and Present at local, national, European
Inspect welfare facilities as part of improvements to welfare facilities. Or longevity forums on the content and execution
inspections survey staff specifically on the welfare of your programme.
facilities and how these could be Monitor and manage action plan,
Provide basic level of quality PPE to improved be ready to make based on staff feedback on bettering Share the strategy and benefits with
all staff changes if suggested so as not to de- welfare provided indirect staff as well
motivate future feedback
Audit against adherence to legislation Monitor and sustain a high level of Holistic proactive health monitoring
with regard to fatigues, stress Investigate the use of personalised engagement with staff process in place
management and occupational health PPE.

Invest in greater range of PPE this


can be more versatile range of
gloves. Or more versatile PPE in
general ie summer / winter versions.

Put in place a feedback mechanism to


encourage staff to make suggestions
on how PPE can be improved.

Implement a fatigue monitoring


system. Investigate with staff their
travelling times etc to gain a realistic
view of this

Put in place links with local gyms etc


to provide reduced price membership
etc for direct staff
1 to 2 2 to 3 3 to 4 4 to 5
WORKFORCE
Activity Risk Assessment Complete and distribute task based Put in place a process by which Include behaviours in the risk Share the learning and development
risk assessment. This should focus on Supervisory and front line staff are assessment, not just the process. of risk assessment across your
the processes of completing the tasks involved in the design of task risk This could define acceptable and business and with your Supply Chain
assessments unacceptable behaviours. for them to use as well

Test for usability of the risk Implement a system of regular risk


assessments review to check that risk assessments
are targeting the highest risk areas

Competence Management Review competency matrices and Investigate the use of job profiling and Include the use of behavioural Include the use of behavioural
make sure they are up to date. behavioural markers and implement markers for all supervisor and markers for all roles and associated
this process on one or two roles. management roles and associated competency matrix which details the
Conduct Training Needs Analyses competency matrix which details the observable outcomes
where necessary to review From this exercise, include observable outcomes
competencies behavioural traits to job descriptions Include behavioural and performance
Include the use of 360 reviews to based improvements as part of review
Competency matrices should focus Communicate out the results from the validated the observable outcomes process and 1:1s.
primarily on the technical or process behavioural markers exercise to rest
skills required to complete the role of the organisation / rest of the
relevant HR departments

Safety Action Groups Management arrange safety action Aim for and manage a consistent Communicate the outputs from the Provide SAGs with funding and
groups. Managers should lead these level of attendance and encourage SAGs internally to share best autonomy to make changes.
and encourage staff to attend and be this through ownership and open practice.
honest communications SAGs invite Senior Managers to
Encourage SAG members to present attend meetings to present or
Invest time in building relationships Manage a system of formal minute to other areas of your business feedback
with group member to enhance trust. taking and action planning, with follow
This can be increased through the up and manage the ownership and Supervisors or front line staff should Invite Supply Chain members to be
choice of the manager to lead it and completion of actions on time take over the management and part of SAG
through making quick win coordination of the SAGs. Managers
improvements as a result of feedback must still retain and consistent and
from meetings interested presence at the meetings

Monitor the attendance figures and


names to check the consistency of
attendance

Cultural / Climate surveys Set up safety culture survey and Introduce different methods of Implement cross functional and role Set a target of 75-100% response
publish its forthcoming arrival to disseminating the culture survey to specific surveys. rate
company make it more appealing
Set target of 60 % response rate Utilise multi media resources for
Set a target for 20% return rate Set target for response rate of 30% sharing results and actions
Implement and manage a consistent associated with them
Implement a system for action Communicate through corporate use of the results and the action
planning or follow up communications the upcoming culture planning associated with the findings. Share results with Supply Chain
surveys, its use and how the results
will be utilised. These action plans should be Engage your supply chain on
monitored by senior management undertaking the survey
1 to 2 2 to 3 3 to 4 4 to 5
Companies
Safety Culture Management. Design and use methods to capture Set clear Specific, Measurable, Review the action plan and establish Periodically review your safety culture,
current perception of Safety Culture. Realistic and Time Bound actions success criteria which include using feedback, surveys, forums or
Use to results to identify opportunities associated with requirements observable and behavioural outcomes similar.
to develop. identified to improve Safety Culture. in order to fully understand the
changes achieved in Safety Culture. Review the Safety Culture of Client
Clearly communicate strategy and Communicate progress across your and Supply Chain as appropriate to
commitment at all levels of your organisation. Build upon the work force feedback enable consistency in practices and to
organisation facility and include your supply chain identify other opportunities to
If not already established, introduce a in the effort. improve.
feedback mechanism to allow
workforce to comment on changes or Use newsletters or similar accessible
Actively encourage use of good
make suggestions. Use this function communication mediums to give your practice and feedback processes
to drive engagement by workforce visibility of commitment to
throughout Supply Chain provide
communicating feedback received improving your safety culture. visibility of action planning across
across your organisation supply chain as part of the
Use competency and objective commitment to safety culture
frameworks to raise awareness and management and improvement.
build commitment within your
organisation.

Audit. Review audit processes to identify Expand training and competency Initiate best practice forums and If not already done, integrate your
associated behavioural aspects. framework reviews to include audit, capture lessons learnt for continuous improvement processes
observable outcomes and behavioural dissemination across your with your audit processes.
Review training and competency indicators for all levels of the organisation.
frameworks for Workforce to line up organisation. Use your communication and
observable outcomes, behavioural Use the audit readiness review feedback strategies to give visibility of
indicators and audit protocols. Communicate your audit actions plans concept in planning and tender achievements and to capture
Communicate these through your across your organisation. Drive activities. Focus on behavioural opportunities to identify Behavioural
organisation visibility of requirements by linking the indicators to measure performance Based Safety for each level of the
"what" and the "why" of the actions. and achievements. organisation.

Introduce audit readiness reviews and Include all levels of the organisation in Review client and industry audit
proactively engage with clients to feedback and organisational protocols for development
satisfy requirements. performance reviews. opportunities and to communicate
your own best practice.

Sustainability. Review Client Sustainability policies Develop KPIs for sustainability Use research and findings to Review all your current products and
and those of competitors. Perform targets. Include observable and introduce sustainable products and services against industry capabilities
gap analyses to identify opportunities leading indicators for visibility and services. Establish indicators and and well established sustainability
to improve. ease of measurement. measures that help inform strategic programmes.
decision making to lead delivery of
Engage with workforce for Use research and other sources of sustainability commitments. Include behavioural and sustainability
suggestions on improving information to identify materials, components in competency and
sustainability in working practices. working methods and processes to Encourage and include sustainable training frameworks.
encourage and introduce sustainable approach in tender activities
Develop initial Sustainability Policy for "future proofing" approaches to Use feedback and best practice
your organisation. activities working practices. Include sustainability on your processes to capture ideas and
balanced score card / dashboard or encourage ownership, visibility and
similar. understanding of what sustainability
and future proofing is throughout the
Consider the observable behaviours organisation for both front line and
associated with good sustainable office staff.
working and include in competency
frameworks etc to build consistency
across your organisation.

NCR Management. Review NCR performance, and Use KPI protocols to target NCR Use KPI protocols to target NCR Use NCR findings and communicate
introduce action planning in line with close out, first stage measurements close out, second stage with Supply Chain to encourage
Industry expectations. suggested at 50% within timescales. measurements suggested at 75% proactive working and pre-emptive
within timescales. lessons learnt approaches.
Work with Management and Communicate achievements and
Workforce to encourage ownership results throughout organisation focus Consider using stretch targets for Build communication protocols to
and engagement in closure of NCRs. on successes and on results of close out of actions. engage all levels of your organisation
closing out NCRs within timescales to raise awareness and encourage
Communicate change in approach set. Use your feedback and ownership.
and control across the organisation to communication processes to engage
build support. Review success and identify what with workforce to communicate Review your action planning and aim
contributed to this, expand to success and build ownership across for 100% of NCRs closed out within
remaining NCRS. the organisation. timescales met.

Review your design and risk Design working activities and work
mitigation processes and encorporate planning to incorporate learning from
learning from NCR management to NCR management and close out.
preempt NCRs.
1 to 2 2 to 3 3 to 4 4 to 5
Processes and Systems
Process Improvement. Communicate the benefits of Process Initiate periodic reviews to capture Review process improvement Attend external forums focusing on
Improvement via management changes to; Standards, expectations methodologies such as Six Sigma or Process Improvement.
meetings. from external authorities and audit Lean, for suitability of use.
findings. Tie these reviews into your Review other industries for
Collate all current requests or Process Improvement processes. Include Process Improvement in your opportunities to improve processes.
requirements for Process internal audit processes.
Improvement in one log. Use your communications channels Include internal suggestions and
Review this regularly and initiate and training methodologies to Consider inclusion of Process recommendations to action plan for
SMART action planning to manage promote commitment to process Improvement in review of Supply changes to processes.
and control change. improvement and capture Chain.
suggestions from across your Consider inclusion of Process
Engage with other business functions business. If not already doing so, include Improvement in review of Supply
to gain visibility of holistic business change management in your process Chain.
practices and impacts of improving Review your supply chain and client improvements and review impacts of
processes. policies to identify opportunities to improvements to allow detailed lesson Build detailed briefing packages to
improve processes. Action plan for learnt recording and communication educate those affected internally and
delivery as appropriate. of same across Supply Chain and externally.
Industry.

Near Miss and Close Call Reporting. Prepare and initiate work safe Develop trending to identify recurring Use reviews of reporting in risk Communicate your actions,
procedure briefing. events and initiate holistic action management processes. mitigations, lessons learnt and best
planning across your organisation. practice with your Supply Chain and
Promote benefits of Near Miss and Input your findings and actions Industry.
Close Call reporting. Monitor use of work safe procedure in completed in your work safe
conjunction with Close Call and Near procedures, best practice and lessons Benchmark your results with Industry
Develop an action planning process Miss report reviews. learnt processes. to identify opportunities to improve
to close out reports made in a timely and develop Near Miss and Close
fashion. Consider trendability of Include behavioural indicators in Communicate your findings with your Call processes.
action planning. reviews of reports and feed findings workforce to build engagement in
into training, briefing and reporting Near Miss and Close Calls. Attend Industry forums and share
communication processes. your learning to communicate
commitments to this reporting.

Contract / Tender Process. Review opportunities to include Use your lessons learnt process to Include review of EHS requirements Use your validation and Verification
Environmental Health and Safety capture how including EHS in your as part of your Tender processes. processes to capture success
(EHS) in your tendering processes. Tender process has been successful indicators for EHS performance and
and could be improved further. Design leading indicators in your EHS feed findings into performance
Engage with clients to identify benefits KPIs, aligning with client audit and indicators.
of including EHS in your Tendering Build KPIs measuring EHS KPI measurements to enable holistic
and Contract Processes. specifically. Communicate metrics visibility of EHS commitments. Review Supply Chain and Industry for
and requirements across your EHS improvement opportunities.
Communicate opportunities internally. business to encourage and engage Use your communication channels to
the workforce. give visibility of benefits and Communicate your lessons learnt and
successes in respect of EHS success indicators with Industry and
Review your internal EHS policies and achievements. Supply chain.
identify opportunities in aligning with
those of your clients. Communicate EHS expectations and Use your EHS best practice to
quality criteria with Industry. encourage Clients to make similar
commitments for holistic and
collaborative measurement and
success.

Risk Management. Review the risks and associated Review business risk processes and Focus on and include behavioural Include identifying best practice and
mitigation Plans to identify strategies for inclusion and impact aspects to risks to inform your improvement opportunities in your risk
opportunities to include task specific analysis. mitigation planning. review processes.
risks.
Use your mitigation planning
Include risk and mitigation planning to Include your supply chain and
Look at the timeliness of reviewing holistically and record centrally to training and competency processes to industry in risk review meetings.
your risk register and identify benefits allow visibility of risk, best practice
educate and involve workforce.
of reviewing more regularly that and learning for better risk visibility Use your communication channels to
currently done. and management. Build dynamic risk assessments into share learning with your Supply Chain
task briefings and other work related and Industry.
Invite and involve your workforce in Raise the profile of effective risk tasks. Capture all findings and
the risk review meetings. Table management via your communication absorb these into your Risk
behavioural indicators for inclusion in channels. Management approach.
your risk processes.