Time
Description of Events
2:00 - 330|-
met Carol (J) and John (Med Asst)
observed computer system to record patient symptoms
- discussed affordable care at reguirements
- watch Dr. meet with patient
o learned how much listening 1S involved
B/29/\0
2:30 - FHS
(4S min)
met Aaron &
rt
recieved 8 sma tour of
obser ved ion of Gn ar al
heard in
accepred as tt
work wW/ Raton
recieved a badge 4 syncardia email
underwent ‘taining
= Orr
a comprved bioburden Fe Ss
A/19/\6 730) S729 learned about procedures for
(brs) | oonsumer safety & STeritizarioy
trainin
- tee nondisclosure agreemen +
‘ rocedure
9) 26/1 }2:30~S-% | -auditer PCC
(3 hes) researched effective ways fe clean
e
cleanroom walls —7 mep, VaouUTn, WIP
/\6
2:30 ~ 5:30
(3 nes)
training
researched Cleaning contro \\ed
environment Wwals
paper fight in ofeice?Description of Events
Time
finish Training!
. wrote a 1 page paper on effective
L
9/29/16 | > 30" $30 ways fe Clea lean fom walls
researched new engraving
yeehniques fer syncard:g
Alae/\e | * 31S | ceriar numbers
man
WENT INTO LAB srAcE!\!
als lts ssaw hor a heart made\
MECEI NON ES S88 suited wp in: coe
ms hairnet, boott yur T+ % gloves
met quaiity adept head
restarched Marking techniqu
2:39-6:30 | FY AumiuM vidi Number VIqQs
WOM | anes) | myere @ Paper On Veseaych>
finighed up ascighmert todo
10/0) 2°30~530] wilt
1OSI\61 Oe nesy
finished marking System
lo/io/ 1G [2:30 -sa0| techniques research
(3 hrs)Time
Description of Events
Date
site visit w/ Mrs. Wahl
\0/H/l6 2:30-8:30 |
(brs)
started writing eMhanel report
- contacted poSSibu companies +o
30°S
fee Neh) engrave aluMunUn Fags
Hrushed ethanol report
\\ /o7/1@ | 2:30°S 30 | SCanned documents fe be uUpwaded
(2 prs) | fe MasterControl
unaid eri
wis fie | 2-30°S 3] Started GaP cunaby SiS
anabysis
MW/23/16 | 230-50 Heesga Vv NY cwsure
qi \ecked in
gap wnarysis
\W/28/\6 }21S-S-1SDate Time Description of Events
| continued gap analysis
|
2/5/16 |2207 | mer biomedical engineer (karring)
| b discussed Working with her |
inthe Cuture |
Finished gap analysis !
2:80 -
VAN2/I6| S239 |
|
|
7 worked with Katrina
2:30 — -took pictures sf cannula tear |
$:30 finished task in Master Control
A/a 6 met other intern —Justine
| worked with her on project
| Finished sustines Project
ae “summarizing NCR's
2/21 | $30
| emailed menror the gap analysis
yooked over Mo 7-5/0 r
2°00 - 6 a mMarias o Work
1/9/17} 5:39 |upicaded quarity reports re Mas ter
| aiscussed SEP Presenratton 4 ,gentrel
| Fyped one page proposa |
| mentor gone
2:30 — - :
1/23/17 Eee began worle on final projectbey
Date Time Description of Events
an | emailed co-worker gbout manuals
Wa0/17 26239. | FAKED With mentor about project
‘30 | shadowed mentor at a meeting
to invoke new policy immediately
5e26~ began writing final project
2/6/17| $:30 set up a meeting with mentor
mentor signed project check 1
went thr
emails