The document outlines the work program for Jems Multi-Tech Consultancy over a 12 month period. It details the number of inspections, length of roads to be inspected, quality monitors and administrative staff deployed each month. Over the 12 months there will be a total of 2735 inspections covering 8205 km of roads, with 136 quality monitors and 12 administrative staff deployed.
The document outlines the work program for Jems Multi-Tech Consultancy over a 12 month period. It details the number of inspections, length of roads to be inspected, quality monitors and administrative staff deployed each month. Over the 12 months there will be a total of 2735 inspections covering 8205 km of roads, with 136 quality monitors and 12 administrative staff deployed.
The document outlines the work program for Jems Multi-Tech Consultancy over a 12 month period. It details the number of inspections, length of roads to be inspected, quality monitors and administrative staff deployed each month. Over the 12 months there will be a total of 2735 inspections covering 8205 km of roads, with 136 quality monitors and 12 administrative staff deployed.
Month Since No. of Inspection Length of Roas Works No. of QMs to be No. of ALWMs to Commencement of Planned Planned for Inspection deployed at field be deployed at Services Main Office 1 st Month 100 300 5 1 2nd Month 220 660 11 1 3rd Month 230 690 11 1 Total of 1st Quarter 4th Month 240 720 12 1 5th Month 240 720 12 1 6th Month 240 720 12 1 Total of 2nd Quarter 7th Month 240 720 12 1 8th Month 240 720 12 1 9th Month 240 720 12 1 Total of 3rd Quarter 10th Month 240 720 12 1 11th Month 240 720 12 1 12th Month 265 795 13 1 Grand Total 2735 8205 136 12