You are on page 1of 2

BOOSTER PUMP PROJECT

Objective-Reduction in Auxillary Consumption.

With Reference to above Project Idea by Vineet Sir, I am hereby enclosing Proposed Logic
Operations of the process. The logic has been developed keeping in mind maximum redundancy
without affecting the current performance parameters.

In Normal Mode

SSF-1 in Running Mode

MOV (Fully Closed)

Booster Pump (Running Mode)

Following Failure Cases are Possible.

Case: 1 SSF-1 Trips

You might also like