PROBLEM BY INJECTING SOLVENT IN THE EFFORTS FOR INCREASING OIL PRODUCTION AT WELL X-14 STRUCTURE Y PT PERTAMINA EP ASSET 2 PENDOPO FIELD Scientific Papers in the form of Skripsi, Maret 2016
Ivan Firmansyah; Dibimbing oleh Ir. Ubaidillah Anwar Prabu, MS. dan Ir. H. M. Akib Abro, MT.
Evaluasi Keberhasilan Penanggulangan Paraffin Problem Dengan Injeksi Solvent
Dalam Upaya Peningkatan Produksi Minyak Di Sumur X-14 Lapangan Y PT. Pertamina EP Asset 2 Pendopo Field
xii + 69 pages, 16 images, 18 tables, 10 attachments
SUMMARY
A significant decrease in the rate of production on wells "X-14" is identified as the
paraffin precipitate formed. It was based on oil analysis data in the laboratory that shows the tendency of formation of paraffin, supported by the discovery of paraffin deposition when well service. Combating the problem of paraffin is done by injection chemcial solvent that is used Beka-6405. The working principle of solvent that dissolves paraffin deposits so that the fluid can be produced to the surface with ease. Before the injection of solvent, first at doing the planning is determining the volume of solvent (V). In this case the chemical solvent used 8 drum. After injected solvent to well X-14 than Evaluating injection program based on three parameters of analysis. The increase in oil production where from the previous rate of 28 BOPD to 69 BOPD. Then Increased productivity price index from 0.42 BFPD / psi to 1.06 BFPD / psi. As well as the IPR curve analysis where the maximum rate of increase of fluid into 300.936 129.576 BFPD. Based on the evaluation, the solvent injection wells "X-14" can be declared a success.
Keywords : Solvent Injection, Paraffin Problem, Rate of Production,