1993 7 1
35kV
1992912
19862630
35kV
35kV GB50173-92
1993 7 1 GBJ232-82
10kV
1992 12
19862630
(GBJ23282)10kV
35kV
35kV
(102401)
1991 3
UDC
GB50173-92
35kV
1992 12 16 1993 - 07 - 01
1.0.1 35kV
1.0.2 35kV
35kV
110500kV
35kV
1.0.3
1.0.4
1.0.5
1.0.6
2.0.1
2.0.2
2.0.3 2.0.2
2.0.4
2.0.5
2.0.6
1300mm
2.0.7
2.0.8
2.0.9
0.1mm
1/1000
2.0.10
1/1000
2.0.11
2.0.12
3.0.1
35kV 1%10kV
3% 50mm
50mm
3.0.2
+100mm-50mm
3.0.3
30mm
3.0.4
3.0.5
50mm
500mm
3.0.6
35kV 300mm 10kV
500mm
300mm
()
3.0.7 110500kV
4.0.1
4.0.2
25mm
2mm
34
6mm V
4.0.2 ( 4.0.2)
4.0.2 (mm)
s(mm)
10 1020
c 1.52.5 23
e 12 23
4.0.2
0.5mm 10%
-
20 100120
2/1000
1. 140mm
2.
0.05mm
3.
4.0.3
4.0.4
50mm
35kV 310kV
1/2
50mm
4.0.5
4.0.6
50mm
50mm
30mm
30mm
4.0.7 50mm
50mm
4.0.8
2
4.0.9
()
4.0.10 90()
4.0.11
20mm
20mm
5/1000
1/100
4.0.12
10mm
515 20mm
(
)
4.0.13
1.
2.
3.
50mm
4.0.14
3060
4.0.15 35kV 5000V
500M
5.0.1
500700mm
5.0.2
1. 35kV 1
2. 10kV 3
3.
5m
UT
1.
2.
3.
300500mm
4.
5. UT 1/2
UT
1.
2. 3.2mm
5.0.2
5.0.3
1. 1/6
2.
5.0.2
(mm)
(mm2)
25 200 200 150 250 80
35 250 250 200 250 80
50 300 300 250 250 80
1020
30
250mm
5.0.2
5.0.4
5.0.5 3
4.0mm
5.0.6 3.2mm
5 200mm200mm 150mm
250mm 100mm
3
80mm5 150mm
5.0.7
2.5m
5.0.8 ()
0.5m
5
6.0.1
6.0.2 0
1/2
5%
4%
4%
()
1/2
6.0.3
6.0.3
6.0.3
6.0.2
5%
5% 17%
6.0.2
5%
7%
5% 17%
25%
1.
2. 2mm
3.
100mm
1.
2. 3
3.
1.()
2. 20mm
3.
()
6.0.4
6.0.3
6.0.3
1.5
6.0.5 6.0.5
6.0.5
7 1 2
19 1 2 3
6.0.6
6.0.7
95%
90%
6.0.8
2
6.0.9
6.0.9
6.0.9
(mm)
D a1 a2 a3
(mm)
LJ16 6 10.5 28 20 34
LJ25 6 12.5 32 20 36
LJ35 6 14.0 36 25 43
LJ50 8 16.5 40 25 45
LJ70 8 19.5 44 28 50
LJ95 10 23.0 48 32 56
LJ120 10 26.0 52 33 59
LJ150 10 30.0 56 34 62
LJ185 10 33.5 60 35 65
LGJ16/3 12 12.5 28 14 28
LGJ25/4 14 14.5 32 15 31
LGJ35/6 14 17.5 34 42.5 93.5
LGJ50/8 16 20.5 38 48.5 105.5
LGJ70/10 16 25.0 46 54.5 123.5
LGJ95/20 20 29.0 54 61.5 142.5
LGJ120/20 24 33.0 62 67.5 160.5
LGJ150/20 24 36.0 64 70 166
LGJ185/25 26 39.0 66 74.5 173.5
LGJ240/30 214 43.0 62 68.5 161.5
6.0.9
123
AB
6.0.9
20mm
2%
1.0mm0.5mm
6.0.10
6.0.11 35kV
()
6.0.12 10kV
6.0.13 10kV
0.5m
1
6.0.14 35kV 1
3 ()
15m
6.0.15 35kV
5 1
612 1
12 1
6.0.16 35kV
+5%-2.5% 500mm
6.0.17 10kV
5% 50mm
6.0.18 35kV
200mm
6.0.19
6.0.20
30mm
6.0.21 10kV
6.0.21
6.0.21
(mm2) (mm)
LJ50LGJ50 150
LJ70 200
6.0.22 35kV
5
6.0.23 35kV
30mm
6.0.24 1035kV
2
6.0.25 10kV ()
6.0.25
6.0.25
(mm2) (mm)
35 150
50 200
70 250
6.0.26 2.0mm
6.0.27 110kV
300mm1kV 150mm
6.0.28 35kV
600mm110kV 200mm1kV 100mm
6.0.29 1kV
6.0.21
6.0.30 1kV
6.0.31
10kV
7.0.1
7.0.2
1/100
7.0.3
1530
500mm
7.0.4
1/100
150mm
7.0.5
200mm
7.0.6
110kV 350mm1kV
150mm
1. 16mm2 25mm2
2. 25mm2 35mm2
7.0.7
7.0.8 ()
()
8.0.1 10kV
8.0.2 10kV
1kV
8.0.3 10kV
8.0.4 10kV 8.0.4
8.0.4
(mm2) (mm) (mm2) (mm)
10 50 2550 120
16 80 70120 200
9.0.1
9.0.2
9.0.3
2
6
6
()()
9.0.4
9.0.5
9.0.6
9.0.7
9.0.8
100300mm
10.0.1
10.0.2
()
()
1.
2.
3.
35kV
GB50173-92
19862630
35kV
GB50173-92 1992 12 16
1992912
35kV
35kV
1.0.1
1.0.2 35kV
35kV
35kV
35kV
35kV 10kV
35kV
10kV 35kV
35kV
(LGJ150 ) 110kV
110500kV
35kV
()
35kV
35kV
110500kV
1.0.3
1.0.4
()
1.0.5
()
1.0.6 10kV
2.0.1
2.0.2
10kV
10kV
2.0.4
2.0.5
2.0.6 10kV
2.0.7
()
2.0.8
2.0.9 2.0.10
10kV
0.20.35mm 0.5mm
0.1mm
110500kV
35kV
2.0.11
2.0.12
3.0.1
3.0.2
3.0.3
3.0.4
3.0.6
4.0.1
4.0.2
110500kV
(1) 140mm(2)
(3) 0.05mm
4.0.2
4.0.2
100 15 300 6
600
4.0.8
4.0.12 70
4.0.13
4.0.14
SD2682
45
R W
4.0.15
18mm 6300V
5000V
5.0.1
5.0.2 UT 400mm 300
500mm 70mm2
(100mm2 )
6m
5.0.8
6.0.1
6.0.2 10kV
10kV
4%
6 1 LGJ10/2 1
1/2 4.17%( 5.1%) 4%
1/2
6.0.3
5%
()
5%
95%(
)
5%
5%
100%
5%
10kV
110500kV
6.0.3
19.4 25%
18% 17%
17%
6.0.5
19 1
GB120075 7 12 19 13
6.0.5
6.0.5
1 2 3
7 14.3 28.6
19 5.3 10.6 15.9
6.0.7
GBJ117983
95%
(GB231485)
95%()
95%
6.0.8
6.0.9
6.0.10
6.0.15
6.0.19
6.0.24 ()
6.0.29
6.0.30
10kV
10kV