Professional Documents
Culture Documents
Aws c2 25 Thermal Spray Feedstock PDF
Aws c2 25 Thermal Spray Feedstock PDF
25M:2002
An American National Standard
Specification for
Thermal Spray
FeedstockSolid
and Composite
Wire and Ceramic
Rods
--``,``-`-`,,`,,`,`,,`---
Specification for
Thermal Spray Feedstock
Solid and Composite Wire
and Ceramic Rods
Prepared by
AWS C2 Committee on Thermal Spray
Approved by
AWS Board of Directors
Abstract
This specification provides the as-manufactured chemical composition classification requirements for solid and compos-
ite wires and ceramic rods for thermal spraying. Requirements for standard sizes, marking, manufacturing, and packag-
ing are included.
--``,``-`-`,,`,,`,`,,`---
--``,``-`-`,,`,,`,`,,`---
ing, to the Managing Director Technical Services, American Welding Society, 550 N.W. LeJeune Road, Miami, FL 33126
(see Annex B). With regard to technical inquiries made concerning AWS standards, oral opinions on AWS standards may
be rendered. However, such opinions represent only the personal opinions of the particular individuals giving them. These
individuals do not speak on behalf of AWS, nor do these oral opinions constitute official or unofficial opinions or interpre-
tations of AWS. In addition, oral opinions are informal and should not be used as a substitute for an official interpretation.
This standard is subject to revision at any time by the AWS C2 Committee on Thermal Spray. It must be reviewed every
five years and if not revised, it must be either reapproved or withdrawn. Comments (recommendations, additions, or
deletions) and any pertinent data that may be of use in improving this standard are required and should be addressed to
AWS Headquarters. Such comments will receive careful consideration by the AWS C2 Committee on Thermal Spray
and the author of the comments will be informed of the Committees response to the comments. Guests are invited to
attend all meetings of the AWS C2 Committee on Thermal Spray to express their comments verbally. Procedures for
appeal of an adverse decision concerning all such comments are provided in the Rules of Operation of the Technical
Activities Committee. A copy of these Rules can be obtained from the American Welding Society, 550 N.W. LeJeune
Road, Miami, FL 33126.
Photocopy Rights
Authorization to photocopy items for internal, personal, or educational classroom use only, or the internal, personal, or
educational classroom use only of specific clients, is granted by the American Welding Society (AWS) provided that the
appropriate fee is paid to the Copyright Clearance Center, 222 Rosewood Drive, Danvers, MA 01923, Tel: 978-750-8400;
online: http://www.copyright.com.
iii
--``,``-`-`,,`,,`,`,,`---
iv
Copyright American Welding Society
Provided by IHS under license with AWS
No reproduction or networking permitted without license from IHS Not for Resale
Foreword
(This Foreword is not a part of AWS C2.25/C2.25M:2002, Specification for Thermal Spray FeedstockSolid and
Composite Wire and Ceramic Rods, but is included for information purposes only.)
Thermal spray users following this specification may decide in many, but not all, cases that a thermal spray wire or
ceramic rod from one manufacturer is interchangeable with that from another. The classification tests permit identification
of similar thermal spray wires and ceramic rods.
This specification was developed pursuant to a request from the U.S. Army Material Technology Center to incorporate
MIL-W-6712C, Metallizing Wire, as an American Welding Society Standard.
--``,``-`-`,,`,,`,`,,`---
v
Copyright American Welding Society
Provided by IHS under license with AWS
No reproduction or networking permitted without license from IHS Not for Resale
--``,``-`-`,,`,,`,`,,`---
1. Scope .....................................................................................................................................................................1
2. Reference Documents ...........................................................................................................................................1
3. Significance and Use .............................................................................................................................................1
4. Basis of Classification ...........................................................................................................................................2
--``,``-`-`,,`,,`,`,,`---
5. Certification...........................................................................................................................................................2
6. Test Methods and Retest ......................................................................................................................................2
6.1 Chemical Analysis ........................................................................................................................................2
6.2 Retest ............................................................................................................................................................2
7. Method of Manufacture.........................................................................................................................................8
8. Standard Sizes .......................................................................................................................................................8
9. Finish and Uniformity ...........................................................................................................................................8
10. Standard Packaging Forms....................................................................................................................................9
10.1 Coils with Support ........................................................................................................................................9
10.2 Spools............................................................................................................................................................9
10.3 Ceramics Rods ............................................................................................................................................10
11. Winding Requirements........................................................................................................................................10
11.1 Winding.......................................................................................................................................................10
11.2 Cast and Helix.............................................................................................................................................10
12. Solid and Composite Wire and Ceramic Rod Identification ...............................................................................11
13. Packaging ............................................................................................................................................................11
14. Marking of Packages ...........................................................................................................................................12
14.1 Product Information ....................................................................................................................................12
14.2 Precautionary Information .........................................................................................................................12
Nonmandatory Annexes..............................................................................................................................................13
Annex AGuide to Ventilation and Personnel Protection During Thermal Spraying...............................................13
Annex BTechnical Inquiries ....................................................................................................................................17
vii
Copyright American Welding Society
Provided by IHS under license with AWS
No reproduction or networking permitted without license from IHS Not for Resale
List of Tables
Table Page No.
1 Chemical Composition Requirements for Solid Ferrous Thermal Spray Wires............................................3
2 Chemical Composition Requirements for Solid Nonferrous Thermal Spray Wires......................................4
3 Chemical Composition Requirements for Cored Composite Thermal Spray Wires .....................................6
4 Chemical Composition Requirements for Thermal Spray Ceramic Rods .....................................................7
--``,``-`-`,,`,,`,`,,`---
List of Figures
Figure Page No.
1 Thermal Spray Feedstock Classification System Format ..............................................................................8
2 Dimensions of Standard 12- and 14-in. [300- and 350-mm] Spools ...........................................................11
3 Dimensions of Standard 22-, 24-, and 30-in. [560-, 610-, and 760-mm) Spools.........................................12
A1 Arc Spraying 85/15 Zn/Al on the Interior of a 7-ft Diameter Steel Water Pipe
Over the Missouri River, 1998 .....................................................................................................................15
viii
Copyright American Welding Society
Provided by IHS under license with AWS
No reproduction or networking permitted without license from IHS Not for Resale
AWS C2.25/C2.25M:2002
--``,``-`-`,,`,,`,`,,`---
2. Reference Documents
The following ASTM1 standards are referenced in the 3. Significance and Use
mandatory sections of this document:
This specification defines the as-manufactured chemi-
(1) ASTM E 29, Standard Practice for Using Signifi-
cal composition classification requirements for solid and
cant Digits in Test Data to Determine Conformance with
composite wires and ceramic rods for thermal spraying.
Specifications
Requirements for standard sizes, marking, manufactur-
(2) ASTM E 34, Test Method for Chemical Analysis
ing, and packaging are included.
of Aluminum and Aluminum Alloys (referee)
(3) ASTM E 227, Standard Method for Optical Emis-
sion Spectrometric Analysis of Aluminum and Aluminum 2. AWS standards can be obtained from Global Engineering
Alloys by the Point-to-Plane Technique Documents, 15 Inverness Way East, Englewood, CO 80112-
5776, Telephone (800) 854-7179, (303) 397-7956, Fax (303)
307-2740, Internet www.global.his.com.
1. ASTM standards can be obtained from American Society of 3. ISO standards can be obtained from American National
Testing and Materials, 100 Barr Harbor Drive, West Consho- Standards Institute, 11 West 42nd Street, New York, NY
hocken, PA 19428-2959. 10036-8002.
1
Copyright American Welding Society
Provided by IHS under license with AWS
No reproduction or networking permitted without license from IHS Not for Resale
AWS C2.25/C2.25M:2002
This specification may be used to classify and procure cordance with the round-off method given in ASTM E 29,
solid and composite wire and ceramic rods for thermal Standard practice for Using Significant Digits in Test
spraying. Data to Determine Conformance with this Specification.
stock under this AWS standard is using W, CW, and CR (2) ASTM E 227, Standard Method for Optical Emis-
as the prefix designation for solid-alloy and solid- sion Spectrometric Analysis of Aluminum and Aluminum
composite wires, cored-composite wires, and ceramic Alloys by the Point-to-Plane Technique
rods respectively, followed by the chemical composition (3) ASTM E 354, Test Method for Chemical Analysis
in decreasing percentage order (see Figure 1). of High-Temperature, Electrical, Magnetic, and Other
4.3 Thermal-spray solid and composite wires and ceramic Similar Iron, Nickel, and Cobalt Alloys
rods classified under one classification shall not be classi- (4) ASTM E 363, Methods for Chemical Analysis of
fied under any other classification in this specification. Chromium and Ferrochromium
(5 ASTM E 536, Test Method for Chemical Analysis
of Zinc and Zinc Alloys
5. Certification (6) ASTM E 926, Test Method for Preparing Refuse-
Derived Fuel (RDF) Samples for Analysis of Metals
5.1 The act of placing the C2.25 specification and classi- (7) ASTM STP 747, New Analytical Techniques for
fication designations on the packaging enclosing the Trace Constituents of Metallic and Metal Bearing Ores
product, or the classification on the product itself, consti- (8) ASTM STP 944, Chemical Analysis of Metals
tutes the suppliers (manufacturers) certification that the
product meets all of the requirements of the specification. 6.1.2 The sampling for chemical analysis shall be for:
(1) Solid Wires. A representative sample obtained
5.2 The only testing requirement implicit in this certifi- from each heat during pouring or subsequent processing.
cation is that the manufacturer has actually conducted (2) Cored Composite Wires and Ceramic Rods. A rep-
the tests required by the specification on material that is resentative sample obtained from a melt or a firing of a
representative of that being shipped and that material met representative sample (melt button) of a lot of the prod-
the requirements of the specification. Representative ma- uct manufactured at the same time. The chemical compo-
terial, in this case, is material from any production run of sition can be determined by other than a melt button or as
that classification using the same formulation. Certifica- agreed by the purchaser and supplier.
tion is not construed to mean that tests of any kind were
necessarily conducted on samples of the specific material 6.1.3 The sample shall be analyzed by accepted ana-
shipped. Tests on such material may or may not have lytical methods. For elements not covered by the above
been conducted. The basis for the certification required listed test methods, the referee test method per ASTM
by the specification is the classification test of represen- E 34, shall be used or as otherwise agreed upon between
tative material cited above, and the Manufacturers the manufacturer and the purchaser.
Quality Assurance Program. 6.2 Retest
5.3 For the purpose of determining conformance with this 6.2.1 If the results of any test fail to meet the require-
specification, an observed or calculated value shall be ment, that test shall be repeated twice. The results of both
rounded to the nearest unit in the right-hand place figures retests shall meet the requirements. Specimens for retest
used in expressing the limiting values for quantities in ac- may be taken from the original sample. For chemical
2
Copyright American Welding Society
Provided by IHS under license with AWS
No reproduction or networking permitted without license from IHS Not for Resale
--``,``-`-`,,`,,`,`,,`---
W-FeCrMn T87515 1.0 1.62.0 Rem 1.72.0 0.150.25 0.010 0.35(6) 0.040 Ti 0.110.15
Alloy
W-FeCrC T87510 1.0 1.351.65 Rem 0.250.40 0.020 0.50 0.020
Steel(4)
W-FeNiCr T87520 0.10 1.02.0 Rem 2.50 1.03.0 3.75.0 0.030 0.35(6) 0.030
3
W-FeCrNi-1 S30481 304 0.080 1820 Rem 2.00 8.011.0 0.045 1.00 0.045
W-FeCrNi-2 S30280 0.120 1719 Rem 1.50 7.09.0 0.50
Notes:
(1) Single values shown are maximum percentages. Rem = remainder,
(2) SAE/ASTM Unified Numbering System for Metals and Alloys.
(3) Carbon steels nominally contain <1.5 Mn, <0.35 Si, and <0.90 C.
(4) Alloy steels nominally contain higher Mn, Si, or Cr content than carbon steels.
(5) Stainless steels nominally contain >10 Cr.
(6) 0.50 maximum for arc spraying.
AWS C2.25/C2.25M:2002
--``,``-`-`,,`,,`,`,,`---
Table 2
W-Al-1350 A91350 1350 Aluminum 99.50 0.01 0.05 0.40 0.01 0.10 0.02 GaB 0.03(6)
min (V+Ti) (4),(7) 0.05(7)
W-Al-4043 A94043 4043 Silicon Rem 0.30 0.8 0.05 4.5 0.20 0.10 Mg 0.05(6)
Aluminum 6.0 (4),(6)
W-Al-4047 A94047 4047 Silicon Rem 0.30 0.8 0.15 11.0 0.20 Mg 0.10(6)
Aluminum 13.0 (4),(6)
W-Al-5356 A95356 5356 Mg Aluminum Rem 0.05 0.10 0.40 0.05 0.25 0.06 0.10 Mg 4.55.5(6)
0.20 0.20 0.20 (4),(6)
4
96.5 0.35
W-CuAl C61800 Aluminum bronze 910 88.0 0.71.3
min
5
W-SnSbCu-2 L13892 Babbitt 35 0.50 69 Rem
W-SnSbCu-3 L13893 Babbitt 24 68 Rem
--``,``-`-`,,`,,`,`,,`---
Copyright American Welding Society
Table 3
CW-CoCrW W73136 Cobalt Hardfacing 0.901.30 2731 3 1.0 1.0 3 1.5 Co Rem
W 4.06.0
CW-CoMoCr W73138 Cobalt Hardfacing 0.08 1719 2730 3.23.8 Co Rem
CW-FeCr-1 W41036 410 Nickel Molybdenum SS 0.06 1113 Rem 1.0 0.400.70 4.05.0 1.0
CW-FeCr-2 W41039 410 Nickel SS 0.06 1214 Rem 1.0 3.04.0
CW-FeCr-3 W42040 420 SS 0.200.40 1214 Rem 1.0 1.0
CW-FeCr-4 W43070 430 SS 0.600.80 1618 Rem 1.0 0.75 1.0
CW-FeCrC-1 W74532 Hardfacing Alloy 4.05.0 1821 Rem 2.5 2.0 2.5
CW-FeCrC-2 W74535 Hardfacing Alloy 1.52.0 2428 Rem 2.5 2.0 2.04.0 2.5
CW-FeCrNiB W89640 Iron-Chromium-Nickel-Boron 2.53.5 3032 2.53.5 Rem 3.54.5 2931
6
CW-FeMnAl W79840 Iron-Manganese-Aluminum 45 Rem 68 12
Notes:
(1) Single values shown are maximum percentages. Rem = remainder.
(2) SAE/ASTM Unified Numbering System for Metals and Alloys.
--``,``-`-`,,`,,`,`,,`---
Copyright American Welding Society
Provided by IHS under license with AWS
No reproduction or networking permitted without license from IHS
Table 4
Chemical Composition Requirements for Thermal Spray Ceramic Rods
Composition, Weight Percent(1)
C2.25
Designation Common Name Al2O3 CaO Cr2O3 SiO2 Fe2O3 TiO2 NaO2 ZrO2 MgO Y2O3 Others Amount
CR-Al2O3-1 Aluminum Oxide Rem 0.10.2 0.70.9 0.030.07 0.01 0.20.4 0.30.4
CR-Al2O3-2 Aluminum Oxide Rem 0.03 0.04 0.09 0.03 0.06 0.01
7
CR-Al2O3-3 Aluminum Oxide Rem 0.10.2 0.10 0.02 0.03 0.03 0.01
CR-Al2O3-4 Aluminum Oxide Rem 0.10 0.71.1 0.03 0.03 0.10 0.01
CR-Al2O3-5 Alumina Titania Rem 0.10.3 0.60.8 0.40.6 3.03.2 0.04 0.10.2 0.40.5
CR-ZrO2-1 Zirconium Oxide 0.60.8 3.33.7 0.20.4 0.40 0.40.5 0.02 Rem 0.06 Hf 0.02
CR-ZrO2-2 Zirconium Oxide 2.02.6 3.84.4 2.73.2 0.08 0.30.5 0.02 Rem 0.07 Hf 0.02
CR-ZrO2-3 Zirconium Oxide 0.090.13 0.03 0.30.5 0.04 0.10.2 0.04 Rem 0.02 7.68.3 Hf 0.02
CR-ZrO2-4 Magnesium Zirconate 0.20.3 0.30.4 0.08 0.20.3 Rem 2122 Hf 0.02
CR-ZrO2-5 Zirconium Silicate 0.81.1 0.81.0 3742 0.09 0.10.2 0.07 Rem 0.30.5 Hf 0.02
Notes:
(1) Single values are maximum percentages. Rem = remainder.
AWS C2.25/C2.25M:2002
--``,``-`-`,,`,,`,`,,`---
AWS C2.25/C2.25M:2002
Major chemical elements in percentage order of the solid and cored wires, ceramic rods, or the Aluminum
Association alloy designation
Suffix number to differentiate similar chemical compositions in solid wires, cored wires, and ceramic
rods
--``,``-`-`,,`,,`,`,,`---
XX - xxxx - N - yyyy
Examples:
A. W-FeC-2 The second (2) carbon steel (FeC) solid wire.
B. W-Al-Al2O3 A solid ceramic composite (Al2O3) in a metal matrix (Al) wire.
C. CW-CrFeB A cored composite chrome-iron-boron (CrFeB) composite wire.
D. CR-ZrO2-3 The third (3) zirconium oxide (ZrO2) ceramic rod.
analysis, retest need be only for those specific elements coils without support, spools, and drums, and straight
that failed to meet the test requirement. If the results of lengths for ceramic rodssee Section 10) are shown in
one or both retests fail to meet the requirement, the mate- Tables 5 and 6. Note: When ordering thermal-spray wire
rial under test shall be considered as not meeting the re- for flame thermal spraying, the wire maximum diameter
quirements of this specification for that classification. and tolerance required by the spray gun manufacturer,
i.e., the spray gun nozzle diameter, should be specified.
6.2.2 In the event that, during preparation or after
completion of any test, it is clearly determined that pre-
scribed or proper procedures were not followed in pre-
paring the test specimens or in conducting the test, the 9. Finish and Uniformity
test shall be considered invalid, without regard to
whether the test was actually completed, or whether test The finish and uniformity of thermal-spray wires shall
results met, or failed to meet, the requirement. That test meet the following requirements:
shall be repeated, following proper prescribed proce- (1) All thermal-spray wires shall have a smooth finish
dures. In this case, the requirement for doubling the num- that is free from slivers, depressions, scratches, scale,
ber of test specimens does not apply. laps, and foreign matter that would adversely affect wire
feedability or the properties of the thermal-spray wire.
(2) Each continuous length of thermal-spray wire
7. Method of Manufacture shall be from a single heat or lot of material. Welds,
when present, shall be made so as not to interfere with
Thermal-spray solid and composite wires and ceramic
the uniform, uninterrupted feeding of the thermal-spray
rods classified according to this specification may be
wire in automatic or semiautomatic equipment.
manufactured by any method, which meets the require-
(3) Cored composite wires shall have the core ingre-
ments of this specification.
dients evenly distributed throughout their length so as not
to adversely affect the performance of the thermal-spray
wire, or the deposited thermal-spray coating properties.
8. Standard Sizes (4) Carbon steel thermal-spray wires may be pro-
Standard sizes for thermal-spray wires and ceramic tected with a flash coat of copper when necessary to pre-
rods in the different package forms (coils with support, vent corrosion during storage.
8
Copyright American Welding Society
Provided by IHS under license with AWS
No reproduction or networking permitted without license from IHS Not for Resale
AWS C2.25/C2.25M:2002
Table 5
Standard Sizes for Thermal Spray Wires
Wire Diameter Tolerance
Table 6
Standard Sizes for Thermal Spray Ceramic Rods
Rod Diameter Tolerance
(5) Subject to agreement between the purchaser and and weights other than these shall be as agreed upon
the supplier, a very small amount of specified lubricant between purchaser and supplier.
that will not degrade the deposited coating may be ap-
plied to the thermal-spray wire to permit smooth and low- 10.1 Coils with Support
friction feeding through the thermal-spray equipment.
10.1.1 The liners in coils with support shall be de-
signed and constructed to prevent distortion of the coil
during normal handling and use. They shall be clean and
10. Standard Packaging Forms dry to maintain the cleanliness of the thermal-spray wire.
Standard packaging forms are (a) coils with and with- 10.2 Spools
out support, drums, and spools for solid and composite
wires and (b) straight lengths for ceramic rods. Standard 10.2.1 Spools shall be designed and constructed to
package dimensions and weights for the thermal-spray prevent distortion of the spool and thermal-spray wire
wires are given in Table 7. Dimensions for standard during normal handling and use. They shall be clean and
spools are given in Figures 2 and 3. Package forms, sizes, dry to maintain the cleanliness of the thermal-spray wire.
--``,``-`-`,,`,,`,`,,`---
9
Copyright American Welding Society
Provided by IHS under license with AWS
No reproduction or networking permitted without license from IHS Not for Resale
AWS C2.25/C2.25M:2002
Table 7
Standard Packaging Dimensions and Weights for Thermal Spray Wires(1)
Package Size Net Weight(2)
Coils With Support 12 Inside 300 25, 30, 50, and 60 10, 15, 20, and 25
12 1/8 Inside 300 3 25 and 30 10 and 15
12 1/8 Inside 300 3 50, 60, and 65 20, 25, and 30
The use of insulated spools shall be agreed upon between 11.1.2 Coils without support shall be wound with a
purchaser and supplier. left-hand configuration so that when the coil is laid hori-
zontal with the beginning end tag up, the coil will un-
10.3 Ceramic Rods wind in a counterclockwise direction.
10
Copyright American Welding Society
Provided by IHS under license with AWS
No reproduction or networking permitted without license from IHS Not for Resale
AWS C2.25/C2.25M:2002
Notes:
1. Outside diameter of barrel shall be such as to permit feeding of the wire.
2. Holes are provided on each flange, but they need not be aligned.
General Notes:
Inside diameter of the barrel shall be such that swelling of the barrel or misalignment of the barrel and flanges will not result in the in-
side of the diameter of the barrel being less than the inside diameter of the flanges.
Metric dimensions and tolerances conform to ISO 544 except that A specifies tolerances on the nominal diameter rather than a
plus tolerance only, which is shown here as a maximum.
Figure 2Dimensions of Standard 12- and 14-in. [300- and 350-mm] Spools
12. Solid and Composite Wire and Drums shall have the information securely affixed in a
prominent location on the side of the drum.
Ceramic Rod Identification
Packages of ceramic rods shall have the information
The product information (14.1) and the precautionary securely affixed in a prominent location on the side of the
information (14.2) shall be placed on each coil, spool, or package.
drum of wire and on each package of ceramic rods.
(1) Coils without support shall have a tag containing
this information securely attached to the thermal-spray
wire at the inside of the coil.
(2) Coils with support shall have the information se- 13. Packaging
curely affixed in a prominent location on the support.
Spools shall have this information securely affixed in Thermal-spray products shall be suitably packaged to
a prominent location on the outside of at least one flange ensure against damage during shipment and storage
of the spool. under normal conditions.
--``,``-`-`,,`,,`,`,,`---
11
Copyright American Welding Society
Provided by IHS under license with AWS
No reproduction or networking permitted without license from IHS Not for Resale
AWS C2.25/C2.25M:2002
Note:
1. Outside diameter of barrel shall be such as to permit feeding of the wire.
General Notes:
Inside diameter of the barrel shall be such that swelling of the barrel or misalignment of the barrel and flanges will not result in the
inside of the diameter of the barrel being less than the inside diameter of the flanges.
Two holes are provided on each flange and shall be aligned on both flanges with the center hole.
Figure 3Dimensions of Standard 22-, 24-, and 30-in. [560-, 610-, and 760-mm] Spools
--``,``-`-`,,`,,`,`,,`---
12
Copyright American Welding Society
Provided by IHS under license with AWS
No reproduction or networking permitted without license from IHS Not for Resale
AWS C2.25/C2.25M:2002
Nonmandatory Annexes
Annex A
Guide to Ventilation and Personnel
Protection During Thermal Spraying
(This Annex is not a part of AWS C2.25/C2.25M:2002, Specification for Thermal Spray Feedstock-Solid and Com-
posite Wires and Ceramic Rods, but is included for information purposes only.)
For more information, consult 11.8 (Ventilation), AWS Forced-air respiratory devices require Grade D or bet-
Thermal Spraying: Practice, Theory, and Application, ter air per Compressed Gas Association, CGA No. G-7.1,
OSHA Safety and Health Standards available from U.S. Commodity Specification for Air.5
Government Printing Office, Superintendent of Docu- Mechanical ventilation or local exhaust ventilation is
ments, P.O. Box 371054, Pittsburgh. PA 15250-7954, and required in spraying and blasting operations that are not
the manufacturers Material Safety Data Sheet (MSDS). performed in the open or in a properly designed and ven-
A number of factors determine the amount of contam- tilated room. Otherwise, the dust will rapidly fill a large
ination to which the workman is exposed when perform- tank, building, or semi-enclosed space.
ing blast and thermal spray operations. These include the The ventilation equipment for most field thermal
following: spray and blast operations consists of engine- or motor-
(1) Volume of space in which the thermal spraying or air- (venturi) driven portable exhausters with flexible
operation is to be done piping or ducts. This removes the dust rapidly and allows
(2) Number of spray and grit blast operators operators suitable visibility. Systems of this type have
(3) The evolution of hazardous fumes, gases, or dusts deficiencies, and operators should wear respiratory de-
depending on what type of abrasive process is used or vices approved by the U.S. Bureau of Mines, NIOSH, or
material being sprayed other approved authority for the purpose intended. Selec-
(4) Heat generated by the spraying process tion of the respiratory device should follow the guide-
(5) Presence of volatile solvents lines of ANSI/ASC Z88.2.
All of the preceding should be considered in order to When removing dust with portable exhausters, it is
better protect the operators and to supply adequate venti- necessary to attach a dust collector to trap the dust and
lation to the spray room. prevent contamination of the surrounding areas.
Local exhaust or general ventilation systems should In shop environments, use wet (water wash), bag, or
be provided to control toxic fumes, gases, or dusts, and filter type collectors for gathering spray dust. Dust col-
their removal from the work area. lectors must be replaced and ventilation ducts kept clean
Where thermal spraying operations are incidental to before entrapped dust builds up to create an explosion
general operations, it is good practice to apply local ex- hazard or seriously reduces the efficiency of the system.
haust ventilation to the spray areas. This prevents con- If thermal spraying operations are performed on a ma-
tamination of the general work area. chine tool such as a lathe, an exhaust hood should be
Individual respiratory protective devices should be well mounted at the edge of the carriage so that it travels with
maintained. They should not be transferred from one em- the gun. This allows the dust and fumes to be exhausted
ployee to another without being cleaned and disinfected. into the dust collector. The gun is aimed so that the
Refer to ANSI/ASC Z88.2 for cleansing and disinfecting.4
13 --``,``-`-`,,`,,`,`,,`---
sprayed material enters the face area of the hood. The av- usually required by local ordinances. Further, local, state,
erage size of the opening in a lathe hood is about 2 ft2 and federal regulations should be investigated before ex-
[0.2 m2], and the velocity of the air entering the opening hausting directly into the atmosphere. The blasting room
should be a minimum of 200 ft/min [1 m/sec]. The hood may also occasionally be used for spraying. This is not
opening should eliminate turbulence along the sides that good practice and should be avoided whenever possible.
could force the spray dust into the operators breathing Spray dust will quickly clog most cloth dust collectors
zone. In some permanent installations, the entire lathe, used in the blasting rooms. Moreover, when spraying in a
rotary table, or machine tool is enclosed except the front, blasting room, the dust-collector system will require more
and the velocity of the air entering the enclosure is ap- frequent maintenance to prevent fire or explosion due to
proximately 300 ft/min [1.5 m/sec]. The top of the hood accumulation of metallic dust. All personnel in the blast-
can be hinged, permitting use of a crane for loading or ing room should be provided with respiratory protection.
unloading. In automatic and production spraying, the en- When ventilating confined spaces, all air replacing
tire mechanism is often totally enclosed, and the dust is that withdrawn should be clean and respirable. If porta-
exhausted into a water wash and collecting system. In- ble gasoline or diesel engine-driven ventilators or com-
dustrial Ventilation, published by the American Confer- pressors are used, they should be located so that engine
ence of Governmental Industrial Hygienists, should be exhaust gases cannot be drawn into the ventilating sys-
consulted. tem. This precaution will also prevent exhaust gases
During dry grinding or lapping operations on sprayed from entering the intake of the compressor. This is par-
coatings, precautions should be taken to provide proper ticularly critical if the air is to be used for respirators.
exhaust equipment. ANSI/ASC Z43.1, Ventilation Con- If dust collectors are used, closed-type collectors
trol of Grinding, Polishing, and Buffing Metals, should should be provided with blowout holes or relief panels.
be consulted. Blowout panels should also be provided in ventilation
Spray cabinets used for spraying small and medium piping.
size parts should be equipped with exhaust ventilation, All fans, pipes, dust arrestors, and motors should be
with an air velocity of 200 to 400 ft/min [1 to 2 m/sec] grounded. Grounds should not be attached to pipes that
entering the hood. The spray equipment should be oper- carry fuel gas or oxygen. Ventilating fans should be kept
ated within the face area of the hood and directed into it. running when cleaning out booths, pipes, etc. This pre-
Again, the design of the cabinet should be such that vents the accumulation of dust or fumes in the system.
turbulent eddy currents are eliminated. When spraying Aluminum and magnesium dusts present an explosive
toxic materials, minimum enclosure face velocity of hazard which requires special attention. Adequate wet
400 ft/min [2 m/sec] should be used. Industrial Ventila- collector systems should be used with either of these
tion, published by the American Conference of Govern- metals. Care should be exercised, since these metallic
mental Industrial Hygienists, should be consulted.6 dusts may generate hydrogen gas in water. These systems
Blasting rooms should be designed to be well lighted should be designed to prevent hydrogen accumulation.
and adequately ventilated. Ventilation should provide Frequent clean out operations should be performed to re-
down draft and longitudinal airflow with a velocity of duce residues.
80 to 100 ft/min [0.2 to 0.5 m/sec]. The blasting room
When spraying on unusually large objects or in large
should be equipped with a dust-collecting system. This is
confined spaces, such as encountered in boilers and
tanks, it is imperative that fresh-air helmets and protec-
6. ACGIH documents can be obtained from the American tive clothing be worn (see Figure A1).
Conference of Governmental Industrial Hygienists, 1330 No welding or cutting should be done in the repair of
Kemper Meadow Drive, Suite 600, Cincinnati, OH 95240- any ventilation or dust-collecting equipment, unless the
1634. equipment has been thoroughly cleaned.
14
--``,``-`-`,,`,,`,`,,`---
15
--``,``-`-`,,`,,`,`,,`---
Annex B
Guidelines for Preparation of Technical Inquiries
for AWS Technical Committees
(This guide is not a part of AWS C2.25/C2.25M:2002, Specification for Solid and Composite Wires and Ceramic
Rods for Thermal Spraying, but is included for information purposes only.)
B1. Introduction with the edition of the standard that contains the provi-
sions or that the Inquirer is addressing.
The AWS Board of Directors has adopted a policy
whereby all official interpretations of AWS standards B2.2 Purpose of the Inquiry. The purpose of the inquiry
will be handled in a formal manner. Under that policy, all must be stated in this portion of the inquiry. The purpose
interpretations are made by the committee that is respon- can be either to obtain an interpretation of a standard re-
sible for the standard. Official communication concern- quirement, or to request the revision of a particular provi-
ing an interpretation is through the AWS staff member sion in the standard.
who works with that committee. The policy requires that B2.3 Content of the Inquiry. The inquiry should be
all requests for an interpretation be submitted in writing. concise, yet complete, to enable the committee to quickly
Such requests will be handled as expeditiously as possi- and fully understand the point of the inquiry. Sketches
ble but due to the complexity of the work and the proce- should be used when appropriate and all paragraphs, fig-
dures that must be followed, some interpretations may ures, and tables (or the Annex), which bear on the in-
require considerable time. quiry must be cited. If the point of the inquiry is to obtain
a revision of the standard, the inquiry must provide tech-
--``,``-`-`,,`,,`,`,,`---
nical justification for that revision.
B2. Procedure B2.4 Proposed Reply. The inquirer should, as a pro-
All inquiries must be directed to: posed reply, state an interpretation of the provision that is
the point of the inquiry, or the wording for a proposed re-
Managing Director, Technical Services vision, if that is what the inquirer seeks.
American Welding Society
550 N.W. LeJeune Road
Miami, FL 33126 B3. Interpretation of Provisions of
All inquiries must contain the name, address, and af- the Standard
filiation of the inquirer, and they must provide enough in-
Interpretations of provisions of the standard are made
formation for the committee to fully understand the point
by the relevant AWS Technical Committee. The secre-
of concern in the inquiry. Where that point is not clearly
tary of the committee refers all inquiries to the chairman
defined, the inquiry will be returned for clarification. For
of the particular subcommittee that has jurisdiction over
efficient handling, all inquiries should be typewritten and
the portion of the standard addressed by the inquiry. The
should also be in the format used here.
subcommittee reviews the inquiry and the proposed reply
B2.1 Scope. Each inquiry must address one single pro- to determine what the response to the inquiry should be.
vision of the standard, unless the point of the inquiry Following the subcommittees development of the re-
involves two or more interrelated provisions. That provi- sponse, the inquiry and the response are presented to the
sion must be identified in the scope of the inquiry, along entire committee for review and approval. Upon approval
17
Copyright American Welding Society
Provided by IHS under license with AWS
No reproduction or networking permitted without license from IHS Not for Resale
AWS C2.25/C2.25M:2002
by the committee, the interpretation will be an official in- only through a written request. The Headquarters staff
terpretation of the Society, and the secretary will transmit cannot provide consulting services. The staff can, how-
the response to the inquirer and to the Welding Journal ever, refer a caller to any of those consultants whose
for publication. names are on file at AWS Headquarters.
--``,``-`-`,,`,,`,`,,`---
Telephone inquiries to AWS Headquarters concerning nor the staff is in a position to offer interpretive or con-
AWS standards should be limited to questions of a gen- sulting services on: (1) specific engineering problems, or
eral nature or to matters directly related to the use of the (2) requirements of standards applied to fabrications out-
standard. The Board of Directors policy requires that all side the scope of the document or points not specifically
AWS staff members respond to a telephone request for covered by the standard. In such cases, the inquirer
an official interpretation of any AWS standard with the should seek assistance from a competent engineer experi-
information that such an interpretation can be obtained enced in the particular field of interest.
18
Copyright American Welding Society
Provided by IHS under license with AWS
No reproduction or networking permitted without license from IHS Not for Resale