CONTENTS

1. INTRODUCTION . ...1.
2. INTRODUCTION OF PROJECT..2.
3. ABOUT PROJECT....3-4.
4. LOCATION DETAILS..5.
5. TECHNICAL DETAILS6.
6. SITE PLAN & PLANING OF BULIDING7.
7. BUILDING MATERIALS 8-17.
8. THE EFFECT OF AGGREGATE PROPERTIES
ON CEMENT CONCRETE ..18.
9. REINFORCED CEMENT CONCRETE ..19-20.
10.DESIGN PHILOSOPHY ..21-22.
11.CEMENT CONCRETE 23-24.
12.WORKABILITY .. 25.
13.WATER CEMENT RATIO ..26.
14.MANUFACTURING OF CONCRETE ....27-29.
15.FORMWORK 30.
16.CURING OF CONCRETE 31.
17.REMOVAL OF CONCRETE 32.
18.DEWATERING .33-34.
19.CONCRETE MIX DESIGN ...35-
36.
20.RETAINING WALL ..37-38.
21.SLUMP TEST .39-
41.
22.CONCRETE CUBE TEST ..42-
45.
23.GENERAL NOTES .46-
48.
24.CONCLUSION .49.
INTRODUCTION

The building is defined as any structure what so ever purpose and of whatsoever
materials constructed and ever part thereof whether used as human habitation or not.

For this practical training , I reported at Jaypee Greens Sports City, at construction of
KASSIA Personal Suits ( Residential Buildings , Tower & Non Tower , in response to
Mr. B.L.Sahoo (Vice- President) dated In connection with same, I have reported to Mr.
Aashutosh Mishra (General Manager) at Jaypee Greens Sports City , furthers ordered
me to join project site. The site incharge Mr. Prateek Shrivastva meet me at the site
and gives me brief introduction of this project as under.