You are on page 1of 1

REPORT REPAIR WATER TANK

Date: 2015.5.5 Rev. : Document no. Evolution /

Prepared by Subject Responsibility Approved by


FAIZUL MAMAT HAZERI

MACHINE : HDPE WATER TANK


MODEL :
S/N :
BEFORE REPAIR PAIP AT WATER TANK

- Access to water tank - Outlet paip leaking

-Paip leaking at 90 degree elbow

WORK IN PROGRESS AND AFTER REPAIR PAIP IN WATER TANK

- The old outlet paip was


Empty water in tank
dismantel

- Process paip fitting


- Process paip fitting and install socket tank - Install paip elbow and
straight socket

TECHNICAL REPORT BY HARRAZ TECHNOLOGY 1]

You might also like