Santos
SANTOS (SAMPANG) PTY. LTD.
PROJECT
DOCUMENT TITLE
DOCUMENT NO.
PAGE
OYONG DEVELOPMENT PROJECT
PHASE II
SPECIFICATION FOR ASPHALT ENAMEL
9815- 43-SP-004
DOCUMENT INFORMATION AND REVISION HISTORY
Document No: _| 9615-43-SP-004 Rev: 0
Revision Description Date _| Prepared by: Checked by:_| Approved by:
A Isgued for Review | 22/05/07 sv FF AH
0 Issued for Tender | 24/05/07 sv_ dW roy | ee‘SANTOS SANPANG)PTY.LTO. OCW. SaaS SP.OOH
Sacer ee
antos eee erat
——
41.0
1
12
13
2.0
3.0
4.0
5.0
6.0
7.0
8.0
9.0
94
93
94
10.0
11.0
12.0
13.0
14.0
15.0
16.0
TABLE OF CONTENT
ns
INTRODUCTION
PROTECT DESCRIPTION.
SCOPE ...
DEFINITIONS... 7
REFERENCE DOCUMENTS
CONFLICTING REQUIREMENTS 4
COATING APPLICATION REQUIREMENTS: 4
MATERIALS 5
PIPE RECEIPT 6
REPAIR OF BARE PIPES. 6
SURFACE PREPARATION 6
COATING APPLICATION 8
PRIMER APPLICATION,
[ENAMEL APPLICATION,
[FIBREGLASS INNER-WRAP APPLICATION..
[ENAMEL IMPREGNATED FIBREGLASS OUTER-WRAP APPLICATION
COATING INSPECTION 11
COATING REPAIR 13
IDENTIFICATION AND MARKINGS 14
RECORDS 14
HANDLING AND STORAGE OF COATED PIPES 14
SHIPMENT OF COATED PIPES 15
DOCUMENTATION 15“SANTOS (SANPANG)PTY. LTD. DOG-NO._—— 7 SISA SP OO
‘OYONG DEVELOPMENT PROJECT PHASE REVISION: 0
Santos | serine! fe
1.0
14
12
INTRODUCTION
Project Description
‘Santos (Sampang) Ply. Ltd. undertake the development of the Oyong oll and gas
field, located 8 km South of Madura Istand in East Java Sea.
The proposed Oyong oll and gas field development represents a significant
evelopment focused at supplying the energy of East Java. Phase 1 will focus on
early oll production, utlising a minimum free-standing wellhead platform and
production barge. Oil will be exported directly from the field via chartered oil tanker
acting in an FSO mode. Phase 2 productions will consist of sales gas to Indonesia
Power via sales gas pipeline and onshore processing facilities (OPF), combined with
ongoing oil production.
Phase 2 gas development works come under the purview of this project. Gas
facilities will initially consist of an offshore wellhead platform (WHP) with minimum
facllities, connected by a wet gas subsea pipeline to an onshore gas processing
plant near Grati. Gas processing is required to meet water and hydrocarbon dew
point specifications for gas sales to the Indonesia Power Grati power generation
plant. The pipeline will be 14 inches diameter with the capability to deliver up to 100
MMsofd of wet gas to the OPF.
Scope
This Specification defines the minimum requirements for materials, fabrication,
installation, inspection, testing and commissioning of Corrosion Coating of the
offshore pipelines.
Contractor of these items shall be responsible for furnishing all materials,
equipment, labour, supervision and all other expenses required fo complete the
Work in accordance with the requirements of this Specification.
All manufacturing and testing procedures, detailed fabrication drawings of Corrosion
Coating including dimensions and weights (nett and gross) along with dimensional
tolerances shall be submitted in writing by the Vendor for review and approval by
Company at least four (4) weeks prior to production.
Contractor shall be fully responsible for their Quality Assurance and associated
Quality Control processes.
Unless otherwise agreed with Company, the Contractor's Quality System shall
specify the requirements of ISO 9000 Quality System.
Contractor is required to establish an acceptable Quality Plan, comprising quality
manual and procedures covering all the. activities of the order, to comply with the
Quality System requirements.
Company shall be afforded the right to verify at the Contractor's premises that
products conform to specified requirements. Verification by the Company-shall not