You are on page 1of 12

UNIVERSITAS MUHAMMADIYAH SURAKARTA

FAKULTAS TEKNIK
LABORATORIUM TEKNIK SIPIL
Jl. A Yani Tromol Pos I, Pabelan, Kartasura, Surakarta, 0217-717417
Kelompok
Nama

Tabel 1. Percobaan Steady Uniform Flow

Q terukur H terukur h rata-rata v = Q/A A P =b+2h


No Kv
(cm/dt) h1 h2 h3 (cm) (cm/dt) (cm) (cm)
1 1403.30 4.30 5.20 6.00 5.17 0.183 9.054 155.0 40.333
2 5334.59 8.50 10.00 11.00 9.83 0.183 18.083 295.0 49.667
3 4491.87 8.10 9.90 10.90 9.63 0.183 15.543 289.0 49.267
4 3547.45 7.80 9.20 9.90 8.97 0.183 13.188 269.0 47.933
5 2537.78 6.90 8.30 9.60 8.27 0.183 10.233 248.0 46.533

h Vnoth b p ()
No h/p p/b Ce Manning Stickler
(cm) (cm) (cm)
1 9.90 30 27 35 0.367 0.9 0.584 0.0192 52.186
2 16.50 30 27 35 0.611 0.9 0.630 0.0128 77.975
3 15.50 30 27 35 0.574 0.9 0.619 0.0148 67.579
4 14.20 30 27 35 0.526 0.9 0.607 0.0169 59.057
5 12.50 30 27 35 0.463 0.9 0.595 0.0211 47.431
URAKARTA
K
IPIL
rta, 0217-717417

R = A/P
So tan /2
(cm)
3.843 0.005 0.315
5.940 0.005 0.315
5.866 0.005 0.315
5.612 0.005 0.315
5.330 0.005 0.315

Jenis
Chezzy Re
Aliran
65.313 4022.740 Turbulen
104.934 ### Turbulen
90.755 ### Turbulen
78.727 8556.835 Turbulen
62.686 6305.560 Turbulen
UNIVERSITAS MUHAMMADIYAH SURAKARTA
FAKULTAS TEKNIK
LABORATORIUM TEKNIK SIPIL
Jl. A. Yani Pabelan Kartasura. Telp ( 0271 ) 717417 - 219 Tromol Pos 1 Surakarta 57162

Kelompok : 23
Nama Kelompok :

PERCOBAAN BENDUNG AMBANG LEBAR

Tabel II.A.1 Percobaan Bendung Ambang Lebar


Q terukur H terukur (cm) Vterukur (cm/dt) E1 V2 trial
No h2 trial (cm)
(cm3/dt) h1 h2 V1 V2 h1+(v1^2/2g) Q/(b.h2trial)
1 2537.778 15.90 2.50 5.320 33.837 15.914 2.282 37.1
2 4109.427 16.30 2.20 8.404 62.264 16.336 2.360 58.042
3 3682.397 16.00 1.90 7.672 64.603 16.030 1.903 64.509
4 3163.790 15.60 1.60 6.760 65.912 15.623 1.409 74.862
5 3042.724 15.40 1.50 6.586 67.616 15.422 1.092 92.900

h Vnoth b p
No (o) h/p p/b Ce z
(cm) (cm) (cm)
1 12.50 30 27 35 0.463 0.9 0.5947 12
2 15.00 30 27 35 0.556 0.9 0.6142 12
3 14.40 30 27 35 0.533 0.9 0.6088 12
4 13.60 30 27 35 0.504 0.9 0.6023 12
5 13.40 30 27 35 0.496 0.9 0.6008 12
AH SURAKARTA
NIK
IK SIPIL
Tromol Pos 1 Surakarta 57162

BANG LEBAR

E2 Qteori
h2trial+(V2^2/2g)+z (cm3/dt)
14.866 3980.252
16.336 4275.582
16.030 3684.834
15.623 3022.749
15.422 2760.634

Cd tan /2 Kv h1/z

0.638 0.315 0.183 1.325


0.961 0.315 0.183 1.358
0.999 0.315 0.183 1.333
1.047 0.315 0.183 1.300
1.102 0.315 0.183 1.283
UNIVERSITAS MUHAMMADIYAH SURAKARTA
FAKULTAS TEKNIK
LABORATORIUM TEKNIK SIPIL
Jl. A. Yani Pabelan Kartasura. Telp ( 0271 ) 717417 - 219 Tromol Pos 1 Surakarta 5716

Kelompok : 23
Nama Kelompok : 0
0
0

PERCOBAAN BENDUNG TRIANGULER

Q terukur H terukur (cm) V = Qterukur/ (b.h)


No
(cm3/dt) h1 h2 h3 h4 h5 h6 V1 V2 V3 V4 V5
1 1649.874 18.70 1.40 0.90 0.70 0.60 0.40 2.941 39.28 61.106 78.565 91.660
2 2454.938 19.50 2.00 1.00 0.90 0.70 0.50 4.196 40.92 81.831 90.924 116.902
3 3060.515 19.70 2.00 1.30 1.20 1.00 0.90 5.179 51.01 78.475 85.014 102.017
4 3496.487 20.00 2.10 1.50 1.30 1.20 1.00 5.827 55.50 77.700 89.654 97.125
5 4120.385 20.10 2.80 1.60 1.40 1.30 1.00 6.833 49.05 85.841 98.104 105.651

h Vnoth b p Eterukur = h+V2/(2g)+Z


No h/p p/b Ce Kv (o) tan /2
(cm) (cm) (cm) 1 2 3
1 10.70 30 27 0.396 0.9 0.586 0.183 35 0.315 18.704 19.187 15.803
2 12.50 30 27 0.463 0.9 0.595 0.183 35 0.315 19.509 19.853 17.413
3 13.60 30 27 0.504 0.9 0.602 0.183 35 0.315 19.714 20.326 17.439
4 14.30 30 27 0.530 0.9 0.608 0.183 35 0.315 20.017 20.670 17.577
5 15.20 30 27 0.563 0.9 0.616 0.183 35 0.315 20.124 21.026 18.356
MUHAMMADIYAH SURAKARTA
AKULTAS TEKNIK
ATORIUM TEKNIK SIPIL
p ( 0271 ) 717417 - 219 Tromol Pos 1 Surakarta 57162

AN BENDUNG TRIANGULER

erukur/ (b.h) Z
V6 Z1 Z2 Z3 Z4 Z5 Z6
137.490 0 17 13 9 3 0
163.663 0 17 13 9 3 0
113.352 0 17 13 9 3 0
116.550 0 17 13 9 3 0
137.346 0 17 13 9 3 0

Eterukur = h+V2/(2g)+Z Eterhitung = h+V2/(2g)


4 5 6 1 2 3 4 5 6
12.846 7.882 10.035 18.704 2.187 2.803 3.846 4.882 10.035
14.114 10.665 14.152 19.509 2.853 4.413 5.114 7.665 14.152
13.884 9.305 7.449 19.714 3.326 4.439 4.884 6.305 7.449
14.397 9.008 7.923 20.017 3.670 4.577 5.397 6.008 7.923
15.305 9.989 10.615 20.124 4.026 5.356 6.305 6.989 10.615
UNIVERSITAS MUHAMMADIYAH SURAKARTA
FAKULTAS TEKNIK
LABORATORIUM TEKNIK SIPIL
Jl. A Yani Tromol Pos I, Pabelan, Kartasura, Surakarta, 0217-717417

Percobaan Karakteristik Dekat Bendung

Q terukur h terukur (cm) V terukur (cm/dt) H1 Q teori Y1 terhitung Lj terukur Lj teoritis


No
(cm/dt) h1 h0 Yrata V0 Vyrata-rata (cm) (cm/dt) (cm) (cm) (cm)
1 1549.596 26.00 1.60 6.70 3.798 7.709 1.607 1805.286 0.119 7 40.200
2 2537.778 26.70 2.20 7.30 5.957 11.588 2.218 2926.494 0.264 11 43.800
3 3416.085 27.20 2.40 8.00 7.908 14.234 2.432 3359.620 0.394 14 48.000
4 4183.936 27.50 2.90 8.90 9.360 15.670 2.945 4476.420 0.475 15 53.400
5 4899.813 27.80 3.20 9.10 10.745 17.948 3.259 5211.654 0.615 17 54.600

No h (cm) b (cm) p (cm) () Tan /2 h/p p/b Z Ce Kv Cd

1 10.30 30 27 35 0.315 0.38 0.9 12 0.585 0.183 1.165


2 12.50 30 27 35 0.315 0.46 0.9 12 0.595 0.183 1.153
3 14.00 30 27 35 0.315 0.52 0.9 12 0.605 0.183 0.983
4 15.10 30 27 35 0.315 0.56 0.9 12 0.615 0.183 1.070
5 16.00 30 27 35 0.315 0.59 0.9 12 0.624 0.183 1.064
URAKARTA
K
IPIL
rta, 0217-717417

ung

Fr1 Fr2
Vy1
(cm) (cm)
40.145 0.095 433.851
19.888 0.137 320.179
14.719 0.161 289.250
13.591 0.168 293.459
10.808 0.190 265.505

E1 E2
H1/Z E
Y1+Vy1/(2g) Y2+Vy2/(2g)
0.134 96.055 6.701 89.354
0.185 52.514 7.302 45.212
0.203 43.037 8.002 35.035
0.245 44.368 8.902 35.466
0.272 36.544 9.102 27.442