ITION OF SURVEYORS, MALAYSIA
ING INFORMATION CENTRE,
Givieyor
MENTAL COST ANALYSISFORWT
[E-Spaces in General
A2-2280,
TITLE = Mut Purpose Fal LENT Private
)GATION_: Seberang Persi Selatan, Pulau Pinang TENDER DATE 18-Ape00
INFORMATION ON TOTAL PROJEGT
Project and Contract infomation
Contract
project comprises the constuction and completion of (1) 2- Standard PAM Form of Contract (with Quantities)
3 Mult-Purpose Hall (2) External Works -roads, pavement Period of interim certificate - once a month
carpark, surlace water drainage, water reticulation and Period of honouring of certificate - 20 days from the date of
drainage; (3) Mechanical & Electrical Works which are Architect's Cetitcate
fed as Prime Cost Sum.
ssl to site is good,
| Breraly sit is fat; only removal of op soll is needed to
| Bin tne required platform level,
‘t Conditions: Competitive: Open Tender: § contractors collected the tender and submited their tender subsequently
ind Patialas: [Gempstiive Tender
[ist
f ‘of Contract Standard PAM Form Of Contract (with Cost Fluctuation No Inagayya.
E Quantities)
E 21010000) —T
OpeniSelected Government — [] 752,800.00]
‘Competition 1870,000.00|
Private fra} 1,640,510.00]
Negotiated 1,893,286.00]
i Serial Provisional Sum 0.00
E Prime Cost Sum 210,000.00
Preliminaries 63,700.00
t 52-wooks Contingencies 450,000.00
‘ Contract sum 1,583,285,00
| erlod offered by builders 52 - weeks
2 Iiber of Tender issue 5
' 5
‘ANALYSIS OF SNGLE BULDI
‘Desion'Shapelnfomation
| angle in shape. Gross Floor Area is 2290 N2
t
5 Fuctonal ‘DasioaiShane
Unit 1,505
st Ground Floor +e Percentage of Gross
Floor 4700 we External Wall Area 2276 | Floor Ares
| Bet Foor ‘510_M2 Gross Floor area = 2.230)
18S FLOOR AREA 2200.2 la) Below Grd. Floor -
: 099 [b)2-Sterey 100%
je Area 1.808. M2
ation Area 615 M2 ‘Storey Heiohts =
5 Bilary Area 148 M2 Av. Below Grd, Floor M
2 Bratdivision 24 W2 ‘Atri, Floor 360M
18S FLOOR AREA 2200 M2 ‘Above Grd. Floor 320M
space not enclosed - Me
Area 1922 M2
tural & Plant Rooms)
‘Brief Cost Information Functional Unit Cost a
act Sum 1,998,285.00, ‘excluding extemal works & contingencies
ional Sum 0.00, RM 869.28 por M2
Cost Sum 240,000.00
aes 63,700.00 being «4.61% (of remainder
wgencies 150,000.00 being 10.39% (contract sum1
Gatievor
INSTITUTION OF SURVEYORS, MALAYSIA
BUILDING INFORMATION CENTRE,
ELEMENTAL COST ANALYSIS-FORM2
‘SUWMARY OF ELEMENT COSTS
GROSS FLOOR AREA 2.200 M2. TENDERDATE: 18-Apr-00
Taatcoal | “Cond Element] Clament | Elamant | Ret | Reinfor | Fornwone
of lament | GFaM2 | Unit Unt | Rate! | Con. | -coment |
RM u_| avy rotora | w2cea| ws | “ks m2
7 Sbeaeuce
tailing : - fee il : :
48 Work Below Lowest Flor Finish 190.8600} gaa] 1.778 we] t07s4| 776] 425] 83282 sz
(Group Element Total wooo | BH i
2 Superstuers 1
2 Frame srers00| 3842] 2290 mz] 3842} 1.000] 117] tat aa,
23 Upper Flos ae7ie00| 1860] 510 mz] 70s] 0223| es] an 365]
20° Roof s44go4.00| s5061| 2072 m2| 16646] 0.905) 76) ‘T789| 248)
29° Stairs 726500) 754] g - 4 4ai| ‘2
22 External Wat's Ater700| 1820) 207 a] 20.09] 0906] - -
2F Windows & Extemal Doors sraizoo| tea4| 202 w2| e521] oes]
26 Iniomal Walls & Parton togsoo| 478| 360 ma | soar) oss7| :
224 Intra Doors 42r300| 184] 6a 2} 7022] ooa5| : :
Group Eloment Total SSO | FEES
3 Finishes
A leleral Wal Finishes 72g0500| s1s0| 30s w2| 2162] toi] - P :
3 Internal Floor Finishes se77i00| 1683| 203 w2| 1907| 0888) - : 3
26 Infernal Celing Finshes savsso0| 2347| 2301 w2| 2249] 1.084) - :
30 Extamal Finishes aoe2.00} 7s] Bees 5 :
Group Elemont Total ag | — BED
¢ ting & Fumishing z : : : PE. Sum
alowed
3 Sania
58 Santay Appliance 794500] sar] 4 No| 56750] 0.008
58 Plumbing Instatation sresroo} 16.44) iH :
50 Ratueo Disposal E : 5 é Z
5D Aiecondioning & entation System eso00.00| 2.8] 1600 THs] 4063} 0609 5000.00 | 57,500.00,
Se Electrica! insalion 1000000] 43.00] = : és ‘10,000.00 | 110,000.00
5F Fie Protection Insalition '36.0000| 1828] - : : ‘35,000.00 | 2800.00,
5G Lit@ Conveyor Instaaton e Bs : : :
54 Communication instaion : vy c :
5) Spect Instaiaion = : : : :
5 —Buldere Profi & Atondance On Services 4oo00} 470] = :
5L_ Builders Wark In Connection Wih Services |= : :
‘coup Element Total PeasaOo| TESS ZOO | THE BOO
Tibial Exe. Extrmal Works, Protas &
contingencies 1123853400| $9953
6 Estes Works
BA Ste Wore so2ai900) 44.72
62 Drainage ‘ea00| “0.7
66 Extomal Sorvices 44230.00] 1801
60 Ancilay Bullings fi :
8E Recreation Facies 5 :
‘Group Element Total Tae DsLoo| — 6B
Prosminaros| 93,700.00] 27-82
TOTAL (less contingencies) 1144328500| 62028
WasINSTITUTION OF SURVEYORS, MALAYSIA
BUILDING COST INFORMATION CENTRE
Givieyor
ELEMENTAL COST ANALYSIS - FORMS
(-Eaoearanal Basa
Wook Blow Lonast Fleer Fish
22280
BREF SPEGHICATION
GROSS FLOOR AREA 2220NB TENDER DATE: 18 Ao 2000,
ELEMENT
1 Suber
ta Bling Not Appheabio
Reinforced concrete pas fetngs, column stump, round beam and slabs.
2
2»
Es
oF
Srey
Frame
npr lors
oot
sais
Exel Wals
‘window ond tera Doors
‘Reinforced concrete cium and beams.
Reinorod concrete slabs.
‘coord meadeck rooting en structural stot oof russes and puns:
Reinforsd concrete et roof wth waterproofing membrane nding
‘raimator goods
Reinore corres staraze wih mild stee! balun ished with
(Cement end san tender fh homogeneous nosing es.
Coney 115mm and 230mm hick common day brick was,
coneraly hanced rae adutabieoure window, fies ass panels,
SeRSDL Momo caormet thd glass windows t st Nor hardwood rae
fiver Rush doors: mi steal tape door to main enrence
Intral eor Fishes
Intnl Cain Fishes
sternal Fishes
26. Inera Walls and Parion Caner 1S! and 220mm tek common lay bik wal
2H eral Doors Ccansraly hans sklaonfush ors, fre dors o Authors
‘equremant: complete win eal ronmengey
oH
2k Infor! Wall Fish CGoneraly cement and sand piaster wi enuision pint zed ceramic
wal as tots.
CGanecaly ceramic los ta affen sea: antlp ceramic tes totes
‘Sementrendor thal ad ereuaton es.
Generally esbostoete eng boar: 12m coment and sand laser.
‘Goneraty coment ng sand plaster wth weatheshiol emulsion pit to wal
‘sued core wall.
a Faia
Tat aS
aaa,
Saray Apiinoas
Plumbing nsatton
Refuse posal
-ie-conioning & Vendio System
Ect Ietaitin
Fre Protection Intsation
ut 8 Conveyor Insaiaton
CcommunizatonInstalaton
‘Special ntalsion
ule’ Profit &Atendance On Servis
‘ules Work In Connection With Senicas
Water lose, basin ot al holder par tp, bsp and mio.
Author approves sanitary and cold water insta.
Not sppeabe
Prime Cost Sum -RMBS.000.00,
ame Cost Sum -R110/000.00
Prime Cost Sum - RMS 000.00
Not apeteabie
Net appicabe
Net apptesbie
Bul’ prot an atlendance fel prime cost sum
Net apostle
Roads, pavement and carpets.
BA Sto Work
62 Orsnage 225nen Surace wate rim sol aating. emoaie
over, sums and box uve.
8¢ Exemal Seniees Ema ater rection and Peary Sol ranage
60 Avcliar ulings Not applicable ee
62 Recreation Facies Not sppeable
53,