Professional Documents
Culture Documents
Project : Perencanaan Desain Awal dan Detail Design Jalan Tol Terbanggi Besar Pematang Panggang Kayu Agung
Location : Basic Design Planning and Detail Design for Terbanggi Besar Pematang Panggang Kayu Agung Tol Road
Date : 0 Insitu Void ratio ,Eo : 1,067
Test by : team Sample Area : 38,50 cm2
Drilling No. : BH 9 Sample Height : 1,9 cm
Depth : 10,00-10,50 m
1,10
Pc P1
1,05
1,00
e1
0,95
0,90
Void Ratio (e)
0,85
0,80
0,75
0,70
e2
0,65
0,60
0,1 Presure in Kg/cm2 1,0 10,0
7,0E-04 e2 : 0,718
6,0E-04 Compression Index ,Cc = 0,358 Cc = (e1-e2)/log(p1/pc)
5,0E-04 Cc : 0,36
4,0E-04 Cv : 6,970E-04
3,0E-04
2,0E-04
1,0E-04
0,0E+00
0,1 Presure in Kg/cm2 1,0 10,0
CONSOLIDATION TEST
Project : Perencanaan Desain Awal dan Detail Design Jalan Tol Terbanggi Besar Pematang Panggang Kayu Agung
Location : Basic Design Planning and Detail Design for Terbanggi Besar Pematang Panggang Kayu Agung Tol Road
Date : 0 Insitu Void ratio ,Eo : 0,817
Test by : team Sample Area : 38,50 cm2
Drilling No. : BH 9 Sample Height : 2,0 cm
Depth : 20,00-20,50 m
0,85
Pc P1
0,80
e1
0,75
0,70
Void Ratio (e)
0,65
e2
0,60
0,55
0,50
0,1 Presure in Kg/cm2 1,0 10,0
7,0E-04 e2 : 0,636
6,0E-04 Compression Index ,Cc = 0,293 Cc = (e1-e2)/log(p1/pc)
5,0E-04 Cc : 0,29
4,0E-04 Cv : 7,884E-04
3,0E-04
2,0E-04
1,0E-04
0,0E+00
0,1 Presure in Kg/cm2 1,0 10,0