Information Regarding RTA Act 2005
to
The Department of Higher Education
New Delhi
Subject: Seeking Information Regarding details of Contingency Grant of MHRD TEQUP-II Ph.D.
Students”
Respected Sir/Madam
1am Pursuing Ph.D. under TEQUP-II MHRD trom Kamla Nehru Institute of Technology
Sultanpur U.P. Govt. Engg. Collage), As per SPFU TEQIP-II Ordinance, the contingency
grant is 30,000 per year.
1am seeking miormation for List of item of contingency and others because there 15
ambiguity in 1 EQIP Il ORDINANCE regarding to contingency stems, as mentioned below:
Points
1) List of stem 1m Contingency Grant (Which type of item can be purchased under contingency
TEQIP IL (lor example Laptop battery, Printer, Laptop adopter, Extended RAM in Laptop or
laptop repairing, Bag, laptop. ete.)
2) TA/DA bill related information (for example as student entitled for 3% AC or 24 AC and DA.
allowed or not).
3) How many Conference / Short-Term Training in IIT, NIT and in other Technical Institution can
attend?
4) In one year how many International / National Journal’s fee can be reimbursed through
‘Contingency Grant in one year.
There are discrepancies regarding to above mentioned pomnts in our mstitution due to which we
are unable to get contingency amount for our stationary and other expenditures even after the
submission of related invoices. This situation mainly arises because of the unavailability of
appropriate guidelimes regarding this issue.
Due to this reason I am seeking information with guidelines for above mentioned Four Points for
contingency grant of TEQUP-II Students,
Project Strategy of TEQIP I
The Project will be implemented mn pursuance of the National Policy on Education (NPE-1986
revised m 1992) through the Mistry of Human Resource Development (MHD) of the
Government of India as a “Centrally Sponsored Scheme” with matching contribution from the
State Governments and Union Territories (UTS). The Project cost will be shared by MHRD and
States and private unaided institutions. The funding pattern and cost-sharing details are given in
Table-13. Project cost in the funded and aided institutions for all sub-components will be sharedbetween the Central Government and State governments in the ratio of 75:25 by all States except
the Special Category States for which the ratio will be 90:10. For Centrally Funded Institutions,
the entire Project cost will be bore by MHRD.
Thanks & Regards
Ankur Rai
Research Scholar Hlectromies Engg. Dept.
Email id: - ankur-rail 43 @gmail.com
Mob: - 9170010062
Kamla Nehru Instiute of Technology
Sultanpur (UP.)