You are on page 1of 20
Schneider ap electric FACTORY TEST REPORT #48 AVC RELAY 4 CAL CHECKS AND VISUAL INSPECTION: - ;CRIPTION Inspec for physical damage / defects, [Very connections as per approved di Check bahness of all connection, > 2. ELECTRICAL TESTS; 1. FUNCTIONAL TEST: ~~ pescripTion _ Teal sitch [plug checked for correct function ications checked, ‘Alarm contacts checked Case earthing checked [5 eT soning inks enec 2. MEASUREMENT: Voltage measurement: oe — Injectea Vottge(V) | injected Votage (Vn) Lo. TESTEDBY __ TEST WITNESSED BY Signature =] cai © Osten eu avertinge: 1 © bus GRU al | come ro) + md eeaeam | oat eu 4 ote baat © hin pent es © Ve fon | © Wlon Porotil + pev OO 2 Lee Ux | © Poxathl | + Ron © out For clacting apt Vlas cowed mean Derwes aPev ips Reset akep badton, “We ahisiloy Gorss Bom dost y Atlan Hee ud Dor aby Be mene “Pe prety tee aehel Taukls Goleck Ym oncl inject (oov. Tk H de ed in Whe veleay as 1 2) Fox Covrat frockuremout, Selett Tye Beate Fe cand injec, Cusent ER ae 'k as pete for connection onan 3) For Ragatabing Vole ert ome gok AUS = Tg so+ Sew on Hee trefomect trowel off by ering babe Ack triect toot, and Vy wae dev te jones telen HL eect) gesy ; tte oukpt Af low: moss Aare 1A vod oy fot war nlp 9) oral Inject Caret) Tey Scale Setting Unte | 4. DEGREE OF SENSIVITY TEST. [Scale Sting | Pick up Votage Un = 100% — [Bar AU % Rage Lower 38-5 Iv sie fleiee Range of seting “06% - 9% 5, UNDER VOLTAGE BLOKING TEST: Scale Setting Vie pik uP Reset Bofen: fev ETB W er ey ng TEST WITNESSED AY [__ Test wiesseo e smrae [owe | sna we desk in Acts mode Hoa bs make Settings For clanging fa Settings: esa 19 ep cette h bigot Pras pert istce bette 2 Select T), Then pres program —& earns pen tee Apter wh), bon Ayes press progren Fox Wee 1 So HL Diaet hare ‘dsgit wil blink. 1 Gea wat be set Hee vole» HOLS Reset step» He v Gen in ene see Yolus fom ptbd- for m4 cligit again pres pred Pesguan A Gn ayo for ant disct anl Some ab foo Huyt. “Tens agcin Pres Prgram New fhe decimol pant bunks if gon Dowd be Clone cRecinnl gotten « pees ghopaerl rerck Hep, Aer mating charger In clacrol press Progen Movs aul Mes ay averblink Then press simuttanoonily Rasch Slee & Pfr Part tacttare Aro OhLy “Hee Chowgel vale A actrees De Cored! B) 3 Be one Some 1B) toretee_voltote get yor oF proous Ta %F [ocr when velfese yeduces leo Tov , then OF feel GlinBs in $Pen 1 0he cael the eutat dower peice ble Cec. fake Kove thet fea rely En ache mode. Schneider qptbctr va 6. OVER CURRENT BLOCKING TEST: ‘Seale Sting nt RESET Iep/ et 18 = Tene A (feel Ravling ma - 7. OVER VOLTAGE BLOKING TEST: 5 Seng Vike [eK UP Reser Range of siting: 1051.25 8, TEST OF R COMPENSATION: Settings: ~ EXPECTED READING | ~-ACTUAEREROWG |] 7.0 — o mM CURRENT! “Rase | Lower | awe | Lover T= 0 o an Bon] [ONS ¥ Ux? 025 Andy [te sv 08 96 [4 Fhe 075 - Shay | 9g.5v C4 as | Ise at A) bor eon qe clelall Gotting (8 2 Check fhe geliy 1A Conne chee! In [# oy SA inje chet Cestyoot xtesdh Ht tA gag len tee fo A; then it SiPt fresh fp Let 66S ) for over _vollak - — yas Inject 250» beg fe Moon VP tact BME psn ef leer 9) feet of — Rbensperiahor DE Uproar Uae St Aus PSB Phise anit = 20 in fea te cloct te reine k Leow ptr + 9) fox Timing, Bap ifero > Fer jnleperdent Cridry poet 8GF 5 = 1 > Rev caverie Binwng Let. How & 90 SGFI pros reud by padlar conbiniaserk, 16 9065 Up rtm, Ua , Sr Ms, a, 7. ates that 1b comes - Cap. 7 5 2 cag 7h ae wee Len pre » FEAL 2. A 2 1A SEP2. Agen ples 3 see -fd 15 Counter Ip Cah)» pels PRINS EB the whee § vee n 86 wy the whol Free w2/IT Blink Aken press wigktol- prvgiam fee eles Bill Glink, Han fer asain Preqen / Pecard oldgit bet Lak. chen ah comma chewod SHE trom sigde FACTORY TEST REPORT #48 9. TEST OF X COMPENSATION: =100xUn Phase Angle = 90 Settings: ~~) EXPEGTED READING” ACTUALREADING |] ye — om ve CURRENT . CONT | Ralee | Lower | Raise Lower hy ° - pv [tol sv Upe® 025 | Thay [Jeep Tem Vindeg Veet U1 8 vse eatenat Grecor 7 wa wey Sane fuk (eas) ane - Aye Be Spo NO Bly we i ane Ay > PosiBre (hte bower forenrral NO tastast) Aa > negpbve PELL > Wo 2) £22 we Schneider eget Casiomar Pee [Room fnperaoe SS Us= 100m EXPECTED READING] “ACTUAL READING] - —{ Raise | tower | Rase | Lower ~ Dov] TeTeV [= av | rb | — 00.07 toa.60 erav reg wv] - oe wo sv | tas gy | Phase Angle = 270 Tjro:ty 205 Upe INDEPENOENT THING TEST. oie. Seto ; 2a eo Tine Setrg | jecos . tees | votigety |S ae 420 Lower 5 — tao} — Lover o = sae —- — o -E— INVERSE TIMING TEST: 64s | | Time seting | inectea “| ime seting | (80) Voltage (V) State 15 105 | Tewer 2 ie tower 8 = f Tesepey | _TESTWNESSEDBy TEST WIMESSED BY swe __| —[Rension “Toiwaes sxe [ome fe) Schneider apbectric cue FACTORY TEST REPORT #. 10. BINARY OUTPUT TEST. auto Ob MAN ee ase 8 tower cn bee us ek es oe 11 Bany meuT rest - aioex et 10 ‘ rv raise ‘owen sro was TESTEQUPMENTS USED: ZS), fyo/a TEST WITNESSED BY yatve | bao Spratwe | pate _ Schneider Electric bas FACTORY TEST REPORT # 48 ener Panel Desepton [Pinan Sica Panel Re 2 Nantatser eave 5 Cpe 7 rahe * Z - sera ‘ear masve — ~ } ‘teen — = AVC RELAY CHECKS AND VISUAL INSPECTION: - RIPTION ~~ cnecken pect for physical damage /defecis —2__| Very connections 28 per approved drawings [5 cheek tne oa 2. MEASUREMENT: fore Le 4 OX% Vottage measurement [eta vatagean | anded vege Gav I ae er | testeoay _|_Testwitnesseo sy | __esreoay | _TesTwmess | sonaue |e |soraue [ose | Schneid FACTORY TEST REPORT #48 [Ean Pave Emer sn Tah 7 | Current measurement: Injected Currant (A) [— ° 3. REGULATING VALUE TEST: yore ooo cep oy bona Piek up Voltage a= 5% — ‘Scale Setting Un% |“ Raise Cs —____[Eipesieg |" Actual} expeciea Range seting. 085— 178Va— areas pe ce 4 DEGREE OF SENSIVITY TEST. Us ., Sale Seting [Pik up ate Un = 100% — [Bana Wi 7} = vi Raise Lower | | Z le me ep 7 | ns To Ct —— > Range of sting 06% - 9% 5. UNDER VOLTAGE BLOKING TEST: [See Sar Schneider Electric sue FACTORY TEST REPORT # 4 | Customer | Panel Description Type | Sefial No. t © OVER CURRENT BLOCKING TEST, / © 4m [Sas Sting ae ——— = = Z Range of saing 1057.25 8. TEST OF R COMPENSATION ou “ACTUAL READING 1 (CURRENT | A) TesteD BY —Toae 2 Schneider Mec sae FACTORY TEST REPORT # | custome Pamay Staion ‘Monutacurer Type ‘etal _— | Raise FD 9. TEST OF X COMPENSATION Ux=__s.0 Us=100%Un Phase Angle = 90 Settings: R=0 aus | EXPECTED READING [A _TesTED BY __ TEST WITNESSED By

You might also like