You are on page 1of 6
a Cont & Gen. Tarp l2. DOCUMENT DETAILS JPROJECT: : BOLLYWOOD PARK AREA DEVELOPMENT Reference No. cient + Dubai Parks & Resorts PISC SSS Client Rep. : Samsung C&T Project Consultant : DEC Dynamic Engineering Consultants Rev. 7 Contractor ‘Al Ryum Cont. & Gon. Transp. Est a Date | rome DOCUMENTS TRANSMITTAL SHEET LZ i [DOCUMENT DESCRIPTION: 7 Aewrdue 7] MATERIAL SAMPLE FOR PRECAST KERB STONE MONOLITHIC FINISH AT ROYAL PLAZA qe TivateaSaioren The caiae Trea Das oben /Secty ‘Sample Material [signature: [Status ; [meas [Contractor Project Menager: NEIL JOHNSTON DEC Comments: $ Miled of eked 8 yeu) PROUECT [AREA DEVELOPHENT WORK. signature: tam No, Trenamital Ret. / Document No. Desorption Copies : ML-P1-4008-C0.7-000-T.SaM- | MATERIAL SAMPLE FOR PRECAST KERB STONE MONOLITHIC FINSH | "5 ooas WitnovAt Buvza Ayo! 1b confi ea EMrebood rm Osa hese ae Wanna Tor am Tiesto Tso tps Tha Choma crt Cane Cervarte Clonee A NEL, 9 Natrik is aqppad by DPR oleyye oy 8 Cttabire Ham: My, (sage! ie approxt Shep Fawiry (Ma # (Ode Sh Sue vega) dems, cites) - wg Approved 1 Approved As Noted B—Travise and Resubmit «Rejected DEC Resident Engineer:- & > pate: \"69 en, Construction Submittal Ce ili <5 SAMSUNG C&T From ALAYUN Ter DEC Dynamic Engineowhg Description 'SAVE-0088-Maloal Sample or Precast Genetructon & Consutants Korb Stone Monottae Finish a Royal ‘Senora Trenspert Pace Estabishment Submited Date 11-Sep-18 Rojeev Pazhoor Attention Fadi Hadad Submittal ML.P1.4008,7-0SM.00775, Contractor Consultant Statue Recipient Remarks T__Fortrfomation T)__Aeknowedged pate For Acceptance Ti Accepted rime i _ForReviow and Comments | __C]___ Accepted as Noted cation T__ For Acton T_Revas and Resubmit [contact Repco + [ML 4003-C0.7-000T-SAN¢00098 Matar Sap for Precasl Keb Sane Nenothe Fnsh ot Roya Plas 1 ‘sample [Submitters Comment: ‘Recepiont’s Comment: Latest Workflow Comment: Respone sued via werkowen 1189p46 lRecioved by Ploaee sign and return a copy tothe sender [Signature : sont Prine on 9/1/2016 56:20 AM Prewen lMeet Minutes No, es x Bollywood PARKS 4001-ALR |OM-BPAD-DPM008 Creative Direction Brea Development AX Design Progress Meeting a r 25,22,25,24,25/8/2016 [02:00pm —400 pm —_| [Present Name Postion [Email Company 1 |Nicholas Ferrante Ipark Delery Manager -Dieecior ____aeerante@samvnasom “Samsung | 2 [Richard Hale [Senior Manager Creative ltichard.hale@do-r.com Co | 3 [aan Hassan ETH — [amaabieramsucom | Same | 4 htuces wcegullt@ramsuna.com | Samnune 5 _[ewalina hase esen Manager [eaguire@samsung.com Samsung 2 fea = Sa 7__|atoa rahi Design Manager aai@alwmcom | _Alwm MINUTES. Bipected Aetionee | closure date status Rustic Ravine |Wood finishes for bridges and Sholay tran tracks, eter to Page 25 for {creative direction, Royal plaza (Mughal € Azam vext to Mughal Garden and Hall of Heroes has missing information, to attached sheet Page-22, |wall at Mughal € Azar has missing Information, Refer to attached sheet Page’ ba. lughal E Azam pavers have approved creative direction forthe paver and the| or. Refer to attached Page-26, 3.04 |Mughal Garden colored concrete joints and color finalized. Refer to attached lpage-28 ana Page-29. 305 [OPR Creative direction for the Mughal Garden area. Refer to attached Page- 4, dated 01-May-16. 4.00 Hall of Heroes aon lApproved creative direction for the pavers behind Cinemagic as per attached sheet, Page-27. 5.00 [Entry 401 [creative direction for changing the stamped concrete to mosae tiles a the ntry Courtyard, Refer to attached Page-1é. 402 creative direction for changing the stamped concrete to mosaic tiles at the Peacock pattern (P-043). Refer to attached sheets Page-16 to Page-20, 403 [commented shop drawing forthe peacock with the mosale proposal, has [been Approved with Comments (See attached Page-22). 600 [Bollywood Boulevard Prepared by ARCO-RMTP 29-08-16 Page MINUTES Expected en te | Aatonee 08 t - wo | tance | PRE sion {ete dretin for hanging he tmped concrete to moa tes tthe | [etessrouds Fountain eer to atoced Poe s | os Ty lantity, type, — ototerture naan of pavers was are wihOPRet Tose 703 cory on 24aug26 Retro techs shee, Page to Pe 13 othe Jumma Shee byt and ptr ofthe pavers + ates wate ection nds are alized Reet ached het Fape30 tePoae 703 tan color clout re finale, Refer toatached Page. 8.00 |lswwed on 29-08-2016 a iz = _ | Prepared by ARCO-RMTP 29-08-16 Paws CONTRACTOR Kose ITEM DESCRIPTION QUANTITY COLOUR MATERIAL SAMPLE FOR PRECAST KERB STONE MONOLITHIC FINISH AT ROYAL PLAZA AREA gec OYNAMIC TEM REFERENCE No LOCATION BOLLYWOOD AREA DEVELOPMENT PROJECT NAME: Bollywood Park - Area Development, Dubai Parks and Resorts ‘SUPPORTING DOCUMENT REFERENCE: Date: 11-09-2016 DRAWING REF REVISION APPROVAL "APPROVAL Gec Koes Pe 2 |

You might also like