a Cont & Gen. Tarp
l2. DOCUMENT DETAILS
JPROJECT: : BOLLYWOOD PARK AREA DEVELOPMENT Reference No.
cient + Dubai Parks & Resorts PISC SSS
Client Rep. : Samsung C&T
Project Consultant : DEC Dynamic Engineering Consultants Rev. 7
Contractor ‘Al Ryum Cont. & Gon. Transp. Est a
Date | rome
DOCUMENTS TRANSMITTAL SHEET LZ i
[DOCUMENT DESCRIPTION: 7
Aewrdue 7]
MATERIAL SAMPLE FOR PRECAST KERB STONE MONOLITHIC FINISH AT ROYAL PLAZA qe
TivateaSaioren The caiae Trea Das oben /Secty
‘Sample Material
[signature:
[Status ;
[meas
[Contractor Project Menager: NEIL JOHNSTON
DEC Comments:
$ Miled of eked 8 yeu)
PROUECT
[AREA DEVELOPHENT WORK.
signature:
tam No, Trenamital Ret. / Document No. Desorption Copies
: ML-P1-4008-C0.7-000-T.SaM- | MATERIAL SAMPLE FOR PRECAST KERB STONE MONOLITHIC FINSH | "5
ooas WitnovAt Buvza Ayo!
1b confi
ea
EMrebood
rm
Osa
hese ae Wanna Tor am Tiesto Tso tps Tha
Choma crt Cane Cervarte Clonee
A NEL, 9 Natrik is aqppad by DPR oleyye
oy 8 Cttabire Ham:
My,
(sage!
ie approxt Shep Fawiry (Ma
# (Ode Sh Sue vega)
dems, cites) -
wg
Approved 1 Approved As Noted B—Travise and Resubmit «Rejected
DEC Resident Engineer:- & > pate: \"69 en,Construction Submittal
Ce
ili <5 SAMSUNG C&T
From ALAYUN Ter DEC Dynamic Engineowhg Description 'SAVE-0088-Maloal Sample or Precast
Genetructon & Consutants Korb Stone Monottae Finish a Royal
‘Senora Trenspert Pace
Estabishment
Submited Date 11-Sep-18
Rojeev Pazhoor Attention Fadi Hadad Submittal ML.P1.4008,7-0SM.00775,
Contractor Consultant Statue Recipient Remarks
T__Fortrfomation T)__Aeknowedged pate
For Acceptance Ti Accepted rime
i _ForReviow and Comments | __C]___ Accepted as Noted cation
T__ For Acton T_Revas and Resubmit [contact
Repco
+ [ML 4003-C0.7-000T-SAN¢00098 Matar Sap for Precasl Keb Sane Nenothe Fnsh ot Roya Plas 1 ‘sample
[Submitters Comment:
‘Recepiont’s Comment:
Latest Workflow Comment:
Respone sued via werkowen 1189p46
lRecioved by
Ploaee sign and return a copy tothe sender
[Signature :
sont
Prine on 9/1/2016 56:20 AM
PrewenlMeet
Minutes No,
es
x Bollywood
PARKS
4001-ALR
|OM-BPAD-DPM008
Creative Direction
Brea Development AX
Design Progress Meeting
a
r 25,22,25,24,25/8/2016
[02:00pm —400 pm —_|
[Present Name Postion [Email Company
1 |Nicholas Ferrante Ipark Delery Manager -Dieecior ____aeerante@samvnasom “Samsung |
2 [Richard Hale [Senior Manager Creative ltichard.hale@do-r.com Co
| 3 [aan Hassan ETH — [amaabieramsucom | Same
| 4 htuces wcegullt@ramsuna.com | Samnune
5 _[ewalina hase esen Manager [eaguire@samsung.com Samsung
2 fea = Sa
7__|atoa rahi Design Manager aai@alwmcom | _Alwm
MINUTES.
Bipected
Aetionee | closure date
status
Rustic Ravine
|Wood finishes for bridges and Sholay tran tracks, eter to Page 25 for
{creative direction,
Royal plaza
(Mughal € Azam
vext to Mughal Garden and Hall of Heroes has missing information,
to attached sheet Page-22,
|wall at Mughal € Azar has missing Information, Refer to attached sheet Page’
ba.
lughal E Azam pavers have approved creative direction forthe paver and the|
or. Refer to attached Page-26,
3.04
|Mughal Garden colored concrete joints and color finalized. Refer to attached
lpage-28 ana Page-29.
305
[OPR Creative direction for the Mughal Garden area. Refer to attached Page-
4, dated 01-May-16.
4.00
Hall of Heroes
aon
lApproved creative direction for the pavers behind Cinemagic as per attached
sheet, Page-27.
5.00
[Entry
401
[creative direction for changing the stamped concrete to mosae tiles a the
ntry Courtyard, Refer to attached Page-1é.
402
creative direction for changing the stamped concrete to mosaic tiles at the
Peacock pattern (P-043). Refer to attached sheets Page-16 to Page-20,
403
[commented shop drawing forthe peacock with the mosale proposal, has
[been Approved with Comments (See attached Page-22).
600
[Bollywood Boulevard
Prepared by ARCO-RMTP 29-08-16
PageMINUTES
Expected
en te | Aatonee 08
t - wo | tance | PRE
sion {ete dretin for hanging he tmped concrete to moa tes tthe |
[etessrouds Fountain eer to atoced Poe s |
os Ty
lantity, type, —
ototerture naan of pavers was are wihOPRet Tose
703 cory on 24aug26 Retro techs shee, Page to Pe 13 othe
Jumma Shee byt and ptr ofthe pavers
+ ates wate ection nds are alized Reet ached het Fape30
tePoae
703 tan color clout re finale, Refer toatached Page.
8.00 |lswwed on 29-08-2016 a iz = _ |
Prepared by ARCO-RMTP 29-08-16 PawsCONTRACTOR
Kose
ITEM DESCRIPTION QUANTITY COLOUR
MATERIAL SAMPLE FOR PRECAST KERB STONE
MONOLITHIC FINISH AT ROYAL PLAZA AREA
gec
OYNAMIC
TEM REFERENCE No LOCATION
BOLLYWOOD AREA
DEVELOPMENT
PROJECT NAME: Bollywood Park - Area Development, Dubai Parks and Resorts
‘SUPPORTING DOCUMENT REFERENCE: Date: 11-09-2016
DRAWING REF REVISION APPROVAL
"APPROVAL
Gec Koes
Pe 2
|