The BIOCOS®.strategy (biological ‘combined system) - developed and patented of Prof Dr. Kurt Ingerle— represents an advancement of the conventional activated sludge system One aeration tank (Breaktor ) is hydraulically connected with two cyclic. sedimentation~ and circulation tanks (SU-reactors). Therefore the SU- reactors replaces the clarifier and the sludge recycle unt Wastewater is fed to an aerated ‘reactor (B-reactor) and from there to a ‘sedimentation and circulation reactor ENVIRONMENTAL TECHNOLOGY WASTE WATER BIOCOS® SYSTEM PROJECT & TECHNOLOGY ‘are conducted every day with a recycled period (sludge recycle phase °S") and a ‘tiring period when the settled sludge in the SU-teactor is mixed with the super- natant water (mixing phase *U"), After. wards the sludge in the SU-eactor set- tles (setting phase "V") and finaly su- Pernatant water is withdrawn (discharge phase A) ‘The SU-reactors are used not only for water separation—in contrast to the Clarifler of the activated sludge proo- ess—but also as an anoxic reaction vol- Lume for denitrification and biological P- reduction, Large Waste Water Treatment Plants raptarem SUT and Uys SU ‘+ Separate sowor- and combined sewor system ‘+ Nitifcaton, dentiication ‘+ Fourphase system + Biological phosphor reduction ‘+ BIOCOS" plante wth many ines + High TS in Beactor ‘= Continous in-and outfow ‘+ Approved process and environmental technology ‘+ Compact construction + Simple operation ‘© Lower construction volume + Automatic operation ‘+ Economical operation Low investment cost ‘+ High operation securty + Construction of now, optimise of existing plants www. hafi,oc mye ry ‘Small Waste Water Treatment Plants Reasonable solution for hotels and resorts Fixed price for the construction For 100 to > 10 000 PE + Proved operation procedure ‘+ Simple and automatic operation (SPS) + In expansive to maintain with less mechanical equipment, ‘ewer parts that wear ou, using only compressed air, no moving electrical devices, such as pumps below water surface Lower electrical load and energy use ‘= Short power outages can be tolerated smoothiy + Large cost ettectve sludge storage capacity *= Lower operation and maintaining expenses ‘= Economical of personnel, ime and energy 2000 PE www.hafi.ce 750 PE ‘Space safing and compact construction Covered construction: no smell no noise High performance even having seasonal changing inflow volumes Best puritcation performance with nitrification and denitrification, reduction of phosphoroue Germ reduction inthe biological phase >40% Emission value compliant with Environmental law for biologically purfed sewage Possibilty to uso the outiow for toilet fushing oF garden irigating, saving of drinking water HAFI iF provecraTeccoae BIOCOS Waste Water Plants in Extreme Situation Coburger Hatte, 1970 m, 180 PE, Plant in construction Lamsenjochhitte, 1985 m U.A,, 200 PE Lamsenjochnite, site plan Extract of the referencelist for BIOCOS*-plants. (more than 200 BIOCOS®-plants ) Plants ‘Operation Owner PE Pielenhoten ‘097 Gemeinde Pielenhoten, Germany 1700 “Anburg 11098 Gemeinde Barbug, Germany 2.000 Langenfeld 1997 Gemeinde Langenteld, Austria 10000 Petershausen 2001 ‘Gemeinde Petershausen, Germany 500 Greseraim 1998 Geseralm, Austia 300 Beriner Hote 1097 Deutscher Aipenverein, Germany 300 Karwendethaus 1098 Deutscher Alpenverein, Germany 300 Sosua 2000 Dominican Republic 200 Cofresi ‘1006 Dominican Repubic 5.000 Cabarete 1099 Dominican Republic ‘400 Estrella 1999 Dominican Republic 800 ‘Ucence holder : ‘Agency fant - HAFI PROJECT & TECHNOLOGY GESELLSCHAFT M.BH, ‘A-6800 Feldkich, Muhletorplatz 4-6 Tel ++43 6522 779240 Fax. ++43 5522 74908 wovw.haf.ce / e-mail: sales@hafi ce ‘www hafi.cc

You might also like