PEMBESIAN Karat
PEMBESIAN Karat
dia 10 - 120
0.03
0.10
0.7
Volume Beton
Panjang Beton
diinput angka !!
BEKISTING
LP1 = 0.10 x
= 0.14 m3 LP2 = 0.7 x
= 2.0 m' = 0.28 +
# ANALISA HARGA SATUAN #
Tenaga
-
RGA SATUAN #
Tenaga
Pekerja 2.0000 Oh 30,250.00
Tukang batu 0.3500 Oh 38,500.00
Kepala Tukang batu 0.0350 Oh 44,000.00
Mandor 1.0000 Oh 44,000.00
Tenaga
Pekerja 0.0070 Oh 30,250.00
HARGA SAT. VOL SAT. HARGA SAT. TOTAL
773,815.00 1 M3 773,815.00
654,300.00
403,200.00
76,140.00
174,960.00
119,515.00
60,500.00
13,475.00
1,540.00
44,000.00
529.65
211.75
CEK PEMBESIAN
dia 10 - 120
0.03
0.10
1.2
Volume Beton
Panjang Beton
diinput angka !!
BEKISTING
lp = 0.10 x
= 0.18 m3 = 1.2 x
= 1.5 m' = 0.24 +
# ANALISA HARGA SATUAN #
1.2 x 2 VII. 8 1 Kg
1.5 SNI Bahan
1.8 = 2.04 7394-2008 -
-
4.728
7.392 Tenaga
RGA SATUAN #
Tenaga
Pekerja 2.0000 Oh 30,250.00
Tukang batu 0.3500 Oh 38,500.00
Kepala Tukang batu 0.0350 Oh 44,000.00
Mandor 1.0000 Oh 44,000.00
Tenaga
HARGA SAT. VOL SAT. HARGA SAT. TOTAL
773,815.00 1 M3 773,815.00
654,300.00
403,200.00
76,140.00
174,960.00
119,515.00
60,500.00
13,475.00
1,540.00
44,000.00
529.65