RFM no.

Description
7 Deletion of Trash Basin
57 Speakers at the royal plaza rater foundatin
58 Royal plaza water feature-GRP grating
59 Climbing plants and pond grading works
12 Providing additional 2 green rooom
13 BOH providing power and data for future security koisk
5 Additional 3 break room
21 Changes to mumbai Island and change of tree in rangmanch stage
48 Theater upper basin pump pit (grid)
49 Relocate BOH stop sign, providig hump and mirror
40 Bollywood Haat revised level (planter wall)
53 Entrance area core drilling and installation of stanchion sleeves
61 Raj Mahal stars on step stage flooring replacement
63 Cinemagic gate height
62 Bollywood haat addional themed gate
64 Power Data for picsolve and sponsorship machine
65 Sholay overflow que rail
67 Rustic Ravine railing modification
68 Sholay additional planting for overflow que
71 Studio canteen wall railing