You are on page 1of 3
Part 1 1.01 1.02 Section 01200 Project Meetings General Scope - Work under this Section includes all scheduling and administering of pre-construction and progress meetings as herein specified and necessary for the proper and complete performance of this Work. ‘Scheduling and Administration by Engineer: j 1. Prepare agenda. 2. Make physical arrangements for the meetings. 3. Preside at meetings. 4, Record minutes and include significant proceedings and decisions. 5. Distribute copies of the minutes to participants. Preconstruction Conference The Engineer shall schedule the preconstruction conference the Notice to Proceed, to the issuance of Representatives of the following parties are to be in attendance at the meeting: 1. Owner. 2. Engineer. 3. Contractor and superintendent. Major subcontractors. 5. _ Representatives of governmental or regulatory agencies when appropriate. The agenda for the preconstruction conference shall consist of the following as a minimum: 1. Distribute and discuss a list of major subcontractors and a tentative construction schedule, 2. Critical work sequencing 3. Designation of responsible personnel and emergency telephone numbers. 4, Processing of field decisions and change orders. 02/28/05 2203-0081KA01200 Part 4 1.01 1.02 Section 01200 Project Meetings General Scope Work under this Section includes all scheduling and administering of pre-construction and progress meetings as herein specified and necessary for the proper and complete performance of this Work. ‘Scheduling and Administration by Engineer: 1 5, Prepare agenda. Make physical arrangements for the meetings. Preside at meetings. Record minutes and include significant proceedings and decisions. Distribute copies of the minutes to participants. Preconstruction Conference The Engineer shall schedule the preconstruction conference prior to the issuance of the Notice to Proceed. Representatives of the following parties are to be in attendance at the meeting: 1 2. 3. Owner. Engineer. Contractor and superintendent. Major subcontractors. Representatives of governmental or regulatory agencies when appropriate. The agenda for the preconstruction conference shall consist of the following as a minimum: 4 Distribute and discuss a list of major subcontractors and a tentative construction schedule. : Critica! work sequencing. Designation of responsible personnel and emergency telephone numbers. Processing of field decisions and change orders. (02/28/05 2203-008XA01200 10. " 1200-3 Project Meetings Review off-site fabrication problems, Review Contractor's corrective measures and procedures to regain plan schedule. Review Contractor's revision to the construction schedule as outlined in the Supplementary Conditions, Review submittal schedule; expedite as required to maintain schedule. Maintenance of quality and work standards. Review changes proposed by Owner for their effect on the construction schedule and completion date. Complete other current business. END OF SECTION (02/28/05 2203-008\KAD1200

You might also like