Integrated Operations

Illuminating Innovations
In late September international industry experts gathered for two days
in Trondheim to focus on intelligent fields and integrated operations.

ore than 300 delegates attended the 5th presentation, Gbenga showcased studies from, among
International Conference on Integrated others, the Visund field where use of the IntelliServ
Operations in the Petroleum Industry. The Broadband technology (referred to as wired drill pipe)
IO 09 Conference, billed as: the international meeting avoided trips, saved rig time costs, and enabled better
place for business and science, was well attended by well placement decisions thanks to more real-time data.
players from around the world who all recognize that The joint venture was formed to accelerate the
intelligent fields and integrated operations are becoming development and delivery of intelligent drilling
TIMELY: Drilling decisions can
even more important in improving productivity. solutions. It aims to further develop advanced drilling-
be made from key data delivered
Presenters shared their experiences about working related systems enabled by the IntelliServ Broadband rapidly via wired drillpipe.
with various technologies and work processes for better Network, which is a patented technology that provides
productivity and safety in integrated operations. high-resolution data in real time to and from the
One of the presenters was our Telemetry Business bottom of oil and gas wells as they are being drilled.
Development Manager Gbenga Onadeko who is based in Gbenga reports that his presentation was well
the Drilling & Measurements headquarters in Houston. received, and was followed by a discussion session where
At the conference, Gbenga introduced our recently the group further considered the applications of wired
announced joint venture with National Oilwell Varco to drill pipe and what the industry has to do to move it
provide high-speed drill string telemetry systems. In his from a niche to a widely deployed technology.

Real Time Gives Quick Turnaround


Well Testing Services prepared for a complex surface well testing job in less than
2weeks, and received client appreciation of job execution and real-time capabilities.

C
arlos Paz, real-time GeoMarket * champion Through the InterACT * information system,
for Well Testing, was the overall project we gathered the actual well test values and
coordinator, responsible for monitoring entered them into our ArchiTest * well test design
and controlling the offshore operation from software, Carlos explains. We ran simulations
Well Testings operation support centre (OSC) to make sure we were able to flow the required
GRYPHON REAL TIME TEAM: from
in Aberdeen. He explains the joba surface well 10,000 BOPD and completed all the change
left, Project Coordinator and Real
test clean upinvolved reassessing the pressure, management and exemption requirements in less
Time Geomarket Champion for Testing
permeability, and skin in a Gryphon reservoir for than an hour, he says. The OSC saved rig time Carlos Paz, Completions Senior
Maersk Oil North Sea UK Ltd. and cost as this would normally take 3 to 4 hours. Engineer Ken Muir, Testing Reservoir
Well Testing was given a 2-week window to Maersk Oil Reservoir Engineer Paul Benton Domain Champion Yakov Shumakov,
mobilize equipment . They designed a specific wrote: The service provided by the real-time data Completions Field Specialist Malcolm
spread to handle the complex fluid interfaces and the individuals both onshore and offshore was Mackay, and Completions Project
including a separator, two gauge tanks, a surge excellent. The chat facility was particularly good Engineer Allan Byiers.
tank, several tote tanks, and five transfer pumps. as it allowed communications when individuals
The real-time operation involved transmitting had the time. It was good to have another onshore
downhole gauge data from Completions Services engineer sitting watching the data.
in real time along with the surface well test data. A Carlos says the key to the success of this
brainstorming session with Completions to look at complex operation was the planning and design
options, followed by a hands-on training session, phase and the strict adherence to Testings
overcame software and hardware issues to allow service delivery procedure (SDP) during the job
the real-time transmission of both segments data. preparation and execution. Congratulations to
Two hours after the job started, the well was the entire team, in particular Ken Muir and Allan
flowing better than expected, and Maersk Oil Byiers from Completions, Rizwan Ur Rehman from
asked Well Testing to flow the well at a higher rate. Well Testing, and Yakov Shumakov from DCS.

December 2009 North Sea Contact 21