Professional Documents
Culture Documents
Rab Versi Sni Lengkap
Rab Versi Sni Lengkap
TENAGA
1 Tukang kayu hari 30,000.00
2 Kepala tukang kayu hari 32,500.00
3 Tukang batu hari 27,500.00
4 Kepala tukang batu hari 30,000.00
5 Tukang besi hari 25,000.00
6 Kepala tukang besi hari 27,000.00
7 Tukang las hari 27,500.00
8 Kepala tukang las hari 29,000.00
9 Tukang cat hari 25,000.00
10 Kepala tukang cat hari 27,000.00
11 Tukang plitur hari 27,000.00
12 Kepala tukang plitur hari 29,000.00
13 Tukang bor hari 27,500.00
14 Kepala tukang bor hari 29,000.00
15 Tukang listrik hari 29,000.00
16 Tukanng pipa ledeng hari 27,900.00
17 Tukang kapur hari 22,500.00
18 Pekerja hari 20,000.00
19 Mandor hari 32,500.00
20 Pengawas / Ahli Teknik hari 37,200.00
21 Ahli ukur hari 116,300.00
22 Asisten ahli ukur hari 87,200.00
23 Sopir hari 26,000.00
24 Masinis hari 24,900.00
25 Kernet / pembantu sopir hari 22,000.00
26 Mekanik terlatih hari 29,000.00
27 Operator tak terlatih hari 24,000.00
28 Operator terlatih hari 29,000.00
29 Operator semi terlatih hari 25,000.00
30 Butuh terlatih hari 22,600.00
31 Buruh semi terlatih hari 21,200.00
32 Buruh tak terlatih hari 19,600.00
33 Tukang gali hari 34,900.00
34 Juru godog aspal hari 20,000.00
35 Penjaga hari 20,000.00
36 Penyemprot hari 17,500.00
37 Tukang Sungging hari 40,000.00
38 Kepala Tukang Sungging hari 45,000.00
39 Tukang Ukir hari 40,000.00
40 Kepala Tukang Ukir hari 45,000.00
41 Tukang Prodo hari 40,000.00
42 Kepala Tukang Prodo hari 45,000.00
43 Tukang Gambar hari 35,000.00
44 Tukang Grouting hari 30,000.00
45 Kepala tukang Grouting hari 32,500.00
46 Operator mesin sondir hari 75,000.00
47 Analis test sondir hari 120,000.00
CAT
1 Cat kayu se kualitas Patna kg 10,450.00
2 Cat kayu se kualitas Emco biasa kg 32,000.00
3 Cat kayu se kualitas Emco Bintang kg 42,000.00
4 Cat kayu se kualitas Par kg 29,000.00
5 Cat besi se kualitas Patna kg 10,450.00
6 Cat besi se kualitas Emco biasa kg 32,000.00
7 Cat besi se kualitas Emco Bintang kg 42,000.00
8 Cat kayu se kualitas Avian kg 24,750.00
9 Cat tembok/cat semen Maxilite kg 7,600.00
10 Cat tembok/cat emulsi dasar minyak Express kg 8,250.00
11 Cat tembok/cat polivynyl asetat Dulux kg 25,000.00
12 Cat tembok/cat kilap/cat acrilyc Dulux kg 35,000.00
13 Cat ICI Catylac kg 12,000.00
14 Cat tembok se kualitas Decolith kg 9,500.00
15 Cat Sintex kg 7,500.00
16 Cat dasar meni besi type A (cepat kering) Jago kg 12,000.00
17 Cat dasar meni besi type A (cepat kering) Par kg 22,500.00
18 Cat dasar meni kayu Jago kg 12,000.00
19 Cat duco kg 60,000.00
20 Cat genteng air ICI weathershield kg 42,000.00
21 Cat dasar undercoat / alkali resisiting primer kg 27,200.00
22 Cat dinding weathershield Dulux kg 50,000.00
23 Dempul kayu typa A (putih) Jago kg 10,000.00
24 Dempul lilin / kayu bj 9,000.00
25 Plamur Fuji kg 8,500.00
26 Plamur kayu Jago kg 12,000.00
27 Plamur tembok acrilyc kg 17,500.00
28 Plamur jenis sirlak kuning ltr 17,500.00
29 Sirlak putih batangan kg 65,000.00
Bahan - 1
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)
Bahan - 2
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)
Bahan - 3
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)
Bahan - 4
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)
Bahan - 5
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)
Bahan - 6
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)
Bahan - 7
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)
Bahan - 8
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)
Bahan - 9
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)
Bahan - 10
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)
20 Split D 1 - 2 cm m3 125,000.00
21 Batu merah ( 5x11x23 ) bj 350.00
22 Batu merah ( 4x9x19 ) bj 250.00
23 Krokos 0,2/0,4 m3 70,000.00
24 Tanah urug m3 35,000.00
25 Sirtu m3 66,000.00
26 Batako bh 1,500.00
27 Roster 25/25 bh 2,000.00
BAHAN PEREKAT HIDROLIS & ORGANIK
1 Portland Cement (PC) Gresik 50 kg 38,200.00
40 kg 31,000.00
2 Portland Cement (PC) Nusantara 50 kg 38,200.00
40 kg 31,000.00
3 Portland Cement (PC) Tiga Roda 40 kg 31,000.00
4 Semen putih 40 kg 52,500.00
5 Semen warna kg 6,000.00
6 Lem kayu (putih) Fox kg 11,000.00
7 Lem plastik Acrylic kg 60,000.00
8 Lem plastik Vinyl kg 19,500.00
9 Lem Aica Aibon kg 27,500.00
KAPUR & GIPS
1 Kapur pasang m3 72,500.00
2 Kapur sirih m3 138,000.00
3 Kapur sirih kg 500.00
4 Semen batu bata m3 80,000.00
5 Tepung Gypsum kg 3,500.00
6 Alkasit kg 300,000.00
7 Gypsum board lbr 42,000.00
8 Kasa gypsum roll 10,000.00
9 List profil gypsum lebar sampai 5 cm m1 4,000.00
10 List profil gypsum lebar sampai 6 - 10 cm m1 8,000.00
11 List profil gypsum lebar lebih 10 cm m1 15,000.00
12 Kalsiboard ( 122 x 244 x 0,35 ) cm lbr 46,200.00
13 Kalsiboard ( 122 x 244 x 0,60 ) cm lbr 60,500.00
BAHAN PELARUT, PELUMAS
1 Oli SAE 30 ltr 21,000.00
2 Minyak bakar / kerosene ltr 1,000.00
3 Bensin premium ltr 4,500.00
4 Solar ltr 4,300.00
5 Minyak pelumas ltr 14,000.00
6 Vet kg 13,000.00
7 Gas Elpiji kg 4,500.00
8 Minyak bekisting ltr 5,000.00
BAHAN KIMIA PEMBANTU UNTUK BETON
1 Bahan kimia B (kuat ikat cepat ) kg 35,000.00
2 Bahan kimia E (kuat ikat cepat ) kg 30,000.00
BAHAN PENGAWET DANBITUMEN
1 Teer kayu box 8,000.00
2 Residu ltr 3,500.00
3 Flincoat ltr 35,000.00
BAHAN KACA
1 Genteng kaca lengkung cekung 3 mm bh 5,500.00
2 Genteng kaca lengkung cekung 5 mm bh 7,000.00
3 Genteng kaca lengkung rata 3 mm bh 5,500.00
4 Genteng kaca lengkung rata 5 mm bh 6,850.00
5 Genteng kaca 3 mm bh 4,000.00
6 Genteng kaca 5 mm bh 6,850.00
7 Kaca buram/kaca es 3 mm m2 53,900.00
8 Kaca buram/kaca es 5 mm m2 66,000.00
9 Kaca bening 3 mm m2 49,500.00
10 Kaca bening 5 mm m2 60,500.00
11 Kaca riben 3 mm m2 57,500.00
12 Kaca riben 5 mm m2 70,000.00
13 Kaca cermin 3 mm m2 75,000.00
14 Kaca cermin 5 mm m2 120,000.00
15 Kaca patri m2 300,000.00
16 Fiber glass lbr 28,000.00
BAHAN PLASTIK
1 Pipa PVC abu-abu dia. 1/2" Wavin btg 12,650.00
2 Pipa PVC abu-abu dia. 3/4" Wavin btg 17,000.00
3 Pipa PVC abu-abu dia. 1" Wavin btg 20,500.00
4 Pipa PVC abu-abu dia. 1 1/2" Wavin btg 45,000.00
5 Pipa PVC abu-abu dia. 2" Wavin btg 60,000.00
6 Pipa PVC abu-abu dia. 2 1/2" Wavin btg 82,000.00
7 Pipa PVC abu-abu dia. 3" Wavin btg 82,000.00
8 Pipa PVC abu-abu dia. 4" Wavin btg 135,000.00
9 Pipa PVC putih dia. 1/2" Wavin btg 12,000.00
10 Pipa PVC putih dia. 3/4" Wavin btg 15,000.00
11 Pipa PVC putih dia. 1" Wavin btg 21,000.00
12 Pipa PVC putih medium dia. 3" Wavin btg 48,000.00
13 Pipa PVC putih tebal dia. 3" Wavin btg 80,000.00
14 Pipa PVC putih medium dia. 4" Wavin btg 135,000.00
Bahan - 11
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)
Bahan - 12
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)
Bahan - 13
NO. NAMA BARANG / BAHAN / TENAGA SATUAN HARGA SATUAN (Rp.)
23 Linggis bh 35,000.00
24 Martil bh 10,000.00
25 Betel bh 12,000.00
26 Pacul bh 30,000.00
27 Sewa kendaraan untuk membuang lumpur hr 118,000.00
28 Gas oksigen 5 kg tb 15,000.00
29 Nipel bh 10,000.00
30 Pipa dia. 3/8" - 15 cm bh 1,500.00
31 Nitobond EC kg 100,000.00
32 Conbextra EP kg 200,000.00
33 Cebex 100 kg 150,000.00
34 Sewa Compressor untuk pekerjaan grouting hr 250,000.00
35 Sewa Mesin Grouting hr 150,000.00
36 Sewa mesin gerinda untuk pekerjaan grouting hr 100,000.00
37 Sewa mixer ubtuk pekerjaan grouting hr 6,000.00
38 Alat bantu pekerjaan grouting ls 5,000.00
39 Alat bantu pekerjaan pekerjaan marka ls 130,000.00
40 Alat bantu pekerjaan pekerjaan expantion joint ls 130,000.00
41 Pelapisan kedap air lantai dengan coating ( terpasang ) m2 40,000.00
42 Pelapisan kedap air lantai dengan membran ( terpasang ) m2 60,000.00
LAIN-LAIN
1 Tiang bendera
-Pondasi umpak buah 31,000.00
-Ompak ornamen buah 65,800.00
-Tiang galvanis 3" m' 23,375.00
-Bendera 120 x 180 buah 39,825.00
2 Rambu lalu lintas (terpasang) buah 150,000.00
3 Papan nama jalan (terpasang) buah 250,000.00
4 Sumur peresapan 5 m buah 495,000.00
3 Minyak Flux liter 12,000.00
4 Asbuton kg 2,350.00
5 Tumpuan konstruksi m 66,700.00
4 Kerikil sungai - royalty m3 5,750.00
5 Batu gunung - royalty m3 5,750.00
6 Uji test besi ( 3 sampel tiap jenis diameter benda uji ) set 150,000.00
5 Uji test aspal ttk 100,000.00
6 Sewa alat sondir hr 100,000.00
7 Sewa Scaffolding unit 20,000.00
6 Benda uji silinder beton bh 3,000.00
7 Biaya tes beton per benda uji bh 5,000.00
8 Biaya analisis tes beton perbeda uji bh 15,000.00
Bahan - 14
HARGA ALAT UNTUK PEKERJAAN ANALISA - E
PEKERJAAN PERSIAPAN
AK 100.00 m2 Pekerjaan Pengukuran Gedung
8.0000 org Pekerja @ Rp. 20,000.00 160,000.00
2.0000 org Mandor @ Rp. 32,500.00 65,000.00
0.5000 org Pengawas @ Rp. 37,200.00 18,600.00
2.0000 org Asisten Ahli Ukur @ Rp. 87,200.00 174,400.00
1.0000 hr Sewa alat ukur @ Rp. 75,000.00 75,000.00
JUMLAH ( BELUM PPN ) 493,000.00
JASA 10 % 49,300.00
JUMLAH 542,300.00
DIBULATKAN 542,300.00
SNI 1.0000 m1 Pengukuran dan pemasangan bouwplank untuk gedung dan saluran
6.4 0.0120 m3 Kayu meranti 5/7 @ Rp. 1,678,000.00
03-2835-2002 0.0200 kg Paku reng @ Rp. 8,000.00
0.0070 m3 Kayu meranti papan 3/20 @ Rp. 1,678,000.00
No. Macam Pekerjaan Upah
(1) (2) (3)
0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.0100 org Kepala tukang kayu @ Rp. 32,500.00 325.00
0.1000 org Pekerja @ Rp. 20,000.00 2,000.00
0.0050 org Mandor @ Rp. 32,500.00 162.50
JUMLAH ( BELUM PPN ) 5,487.50
JASA 10 % 548.75
JUMLAH 6,036.25
DIBULATKAN 6,036.00
SNI 1.0000 m1 Pembuatan pagar sementara dari seng gelombang tinggi 2 meter
6.2 1.2500 btg Dolken kayu 8 - 10/400 cm @ Rp. 10,000.00
03-2835-2002 2.5000 kg PC @ Rp. 764.00
1.2000 lbr Seng gelombang 2"-5" BJLS 24 @ Rp. 25,000.00
0.0050 m3 Pasir beton @ Rp. 73,000.00
0.0090 m3 Kerikil beton @ Rp. 78,650.00
0.0250 m3 Kaso 5/7 kayu meranti @ Rp. 1,678,000.00
0.0600 kg Paku biasa 2" - 5" @ Rp. 8,000.00
0.4000 kg Meni besi @ Rp. 12,000.00
0.2000 org Tukang kayu @ Rp. 30,000.00 6,000.00
0.0200 org Kepala tukang kayu @ Rp. 32,500.00 650.00
0.4000 org Pekerja @ Rp. 20,000.00 8,000.00
0.0200 org Mandor @ Rp. 32,500.00 650.00
JUMLAH ( BELUM PPN ) 15,300.00
JASA 10 % 1,530.00
JUMLAH 16,830.00
DIBULATKAN 16,830.00
PEKERJAAN TANAH
SNI 1.0000 m3 Galian tanah biasa sedalam sampai 1 meter
6.1 0.4000 org Pekerja @ Rp. 20,000.00 8,000.00
0.0400 org Mandor @ Rp. 32,500.00 1,300.00
JUMLAH ( BELUM PPN ) 9,300.00
JASA 10 % 930.00
JUMLAH 10,230.00
DIBULATKAN 10,230.00
PEKERJAAN PASANGAN
PEKERJAAN BETON
SNI 1.0000 m3 Membuat beton bertulang, 1 Pc : 2 Ps : 3 Kr
6.13 336.0000 kg PC @ Rp. 764.00
0.5400 m3 Pasir beton @ Rp. 73,000.00
0.8100 m3 Kerikil beton @ Rp. 78,650.00
0.3500 org Tukang batu @ Rp. 27,500.00 9,625.00
0.0350 org Kepala tukang batu @ Rp. 30,000.00 1,050.00
2.0000 org Pekerja @ Rp. 20,000.00 40,000.00
0.1000 org Mandor @ Rp. 32,500.00 3,250.00
JUMLAH ( BELUM PPN ) 53,925.00
JASA 10 % 5,392.50
JUMLAH 59,317.50
DIBULATKAN 59,317.00
PEKERJAAN PELESTERAN
PEKERJAAN KERAMIK
An. 1.0000 m2 Pasang ubin porselin
G.69.c 1.0000 m2 Tegel porselin @ Rp. 40,500.00
4.6800 kg PC @ Rp. 764.00
0.0090 m3 Pasir pasang @ Rp. 76,000.00
1.0000 kg Semen putih @ Rp. 1,312.50
0.5000 org Tukang batu @ Rp. 27,500.00 13,750.00
0.0500 org Kep. Tk. Batu @ Rp. 30,000.00 1,500.00
0.2500 org Pekerja @ Rp. 20,000.00 5,000.00
0.0125 org Mandor @ Rp. 32,500.00 406.25
JUMLAH ( BELUM PPN ) 20,656.25
JASA 10 % 2,065.63
JUMLAH 22,721.88
DIBULATKAN 22,721.00
PEKERJAAN CONBLOCK
AK 1.0000 m2 Pasang usuk 5/7 kayu jati, reng 2/3 kayu bengkirai
2.2000 m1 Usuk kayu jati 5/7 @ Rp. 70,000.00
5.0000 m1 Reng kayu bengkirai 2/3 @ Rp. 3,450.00
0.1500 kg Paku usuk @ Rp. 8,000.00
0.1000 kg Paku reng @ Rp. 8,000.00
0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.0100 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.1000 org Pekerja @ Rp. 20,000.00 2,000.00
0.0025 org Mandor @ Rp. 32,500.00 81.25
JUMLAH ( BELUM PPN ) 5,406.25
JASA 10 % 540.63
JUMLAH 5,946.88
DIBULATKAN 5,946.00
AK 1.0000 m2 Pasang usuk 5/7 kayu bengkirai, reng 2/3 kayu jati
2.2000 m1 Usuk kayu bengkirai 5/7 @ Rp. 20,125.00
5.0000 m1 Reng jati 2/3 @ Rp. 12,000.00
0.1500 kg Paku usuk @ Rp. 8,000.00
0.1000 kg Paku reng @ Rp. 8,000.00
0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.0100 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.1000 org Pekerja @ Rp. 20,000.00 2,000.00
0.0025 org Mandor @ Rp. 32,500.00 81.25
JUMLAH ( BELUM PPN ) 5,406.25
JASA 10 % 540.63
JUMLAH 5,946.88
DIBULATKAN 5,946.00
AK 1.0000 m2 Pasang usuk 5/7 kayu bengkirai, reng 2/3 kayu bengkirai
2.2000 m1 Usuk kayu bengkirai 5/7 @ Rp. 20,125.00
5.0000 m 1
Reng kayu bengkirai 2/3 @ Rp. 3,450.00
0.1500 kg Paku usuk @ Rp. 8,000.00
0.1000 kg Paku reng @ Rp. 8,000.00
0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.0100 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.1000 org Pekerja @ Rp. 20,000.00 2,000.00
0.0025 org Mandor @ Rp. 32,500.00 81.25
JUMLAH ( BELUM PPN ) 5,406.25
JASA 10 % 540.63
JUMLAH 5,946.88
DIBULATKAN 5,946.00
No. Macam Pekerjaan Upah
(1) (2) (3)
AK 1.0000 m2 Pasang usuk 5/7 kayu bengkirai, reng 3/4 kayu jati lokal
2.2000 m1 Usuk kayu bengkirai 5/7 @ Rp. 20,125.00
4.0000 m1 Reng kayu jati 3/4 lokal @ Rp. 9,600.00
0.1500 kg Paku usuk @ Rp. 8,000.00
0.1000 kg Paku reng @ Rp. 8,000.00
0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.0100 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.1000 org Pekerja @ Rp. 20,000.00 2,000.00
0.0025 org Mandor @ Rp. 32,500.00 81.25
JUMLAH ( BELUM PPN ) 5,406.25
JASA 10 % 540.63
JUMLAH 5,946.88
DIBULATKAN 5,946.00
AK 1.0000 m2 Pasang usuk 5/7 kayu bengkirai, reng 3/4 kayu bengkirai
2.2000 m1 Usuk kayu bengkirai 5/7 @ Rp. 20,125.00
4.0000 m1 Reng kayu bengkirai 3/4 @ Rp. 6,900.00
0.1500 kg Paku usuk @ Rp. 8,000.00
0.1000 kg Paku reng @ Rp. 8,000.00
0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.0100 org Kep. Tk. Kayu @ Rp. 32,500.00 325.00
0.1000 org Pekerja @ Rp. 20,000.00 2,000.00
0.0025 org Mandor @ Rp. 32,500.00 81.25
JUMLAH ( BELUM PPN ) 5,406.25
JASA 10 % 540.63
JUMLAH 5,946.88
DIBULATKAN 5,946.00
SNI 1.0000 m2 Pasang pintu teakwood rangkap, rangka kayu jati lokal
6.19 0.0196 m3 Papan kayu jati lokal @ Rp. 8,200,000.00
03-3434-2002 0.0300 kg Paku biasa 1/2" - 1" @ Rp. 8,000.00
0.3000 kg Lem kayu @ Rp. 11,000.00
1.0000 lbr Teakwood 4' x 8' x 4 mm @ Rp. 69,500.00
2.0000 org Tukang kayu @ Rp. 30,000.00 60,000.00
0.2000 org Kepala tukang kayu @ Rp. 32,500.00 6,500.00
0.6000 org Pekerja @ Rp. 20,000.00 12,000.00
0.0300 org Mandor @ Rp. 32,500.00 975.00
JUMLAH ( BELUM PPN ) 79,475.00
JASA 10 % 7,947.50
JUMLAH 87,422.50
DIBULATKAN 87,422.00
No. Macam Pekerjaan Upah
(1) (2) (3)
SNI 1.0000 m2 Pasang pintu dan jendela kaca kayu jati lokal
6.9 0.0350 m3 Papan kayu jati lokal @ Rp. 8,200,000.00
03-3434-2002 2.0000 org Tukang kayu @ Rp. 30,000.00 60,000.00
0.2000 org Kepala tukang kayu @ Rp. 32,500.00 6,500.00
0.8000 org Pekerja @ Rp. 20,000.00 16,000.00
0.0400 org Mandor @ Rp. 32,500.00 1,300.00
JUMLAH ( BELUM PPN ) 83,800.00
JASA 10 % 8,380.00
JUMLAH 92,180.00
No. Macam Pekerjaan Upah
(1) (2) (3)
DIBULATKAN 92,180.00
No. Macam Pekerjaan Upah
(1) (2) (3)
SNI 1.0000 m2 Mengerjakan daun pintu / jendela panil kayu jati lokal
6.7 0.0400 m3 Kayu jati papan lokal @ Rp. 8,200,000.00
03-3434-2002 2.5000 org Tukang kayu @ Rp. 30,000.00 75,000.00
0.2500 org Kepala tukang kayu @ Rp. 32,500.00 8,125.00
1.0000 org Pekerja @ Rp. 20,000.00 20,000.00
0.0500 org Mandor @ Rp. 32,500.00 1,625.00
JUMLAH ( BELUM PPN ) 104,750.00
JASA 10 % 10,475.00
JUMLAH 115,225.00
DIBULATKAN 115,225.00
PEKERJAAN PLAFOND
SNI 1.0000 m2 Pasang rangka langit-langit (1,00 x 1,00) m, kayu lama
03-3434-2002 0.1000 kg Paku biasa 2" - 5" @ Rp. 8,000.00
0.2500 org Tukang kayu @ Rp. 30,000.00 7,500.00
0.0250 org Kepala tukang kayu @ Rp. 32,500.00 812.50
0.1500 org Pekerja @ Rp. 20,000.00 3,000.00
0.0075 org Mandor @ Rp. 32,500.00 243.75
JUMLAH ( BELUM PPN ) 11,556.25
JASA 10 % 1,155.63
JUMLAH 12,711.88
DIBULATKAN 12,711.00
SNI 1.0000 m2 Langit2 asbes (1,00 x 1,00) m, rangka kamper tanpa plepet
0.0120 m3 Kayu kamper balok @ Rp. 4,750,000.00
03-2838-2002 0.0600 kg Paku biasa @ Rp. 10,000.00
1.1000 lbr Asbes 1,00 x 1,00 m @ Rp. 10,000.00
0.3200 org Tukang kayu @ Rp. 30,000.00 9,600.00
0.0320 org Kepala tukang kayu @ Rp. 32,500.00 1,040.00
0.1800 org Pekerja @ Rp. 20,000.00 3,600.00
0.0090 org Mandor @ Rp. 32,500.00 292.50
JUMLAH ( BELUM PPN ) 14,532.50
JASA 10 % 1,453.25
JUMLAH 15,985.75
DIBULATKAN 15,985.00
No. Macam Pekerjaan Upah
(1) (2) (3)
SNI 1.0000 m2 Langit2 asbes (1,00 x 1,00) m, rangka kruing tanpa plepet
0.0120 m3 Kayu kruing balok @ Rp. 4,350,000.00
03-2838-2002 0.0600 kg Paku biasa @ Rp. 10,000.00
1.1000 lbr Asbes 1,00 x 1,00 m @ Rp. 10,000.00
0.3200 org Tukang kayu @ Rp. 30,000.00 9,600.00
0.0320 org Kepala tukang kayu @ Rp. 32,500.00 1,040.00
0.1800 org Pekerja @ Rp. 20,000.00 3,600.00
0.0090 org Mandor @ Rp. 32,500.00 292.50
JUMLAH ( BELUM PPN ) 14,532.50
JASA 10 % 1,453.25
JUMLAH 15,985.75
DIBULATKAN 15,985.00
SNI 1.0000 m2 Langit2 asbes (1,00 x 1,00) m, rangka bengkirai tanpa plepet
0.0120 m3 Kayu bengkirai balok @ Rp. 5,750,000.00
03-2838-2002 0.0600 kg Paku biasa @ Rp. 10,000.00
1.1000 lbr Asbes 1,00 x 1,00 m @ Rp. 10,000.00
0.3200 org Tukang kayu @ Rp. 30,000.00 9,600.00
0.0320 org Kepala tukang kayu @ Rp. 32,500.00 1,040.00
0.1800 org Pekerja @ Rp. 20,000.00 3,600.00
0.0090 org Mandor @ Rp. 32,500.00 292.50
JUMLAH ( BELUM PPN ) 14,532.50
JASA 10 % 1,453.25
JUMLAH 15,985.75
DIBULATKAN 15,985.00
SNI 1.0000 m2 Langit2 asbes (1,00 x 1,00) m, rangka kayu lama dg plepet
03-2838-2002 0.0600 kg Paku biasa @ Rp. 10,000.00
1.1000 lbr Asbes 1,00 x 1,00 m @ Rp. 10,000.00
2.6000 m1 Plepet kayu @ Rp. 2,000.00
0.0100 kg Paku eternit @ Rp. 11,500.00
0.0100 kg Paku plepet @ Rp. 10,000.00
0.3200 org Tukang kayu @ Rp. 30,000.00 9,600.00
0.0320 org Kepala tukang kayu @ Rp. 32,500.00 1,040.00
0.1800 org Pekerja @ Rp. 20,000.00 3,600.00
0.0090 org Mandor @ Rp. 32,500.00 292.50
JUMLAH ( BELUM PPN ) 14,532.50
JASA 10 % 1,453.25
JUMLAH 15,985.75
DIBULATKAN 15,985.00
SNI 1.0000 m2 Langit2 asbes (1,00 x 1,00) m, rangka kayu kamper dg plepet
0.0120 m3 Kayu kamper balok @ Rp. 4,750,000.00
03-2838-2002 0.0600 kg Paku biasa @ Rp. 10,000.00
1.1000 lbr Asbes 1,00 x 1,00 m @ Rp. 10,000.00
2.6000 m1 Plepet kayu @ Rp. 2,000.00
0.0100 kg Paku eternit @ Rp. 11,500.00
0.0100 kg Paku plepet @ Rp. 10,000.00
0.3200 org Tukang kayu @ Rp. 30,000.00 9,600.00
0.0320 org Kepala tukang kayu @ Rp. 32,500.00 1,040.00
0.1800 org Pekerja @ Rp. 20,000.00 3,600.00
0.0090 org Mandor @ Rp. 32,500.00 292.50
JUMLAH ( BELUM PPN ) 14,532.50
JASA 10 % 1,453.25
JUMLAH 15,985.75
DIBULATKAN 15,985.00
SNI 1.0000 m2 Langit2 asbes (1,00 x 1,00) m, rangka kayu kruing dg plepet
0.0120 m3 Kayu kruing balok @ Rp. 4,350,000.00
03-2838-2002 0.0600 kg Paku biasa @ Rp. 10,000.00
1.1000 lbr Asbes 1,00 x 1,00 m @ Rp. 10,000.00
No. Macam Pekerjaan Upah
(1) (2) (3)
2.6000 m1 Plepet kayu @ Rp. 2,000.00
0.0100 kg Paku eternit @ Rp. 11,500.00
0.0100 kg Paku plepet @ Rp. 10,000.00
0.3200 org Tukang kayu @ Rp. 30,000.00 9,600.00
0.0320 org Kepala tukang kayu @ Rp. 32,500.00 1,040.00
0.1800 org Pekerja @ Rp. 20,000.00 3,600.00
0.0090 org Mandor @ Rp. 32,500.00 292.50
JUMLAH ( BELUM PPN ) 14,532.50
JASA 10 % 1,453.25
JUMLAH 15,985.75
DIBULATKAN 15,985.00
No. Macam Pekerjaan Upah
(1) (2) (3)
6.13 1.0000 m2 Langit2 gypsum t;l 9 mm, rangka 60 x 120 kayu kruing
0.0130 m3 Kayu kruing @ Rp. 4,350,000.00
0.3600 lbr Gypsum board 9 mm @ Rp. 42,000.00
0.0500 roll Kasa gypsum @ Rp. 10,000.00
0.4500 kg Tepung gypsum @ Rp. 3,500.00
0.0030 kg Alkasit @ Rp. 300,000.00
0.0500 kg Paku gypsum @ Rp. 20,000.00
0.1200 kg Paku usuk @ Rp. 8,000.00
0.3700 org Tukang kayu @ Rp. 30,000.00 11,100.00
0.0370 org Kepala tukang kayu @ Rp. 32,500.00 1,202.50
0.2400 org Pekerja @ Rp. 20,000.00 4,800.00
0.0120 org Mandor @ Rp. 32,500.00 390.00
JUMLAH ( BELUM PPN ) 17,492.50
JASA 10 % 1,749.25
JUMLAH 19,241.75
DIBULATKAN 19,241.00
6.13 1.0000 m2 Langit2 kalsiboard t;l 3.5 mm, rangka 60 x 120 ky kruing
0.0130 m3 Kayu kruing @ Rp. 4,350,000.00
0.3600 lbr Kalsiboard 3.5 mm @ Rp. 46,200.00
0.0500 roll Kasa gypsum @ Rp. 10,000.00
0.4500 kg Tepung gypsum @ Rp. 3,500.00
0.0030 kg Alkasit @ Rp. 300,000.00
0.0500 kg Paku gypsum @ Rp. 20,000.00
0.1200 kg Paku usuk @ Rp. 8,000.00
0.3700 org Tukang kayu @ Rp. 30,000.00 11,100.00
0.0370 org Kepala tukang kayu @ Rp. 32,500.00 1,202.50
0.2400 org Pekerja @ Rp. 20,000.00 4,800.00
0.0120 org Mandor @ Rp. 32,500.00 390.00
JUMLAH ( BELUM PPN ) 17,492.50
JASA 10 % 1,749.25
JUMLAH 19,241.75
DIBULATKAN 19,241.00
PEKERJAAN LISPLANG
1.0000 m1 Pasang lisplank ukuran (2 x 20) cm, kayu jati
0.0048 m3 Kayu jati papan @ Rp. 22,000,000.00
0.0600 kg Paku biasa 2" - 5" @ Rp. 8,000.00
0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.0100 org Kepala tukang kayu @ Rp. 32,500.00 325.00
0.1000 org Pekerja @ Rp. 20,000.00 2,000.00
0.0050 org Mandor @ Rp. 32,500.00 162.50
JUMLAH ( BELUM PPN ) 5,487.50
JASA 10 % 548.75
JUMLAH 6,036.25
DIBULATKAN 6,036.00
PEKERJAAN TALANG
SNI 1.0000 m1 Pasang talang datar, seng BJLS 28, papan kayu kamper
6.18 0.5000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 44,000.00
0.0150 kg Paku biasa 1/2" - 1" @ Rp. 8,000.00
0.0096 m3 Kayu kamper papan @ Rp. 5,500,000.00
0.2500 kg Flincoat @ Rp. 35,000.00
0.4000 org Tukang kayu @ Rp. 30,000.00 12,000.00
0.0250 org Kepala tukang kayu @ Rp. 32,500.00 812.50
0.1500 org Pekerja @ Rp. 20,000.00 3,000.00
0.0013 org Mandor @ Rp. 32,500.00 40.63
JUMLAH ( BELUM PPN ) 15,853.13
JASA 10 % 1,585.31
JUMLAH 17,438.44
DIBULATKAN 17,438.00
SNI 1.0000 m1 Pasang talang datar, seng BJLS 28, papan kayu kruing
6.18 0.5000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 44,000.00
0.0150 kg Paku biasa 1/2" - 1" @ Rp. 8,000.00
0.0096 m3 Kayu kruing papan @ Rp. 4,750,000.00
0.2500 kg Flincoat @ Rp. 35,000.00
0.4000 org Tukang kayu @ Rp. 30,000.00 12,000.00
0.0250 org Kepala tukang kayu @ Rp. 32,500.00 812.50
0.1500 org Pekerja @ Rp. 20,000.00 3,000.00
0.0013 org Mandor @ Rp. 32,500.00 40.63
No. Macam Pekerjaan Upah
(1) (2) (3)
JUMLAH ( BELUM PPN ) 15,853.13
JASA 10 % 1,585.31
JUMLAH 17,438.44
DIBULATKAN 17,438.00
No. Macam Pekerjaan Upah
(1) (2) (3)
SNI 1.0000 m1 Pasang talang datar, seng BJLS 28, papan kayu bengkirai
6.18 0.5000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 44,000.00
0.0150 kg Paku biasa 1/2" - 1" @ Rp. 8,000.00
0.0096 m3 Kayui bengkirai papan @ Rp. 6,000,000.00
0.2500 kg Flincoat @ Rp. 35,000.00
0.4000 org Tukang kayu @ Rp. 30,000.00 12,000.00
0.0250 org Kepala tukang kayu @ Rp. 32,500.00 812.50
0.1500 org Pekerja @ Rp. 20,000.00 3,000.00
0.0013 org Mandor @ Rp. 32,500.00 40.63
JUMLAH ( BELUM PPN ) 15,853.13
JASA 10 % 1,585.31
JUMLAH 17,438.44
DIBULATKAN 17,438.00
SNI 1.0000 m1 Pasang talang miring, seng BJLS 28, papan kayu kamper
6.19 0.5000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 44,000.00
0.0150 kg Paku biasa 1/2" - 1" @ Rp. 8,000.00
0.0190 m3 Kayu kamper papan @ Rp. 5,500,000.00
0.2500 kg Flincoat @ Rp. 35,000.00
0.4000 org Tukang kayu @ Rp. 30,000.00 12,000.00
0.0250 org Kepala tukang kayu @ Rp. 32,500.00 812.50
0.0400 org Pekerja @ Rp. 20,000.00 800.00
0.0013 org Mandor @ Rp. 32,500.00 40.63
JUMLAH ( BELUM PPN ) 13,653.13
JASA 10 % 1,365.31
JUMLAH 15,018.44
DIBULATKAN 15,018.00
SNI 1.0000 m1 Pasang talang miring, seng BJLS 28, papan kayu kruing
6.19 0.5000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 44,000.00
0.0150 kg Paku biasa 1/2" - 1" @ Rp. 8,000.00
0.0190 m3 Kayu kruing papan @ Rp. 4,750,000.00
0.2500 kg Flincoat @ Rp. 35,000.00
0.4000 org Tukang kayu @ Rp. 30,000.00 12,000.00
0.0250 org Kepala tukang kayu @ Rp. 32,500.00 812.50
0.0400 org Pekerja @ Rp. 20,000.00 800.00
0.0013 org Mandor @ Rp. 32,500.00 40.63
JUMLAH ( BELUM PPN ) 13,653.13
JASA 10 % 1,365.31
JUMLAH 15,018.44
DIBULATKAN 15,018.00
SNI 1.0000 m1 Pasang talang miring, seng BJLS 28, papan kayu bengkirai
6.19 0.5000 lbr Seng plat 3' x 6' BJLS 28 @ Rp. 44,000.00
0.0150 kg Paku biasa 1/2" - 1" @ Rp. 8,000.00
0.0190 m3 Kayu bengkirai papan @ Rp. 6,000,000.00
0.2500 kg Flincoat @ Rp. 35,000.00
0.4000 org Tukang kayu @ Rp. 30,000.00 12,000.00
0.0250 org Kepala tukang kayu @ Rp. 32,500.00 812.50
0.0400 org Pekerja @ Rp. 20,000.00 800.00
0.0013 org Mandor @ Rp. 32,500.00 40.63
JUMLAH ( BELUM PPN ) 13,653.13
JASA 10 % 1,365.31
JUMLAH 15,018.44
DIBULATKAN 15,018.00
SNI 1.0000 m2 Pasang dinding pemisah teakwood rangkap, rangka kayu kamper
03-3434-2002 0.0195 m3 Kayu kamper balok @ Rp. 4,750,000.00
6.56 0.0070 m3 Kayu kamper papan @ Rp. 5,500,000.00
0.1000 kg Paku biasa 2" - 5" @ Rp. 8,000.00
0.5600 kg Lem kayu @ Rp. 11,000.00
1.0000 lbr Teakwood 4' x 8' x 4 mm @ Rp. 69,500.00
0.4500 org Tukang kayu @ Rp. 30,000.00 13,500.00
0.0450 org Kepala tukang kayu @ Rp. 32,500.00 1,462.50
0.1500 org Pekerja @ Rp. 20,000.00 3,000.00
0.0750 org Mandor @ Rp. 32,500.00 2,437.50
JUMLAH ( BELUM PPN ) 20,400.00
JASA 10 % 2,040.00
JUMLAH 22,440.00
DIBULATKAN 22,440.00
PEKERJAAN ATAP
H.2A 1.0000 m2 Pas. genteng beton besar Natural ( isi 9 / m2 ) untuk r. tingkat
9.0000 bh Genteng beton natural @ Rp. 2,750.00
0.1000 org Tukang batu @ Rp. 27,500.00 2,750.00
0.0100 org Kep. Tk. Batu @ Rp. 30,000.00 300.00
0.3000 org Pekerja @ Rp. 20,000.00 6,000.00
0.0150 org Mandor @ Rp. 32,500.00 487.50
JUMLAH ( BELUM PPN ) 9,537.50
JASA 10 % 953.75
JUMLAH 10,491.25
DIBULATKAN 10,491.00
No. Macam Pekerjaan Upah
(1) (2) (3)
H.2A 1.0000 m2 Pas. genteng beton besar Warna ( isi 9 / m2 ) untuk r. tingkat
9.0000 bh Genteng beton Warna @ Rp. 4,420.00
0.1000 org Tukang batu @ Rp. 27,500.00 2,750.00
0.0100 org Kep. Tk. Batu @ Rp. 30,000.00 300.00
0.3000 org Pekerja @ Rp. 20,000.00 6,000.00
0.0150 org Mandor @ Rp. 32,500.00 487.50
JUMLAH ( BELUM PPN ) 9,537.50
JASA 10 % 953.75
JUMLAH 10,491.25
DIBULATKAN 10,491.00
SNI 1.0000 m2 Pasang atap genteng metal zinc alume type prima roof
03-3436-2002 1.0200 m2 Genteng metal @ Rp. 95,400.00
6.32 0.2000 kg Paku anti karat @ Rp. 20,000.00
0.1000 org Tukang kayu @ Rp. 30,000.00 3,000.00
0.0100 org Kepala tukang kayu @ Rp. 32,500.00 325.00
0.2000 org Pekerja @ Rp. 20,000.00 4,000.00
0.0010 org Mandor @ Rp. 32,500.00 32.50
JUMLAH ( BELUM PPN ) 7,357.50
JASA 10 % 735.75
JUMLAH 8,093.25
DIBULATKAN 8,093.00
PEKERJAAN CAT-CATAN
SNI 1.0000 m2 Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 2 lapis cat penutup
6.8 0.2000 kg Cat meni @ Rp. 12,000.00
0.1500 kg Plamir @ Rp. 12,000.00
0.1700 kg Cat dasar @ Rp. 32,000.00
0.2600 kg Cat penutup @ Rp. 32,000.00
0.0900 org Tukang cat @ Rp. 25,000.00 2,250.00
0.0060 org Kepala tukang cat @ Rp. 27,000.00 162.00
0.0700 org Pekerja @ Rp. 20,000.00 1,400.00
0.0025 org Mandor @ Rp. 32,500.00 81.25
JUMLAH ( BELUM PPN ) 3,893.25
JASA 10 % 389.33
JUMLAH 4,282.58
DIBULATKAN 4,282.00
No. Macam Pekerjaan Upah
(1) (2) (3)
SNI 1.0000 m2 Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 3 lapis cat penutup
6.9 0.2000 kg Cat meni @ Rp. 12,000.00
0.1500 kg Plamir @ Rp. 12,000.00
0.1700 kg Cat dasar @ Rp. 32,000.00
0.3500 kg Cat penutup @ Rp. 32,000.00
0.1050 org Tukang cat @ Rp. 25,000.00 2,625.00
0.0040 org Kepala tukang cat @ Rp. 27,000.00 108.00
0.0700 org Pekerja @ Rp. 20,000.00 1,400.00
0.0025 org Mandor @ Rp. 32,500.00 81.25
JUMLAH ( BELUM PPN ) 4,214.25
JASA 10 % 421.43
JUMLAH 4,635.68
DIBULATKAN 4,635.00
SNI 1.0000 m2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat penutup)
6.14 0.1000 kg Plamir tembok @ Rp. 8,500.00
0.1000 kg Cat dasar @ Rp. 9,500.00
0.2600 kg Cat penutup 2 x @ Rp. 9,500.00
0.0630 org Tukang cat @ Rp. 25,000.00 1,575.00
0.0063 org Kepala tukang cat @ Rp. 27,000.00 170.10
0.0200 org Pekerja @ Rp. 20,000.00 400.00
0.0025 org Mandor @ Rp. 32,500.00 81.25
JUMLAH ( BELUM PPN ) 2,226.35
JASA 10 % 222.64
JUMLAH 2,448.99
DIBULATKAN 2,448.00
SNI 1.0000 m2 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup)
6.15 0.1200 kg Cat dasar @ Rp. 9,500.00
0.1800 kg Cat penutup 2 x @ Rp. 9,500.00
0.0420 org Tukang cat @ Rp. 25,000.00 1,050.00
0.0042 org Kepala tukang cat @ Rp. 27,000.00 113.40
0.0280 org Pekerja @ Rp. 20,000.00 560.00
0.0025 org Mandor @ Rp. 32,500.00 81.25
JUMLAH ( BELUM PPN ) 1,804.65
JASA 10 % 180.47
JUMLAH 1,985.12
DIBULATKAN 1,985.00
SNI 1.0000 m2 Pengecatan tembok tidak terlindung dari panas dan hujan
6.14 0.1000 kg Cat alkali resisting primer @ Rp. 27,200.00
0.3600 kg Cat ICI Weathershield @ Rp. 50,000.00
0.0630 org Tukang cat @ Rp. 25,000.00 1,575.00
0.0063 org Kepala tukang cat @ Rp. 27,000.00 170.10
0.0200 org Pekerja @ Rp. 20,000.00 400.00
0.0025 org Mandor @ Rp. 32,500.00 81.25
JUMLAH ( BELUM PPN ) 2,226.35
JASA 10 % 222.64
JUMLAH 2,448.99
DIBULATKAN 2,448.00
SNI 1.0000 m2 Melabur tembok lama dengan kapur sirih (untuk pemeliharaan)
6.18 0.0020 m3 Perancah kayu @ Rp. 1,000,000.00
0.3000 kg Kapur sirih @ Rp. 500.00
0.0050 org Tukang cat @ Rp. 25,000.00 125.00
0.0005 org Kepala tukang cat @ Rp. 27,000.00 13.50
0.0400 org Pekerja @ Rp. 20,000.00 800.00
0.0025 org Mandor @ Rp. 32,500.00 81.25
JUMLAH ( BELUM PPN ) 1,019.75
JASA 10 % 101.98
JUMLAH 1,121.73
DIBULATKAN 1,121.00
SNI 1.0000 m2 Pengecacatan permukaan baja dengan meni besi memakai perancah
6.21 0.1000 kg Meni besi sinkromat @ Rp. 22,500.00
0.0100 bh Kuas @ Rp. 8,000.00
0.0020 m3 Perancah kayu @ Rp. 1,000,000.00
0.2250 org Tukang cat @ Rp. 25,000.00 5,625.00
0.0225 org Kepala tukang cat @ Rp. 27,000.00 607.50
0.2250 org Pekerja @ Rp. 20,000.00 4,500.00
0.0075 org Mandor @ Rp. 32,500.00 243.75
JUMLAH ( BELUM PPN ) 10,976.25
JASA 10 % 1,097.63
JUMLAH 12,073.88
DIBULATKAN 12,073.00
No. Macam Pekerjaan Upah
(1) (2) (3)
PEKERJAAN BONGKARAN
L.12 1.0000 m3 Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan untuk digunakan lagi
6.0000 org Tukang kayu @ Rp. 30,000.00 180,000.00
0.6000 org Kep. Tk. Kayu @ Rp. 32,500.00 19,500.00
4.0000 org Pekerja @ Rp. 20,000.00 80,000.00
0.2000 org Mandor @ Rp. 32,500.00 6,500.00
JUMLAH ( BELUM PPN ) 286,000.00
JASA 10 % 28,600.00
JUMLAH 314,600.00
DIBULATKAN 314,600.00
1.0000 m3 Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan tidak digunakan lagi
1.0000 org Pekerja @ Rp. 20,000.00 20,000.00
0.2000 org Mandor @ Rp. 32,500.00 6,500.00
JUMLAH ( BELUM PPN ) 26,500.00
JASA 10 % 2,650.00
JUMLAH 29,150.00
DIBULATKAN 29,150.00
ANALISA SUPLEMEN
PEKERJAAN SANITASI
SNI 1.0000 bh Memasang kloset duduk/monoblock
1.0000 bh Kloset duduk / monoblock @ Rp. 1,250,000.00
6.1 6% x Harga kloset (Perlengkapan) @ Rp. 1,250,000.00
1.1000 org Tukang batu @ Rp. 27,500.00 30,250.00
0.0010 org Kepala tukang batu @ Rp. 30,000.00 30.00
3.3000 org Pekerja @ Rp. 20,000.00 66,000.00
0.1600 org Mandor @ Rp. 32,500.00 5,200.00
JUMLAH ( BELUM PPN ) 101,480.00
JASA 10 % 10,148.00
JUMLAH 111,628.00
DIBULATKAN 111,628.00
SNI 1.0000 bh Memasang bak kontrol pas.bata (30 x 30) cm, tinggi 35 cm
87.0000 bh Batu bata @ Rp. 350.00
6.16 44.0000 kg PC @ Rp. 764.00
0.0700 m3 Pasir pasang @ Rp. 76,000.00
0.0700 m3 Batu kerikil @ Rp. 55,000.00
1.6000 kg Besi beton @ Rp. 7,900.00
0.0600 m3 Pasir beton @ Rp. 73,000.00
1.0150 org Tukang batu @ Rp. 27,500.00 27,912.50
0.0015 org Kepala tukang batu @ Rp. 30,000.00 45.00
3.2000 org Pekerja @ Rp. 20,000.00 64,000.00
0.0160 org Mandor @ Rp. 32,500.00 520.00
JUMLAH ( BELUM PPN ) 92,477.50
JASA 10 % 9,247.75
JUMLAH 101,725.25
DIBULATKAN 101,725.00
No. Macam Pekerjaan Upah
(1) (2) (3)
SNI 1.0000 bh Memasang bak kontrol pas. bata (45 x 45) cm, tinggi 50 cm
150.0000 bh Batu bata @ Rp. 350.00
6.17 77.0000 kg PC @ Rp. 764.00
0.1300 m3 Pasir pasang @ Rp. 76,000.00
0.0200 m 3
Batu kerikil @ Rp. 55,000.00
2.6000 kg Besi beton @ Rp. 7,900.00
0.0900 m3 Pasir beton @ Rp. 73,000.00
0.4730 org Tukang batu @ Rp. 27,500.00 13,007.50
0.0470 org Kepala tukang batu @ Rp. 30,000.00 1,410.00
1.4200 org Pekerja @ Rp. 20,000.00 28,400.00
0.0710 org Mandor @ Rp. 32,500.00 2,307.50
JUMLAH ( BELUM PPN ) 45,125.00
JASA 10 % 4,512.50
JUMLAH 49,637.50
DIBULATKAN 49,637.00
SNI 1.0000 bh Memasang bak kontrol pas. bata (60 x 60) cm, tingg 65 cm
222.0000 bh Batu bata @ Rp. 350.00
6.18 114.0000 kg PC @ Rp. 764.00
0.1840 m3 Pasir pasang @ Rp. 76,000.00
0.0330 m 3
Batu kerikil @ Rp. 55,000.00
4.8500 kg Besi beton @ Rp. 7,900.00
0.1200 m3 Pasir beton @ Rp. 73,000.00
0.7200 org Tukang batu @ Rp. 27,500.00 19,800.00
0.0720 org Kepala tukang batu @ Rp. 30,000.00 2,160.00
2.1600 org Pekerja @ Rp. 20,000.00 43,200.00
0.1000 org Mandor @ Rp. 32,500.00 3,250.00
JUMLAH ( BELUM PPN ) 68,410.00
JASA 10 % 6,841.00
JUMLAH 75,251.00
DIBULATKAN 75,251.00
-
-
-
-
-
- 493,000.00
49,300.00
542,300.00
542,300.00
- 5,423.00
20,136.00
160.00
11,746.00
Bahan Jumlah
(4) (5)
32,042.00 37,529.50
3,204.20 3,752.95
35,246.20 41,282.45
35,246.00 41,282.00
- 3,625.00
362.50
3,987.50
3,987.00
58,730.00
35,000.00
6,000.00
48,000.00
12,835.20
1,971.00
3,185.33
165,721.53 295,865.28
16,572.15 29,586.53
182,293.68 325,451.80
182,293.00 325,451.00
22,000.00
2,359.50
3,800.00
28,159.50 51,409.50
2,815.95 5,140.95
30,975.45 56,550.45
30,975.00 56,550.00
Bahan Jumlah
(4) (5)
12,500.00
302,040.00
6,800.00
9,680.00
26,740.00
11,400.00
7,300.00
11,797.50
10,500.00
9,625.00
40,000.00
4,840.00
5,250.00
2,475.00
460,947.50 599,822.50
46,094.75 59,982.25
507,042.25 659,804.75
507,042.00 659,804.00
12,500.00
1,910.00
30,000.00
365.00
707.85
41,950.00
480.00
4,800.00
92,712.85 108,012.85
9,271.29 10,801.29
101,984.14 118,814.14
101,984.00 118,814.00
- 9,300.00
930.00
10,230.00
10,230.00
- 12,229.50
1,222.95
13,452.45
13,452.00
Bahan Jumlah
(4) (5)
- 17,088.75
1,708.88
18,797.63
18,797.00
Bahan Jumlah
(4) (5)
- 14,515.00
1,451.50
15,966.50
15,966.00
- 29,062.50
2,906.25
31,968.75
31,968.00
- 19,157.50
1,915.75
21,073.25
21,073.00
64,000.00
64,000.00 115,988.75
6,400.00 11,598.88
70,400.00 127,587.63
70,400.00 127,587.00
6,925.00
692.50
7,617.50
7,617.00
- 11,945.00
1,194.50
13,139.50
13,139.00
5,325.00
532.50
5,857.50
5,857.00
4,457.50
Bahan Jumlah
(4) (5)
445.75
4,903.25
4,903.00
Bahan Jumlah
(4) (5)
5,325.00
532.50
5,857.50
5,857.00
66,000.00
66,000.00 72,325.00
6,600.00 7,232.50
72,600.00 79,557.50
72,600.00 79,557.00
42,000.00
42,000.00 48,325.00
4,200.00 4,832.50
46,200.00 53,157.50
46,200.00 53,157.00
79,200.00
79,200.00 85,012.50
7,920.00 8,501.25
87,120.00 93,513.75
87,120.00 93,513.00
90,000.00
90,000.00 93,487.50
9,000.00 9,348.75
99,000.00 102,836.25
99,000.00 102,836.00
1,400.00
5,000.00
6,400.00 17,212.50
640.00 1,721.25
7,040.00 18,933.75
7,040.00 18,933.00
Bahan Jumlah
(4) (5)
96,000.00
16,500.00
112,500.00 141,262.50
11,250.00 14,126.25
123,750.00 155,388.75
123,750.00 155,388.00
88,000.00
16,602.50
18,320.00
41,344.00
164,266.50 215,004.00
16,426.65 21,500.40
180,693.15 236,504.40
180,693.00 236,504.00
96,000.00
72,900.88
16,602.50
29,032.00
214,535.38 265,272.88
21,453.54 26,527.29
235,988.92 291,800.17
235,988.00 291,800.00
88,000.00
46,604.00
10,657.50
37,392.00
182,653.50 233,391.00
18,265.35 23,339.10
200,918.85 256,730.10
200,918.00 256,730.00
88,000.00
124,532.00
39,520.00
Bahan Jumlah
(4) (5)
252,052.00 302,789.50
25,205.20 30,278.95
277,257.20 333,068.45
277,257.00 333,068.00
Bahan Jumlah
(4) (5)
24,500.00
3,438.00
1,087.50
3,800.00
32,825.50 42,763.00
3,282.55 4,276.30
36,108.05 47,039.30
36,108.00 47,039.00
24,500.00
8,786.00
3,268.00
36,554.00 46,491.50
3,655.40 4,649.15
40,209.40 51,140.65
40,209.00 51,140.00
49,000.00
7,701.12
1,993.75
7,030.00
65,724.87 85,799.87
6,572.49 8,579.99
72,297.36 94,379.86
72,297.00 94,379.00
49,000.00
20,207.80
7,448.00
76,655.80 96,730.80
7,665.58 9,673.08
84,321.38 106,403.88
84,321.00 106,403.00
18,750.00
9,550.00
3,040.00
Bahan Jumlah
(4) (5)
31,340.00 45,202.50
3,134.00 4,520.25
34,474.00 49,722.75
34,474.00 49,722.00
Bahan Jumlah
(4) (5)
32,000.00
9,550.00
3,040.00
44,590.00 58,452.50
4,459.00 5,845.25
49,049.00 64,297.75
49,049.00 64,297.00
-
256,704.00
39,420.00
63,706.50
359,830.50 413,755.50
35,983.05 41,375.55
395,813.55 455,131.05
395,813.00 455,131.00
166,552.00
37,960.00
68,425.50
272,937.50 316,162.50
27,293.75 31,616.25
300,231.25 347,778.75
300,231.00 347,778.00
56,000.00
46,795.00
30,400.00
51,122.50
184,317.50 344,567.50
18,431.75 34,456.75
202,749.25 379,024.25
202,749.00 379,024.00
Bahan Jumlah
(4) (5)
305,600.00
35,040.00
62,920.00
403,560.00 486,735.00
40,356.00 48,673.50
443,916.00 535,408.50
443,916.00 535,408.00
296,432.00
47,450.00
51,122.50
395,004.50 555,254.50
39,500.45 55,525.45
434,504.95 610,779.95
434,504.00 610,779.00
305,600.00
29,200.00
64,493.00
399,293.00 559,543.00
39,929.30 55,954.30
439,222.30 615,497.30
439,222.00 615,497.00
328,520.00
37,668.00
54,268.50
420,456.50 580,706.50
42,045.65 58,070.65
462,502.15 638,777.15
462,502.00 638,777.00
8,295.00
141.00
8,436.00 8,779.65
843.60 877.97
Bahan Jumlah
(4) (5)
9,279.60 9,657.62
9,279.00 9,657.00
Bahan Jumlah
(4) (5)
8,400.00
141.00
8,541.00 8,884.65
854.10 888.47
9,395.10 9,773.12
9,395.00 9,773.00
28,526.00
24,000.00
3,200.00
55,726.00 76,676.00
5,572.60 7,667.60
61,298.60 84,343.60
61,298.00 84,343.00
28,526.00
31,230.00
3,200.00
62,956.00 83,906.00
6,295.60 8,390.60
69,251.60 92,296.60
69,251.00 92,296.00
- 80,000.00
8,000.00
88,000.00
88,000.00
700,000.00
700,000.00 1,124,812.50
70,000.00 112,481.25
770,000.00 1,237,293.75
770,000.00 1,237,293.00
Bahan Jumlah
(4) (5)
640,000.00
640,000.00 804,275.00
64,000.00 80,427.50
704,000.00 884,702.50
704,000.00 884,702.00
395,813.55 455,131.05
927,960.00 965,761.50
612,986.00 843,436.00
- 88,000.00
1,936,759.55 2,352,328.55
1,936,759.00 2,352,328.00
395,813.55 455,131.05
1,159,950.00 1,207,201.88
612,986.00 843,436.00
- 88,000.00
2,168,749.55 2,593,768.93
2,168,749.00 2,593,768.00
395,813.55 455,131.05
1,391,940.00 1,448,642.25
612,986.00 843,436.00
- 88,000.00
2,400,739.55 2,835,209.30
2,400,739.00 2,835,209.00
395,813.55 455,131.05
1,623,930.00 1,690,082.63
612,986.00 843,436.00
- 88,000.00
2,632,729.55 3,076,649.68
2,632,729.00 3,076,649.00
395,813.55 455,131.05
1,855,920.00 1,931,523.00
612,986.00 843,436.00
- 88,000.00
2,864,719.55 3,318,090.05
2,864,719.00 3,318,090.00
Bahan Jumlah
(4) (5)
395,813.55 455,131.05
927,960.00 965,761.50
612,986.00 843,436.00
770,000.00 1,237,293.75
- 88,000.00
2,706,759.55 3,589,622.30
2,706,759.00 3,589,622.00
Bahan Jumlah
(4) (5)
395,813.55 455,131.05
1,159,950.00 1,207,201.88
612,986.00 843,436.00
770,000.00 1,237,293.75
- 88,000.00
2,938,749.55 3,831,062.68
2,938,749.00 3,831,062.00
395,813.55 455,131.05
1,391,940.00 1,448,642.25
612,986.00 843,436.00
770,000.00 1,237,293.75
- 88,000.00
3,170,739.55 4,072,503.05
3,170,739.00 4,072,503.00
395,813.55 455,131.05
1,623,930.00 1,690,082.63
612,986.00 843,436.00
770,000.00 1,237,293.75
- 88,000.00
3,402,729.55 4,313,943.43
3,402,729.00 4,313,943.00
395,813.55 455,131.05
1,855,920.00 1,931,523.00
612,986.00 843,436.00
770,000.00 1,237,293.75
- 88,000.00
3,634,719.55 4,555,383.80
3,634,719.00 4,555,383.00
395,813.55 455,131.05
927,960.00 965,761.50
612,986.00 843,436.00
704,000.00 884,702.50
- 88,000.00
2,640,759.55 3,237,031.05
2,640,759.00 3,237,031.00
395,813.55 455,131.05
1,159,950.00 1,207,201.88
612,986.00 843,436.00
704,000.00 884,702.50
Bahan Jumlah
(4) (5)
- 88,000.00
2,872,749.55 3,478,471.43
2,872,749.00 3,478,471.00
Bahan Jumlah
(4) (5)
395,813.55 455,131.05
1,391,940.00 1,448,642.25
612,986.00 843,436.00
704,000.00 884,702.50
- 88,000.00
3,104,739.55 3,719,911.80
3,104,739.00 3,719,911.00
395,813.55 455,131.05
1,623,930.00 1,690,082.63
612,986.00 843,436.00
704,000.00 884,702.50
- 88,000.00
3,336,729.55 3,961,352.18
3,336,729.00 3,961,352.00
395,813.55 455,131.05
1,855,920.00 1,931,523.00
612,986.00 843,436.00
704,000.00 884,702.50
- 88,000.00
3,568,719.55 4,202,792.55
3,568,719.00 4,202,792.00
4,974.40
1,588.40
6,562.80 21,312.80
656.28 2,131.28
7,219.08 23,444.08
7,219.00 23,444.00
Bahan Jumlah
(4) (5)
1,405.76
435.00
1,064.00
2,904.76 11,804.76
290.48 1,180.48
3,195.24 12,985.24
3,195.00 12,985.00
3,972.80
1,520.00
5,492.80 14,392.80
549.28 1,439.28
6,042.08 15,832.08
6,042.00 15,832.00
5,401.48
1,596.00
6,997.48 18,719.98
699.75 1,872.00
7,697.23 20,591.98
7,697.00 20,591.00
382.00
152.00
534.00 3,924.00
53.40 392.40
587.40 4,316.40
587.00 4,316.00
3,300.48
1,216.00
4,516.48 9,911.48
451.65 991.15
4,968.13 10,902.63
4,968.00 10,902.00
Bahan Jumlah
(4) (5)
3,300.48
880.00
4,180.48 12,717.98
418.05 1,271.80
4,598.53 13,989.78
4,598.00 13,989.00
2,674.00
2,674.00 5,194.25
267.40 519.43
2,941.40 5,713.68
2,941.00 5,713.00
63,000.00
8,977.00
2,660.00
74,637.00 99,287.00
7,463.70 9,928.70
82,100.70 109,215.70
82,100.00 109,215.00
28,000.00
1,160.00
2,432.00
764.00
32,356.00 50,793.50
3,235.60 5,079.35
35,591.60 55,872.85
35,591.00 55,872.00
Bahan Jumlah
(4) (5)
20,000.00
1,160.00
2,432.00
764.00
24,356.00 42,793.50
2,435.60 4,279.35
26,791.60 47,072.85
26,791.00 47,072.00
40,500.00
3,575.52
684.00
1,312.50
46,072.02 66,728.27
4,607.20 6,672.83
50,679.22 73,401.10
50,679.00 73,401.00
42,500.00
3,117.12
684.00
787.50
47,088.62 67,744.87
4,708.86 6,774.49
51,797.48 74,519.36
51,797.00 74,519.00
30,000.00
3,117.12
684.00
787.50
34,588.62 55,244.87
3,458.86 5,524.49
38,047.48 60,769.36
38,047.00 60,769.00
Bahan Jumlah
(4) (5)
32,000.00
3,117.12
684.00
787.50
36,588.62 57,244.87
3,658.86 5,724.49
40,247.48 62,969.36
40,247.00 62,969.00
32,500.00
3,117.12
684.00
787.50
37,088.62 57,744.87
3,708.86 5,774.49
40,797.48 63,519.36
40,797.00 63,519.00
9,200.00
916.80
228.00
600.00
10,944.80 13,157.30
1,094.48 1,315.73
12,039.28 14,473.03
12,039.00 14,473.00
Bahan Jumlah
(4) (5)
5,850.00
1,260.60
243.20
600.00
7,953.80 10,166.30
795.38 1,016.63
8,749.18 11,182.93
8,749.00 11,182.00
33,660.00
311.71
68.40
78.75
34,118.86 38,250.11
3,411.89 3,825.01
37,530.75 42,075.12
37,530.00 42,075.00
25,000.00
311.71
68.40
78.75
25,458.86 29,590.11
2,545.89 2,959.01
28,004.75 32,549.12
28,004.00 32,549.00
37,500.00
7,105.20
1,368.00
1,968.75
47,941.95 74,686.95
4,794.20 7,468.70
52,736.15 82,155.65
52,736.00 82,155.00
Bahan Jumlah
(4) (5)
38,250.00
2,750.00
41,000.00 59,437.50
4,100.00 5,943.75
45,100.00 65,381.25
45,100.00 65,381.00
46,700.00
2,750.00
49,450.00 67,887.50
4,945.00 6,788.75
54,395.00 74,676.25
54,395.00 74,676.00
38,100.00
2,750.00
40,850.00 59,287.50
4,085.00 5,928.75
44,935.00 65,216.25
44,935.00 65,216.00
46,700.00
2,750.00
49,450.00 67,887.50
4,945.00 6,788.75
54,395.00 74,676.25
54,395.00 74,676.00
Bahan Jumlah
(4) (5)
43,500.00
2,750.00
46,250.00 64,687.50
4,625.00 6,468.75
50,875.00 71,156.25
50,875.00 71,156.00
52,000.00
2,750.00
54,750.00 73,187.50
5,475.00 7,318.75
60,225.00 80,506.25
60,225.00 80,506.00
43,500.00
2,750.00
46,250.00 64,687.50
4,625.00 6,468.75
50,875.00 71,156.25
50,875.00 71,156.00
52,000.00
2,750.00
54,750.00 73,187.50
5,475.00 7,318.75
60,225.00 80,506.25
60,225.00 80,506.00
41,400.00
2,750.00
44,150.00 62,587.50
4,415.00 6,258.75
48,565.00 68,846.25
48,565.00 68,846.00
Bahan Jumlah
(4) (5)
41,400.00
2,750.00
44,150.00 62,587.50
4,415.00 6,258.75
48,565.00 68,846.25
48,565.00 68,846.00
32,000.00
32,000.00 40,812.50
3,200.00 4,081.25
35,200.00 44,893.75
35,200.00 44,893.00
5,225,000.00
112,500.00
6,400.00
5,343,900.00 5,829,400.00
534,390.00 582,940.00
5,878,290.00 6,412,340.00
5,878,290.00 6,412,340.00
4,785,000.00
112,500.00
6,400.00
4,903,900.00 5,389,400.00
490,390.00 538,940.00
5,394,290.00 5,928,340.00
5,394,290.00 5,928,340.00
6,325,000.00
112,500.00
6,400.00
6,443,900.00 6,929,400.00
644,390.00 692,940.00
7,088,290.00 7,622,340.00
Bahan Jumlah
(4) (5)
7,088,290.00 7,622,340.00
Bahan Jumlah
(4) (5)
112,500.00
6,400.00
118,900.00 604,400.00
11,890.00 60,440.00
130,790.00 664,840.00
130,790.00 664,840.00
6,325,000.00
6,400.00
6,331,400.00 6,816,900.00
633,140.00 681,690.00
6,964,540.00 7,498,590.00
6,964,540.00 7,498,590.00
6,400.00
6,400.00 491,900.00
640.00 49,190.00
7,040.00 541,090.00
7,040.00 541,090.00
1,200.00
800.00
2,000.00 7,406.25
200.00 740.63
2,200.00 8,146.88
2,200.00 8,146.00
154,000.00
60,000.00
1,200.00
800.00
216,000.00 221,406.25
21,600.00 22,140.63
237,600.00 243,546.88
237,600.00 243,546.00
Bahan Jumlah
(4) (5)
154,000.00
17,250.00
1,200.00
800.00
173,250.00 178,656.25
17,325.00 17,865.63
190,575.00 196,521.88
190,575.00 196,521.00
44,275.00
60,000.00
1,200.00
800.00
106,275.00 111,681.25
10,627.50 11,168.13
116,902.50 122,849.38
116,902.00 122,849.00
44,275.00
17,250.00
1,200.00
800.00
63,525.00 68,931.25
6,352.50 6,893.13
69,877.50 75,824.38
69,877.00 75,824.00
Bahan Jumlah
(4) (5)
154,000.00
96,000.00
1,200.00
800.00
252,000.00 257,406.25
25,200.00 25,740.63
277,200.00 283,146.88
277,200.00 283,146.00
44,275.00
38,400.00
1,200.00
800.00
84,675.00 90,081.25
8,467.50 9,008.13
93,142.50 99,089.38
93,142.00 99,089.00
44,275.00
27,600.00
1,200.00
800.00
73,875.00 79,281.25
7,387.50 7,928.13
81,262.50 87,209.38
81,262.00 87,209.00
22,000,000.00
22,000,000.00 22,794,750.00
2,200,000.00 2,279,475.00
24,200,000.00 25,074,225.00
### 25,074,225.00
8,800,000.00
8,800,000.00 9,594,750.00
Bahan Jumlah
(4) (5)
880,000.00 959,475.00
9,680,000.00 10,554,225.00
9,680,000.00 10,554,225.00
Bahan Jumlah
(4) (5)
5,700,000.00
5,700,000.00 6,434,750.00
570,000.00 643,475.00
6,270,000.00 7,078,225.00
6,270,000.00 7,078,225.00
5,220,000.00
5,220,000.00 5,954,750.00
522,000.00 595,475.00
5,742,000.00 6,550,225.00
5,742,000.00 6,550,225.00
6,900,000.00
6,900,000.00 7,634,750.00
690,000.00 763,475.00
7,590,000.00 8,398,225.00
7,590,000.00 8,398,225.00
431,200.00
240.00
3,300.00
69,500.00
504,240.00 583,715.00
50,424.00 58,371.50
554,664.00 642,086.50
554,664.00 642,086.00
160,720.00
240.00
3,300.00
69,500.00
233,760.00 313,235.00
23,376.00 31,323.50
257,136.00 344,558.50
257,136.00 344,558.00
Bahan Jumlah
(4) (5)
107,800.00
240.00
3,300.00
69,500.00
180,840.00 260,315.00
18,084.00 26,031.50
198,924.00 286,346.50
198,924.00 286,346.00
93,100.00
240.00
3,300.00
69,500.00
166,140.00 245,615.00
16,614.00 24,561.50
182,754.00 270,176.50
182,754.00 270,176.00
117,600.00
240.00
3,300.00
69,500.00
190,640.00 270,115.00
19,064.00 27,011.50
209,704.00 297,126.50
209,704.00 297,126.00
770,000.00
770,000.00 853,800.00
77,000.00 85,380.00
847,000.00 939,180.00
847,000.00 939,180.00
287,000.00
287,000.00 370,800.00
28,700.00 37,080.00
315,700.00 407,880.00
Bahan Jumlah
(4) (5)
315,700.00 407,880.00
Bahan Jumlah
(4) (5)
192,500.00
192,500.00 276,300.00
19,250.00 27,630.00
211,750.00 303,930.00
211,750.00 303,930.00
166,250.00
166,250.00 250,050.00
16,625.00 25,005.00
182,875.00 275,055.00
182,875.00 275,055.00
210,000.00
210,000.00 293,800.00
21,000.00 29,380.00
231,000.00 323,180.00
231,000.00 323,180.00
880,000.00
880,000.00 984,750.00
88,000.00 98,475.00
968,000.00 1,083,225.00
968,000.00 1,083,225.00
328,000.00
328,000.00 432,750.00
32,800.00 43,275.00
360,800.00 476,025.00
360,800.00 476,025.00
220,000.00
Bahan Jumlah
(4) (5)
220,000.00 324,750.00
22,000.00 32,475.00
242,000.00 357,225.00
242,000.00 357,225.00
Bahan Jumlah
(4) (5)
190,000.00
190,000.00 294,750.00
19,000.00 29,475.00
209,000.00 324,225.00
209,000.00 324,225.00
240,000.00
240,000.00 344,750.00
24,000.00 34,475.00
264,000.00 379,225.00
264,000.00 379,225.00
1,408,000.00
1,408,000.00 1,537,500.00
140,800.00 153,750.00
1,548,800.00 1,691,250.00
1,548,800.00 1,691,250.00
524,800.00
524,800.00 654,300.00
52,480.00 65,430.00
577,280.00 719,730.00
577,280.00 719,730.00
352,000.00
352,000.00 473,375.00
35,200.00 47,337.50
387,200.00 520,712.50
387,200.00 520,712.00
304,000.00
Bahan Jumlah
(4) (5)
304,000.00 425,375.00
30,400.00 42,537.50
334,400.00 467,912.50
334,400.00 467,912.00
Bahan Jumlah
(4) (5)
384,000.00
384,000.00 505,375.00
38,400.00 50,537.50
422,400.00 555,912.50
422,400.00 555,912.00
800.00
800.00 12,356.25
80.00 1,235.63
880.00 13,591.88
880.00 13,591.00
57,000.00
800.00
57,800.00 69,356.25
5,780.00 6,935.63
63,580.00 76,291.88
63,580.00 76,291.00
52,200.00
800.00
53,000.00 64,556.25
5,300.00 6,455.63
58,300.00 71,011.88
58,300.00 71,011.00
69,000.00
800.00
69,800.00 81,356.25
6,980.00 8,135.63
76,780.00 89,491.88
76,780.00 89,491.00
Bahan Jumlah
(4) (5)
61,750.00
960.00
62,710.00 75,363.75
6,271.00 7,536.38
68,981.00 82,900.13
68,981.00 82,900.00
Bahan Jumlah
(4) (5)
56,550.00
960.00
57,510.00 70,163.75
5,751.00 7,016.38
63,261.00 77,180.13
63,261.00 77,180.00
74,750.00
960.00
75,710.00 88,363.75
7,571.00 8,836.38
83,281.00 97,200.13
83,281.00 97,200.00
11,000.00
115.00
11,115.00 14,091.25
1,111.50 1,409.13
12,226.50 15,500.38
12,226.00 15,500.00
11,000.00
5,200.00
115.00
100.00
16,415.00 19,391.25
1,641.50 1,939.13
18,056.50 21,330.38
18,056.00 21,330.00
57,000.00
600.00
11,000.00
68,600.00 83,132.50
6,860.00 8,313.25
75,460.00 91,445.75
75,460.00 91,445.00
Bahan Jumlah
(4) (5)
52,200.00
600.00
11,000.00
63,800.00 78,332.50
6,380.00 7,833.25
70,180.00 86,165.75
70,180.00 86,165.00
69,000.00
600.00
11,000.00
80,600.00 95,132.50
8,060.00 9,513.25
88,660.00 104,645.75
88,660.00 104,645.00
600.00
11,000.00
5,200.00
115.00
100.00
17,015.00 31,547.50
1,701.50 3,154.75
18,716.50 34,702.25
18,716.00 34,702.00
57,000.00
600.00
11,000.00
5,200.00
115.00
100.00
74,015.00 88,547.50
7,401.50 8,854.75
81,416.50 97,402.25
81,416.00 97,402.00
52,200.00
600.00
11,000.00
Bahan Jumlah
(4) (5)
5,200.00
115.00
100.00
69,215.00 83,747.50
6,921.50 8,374.75
76,136.50 92,122.25
76,136.00 92,122.00
Bahan Jumlah
(4) (5)
69,000.00
600.00
11,000.00
5,200.00
115.00
100.00
86,015.00 100,547.50
8,601.50 10,054.75
94,616.50 110,602.25
94,616.00 110,602.00
61,750.00
15,120.00
500.00
1,575.00
900.00
1,000.00
960.00
81,805.00 99,297.50
8,180.50 9,929.75
89,985.50 109,227.25
89,985.00 109,227.00
56,550.00
15,120.00
500.00
1,575.00
900.00
1,000.00
960.00
76,605.00 94,097.50
7,660.50 9,409.75
84,265.50 103,507.25
84,265.00 103,507.00
74,750.00
15,120.00
500.00
1,575.00
900.00
1,000.00
960.00
Bahan Jumlah
(4) (5)
94,805.00 112,297.50
9,480.50 11,229.75
104,285.50 123,527.25
104,285.00 123,527.00
42,750.00
15,120.00
500.00
1,575.00
900.00
1,500.00
2,500.00
64,845.00 82,337.50
6,484.50 8,233.75
71,329.50 90,571.25
71,329.00 90,571.00
Bahan Jumlah
(4) (5)
61,750.00
16,632.00
500.00
1,575.00
900.00
1,000.00
960.00
83,317.00 100,809.50
8,331.70 10,080.95
91,648.70 110,890.45
91,648.00 110,890.00
56,550.00
16,632.00
500.00
1,575.00
900.00
1,000.00
960.00
78,117.00 95,609.50
7,811.70 9,560.95
85,928.70 105,170.45
85,928.00 105,170.00
74,750.00
16,632.00
500.00
1,575.00
900.00
1,000.00
960.00
96,317.00 113,809.50
9,631.70 11,380.95
105,948.70 125,190.45
105,948.00 125,190.00
42,750.00
16,632.00
500.00
1,575.00
900.00
1,500.00
2,500.00
Bahan Jumlah
(4) (5)
66,357.00 83,849.50
6,635.70 8,384.95
72,992.70 92,234.45
72,992.00 92,234.00
Bahan Jumlah
(4) (5)
72,000.00
1,425.00
2,500.00
187,500.00
263,425.00 283,293.75
26,342.50 28,329.38
289,767.50 311,623.13
289,767.00 311,623.00
4,400.00
2,450.00
1,050.00
7,900.00 11,606.50
790.00 1,160.65
8,690.00 12,767.15
8,690.00 12,767.00
8,800.00
3,062.50
1,320.00
13,182.50 16,889.00
1,318.25 1,688.90
14,500.75 18,577.90
14,500.00 18,577.00
16,500.00
3,675.00
1,590.00
21,765.00 25,556.25
2,176.50 2,555.63
23,941.50 28,111.88
23,941.00 28,111.00
6,050.00
100.00
6,150.00 8,910.00
615.00 891.00
Bahan Jumlah
(4) (5)
6,765.00 9,801.00
6,765.00 9,801.00
Bahan Jumlah
(4) (5)
105,600.00
480.00
106,080.00 111,567.50
10,608.00 11,156.75
116,688.00 122,724.25
116,688.00 122,724.00
189,200.00
480.00
189,680.00 195,167.50
18,968.00 19,516.75
208,648.00 214,684.25
208,648.00 214,684.00
39,360.00
480.00
39,840.00 45,327.50
3,984.00 4,532.75
43,824.00 49,860.25
43,824.00 49,860.00
26,400.00
480.00
26,880.00 32,367.50
2,688.00 3,236.75
29,568.00 35,604.25
29,568.00 35,604.00
47,300.00
480.00
47,780.00 53,267.50
4,778.00 5,326.75
52,558.00 58,594.25
52,558.00 58,594.00
Bahan Jumlah
(4) (5)
22,800.00
480.00
23,280.00 28,767.50
2,328.00 2,876.75
25,608.00 31,644.25
25,608.00 31,644.00
Bahan Jumlah
(4) (5)
40,850.00
480.00
41,330.00 46,817.50
4,133.00 4,681.75
45,463.00 51,499.25
45,463.00 51,499.00
28,800.00
480.00
29,280.00 34,767.50
2,928.00 3,476.75
32,208.00 38,244.25
32,208.00 38,244.00
51,600.00
480.00
52,080.00 57,567.50
5,208.00 5,756.75
57,288.00 63,324.25
57,288.00 63,324.00
118,750.00
10,000.00
2,400.00
131,150.00 203,975.00
13,115.00 20,397.50
144,265.00 224,372.50
144,265.00 224,372.00
108,750.00
10,000.00
2,400.00
121,150.00 193,975.00
12,115.00 19,397.50
133,265.00 213,372.50
133,265.00 213,372.00
Bahan Jumlah
(4) (5)
143,750.00
10,000.00
2,400.00
156,150.00 228,975.00
15,615.00 22,897.50
171,765.00 251,872.50
171,765.00 251,872.00
Bahan Jumlah
(4) (5)
22,000.00
160.00
22,160.00 25,425.50
2,216.00 2,542.55
24,376.00 27,968.05
24,376.00 27,968.00
19,000.00
160.00
19,160.00 22,425.50
1,916.00 2,242.55
21,076.00 24,668.05
21,076.00 24,668.00
24,000.00
160.00
24,160.00 27,425.50
2,416.00 2,742.55
26,576.00 30,168.05
26,576.00 30,168.00
22,000.00
120.00
52,800.00
8,750.00
83,670.00 99,523.13
8,367.00 9,952.31
92,037.00 109,475.44
92,037.00 109,475.00
22,000.00
120.00
45,600.00
8,750.00
Bahan Jumlah
(4) (5)
76,470.00 92,323.13
7,647.00 9,232.31
84,117.00 101,555.44
84,117.00 101,555.00
Bahan Jumlah
(4) (5)
22,000.00
120.00
57,600.00
8,750.00
88,470.00 104,323.13
8,847.00 10,432.31
97,317.00 114,755.44
97,317.00 114,755.00
22,000.00
120.00
104,500.00
8,750.00
135,370.00 149,023.13
13,537.00 14,902.31
148,907.00 163,925.44
148,907.00 163,925.00
22,000.00
120.00
90,250.00
8,750.00
121,120.00 134,773.13
12,112.00 13,477.31
133,232.00 148,250.44
133,232.00 148,250.00
22,000.00
120.00
114,000.00
8,750.00
144,870.00 158,523.13
14,487.00 15,852.31
159,357.00 174,375.44
159,357.00 174,375.00
200,000.00
90,000.00
Bahan Jumlah
(4) (5)
290,000.00 442,450.00
29,000.00 44,245.00
2,900.00 4,424.50
31,900.00 48,669.50
31,900.00 48,669.00
Bahan Jumlah
(4) (5)
13,200.00
800.00
114,000.00
4,400.00
132,400.00 143,753.13
13,240.00 14,375.31
145,640.00 158,128.44
145,640.00 158,128.00
92,625.00
38,500.00
800.00
6,160.00
138,085.00 158,485.00
13,808.50 15,848.50
151,893.50 174,333.50
151,893.00 174,333.00
92,625.00
38,500.00
800.00
6,160.00
41,250.00
179,335.00 203,610.00
17,933.50 20,361.00
197,268.50 223,971.00
197,268.00 223,971.00
16,500.00
400.00
16,900.00 19,936.00
1,690.00 1,993.60
18,590.00 21,929.60
18,590.00 21,929.00
Bahan Jumlah
(4) (5)
- 7,375.00
- 737.50
- 8,112.50
- 8,112.00
15,000.00
15,000.00 22,375.00
1,500.00 2,237.50
16,500.00 24,612.50
16,500.00 24,612.00
15,000.00
15,000.00 24,537.50
1,500.00 2,453.75
16,500.00 26,991.25
16,500.00 26,991.00
24,750.00
24,750.00 32,125.00
2,475.00 3,212.50
27,225.00 35,337.50
27,225.00 35,337.00
24,750.00
24,750.00 34,287.50
2,475.00 3,428.75
27,225.00 37,716.25
27,225.00 37,716.00
Bahan Jumlah
(4) (5)
39,780.00
39,780.00 47,155.00
3,978.00 4,715.50
43,758.00 51,870.50
43,758.00 51,870.00
39,780.00
39,780.00 49,317.50
3,978.00 4,931.75
43,758.00 54,249.25
43,758.00 54,249.00
8,250.00
1,102.00
1,155.20
1,164.34
11,671.54 26,421.54
1,167.15 2,642.15
12,838.69 29,063.69
12,838.00 29,063.00
12,300.00
1,102.00
1,155.20
1,164.34
15,721.54 30,471.54
1,572.15 3,047.15
17,293.69 33,518.69
17,293.00 33,518.00
Bahan Jumlah
(4) (5)
17,040.00
1,102.00
1,155.20
1,164.34
20,461.54 35,211.54
2,046.15 3,521.15
22,507.69 38,732.69
22,507.00 38,732.00
31,480.00
1,122.00
32,602.00 38,172.00
3,260.20 3,817.20
35,862.20 41,989.20
35,862.00 41,989.00
30,198.00
1,122.00
31,320.00 36,675.00
3,132.00 3,667.50
34,452.00 40,342.50
34,452.00 40,342.00
33,967.50
1,122.00
35,089.50 40,444.50
3,508.95 4,044.45
38,598.45 44,488.95
38,598.00 44,488.00
24,972.50
1,122.00
26,094.50 31,449.50
2,609.45 3,144.95
28,703.95 34,594.45
28,703.00 34,594.00
Bahan Jumlah
(4) (5)
26,840.00
1,122.00
27,962.00 33,227.00
2,796.20 3,322.70
30,758.20 36,549.70
30,758.00 36,549.00
29,325.00
1,122.00
30,447.00 35,712.00
3,044.70 3,571.20
33,491.70 39,283.20
33,491.00 39,283.00
28,760.00
1,122.00
29,882.00 35,147.00
2,988.20 3,514.70
32,870.20 38,661.70
32,870.00 38,661.00
41,747.10
1,122.00
42,869.10 48,134.10
4,286.91 4,813.41
47,156.01 52,947.51
47,156.00 52,947.00
41,521.90
1,122.00
42,643.90 47,908.90
4,264.39 4,790.89
46,908.29 52,699.79
46,908.00 52,699.00
Bahan Jumlah
(4) (5)
38,700.20
1,122.00
39,822.20 45,087.20
3,982.22 4,508.72
43,804.42 49,595.92
43,804.00 49,595.00
38,583.30
1,122.00
39,705.30 44,970.30
3,970.53 4,497.03
43,675.83 49,467.33
43,675.00 49,467.00
69,600.00
4,500.00
74,100.00 80,082.50
7,410.00 8,008.25
81,510.00 88,090.75
81,510.00 88,090.00
60,900.00
4,500.00
65,400.00 71,382.50
6,540.00 7,138.25
71,940.00 78,520.75
71,940.00 78,520.00
59,450.00
4,500.00
63,950.00 69,932.50
6,395.00 6,993.25
70,345.00 76,925.75
70,345.00 76,925.00
Bahan Jumlah
(4) (5)
97,308.00
4,000.00
101,308.00 108,665.50
10,130.80 10,866.55
111,438.80 119,532.05
111,438.00 119,532.00
61,200.00
4,800.00
66,000.00 73,357.50
6,600.00 7,335.75
72,600.00 80,693.25
72,600.00 80,693.00
26,250.00
26,250.00 31,172.50
2,625.00 3,117.25
28,875.00 34,289.75
28,875.00 34,289.00
236,250.00
61,600.00
10,800.00
308,650.00 332,581.25
30,865.00 33,258.13
339,515.00 365,839.38
339,515.00 365,839.00
Bahan Jumlah
(4) (5)
750.00
750.00 3,831.25
75.00 383.13
825.00 4,214.38
825.00 4,214.00
1,800.00
5,440.00
5,440.00
12,680.00 16,238.75
1,268.00 1,623.88
13,948.00 17,862.63
13,948.00 17,862.00
17,960.00 21,853.25
1,796.00 2,185.33
19,756.00 24,038.58
19,756.00 24,038.00
Bahan Jumlah
(4) (5)
20,840.00 25,054.25
2,084.00 2,505.43
22,924.00 27,559.68
22,924.00 27,559.00
3,000.00
7,440.00
5,000.00
15,440.00 17,453.25
1,544.00 1,745.33
16,984.00 19,198.58
16,984.00 19,198.00
1,875.00
500.00
250.00
80.00
2,705.00 10,418.25
270.50 1,041.83
2,975.50 11,460.08
2,975.00 11,460.00
Bahan Jumlah
(4) (5)
4,270.00 6,496.35
427.00 649.64
4,697.00 7,145.99
4,697.00 7,145.00
1,140.00
1,710.00
2,850.00 4,654.65
285.00 465.47
3,135.00 5,120.12
3,135.00 5,120.00
2,720.00
18,000.00
20,720.00 22,946.35
2,072.00 2,294.64
22,792.00 25,240.99
22,792.00 25,240.00
250.00
125.00
2,000.00
75.00
2,450.00 5,558.95
245.00 555.90
2,695.00 6,114.85
2,695.00 6,114.00
Bahan Jumlah
(4) (5)
2,000.00
150.00
2,150.00 3,169.75
215.00 316.98
2,365.00 3,486.73
2,365.00 3,486.00
2,004.00
6,400.00
1,800.00
10,204.00 14,418.25
1,020.40 1,441.83
11,224.40 15,860.08
11,224.00 15,860.00
2,250.00
80.00
2,330.00 8,595.00
233.00 859.50
2,563.00 9,454.50
2,563.00 9,454.00
akai perancah
2,250.00
80.00
2,000.00
4,330.00 15,306.25
433.00 1,530.63
4,763.00 16,836.88
4,763.00 16,836.00
Bahan Jumlah
(4) (5)
2,800.00
2,800.00 4,962.50
280.00 496.25
3,080.00 5,458.75
3,080.00 5,458.00
25,500.00
741.00
26,241.00 39,126.00
2,624.10 3,912.60
28,865.10 43,038.60
28,865.00 43,038.00
1,440.00
1,440.00 3,989.25
13,600.00
1,000.00
14,600.00 241,425.00
16,040.00 245,414.25
1,604.00 24,541.43
17,644.00 269,955.68
17,644.00 269,955.00
15,120.00
15,120.00 17,346.35
1,512.00 1,734.64
16,632.00 19,080.99
16,632.00 19,080.00
- 118,000.00
- 11,800.00
- 129,800.00
Bahan Jumlah
(4) (5)
- 129,800.00
- 57,000.00
- 5,700.00
- 62,700.00
- 62,700.00
- 168,750.00
- 16,875.00
- 185,625.00
- 185,625.00
Bahan Jumlah
(4) (5)
- 43,250.00
- 4,325.00
- 432.50
- 4,757.50
- 4,757.00
- 29,062.50
- 2,906.25
- 290.63
- 3,196.88
- 3,196.00
- 43,250.00
- 4,325.00
- 432.50
- 4,757.50
- 4,757.00
- 32,500.00
- 3,250.00
- 325.00
- 3,575.00
- 3,575.00
- 63,200.00
- 6,320.00
- 632.00
- 6,952.00
- 6,952.00
- 43,250.00
- 4,325.00
- 432.50
- 4,757.50
- 4,757.00
Bahan Jumlah
(4) (5)
- 286,000.00
- 28,600.00
- 314,600.00
- 314,600.00
- 26,500.00
- 2,650.00
- 29,150.00
- 29,150.00
- 485,500.00
- 48,550.00
- 534,050.00
- 534,050.00
19,500.00
75,000.00
94,500.00 169,700.00
9,450.00 16,970.00
103,950.00 186,670.00
103,950.00 186,670.00
Bahan Jumlah
(4) (5)
1,250,000.00
75,000.00
1,325,000.00 1,426,480.00
132,500.00 142,648.00
1,457,500.00 1,569,128.00
1,457,500.00 1,569,128.00
75,000.00
4,584.00
760.00
80,344.00 191,794.00
8,034.40 19,179.40
88,378.40 210,973.40
88,378.00 210,973.00
785,000.00
235,500.00
4,584.00
760.00
1,025,844.00 1,079,594.00
102,584.40 107,959.40
1,128,428.40 1,187,553.40
1,128,428.00 1,187,553.00
271,340.00
32,560.80
4,584.00
760.00
309,244.80 380,869.80
30,924.48 38,086.98
340,169.28 418,956.78
340,169.00 418,956.00
Bahan Jumlah
(4) (5)
275,000.00
49,500.00
324,500.00 454,525.00
32,450.00 45,452.50
356,950.00 499,977.50
356,950.00 499,977.00
150,000.00
30,000.00
180,000.00 212,687.50
18,000.00 21,268.75
198,000.00 233,956.25
198,000.00 233,956.00
825,000.00
99,000.00
924,000.00 1,164,000.00
92,400.00 116,400.00
1,016,400.00 1,280,400.00
1,016,400.00 1,280,400.00
26,400.00
5,600.00
2,994.88
4,256.00
1,320.00
40,570.88 45,733.38
4,057.09 4,573.34
44,627.97 50,306.72
44,627.00 50,306.00
27,500.00
115,500.00
7,869.20
4,636.00
3,795.00
159,300.20 173,312.70
Bahan Jumlah
(4) (5)
15,930.02 17,331.27
175,230.22 190,643.97
175,230.00 190,643.00
30,450.00
33,616.00
5,320.00
3,850.00
12,640.00
4,380.00
90,256.00 182,733.50
9,025.60 18,273.35
99,281.60 201,006.85
99,281.00 201,006.00
Bahan Jumlah
(4) (5)
52,500.00
58,828.00
9,880.00
1,100.00
20,540.00
6,570.00
149,418.00 194,543.00
14,941.80 19,454.30
164,359.80 213,997.30
164,359.00 213,997.00
77,700.00
87,096.00
13,984.00
1,815.00
38,315.00
8,760.00
227,670.00 296,080.00
22,767.00 29,608.00
250,437.00 325,688.00
250,437.00 325,688.00
18,000.00
5,250.00
23,250.00 27,952.50
2,325.00 2,795.25
25,575.00 30,747.75
25,575.00 30,747.00
30,000.00
8,750.00
38,750.00 43,452.50
3,875.00 4,345.25
42,625.00 47,797.75
42,625.00 47,797.00
45,000.00
13,125.00
Bahan Jumlah
(4) (5)
58,125.00 62,827.50
5,812.50 6,282.75
63,937.50 69,110.25
63,937.00 69,110.00
60,000.00
17,500.00
77,500.00 85,325.50
7,750.00 8,532.55
85,250.00 93,858.05
85,250.00 93,858.00
Bahan Jumlah
(4) (5)
3,795.00
1,106.88
4,901.88 7,510.38
490.19 751.04
5,392.06 8,261.41
5,392.00 8,261.00
5,100.00
1,487.50
6,587.50 9,196.00
658.75 919.60
7,246.25 10,115.60
7,246.00 10,115.00
6,150.00
1,793.75
7,943.75 10,552.25
794.38 1,055.23
8,738.13 11,607.48
8,738.00 11,607.00
13,500.00
3,937.50
17,437.50 20,046.00
1,743.75 2,004.60
19,181.25 22,050.60
19,181.00 22,050.00
Bahan Jumlah
(4) (5)
18,000.00
5,250.00
23,250.00 27,170.75
2,325.00 2,717.08
25,575.00 29,887.83
25,575.00 29,887.00
24,600.00
7,175.00
31,775.00 34,383.50
3,177.50 3,438.35
34,952.50 37,821.85
34,952.00 37,821.00
24,600.00
7,175.00
31,775.00 38,845.00
3,177.50 3,884.50
34,952.50 42,729.50
34,952.00 42,729.00
40,500.00
11,812.50
52,312.50 59,382.50
5,231.25 5,938.25
57,543.75 65,320.75
57,543.00 65,320.00
Bahan Jumlah
(4) (5)
500,000.00
75,000.00
575,000.00 584,798.75
57,500.00 58,479.88
632,500.00 643,278.63
632,500.00 643,278.00
25,000.00
62.50
25,062.50 28,475.00
2,506.25 2,847.50
27,568.75 31,322.50
27,568.00 31,322.00
55,000.00
55,000.00 58,412.50
5,500.00 5,841.25
60,500.00 64,253.75
60,500.00 64,253.00
19,500.00
75,000.00
94,500.00 169,700.00
9,450.00 16,970.00
103,950.00 186,670.00
103,950.00 186,670.00
9,680.00
1,800.00
11,480.00 13,001.75
1,148.00 1,300.18
12,628.00 14,301.93
12,628.00 14,301.00
Bahan Jumlah
(4) (5)
750,000.00
750,000.00 782,045.00
75,000.00 78,204.50
825,000.00 860,249.50
825,000.00 860,249.00
250,000.00
250,000.00 307,435.00
25,000.00 30,743.50
275,000.00 338,178.50
275,000.00 338,178.00
500,000.00
500,000.00 550,254.00
50,000.00 55,025.40
550,000.00 605,279.40
550,000.00 605,279.00
Bahan Jumlah
(4) (5)
200,000.00
200,000.00 261,504.00
20,000.00 26,150.40
220,000.00 287,654.40
220,000.00 287,654.00
400,000.00
400,000.00 450,254.00
40,000.00 45,025.40
440,000.00 495,279.40
440,000.00 495,279.00
101,200.00
101,200.00 158,567.50
10,120.00 15,856.75
111,320.00 174,424.25
111,320.00 174,424.00
27,500.00
200.00
9,900.00
37,600.00 42,941.25
3,760.00 4,294.13
41,360.00 47,235.38
41,360.00 47,235.00
Bahan Jumlah
(4) (5)
9,075.00
200.00
9,900.00
19,175.00 24,516.25
1,917.50 2,451.63
21,092.50 26,967.88
21,092.00 26,967.00
11,000.00
200.00
9,900.00
21,100.00 26,441.25
2,110.00 2,644.13
23,210.00 29,085.38
23,210.00 29,085.00
22,000.00
200.00
187.50
22,387.50 33,070.00
2,238.75 3,307.00
24,626.25 36,377.00
24,626.00 36,377.00
250,000.00
250,000.00 271,247.50
25,000.00 27,124.75
275,000.00 298,372.25
275,000.00 298,372.00
Bahan Jumlah
(4) (5)
125,000.00
125,000.00 140,687.50
12,500.00 14,068.75
137,500.00 154,756.25
137,500.00 154,756.00
50,000.00
50,000.00 65,343.75
5,000.00 6,534.38
55,000.00 71,878.13
55,000.00 71,878.00
75,000.00
75,000.00 90,270.63
7,500.00 9,027.06
82,500.00 99,297.69
82,500.00 99,297.00
11,000.00
11,000.00 16,311.88
1,100.00 1,631.19
12,100.00 17,943.06
12,100.00 17,943.00
7,500.00
7,500.00 11,187.50
750.00 1,118.75
8,250.00 12,306.25
8,250.00 12,306.00
3,000.00
3,000.00 10,375.00
300.00 1,037.50
Bahan Jumlah
(4) (5)
3,300.00 11,412.50
3,300.00 11,412.00
Bahan Jumlah
(4) (5)
7,500.00
7,500.00 12,811.88
750.00 1,281.19
8,250.00 14,093.06
8,250.00 14,093.00
3,000.00
3,000.00 8,311.88
300.00 831.19
3,300.00 9,143.06
3,300.00 9,143.00
150,000.00
150,000.00 167,706.25
15,000.00 16,770.63
165,000.00 184,476.88
165,000.00 184,476.00
50,000.00
50,000.00 57,082.50
5,000.00 5,708.25
55,000.00 62,790.75
55,000.00 62,790.00
15,000.00
15,000.00 32,706.25
1,500.00 3,270.63
16,500.00 35,976.88
16,500.00 35,976.00
15,000.00
15,000.00 18,541.25
1,500.00 1,854.13
Bahan Jumlah
(4) (5)
16,500.00 20,395.38
16,500.00 20,395.00
Bahan Jumlah
(4) (5)
200,000.00
200,000.00 221,247.50
20,000.00 22,124.75
220,000.00 243,372.25
220,000.00 243,372.00
12,000.00
12,000.00 20,853.13
1,200.00 2,085.31
13,200.00 22,938.44
13,200.00 22,938.00
54,450.00
54,450.00 59,761.88
5,445.00 5,976.19
59,895.00 65,738.06
59,895.00 65,738.00
66,550.00
66,550.00 71,861.88
6,655.00 7,186.19
73,205.00 79,048.06
73,205.00 79,048.00
132,000.00
132,000.00 137,311.88
13,200.00 13,731.19
145,200.00 151,043.06
145,200.00 151,043.00
330,000.00
330,000.00 335,311.88
Bahan Jumlah
(4) (5)
33,000.00 33,531.19
363,000.00 368,843.06
363,000.00 368,843.00
Bahan Jumlah
(4) (5)
60,500.00
8,250.00
68,750.00 73,229.38
6,875.00 7,322.94
68,750.00 73,677.31
68,750.00 73,677.00
ANALISA KPUT
No. Macam Pekerjaan Upah Bahan Jumlah
(1) (2) (3) (4) (5)
KPUT 100.0000 m2 Perkerasan lapis pondasi bawah (sub base) tebal 20 cm padat
10.8 5.0000 m3 Pasair pasang @ Rp. 76,000.00 380,000.00
23.0000 m3 Batu belah 15/20 @ Rp. 80,000.00 1,840,000.00
3.0000 m3 Batu pecah 5/7 cm @ Rp. 132,000.00 396,000.00
6.5000 m3 Pasir urug @ Rp. 55,000.00 357,500.00
26.0000 m Isi batu berkerasan
3
@ Rp. 32,372.00 841,672.00
6.5000 Tng Menyawur pasir @ Rp. 20,000.00 130,000.00
JUMLAH ( BELUM TERMASUK PPN ) 971,672.00 2,973,500.00 3,945,172.00
DIBULATKAN 3,945,172.00
Tiap m2
1/100 x 971,672.00 + 2,973,500.00 9,716.72 29,735.00
Biaya menggilas
1/200 x 86,900.00 + 120,550.00 434.50 602.75
Sewa motor walls
1/200 x #REF! #REF!
JUMLAH ( BELUM TERMASUK PPN ) #REF! 30,337.75 #REF!
JASA 10 % #REF!
JUMLAH #REF!
DIBULATKAN #REF!
Tiap m2
1/100 x 763,626.00 + 2,412,000.00 7,636.26 24,120.00
Biaya menggilas
1/200 x 86,900.00 + 120,550.00 434.50 602.75
Sewa motor walls
1/200 x #REF! #REF!
JUMLAH ( BELUM TERMASUK PPN ) #REF! 24,722.75 #REF!
JASA 10 % #REF!
Tiap m2
1/100 x 485,836.00 + 1,896,750.00 4,858.36 18,967.50
Biaya menggilas
1/150 x 86,900.00 + 120,550.00 579.33 803.67
Sewa motor walls
1/150 x #REF! #REF!
JUMLAH ( BELUM TERMASUK PPN ) #REF! 19,771.17 #REF!
JASA 10 % #REF!
JUMLAH #REF!
DIBULATKAN #REF!
Tiap m2
1/100 x 406,900.00 + #REF! 4,069.00 #REF!
Biaya menggilas
4/12,5/200 x 86,900.00 + 120,550.00 139.04 192.88
Sewa motor walls
1/200 x #REF! #REF!
JUMLAH ( BELUM TERMASUK PPN ) #REF! #REF! #REF!
JASA 10 % #REF!
JUMLAH #REF!
DIBULATKAN #REF!
Tiap m2
Aspal sand sheet 2 cm jereng (1 cm padat)
2/100 x 180,000.00 + 1,488,250.00 3,600.00 29,765.00
Biaya menggilas
1/500 x 86,900.00 + 120,550.00 173.80 241.10
Sewa motor walls
1/500 x #REF! #REF!
Aspal untuk lem 0,5 kg
0.5000 x 10,650.00 5,325.00
JUMLAH ( BELUM TERMASUK PPN ) #REF! 35,331.10 #REF!
JASA 10 % #REF!
JUMLAH #REF!
DIBULATKAN #REF!
Tiap m2
Aspal sand sheet 3 cm jereng (2 cm padat)
3/100 x 180,000.00 + 1,488,250.00 5,400.00 44,647.50
Biaya menggilas
1/500 x 86,900.00 + 120,550.00 173.80 241.10
Sewa motor walls
1/500 x #REF! #REF!
Aspal untuk lem 0,5 kg
0.5000 x 10,650.00 5,325.00
JUMLAH ( BELUM TERMASUK PPN ) #REF! 50,213.60 #REF!
JASA 10 % #REF!
JUMLAH #REF!
DIBULATKAN #REF!
KPUT 100.0000 m2 Pengaspalan sand sheet (latasir) tanpa aspal, tebal 1 cm jereng
M.8 - kg Aspal 10,650.00 -
1.0000 m3 Pasair pasang @ Rp. 76,000.00 76,000.00
0.9000 m3 Kayu bakar @ Rp. 90,000.00 81,000.00
0.2500 org Juru godog aspal @ Rp. 20,000.00 5,000.00
8.1000 org Pekerja @ Rp. 20,000.00 162,000.00
0.4000 org Mandor @ Rp. 32,500.00 13,000.00
JUMLAH ( BELUM TERMASUK PPN ) 180,000.00 157,000.00 337,000.00
DIBULATKAN 337,000.00
Tiap m2
Aspal sand sheet 2 cm jereng (1 cm padat) tanpa aspal
2/100 x 180,000.00 + 157,000.00 3,600.00 3,140.00
Biaya menggilas
1/500 x 86,900.00 + 120,550.00 173.80 241.10
Sewa motor walls
1/500 x #REF! #REF!
Aspal untuk lem 0,5 kg
- x 10,650.00 -
JUMLAH ( BELUM TERMASUK PPN ) #REF! 3,381.10 #REF!
JASA 10 % #REF!
JUMLAH #REF!
DIBULATKAN #REF!
Tiap m2
Aspal sand sheet 3 cm jereng (2 cm padat) tanpa aspal
3/100 x 180,000.00 + 157,000.00 5,400.00 4,710.00
Biaya menggilas
1/500 x 86,900.00 + 120,550.00 173.80 241.10
Sewa motor walls
1/500 x #REF! #REF!
Aspal untuk lem 0,5 kg
- x 10,650.00 -
JUMLAH ( BELUM TERMASUK PPN ) #REF! 4,951.10 #REF!
JASA 10 % #REF!
JUMLAH #REF!
DIBULATKAN #REF!
25. 1.0000 set Pasang Stang Ornamen 2,2 meter + Lampu SRP 822/250 Watt Son + pengetesan dan penyalaan
0.5000 org Pekerja @ Rp. 20,000.00 10,000.00
0.5000 org Tukang Listrik @ Rp. 29,000.00 14,500.00
1.2500 org Pengawas @ Rp. 37,200.00 46,500.00
0.5000 org Mandor @ Rp. 32,500.00 16,250.00
JUMLAH (A) 87,250.00 - 87,250.00
27. 1.0000 set Pasang Stang Ornamen 6 meter + Lampu SRP 822/250 Watt Son
0.8750 org Pekerja @ Rp. 20,000.00 17,500.00
0.8750 org Tukang Listrik @ Rp. 29,000.00 25,375.00
1.8033 org Pengawas @ Rp. 37,200.00 67,082.76
0.7413 org Mandor @ Rp. 32,500.00 24,093.23
JUMLAH (C) 134,050.99 - 134,050.99
28. 1.0000 set Pasang Stang Ornamen 2,2 meter + Lampu SRP 822/250 Watt Son
0.5000 org Pekerja @ Rp. 20,000.00 10,000.00
0.5000 org Tukang Listrik @ Rp. 29,000.00 14,500.00
1.2500 org Pengawas @ Rp. 37,200.00 46,500.00
0.5000 org Mandor @ Rp. 32,500.00 16,250.00
JUMLAH (D) 87,250.00 - 87,250.00
29. 1.0000 set Pasang Tiang Octogonal Cabang 1, h= 7 meter+ lampu SRP 822/250 Watt Son
0.4200 m3 Pondasi Tiang Beton bertulang 1:2:3 @ Rp. 4,313,943.43 1,811,856.24
2.8500 org Pekerja @ Rp. 20,000.00 57,000.00
2.8500 org Tukang Listrik @ Rp. 29,000.00 82,650.00
2.0075 org Pengawas @ Rp. 37,200.00 74,679.00
1.0000 org Mandor @ Rp. 32,500.00 32,500.00
JUMLAH (E) 246,829.00 1,811,856.24 2,058,685.24
30. 1.0000 set Pasang Tiang Octogonal Cabang 1, h= 9 meter + lampu SRP 822/250 Watt Son
0.4200 m3 Pondasi Tiang Beton bertulang 1:2:3 @ Rp. 4,313,943.43 1,811,856.24
3.1000 org Pekerja @ Rp. 20,000.00 62,000.00
3.1000 org Tukang Listrik @ Rp. 29,000.00 89,900.00
2.5000 org Pengawas @ Rp. 37,200.00 93,000.00
1.2100 org Mandor @ Rp. 32,500.00 39,325.00
JUMLAH (F) 284,225.00 1,811,856.24 2,096,081.24
31. 1.0000 set Pasang Tiang Octogonal Cabang 2, h= 9 meter+ lampu SRP 822/250 Watt Son
0.4200 m3 Pondasi Tiang Beton bertulang 1:2:3 @ Rp. 4,313,943.43 1,811,856.24
3.3000 org Pekerja @ Rp. 20,000.00 66,000.00
3.3000 org Tukang Listrik @ Rp. 29,000.00 95,700.00
2.5782 org Pengawas @ Rp. 37,200.00 95,909.04
1.2433 org Mandor @ Rp. 32,500.00 40,407.25
JUMLAH (G) 298,016.29 1,811,856.24 2,109,872.53
32. 1.0000 set Pasang Tiang Octogonal Cabang 3, h= 9 m+ lampu SRP 822/250 Watt Son
0.4200 m3 Pondasi Tiang Beton bertulang 1:2:3 @ Rp. 4,313,943.43 1,811,856.24
3.8100 org Pekerja @ Rp. 20,000.00 76,200.00
3.8100 org Tukang Listrik @ Rp. 29,000.00 110,490.00
2.6626 org Pengawas @ Rp. 37,200.00 99,048.72
1.2650 org Mandor @ Rp. 32,500.00 41,112.50
JUMLAH (H) 326,851.22 1,811,856.24 2,138,707.46
33. 1.0000 set Pasang Tiang Octogonal Cabang 3, h= 11 m+ lampu SRP 822/250 Watt Son
0.4200 m 3
Pondasi Tiang Beton bertulang 1:2:3 @ Rp. 4,313,943.43 1,811,856.24
4.2500 org Pekerja @ Rp. 20,000.00 85,000.00
4.2500 org Tukang Listrik @ Rp. 29,000.00 123,250.00
2.9287 org Pengawas @ Rp. 37,200.00 108,947.64
1.2939 org Mandor @ Rp. 32,500.00 42,051.75
JUMLAH (I) 359,249.39 1,811,856.24 2,171,105.63
34. 1.0000 set Bongkar armatur pada stang ornamen existing + pasang lampu SRP 822/150 Watt Son + return
0.9000 org Pekerja @ Rp. 20,000.00 18,000.00
0.9000 org Tukang Listrik @ Rp. 29,000.00 26,100.00
2.1044 org Pengawas @ Rp. 37,200.00 78,283.68
0.8418 org Mandor @ Rp. 32,500.00 27,358.50
0.0500 unit Retur material existing @ Rp. 100,000.00 5,000.00
JUMLAH (J) 154,742.18 - 154,742.18
35. 1.0000 set Bongkar armatur pada stang ornamen existing + pasang Lampu SRP 822/250 Watt Son + retur
0.8750 org Pekerja @ Rp. 20,000.00 17,500.00
0.8750 org Tukang Listrik @ Rp. 29,000.00 25,375.00
1.6995 org Pengawas @ Rp. 37,200.00 63,221.40
0.6798 org Mandor @ Rp. 32,500.00 22,093.50
0.0500 unit Retur material existing @ Rp. 100,000.00 5,000.00
JUMLAH (K) 133,189.90 - 133,189.90
36. 1.0000 set Bongkar armatur pada tang existing + pasang Lampu SRP 822/250 Watt Son + retur
0.9000 org Pekerja @ Rp. 20,000.00 18,000.00
0.9000 org Tukang Listrik @ Rp. 29,000.00 26,100.00
2.1044 org Pengawas @ Rp. 37,200.00 78,283.68
0.8418 org Mandor @ Rp. 32,500.00 27,358.50
0.0500 unit Retur material existing @ Rp. 100,000.00 5,000.00
JUMLAH (L) 154,742.18 - 154,742.18
37. 1.0000 set Bongkar komponen lama existing + pasang komponen Lampu SRP 822/250 Watt Son + retur
0.8500 org Pekerja @ Rp. 20,000.00 17,000.00
0.8500 org Tukang Listrik @ Rp. 29,000.00 24,650.00
1.9554 org Pengawas @ Rp. 37,200.00 72,740.88
0.7822 org Mandor @ Rp. 32,500.00 25,421.50
0.0500 unit Retur material existing @ Rp. 100,000.00 5,000.00
JUMLAH (M) 144,812.38 - 144,812.38
I URAIAN PERALATAN
1 Jenis Peralatan ASPHALT MIXING PLANT E01
2 Tenaga Pw 150.00 HP
3 Kapasitas Cp 50.00 Ton/jam
4 Alat Baru : a. Umur Ekonomis A 10.00 Tahun
b. Jam Kerja dalam 1 Tahun W 1,500.00 Jam
c. Harga Alat B 7,500,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 10.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 1,500.00 Jam Alat Baru
c. Harga Alat B' 7,500,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
I URAIAN PERALATAN
1 Jenis Peralatan ASPHALT FINISHER E02
2 Tenaga Pw 47.00 HP
3 Kapasitas Cp 6.00 Ton
4 Alat Baru : a. Umur Ekonomis A 6.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000 Jam
c. Harga Alat B 715,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 6.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 715,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
I URAIAN PERALATAN
1 Jenis Peralatan ASPHALT SPRAYER E03
2 Tenaga Pw 15.00 HP
3 Kapasitas Cp 800.00 Liter
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000 Jam
c. Harga Alat B 145,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 145,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
I URAIAN PERALATAN
1 Jenis Peralatan BULLDOZER 100 -150 HP E04
2 Tenaga Pw 140.00 HP
3 Kapasitas Cp Ton
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000 Jam
c. Harga Alat B 700,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 700,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
I URAIAN PERALATAN
1 Jenis Peralatan COMPRESSOR 4000 - 6500 L/M E05
2 Tenaga Pw 80.00 HP
3 Kapasitas Cp Ton
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000 Jam
c. Harga Alat B 175,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 175,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
I URAIAN PERALATAN
1 Jenis Peralatan WHEEL LOADER 1,0 - 1,6 M3 E15
2 Tenaga Pw 105.00 HP
3 Kapasitas Cp 1.50 Ton
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 840,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 840,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
I URAIAN PERALATAN
1 Jenis Peralatan TANDEM ROLLER 6 - 8 T E17
2 Tenaga Pw 50.00 HP
3 Kapasitas Cp 8.00 Ton
4 Alat Baru a Umur Ekonomis A 5.00 Tahun
b Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c Harga Alat B 460,000,000.00 Rupiah
5 Alat yang dipakai a Umur Ekonomis A' 5.00 Tahun Alat Baru
b Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c Harga Alat B' 460,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
I URAIAN PERALATAN
1 Jenis Peralatan PNEUMATIC TYRE ROLLER 8 - 10 T E18
2 Tenaga Pw 60.00 HP
3 Kapasitas Cp 10.00 Ton
4 Alat Baru a Umur Ekonomis A 5.00 Tahun
b Jam Kerja dalam 1 Tahun W 1,800.00 Jam
c Harga Alat B 510,000,000.00 Rupiah
5 Alat yang dipakai a Umur Ekonomis A' 5.00 Tahun Alat Baru
b Jam Kerja dalam 1 Tahun W' 1,800.00 Jam Alat Baru
c Harga Alat B' 510,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
I URAIAN PERALATAN
1 Jenis Peralatan DUMP TRUCK E09
2 Tenaga Pw 125.00 HP
3 Kapasitas Cp 8.00 Ton
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 145,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 145,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
I URAIAN PERALATAN
1 Jenis Peralatan GENERATOR SET E12
2 Tenaga Pw 175.00 HP
3 Kapasitas Cp 125.00 KVA
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 440,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 440,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
I URAIAN PERALATAN
1 Jenis Peralatan MOTOR GRADER > 100 HP E12
2 Tenaga Pw 125.00 HP
3 Kapasitas Cp - -
4 Alat Baru a Umur Ekonomis A 5.00 Tahun
b Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c Harga Alat B 880,000,000.00 Rupiah
5 Alat yang dipakai a Umur Ekonomis A' 5.00 Tahun Alat Baru
b Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c Harga Alat B' 880,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
I URAIAN PERALATAN
1 Jenis Peralatan VIBRATORY ROLLER 5 - 8 T E19
2 Tenaga Pw 75.00 HP
3 Kapasitas Cp 7.00 Ton
4 Alat Baru Umur Ekonomis A 4.00 Tahun
Jam Kerja dalam 1 Tahun W 2,000.00 Jam
Harga Alat B 500,000,000.00 Rupiah
5 Alat yang dipakai a Umur Ekonomis A' 4.00 Tahun Alat Baru
b Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c Harga Alat B' 500,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
I URAIAN PERALATAN
1 Jenis Peralatan WATER TANK TRUCK 3000 - 4000 L E23
2 Tenaga Pw 100.00 HP
3 Kapasitas Cp 4,000.00 Liter
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 50,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 50,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
I URAIAN PERALATAN
1 Jenis Peralatan JACK HAMMER E26
2 Tenaga Pw 3.00 HP
3 Kapasitas Cp - Liter
4 Alat Baru : a. Umur Ekonomis A 4.00 Tahun
b. Jam Kerja dalam 1 Tahun W 1,000.00 Jam
c. Harga Alat B 3,500,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 4.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 1,000.00 Jam Alat Baru
c. Harga Alat B' 3,500,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
I URAIAN PERALATAN
1 Jenis Peralatan TAMPER E25
2 Tenaga Pw 5.00 HP
3 Kapasitas Cp 0.170 Ton
4 Alat Baru : a. Umur Ekonomis A 4.00 Tahun
b. Jam Kerja dalam 1 Tahun W 1,000.00 Jam
c. Harga Alat B 3,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 4.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 1,000.00 Jam Alat Baru
c. Harga Alat B' 3,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
I URAIAN PERALATAN
1 Jenis Peralatan STONE CRUSHER E21
2 Tenaga Pw 220.00 HP
3 Kapasitas Cp 50.00 Ton/Jam
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 491,500,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 491,500,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
I URAIAN PERALATAN
1 Jenis Peralatan THREE WHEEL ROLLER 6 - 8 T E16
2 Tenaga Pw 55.00 HP
3 Kapasitas Cp 8.00 Ton
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 125,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 125,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
I URAIAN PERALATAN
1 Jenis Peralatan CONCRETE VIBRATOR E20
2 Tenaga Pw 10.00 HP
3 Kapasitas Cp - -
4 Alat Baru : a. Umur Ekonomis A 4.00 Tahun
b. Jam Kerja dalam 1 Tahun W 1,000.00 Jam
c. Harga Alat B 12,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 4.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 1,000.00 Jam Alat Baru
c. Harga Alat B' 12,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
I URAIAN PERALATAN
1 Jenis Peralatan CONCRETE MIXER 0.3 - 0.6 M3 E06
2 Tenaga Pw 15.00 HP
3 Kapasitas Cp 500.00 Liter
4 Alat Baru : a. Umur Ekonomis A 4.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 45,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 4.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 45,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
I URAIAN PERALATAN
1 Jenis Peralatan CRANE 10 - 15 TON E07
2 Tenaga Pw 150.00 HP
3 Kapasitas Cp 15.00 Ton
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 300,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 300,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
I URAIAN PERALATAN
1 Jenis Peralatan DUMP TRUCK 3 - 4 M3 E08
2 Tenaga Pw 100.00 HP
3 Kapasitas Cp 6.00 Ton
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 100,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 100,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
I URAIAN PERALATAN
1 Jenis Peralatan EXCAVATOR 80 - 140 HP E10
2 Tenaga Pw 80.00 HP
3 Kapasitas Cp 0.50 M3
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 250,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 250,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
I URAIAN PERALATAN
1 Jenis Peralatan FLAT BED TRUCK 3 - 4 M3 E11
2 Tenaga Pw 100.00 HP
3 Kapasitas Cp 4.00 M3
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 250,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 250,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
I URAIAN PERALATAN
1 Jenis Peralatan WATER PUMP 70 - 100 mm E22
2 Tenaga Pw 6.00 HP
3 Kapasitas Cp - -
4 Alat Baru : a. Umur Ekonomis A 2.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 5,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 2.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 5,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
I URAIAN PERALATAN
1 Jenis Peralatan FULVI MIXER E27
2 Tenaga Pw 75.00 HP
3 Kapasitas Cp - -
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 100,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 100,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
I URAIAN PERALATAN
1 Jenis Peralatan TRACK LOADER 75 - 100 HP E14
2 Tenaga Pw 90.00 HP
3 Kapasitas Cp 1.60 M3
4 Alat Baru : a. Umur Ekonomis A 5.00 Tahun
b. Jam Kerja dalam 1 Tahun W 2,000.00 Jam
c. Harga Alat B 300,000,000.00 Rupiah
5 Alat Yang Dipakai : a. Umur Ekonomis A' 5.00 Tahun Alat Baru
b. Jam Kerja dalam 1 Tahun W' 2,000.00 Jam Alat Baru
c. Harga Alat B' 300,000,000.00 Rupiah Alat Baru
V LAIN LAIN
1 Tingkat suku bunga (i) 20.00 % / Tahun
2 Upah Operator / Sopir U1 3,625.00 Rp / Jam
3 Upah Pembantu Operator / Pembantu Sopir U2 2,750.00 Rp / Jam
4 Bahan bakar bensin Mb 4,500.00 Liter
5 Bahan bakar solar Ms 4,300.00 Liter
6 Minyak Pelumas Mp 14,000.00 Liter
7 PPn diperhitungkan pada lembar Rekapitulasi Biaya Pekerjaan
HARGA JUMLAH
NO KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A TENAGA
1 Pekerja ( L 01 ) Jam 0.0113 2,500.00 28.34
2 Mandor ( L 03 ) Jam 0.0016 4,062.50 6.58
B BAHAN
1 Agregat Kasar ( M 03 ) M3 0.0121 126,500.00 1,532.51
2 Agregat Halus ( M 04 ) M3 0.0232 79,750.00 1,850.41
3 Filler ( M 05 ) Kg 4.8004 750.00 3,600.33
4 Aspal ( M 10 ) Kg 5.2962 10,650.00 56,404.89
C PERALATAN
1 Wheel Loader ( E 15 ) Jam 0.0011 #REF! #REF!
2 AMP ( E 01 ) Jam 0.0016 #REF! #REF!
3 Genset ( E 12 ) Jam 0.0016 #REF! #REF!
4 Dump Truck ( E 09 ) Jam 0.0143 #REF! #REF!
5 Aspal Finisher ( E 02 ) Jam 0.0020 #REF! #REF!
6 Tandem Roller ( E 17 ) Jam 0.0017 #REF! #REF!
7 Pneumatic Tyre Roller ( E 18 ) Jam 0.0013 #REF! #REF!
8 Alat Bantu Ls 1.0000 500.00 500.00
JUMLAH #REF!
JASA 10 % #REF!
JUMLAH ( BELUM TERMASUK PPN ) #REF!
DIBULATKAN #REF!
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )
dan biaya biaya lainnya
Analisa - E 239
URAIAN ANALISA HARGA SATUAN LATASTON ( HRS )
SATUAN : M2 Analisa EI - 633
I ASUMSI
1 Menggunakan alat berat ( cara mekanik )
2 Lokasi pekerjaan sepanjang jalan
3 Kondisi existing jalan sedang
4 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.0 Km
5 Tebal lapisan padat t 0.03 m
6 Jam kerja efektif 1 hari Tk 7.00 Jam
7 Faktor kehilangan material
- Agregat Fh 1 1.10 -
- Aspal Fh 2 1.05 -
II METODA KERJA
1 WHEEL LOADER memuat agregat dan aspal kedalam Coldbin AMP
2 Agregat dan aspal dicampur dan dipanaskan dengan AMP untuk dimuat
langsung ke dalam Dump Truck dan diangkut ke lokasi pekerjaan.
3 Campuran panas HRS dihampar dengan Finisher dan dipadatakan dengan
Tandem dan Peneumatic Tire Roller
4 Selama pemadatan sekelompok pekerja merapikan tepi hamparan dengan
menggunakan alat bantu
2 ALAT
a Wheel Loader ( E 15 )
Kapasitas bucket V 1.50 m3
Faktor bucket Fb 0.90 -
Faktor efisiensi alat Fa 0.83 -
Waktu siklus Ts 1
- Muat T1 1.50 menit
- Lain lain T2 0.50 menit
Ts 1 2.00 menit
Analisa - E 240
No URAIAN KODE KOEF. SATUAN KET.
d Dump Truk ( DT ) ( E 09 )
Kapasitas bak V 8.00 ton
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata rata bermuatan v1 40.00 km / jam
Kecepatan rata rata kosong v2 50.00 km / jam
Kapasitas AMP batch Q2 b 0.50 ton
Waktu menyiapkan 1 batch HRS Tb 1.00 menit
Waktu Siklus Ts2
- Mengisi bak = ( V : Q2b ) x Tb T1 16.00 menit
- Angkut = ( L : v1 ) x 60 menit T2 30.00 menit
- Tunggu + Dumping + Putar T3 15.00 menit
- Kembali = ( L : v2 ) x 60 menit T4 24.00 menit
Ts2 85.00 menit
e Finisher ( E 02 )
Kapasitas produksi V 40.00 km / jam
Faktor efisiensi alat Fa 0.83 -
f Tandem Roller ( E 17 )
Kecepatan rata rata alat v 3.50 km/jam
Lebar efektif pemadatan b 1.20 m
Jumlah lintasan n 6.00 lintasan
Faktor efisiensi alat Fa 0.83 -
Analisa - E 241
No URAIAN KODE KOEF. SATUAN KET.
h Alat Bantu
Diperlukan :
- Kereta dorong = 2 bh Lump sum
- Skop = 3 bh
- Garpu = 2 bh
- Tongkat kontrol ketebalan hamparan
3 TENAGA
Produksi menentukan : ASPALT MIXING PLANT ( AMP ) Q2 617.56 m2 / jam
Produksi HRS / hari = Tk x Q2 Qt 4,322.92 m2
Kebutuhan tenaga
- Pekerja P 7.00 orang
- Mandor M 1.00 orang
Rp #REF! / M2
Analisa - E 242
FORMULIR STANDAR UNTUK PEREKAMAN ANALISA
MASING MASING HARGA SATUAN
HARGA JUMLAH
NO KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A TENAGA
1 Pekerja ( L 01 ) Jam 0.0217 2,500.00 54.22
2 Mandor ( L 03 ) Jam 0.0022 4,062.50 8.81
B BAHAN
1 Agregat Kasar ( M 03 ) M3 0.0336 126,500.00 4,254.51
2 Agregat Halus ( M 04 ) M3 0.0149 79,750.00 1,184.29
3 Filler ( M 05 ) Kg 4.8015 750.00 3,601.13
4 Aspal ( M 10 ) Kg 6.6150 10,650.00 70,449.75
C PERALATAN
1 Wheel Loader ( E 15 ) Jam 0.0015 #REF! #REF!
2 AMP ( E 01 ) Jam 0.0022 #REF! #REF!
3 Genset ( E 12 ) Jam 0.0022 #REF! #REF!
4 Dump Truck ( E 09 ) Jam 0.0348 #REF! #REF!
5 Aspal Finisher ( E 02 ) Jam 0.0027 #REF! #REF!
6 Tandem Roller ( E 17 ) Jam 0.0016 #REF! #REF!
7 Pneumatic Tyre Roller ( E 18 ) Jam 0.0023 #REF! #REF!
8 Alat Bantu Ls 1.0000 500.00 500.00
JUMLAH #REF!
JASA 10 % #REF!
JUMLAH ( BELUM TERMASUK PPN ) #REF!
DIBULATKAN #REF!
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )
dan biaya biaya lainnya
Analisa - E 243
URAIAN ANALISA HARGA SATUAN LASTON ( AC )
SATUAN : M2 Analisa EI - 634
I ASUMSI
1 Menggunakan alat berat
2 Lokasi pekerjaan sepanjang jalan
3 Kondisi existing jalan sedang
4 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.0 Km
5 Tebal lapisan ( AC ) padat t 0.04 m
6 Jam kerja efektif 1 hari Tk 7.00 Jam
7 Faktor kehilangan material
- Agregat Fh 1 1.10 -
- Aspal Fh 2 1.05 -
II METODA KERJA
1 WHEEL LOADER memuat agregat dan aspal kedalam Coldbin AMP
2 Agregat dan aspal dicampur dan dipanaskan dengan AMP untuk dimuat
langsung ke dalam Dump Truck dan diangkut ke lapangan
3 Campuran panas AC dihampar dengan Finisher dan dipadatakan dengan
Tandem dan Tire Roller
4 Selama pemadatan sekelompok pekerja merapikan tepi hamparan dengan
menggunakan alat bantu
2 ALAT
a Wheel Loader ( E 15 )
Kapasitas bucket V 1.50 m3
Faktor bucket Fb 0.90 -
Faktor efisiensi alat Fa 0.83 -
Waktu siklus Ts 1
- Muat T1 1.50 menit
- Lain lain T2 0.50 menit
Ts 1 2.00 menit
Analisa - E 244
No URAIAN KODE KOEF. SATUAN KET.
d Dump Truk ( DT ) ( E 09 )
Kapasitas bak V 4.00 m3
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata rata bermuatan v1 40.00 km / jam
Kecepatan rata rata kosong v2 50.00 km / jam
Kapasitas AMP batch Q2 b 0.50 ton
Waktu menyiapkan 1 batch AC Tb 1.00 menit
Waktu Siklus Ts2
- Mengisi bak = ( V : Q2b ) x Tb T1 8.00 menit
- Angkut = ( L : v1 ) x 60 menit T2 29.99 menit
- Tunggu + Dumping + Putar T3 15.00 menit
- Kembali = ( L : v2 ) x 60 menit T4 23.99 menit
Ts2 76.98 menit
e Finisher ( E 02 )
Kapasitas produksi V 40.00 ton / jam
Faktor efisiensi alat Fa 0.83 -
f Tandem Roller ( E 17 )
Kecepatan rata rata alat v 2.50 km / jam
Lebar efektif pemadatan b 1.20 m
Jumlah lintasan n 4.00 lintasan
Faktor efisiensi alat Fa 0.83 -
Analisa - E 245
No URAIAN KODE KOEF. SATUAN KET.
h Alat Bantu
Diperlukan :
- Rambu = 2 bh
- Kereta dorong = 2 bh Lump sum
- Skop = 3 bh
- Garpu = 2 bh
- Tongkat kontrol ketebalan hamparan
3 TENAGA
Produksi menentukan : ASPALT MIXING PLANT ( AMP ) Q2 461.11 m2 / jam
Produksi AC / hari = Tk x Q2 Qt 3,227.78 m2
Kebutuhan tenaga
- Pekerja P 10.00 orang
- Mandor M 1.00 orang
Rp #REF! / M2
Analisa - E 246
FORMULIR STANDAR UNTUK PEREKAMAN ANALISA
MASING MASING HARGA SATUAN
HARGA JUMLAH
NO KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A TENAGA
1 Pekerja ( L 01 ) Jam 0.3880 2,500.00 969.88
2 Mandor ( L 03 ) Jam 0.0554 4,062.50 225.15
B BAHAN
1 Agregat Kasar ( M 03 ) M3 0.7028 126,500.00 88,901.39
2 Agregat Halus ( M 04 ) M3 0.5341 79,750.00 42,595.36
3 Filler ( M 05 ) Kg 139.2 750.00 104,399.98
4 Aspal ( M 10 ) Kg 157.0 10,650.00 1,672,049.95
C PERALATAN
1 Wheel Loader ( E 15 ) Jam 0.0380 #REF! #REF!
2 AMP ( E 01 ) Jam 0.0554 #REF! #REF!
3 Genset ( E 12 ) Jam 0.0554 #REF! #REF!
4 Dump Truck ( E 09 ) Jam 0.4906 #REF! #REF!
5 Aspal Finisher ( E 02 ) Jam 0.0767 #REF! #REF!
6 Tandem Roller ( E 17 ) Jam 0.0430 #REF! #REF!
7 Pneumatic Tyre Roller ( E 18 ) Jam 0.0321 #REF! #REF!
8 Alat Bantu Ls 1.0000 500.00 500.00
JUMLAH #REF!
JASA 10 % #REF!
JUMLAH ( BELUM TERMASUK PPN ) #REF!
DIBULATKAN #REF!
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )
dan biaya biaya lainnya
Analisa - E 247
URAIAN ANALISA HARGA SATUAN ASPHALT TREATED BASE ( ATB )
I ASUMSI
1 Menggunakan alat berat ( Cara mekanik )
2 Lokasi pekerjaan sepanjang jalan
3 Kondisi existing jalan sedang
4 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.0 Km
5 Tebal lapisan ( ATB ) padat t 0.04 m
6 Jam kerja efektif 1 hari Tk 7.00 Jam
7 Faktor kehilangan material
- Agregat Fh 1 1.10 -
- Aspal Fh 2 1.05 -
II METODA KERJA
1 WHEEL LOADER memuat agregat dan aspal kedalam Coldbin AMP
2 Agregat dan aspal dicampur dan dipanaskan dengan AMP untuk dimuat
langsung ke dalam Dump truck dan diangkut ke lokasi pekerjaan
3 Campuran panas ATB dihampar dengan Finisher dan dipadatakan dengan
Tandem dan Pneumatic Roller
4 Selama pemadatan sekelompok pekerja merapikan tepi hamparan dengan
menggunakan alat bantu
2 ALAT
a Wheel Loader ( E 15 )
Kapasitas bucket V 1.50 m3
Faktor bucket Fb 0.90 -
Faktor efisiensi alat Fa 0.83 -
Waktu siklus Ts 1
- Muat T1 1.50 menit
- Lain lain T2 0.50 menit
Ts 1 2.00 menit
Analisa - E 248
No URAIAN KODE KOEF. SATUAN KET.
d Dump Truk ( DT ) ( E 09 )
Kapasitas bak V 8.00 ton
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata rata bermuatan v1 40.00 km / jam
Kecepatan rata rata kosong v2 50.00 km / jam
Kapasitas AMP batch Q2 b 0.50 ton
Waktu menyiapkan 1 batch ATB Tb 1.00 menit
Waktu Siklus Ts2
- Mengisi bak = ( V : Q2b ) x Tb T1 16.00 menit
- Angkut = ( L : v1 ) x 60 menit T2 29.99 menit
- Tunggu + Dumping + Putar T3 15.00 menit
- Kembali = ( L : v2 ) x 60 menit T4 23.99 menit
Ts2 84.99 menit
e Finisher
Kapasitas produksi V 40.00 ton/jam
Faktor efisiensi alat Fa 0.75 -
f Tandem Roller ( E 17 )
Kecepatan rata rata alat v 3.50 km / jam
Lebar efektif pemadatan b 1.20 m
Jumlah lintasan n 6.00 lintasan
Faktor efisiensi alat Fa 0.83 -
Analisa - E 249
No URAIAN KODE KOEF. SATUAN KET.
h Alat Bantu
Diperlukan :
- Kereta dorong = 2 bh Lump sum
- Skop = 3 bh
- Garpu = 2 bh
- Tongkat kontrol ketebalan hamparan
3 TENAGA
Produksi menentukan : ASPALT MIXING PLANT ( AMP ) Q2 18.04 m3 / jam
Produksi ATB / hari = Tk x Q2 Qt 126.30 m3
Kebutuhan tenaga
- Pekerja P 7.00 orang
- Mandor M 1.00 orang
Rp #REF! / M3
Analisa - E 250
FORMULIR STANDAR UNTUK PEREKAMAN ANALISA
MASING MASING HARGA SATUAN
HARGA JUMLAH
NO KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A TENAGA
1 Pekerja ( L 01 ) Jam 0.0301 2,500.00 75.30
2 Mandor ( L 03 ) Jam 0.0060 4,062.50 24.47
B BAHAN
1 Aspal ( M 10 ) ( M 10 ) Kg 0.6417 10,650.00 6,834.30
2 Karosene ( M 11 ) ( M 11 ) Liter 0.4889 1,000.00 488.90
C PERALATAN
1 Asphalt Sprayer ( E 03 ) Jam 0.0030 #REF! #REF!
2 Compresor ( E 05 ) Jam 0.0031 #REF! #REF!
3 Dump Truck ( E 08 ) Jam 0.0030 #REF! #REF!
JUMLAH #REF!
JASA 10 % #REF!
JUMLAH ( BELUM TERMASUK PPN ) #REF!
DIBULATKAN #REF!
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )
dan biaya biaya lainnya
Analisa - E 251
URAIAN ANALISA HARGA SATUAN LAPIS RESAP PENGIKAT
I ASUMSI
1 Menggunakan alat berat
2 Lokasi pekerjaan sepanjang jalan
3 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.00 Km
4 Jam kerja efektif 1 hari Tk 7.00 Jam
5 Faktor kehilangan material Fh 1.10 -
6 Komposisi campuran AC ( Spesifikasi )
- Aspal AC - 10 atau AC - 20 AS 56 % 100 Bagian
- Minyak Flux / pencair K 44 % 80 Bagian
8 Bahan dasar ( aspal dan minyak pencair ) semuanya diterima di Lokasi Pekerjaan
II METODA KERJA
1 Aspal dan minyak Flux dicampur dan dipanaskan sehingga menjadi campuran aspal cair
2 Permukaan yang akan dilapis dibersihkan dari debu dan kotoran dg air kompresor
3 Campuran aspal cair disemprotkan dg aspahalt sprayer ke atas permukaan yg akan dilapis
4 Angkutan aspal dan minyak Flux menggunakan Dump truck
2 ALAT
a Asphalt Sprayer ( E 03 )
Kapasitas alat V 800.00 liter
Faktor efisiensi alat Fa 0.83 -
Waktu siklus ( termasuk proses pemanasan ) Ts 2.00 jam
b Air Compresor ( E 05 )
Kapasitas alat -----------> Diambil V 400.00 m2 / jam
Aplikasi Lapis Resap Pengikat Rata rata ( Spesifikasi ) Ap 0.80 liter / m2
Analisa - E 252
No URAIAN KODE KOEF. SATUAN KET.
c Dump Truk ( DT ) ( E 08 )
Sebagai alat pengangkut bahan di lokasi pekerjaan Dump Truck melayani alat
Asphalt Sprayer
3 TENAGA
Produksi menentukan : ASPALT FINISHER Q4 332.00 Liter
Produksi Lapis Resap Pengikat / hari = Tk x Q4 Qt 2,324.00 Liter
Kebutuhan tenaga
- Pekerja P 10.00 orang
- Mandor M 2.00 orang
Rp #REF! / LITER
Analisa - E 253
FORMULIR STANDAR UNTUK PEREKAMAN ANALISA
MASING MASING HARGA SATUAN
HARGA JUMLAH
NO KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A TENAGA
1 Pekerja ( L 01 ) Jam 0.4373 2,500.00 1,093.26
2 Mandor ( L 03 ) Jam 0.0625 4,062.50 253.79
B BAHAN
1 Agregat Kasar ( M 03 ) M3 0.7680 126,500.00 97,152.00
2 Agregat Halus ( M 04 ) M3 0.4320 79,750.00 34,452.00
C PERALATAN
1 Wheel Loader ( E 15 ) Jam 0.0625 #REF! #REF!
2 Dump Truck ( E 09 ) Jam 0.1994 #REF! #REF!
3 Motor Grader ( E 13 ) Jam 0.0117 #REF! #REF!
4 Vibratory Roller ( E 19 ) Jam 0.0178 #REF! #REF!
5 Pneumatic Tyre Roller ( E 18 ) Jam 0.0043 #REF! #REF!
6 Water Tank Truck ( E 23 ) Jam 0.0211 #REF! #REF!
7 Alat Bantu Ls 1.0000 500.00 500.00
JUMLAH #REF!
JASA 10 % #REF!
JUMLAH ( BELUM TERMASUK PPN ) #REF!
DIBULATKAN #REF!
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )
dan biaya biaya lainnya
Analisa - E 254
URAIAN ANALISA HARGA SATUAN LAPIS PONDASI AGREGAT KLAS A
I ASUMSI
1 Menggunakan alat berat Cara mekanik
2 Lokasi pekerjaan sepanjang jalan
3 Kondisi existing jalan sedang
4 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.0 Km
5 Tebal Agregat padat t 0.15 m
6 Faktor kembang material ( padat - lepas ) Fk 1.20
7 Jam kerja efektif per hari Tk 7.00 Jam
8 Proporsi campuran
- Agregat Kasar Ak 64.00 % Tabel; 5.1.2 (a)
- Agregat halus Ah 36.00 %
II METODA KERJA
1 WHEEL LOADER mencampur dan memuat agregat ke dalam Dump Truck di
Base camp
2 Dump Truck mengangkut Agregat ke lokasi pekerjaan dan dihampar dg motor
Grader
3 Hamparan Agregat di basahi dengan Water Tank Truck sebelum dipadatkan
dengan Tandem Roller & PTR
4 Selama pemadatan sekelompok pekerja akan merapikan tepi hamparan dan
level permukaan dengan menggunakan alat bantu
2 ALAT
a Wheel Loader ( E 15 )
Kapasitas bucket V 1.50 m3
Faktor bucket Fb 0.90 -
Faktor efisiensi alat Fa 0.83 -
Waktu siklus Ts 1
- Mencampur T1 2.50 menit
- Memuat dan Lain lain T2 1.00 menit
Ts 1 3.50 menit
b Dump Truk ( DT ) ( E 09 )
Kapasitas bak V 6.00 m3
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata rata bermuatan v1 45.00 km / jam
Kecepatan rata rata kosong v2 60.00 km / jam
Waktu Siklus Ts2
- Waktu tempuh isi = ( L : v1 ) x 60 menit T1 26.65 menit
- Waktu tempuh kosong = ( L : v2 ) x 60 menit T2 19.99 menit
- lain lain termasuk menurunkan Agregat T3 3.00 menit
Analisa - E 255
No URAIAN KODE KOEF. SATUAN KET.
c Motor Grader ( E 13 )
Panjang hamparan Lh 50.00 m
Lebar efektif kerja blade b 2.40 m
Faktor Efisiensi alat Fa 0.83 -
Kecepatan rata rata alat v 4.00 km / jam
Jumlah lintasan n 6.00 Lintas 3 x pp
Waktu siklus Ts 3
- Perataan 1 Lintasan = Lh : ( v x 1000 x 60 menit ) T1 0.75 menit
- Lain lain T2 1.00 menit
Ts 3 1.75 menit
d Vibratory Roller ( E 19 )
Kecepatan rata rata alat v 3.00 km / jam
Lebar efektif pemadatan b 1.20 m
Jumlah lintasan n 8.00 lintasan
Faktor efisiensi alat Fa 0.83 -
Analisa - E 256
No URAIAN KODE KOEF. SATUAN KET.
g Alat Bantu
Diperlukan :
3 TENAGA
Produksi menentukan : WHEEL LOADER Q1 16.01 m3 / jam
Produksi Agregat / hari = Tk x Q1 Qt 112.05 m3
Kebutuhan tenaga
- Pekerja P 7.00 orang
- Mandor M 1.00 orang
Rp #REF! / M2
Analisa - E 257
FORMULIR STANDAR UNTUK PEREKAMAN ANALISA
MASING MASING HARGA SATUAN
HARGA JUMLAH
NO KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A TENAGA
1 Pekerja ( L 01 ) Jam 0.4373 2,500.00 1,093.26
2 Mandor ( L 03 ) Jam 0.0625 4,062.50 253.79
B BAHAN
1 Agregat Kasar ( M 03 ) M3 0.7080 126,500.00 89,562.00
2 Agregat Halus ( M 04 ) M3 0.4920 79,750.00 39,237.00
C PERALATAN
1 Wheel Loader ( E 15 ) Jam 0.0625 #REF! #REF!
2 Dump Truck ( E 09 ) Jam 0.1994 #REF! #REF!
3 Motor Grader ( E 13 ) Jam 0.0117 #REF! #REF!
4 Vibratory Roller ( E 19 ) Jam 0.0178 #REF! #REF!
5 Pneumatic Tyre Roller ( E 18 ) Jam 0.0043 #REF! #REF!
6 Water Tank Truck ( E 23 ) Jam 0.0211 #REF! #REF!
7 Alat Bantu Ls 1.0000 500.00 500.00
JUMLAH #REF!
JASA 10 % #REF!
JUMLAH ( BELUM TERMASUK PPN ) #REF!
DIBULATKAN #REF!
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )
dan biaya biaya lainnya
Analisa - E 258
URAIAN ANALISA HARGA SATUAN LAPIS PONDASI AGREGAT KLAS B
I ASUMSI
1 Menggunakan alat berat
2 Lokasi pekerjaan sepanjang jalan
3 Kondisi existing jalan sedang
4 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.0 Km
5 Tebal Agregat padat t 0.15 m
6 Faktor kembang material ( padat - lepas ) Fk 1.20
7 Jam kerja efektif per hari Tk 7.00 Jam
8 Proporsi campuran
- Agregat Kasar Ak 59.00 % Tabel; 5.1.2 (a)
- Agregat halus Ah 41.00 %
II METODA KERJA
1 WHEEL LOADER mencampur dan memuat agregat ke dalam Dump Truck di
Base camp
2 Dump Truck mengangkut Agregat ke lokasi pekerjaan dan dihampar dengan
motor Grader
3 Hamparan Agregat di basahi dengan Water Tank Truck sebelum dipadatkan
dengan Tandem Roller & PTR
4 Selama pemadatan sekelompok pekerja akan merapikan tepi hamparan dan
level permukaan dengan menggunakan alat bantu
2 ALAT
a Wheel Loader ( E 15 )
Kapasitas bucket V 1.50 m3
Faktor bucket Fb 0.90 -
Faktor efisiensi alat Fa 0.83 -
Waktu siklus Ts 1
- Mencampur T1 2.50 menit
- Memuat dan Lain lain T2 1.00 menit
Ts 1 3.50 menit
b Dump Truk ( DT ) ( E 09 )
Kapasitas bak V 6.00 m3
Faktor efisiensi alat Fa 0.83 -
Kecepatan rata rata bermuatan v1 45.00 km / jam
Kecepatan rata rata kosong v2 60.00 km / jam
Waktu Siklus Ts2
- Waktu tempuh isi = ( L : v1 ) x 60 menit T1 26.65 menit
- Waktu tempuh kosong = ( L : v2 ) x 60 menit T2 19.99 menit
- lain lain termasuk menurunkan Agregat T3 3.00 menit
Analisa - E 259
No URAIAN KODE KOEF. SATUAN KET.
c Motor Grader ( E 13 )
Panjang hamparan Lh 50.00 m
Lebar efektif kerja blade b 2.40 m
Faktor Efisiensi alat Fa 0.83 -
Kecepatan rata rata alat v 4.00 km / jam
Jumlah lintasan n 6.00 Lintas 3 x pp
Waktu siklus Ts 3
- Perataan 1 Lintasan = ( Lh x 60 ) : ( v x 1000 ) T1 0.75 menit
- Lain lain T2 1.00 menit
Ts 3 1.75 menit
d Vibratory Roller ( E 17 )
Kecepatan rata rata alat v 3.00 km / jam
Lebar efektif pemadatan b 1.20 m
Jumlah lintasan n 8.00 lintasan
Faktor efisiensi alat Fa 0.83 -
Analisa - E 260
No URAIAN KODE KOEF. SATUAN KET.
g Alat Bantu
Diperlukan :
3 TENAGA
Produksi menentukan : WHEEL LOADER Q1 16.01 m3 / jam
Produksi Agregat / hari = Tk x Q1 Qt 112.05 m3 / jam
Kebutuhan tenaga
- Pekerja P 7.00 orang
- Mandor M 1.00 orang
Rp #REF! / M2
Analisa - E 261
FORMULIR STANDAR UNTUK PEREKAMAN ANALISA
MASING MASING HARGA SATUAN
HARGA JUMLAH
NO KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A TENAGA
1 Pekerja ( L 01 ) Jam 0.0301 2,500.00 75.30
2 Mandor ( L 03 ) Jam 0.0060 4,062.50 24.47
B BAHAN
1 Aspal ( M 10 ) Kg 0.8880 10,650.00 9,456.82
2 Kerosene ( M 11 ) Liter 0.2530 1,000.00 253.00
C PERALATAN
1 Asphalt Sprayer ( E 03 ) Jam 0.0030 #REF! #REF!
2 Compresor ( E 05 ) Jam 0.0063 #REF! #REF!
3 Dump Truck ( E 08 ) Jam 0.0030 #REF! #REF!
JUMLAH #REF!
JASA 10 % #REF!
JUMLAH ( BELUM TERMASUK PPN ) #REF!
DIBULATKAN #REF!
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )
dan biaya biaya lainnya
Analisa - E 262
URAIAN ANALISA HARGA SATUAN LAPIS PEREKAT
I ASUMSI
1 Menggunakan alat berat
2 Lokasi pekerjaan sepanjang jalan
3 Jarak rata rata Base Camp ke Lokasi pekerjaan L 20.00 Km
4 Jam kerja efektif 1 hari Tk 7.00 Jam
5 Faktor kehilangan material Fh 1.10 -
6 Komposisi campuran ( Spesifikasi )
- Aspal AC - 10 atau AC - 20 AS 77 % 100 Bagian
- Minyak Flux / pencair K 23 % 30 Bagian
II METODA KERJA
1 Aspal dan minyak Flux dicampur dan dipanaskan sehingga menjadi campuran
aspal cair
2 Permukaan yang akan dilapis dibersihkan dari debu dan kotoran dg air
kompresor
3 Campuran aspal cair disemprotkan dg aspahalt sprayer ke atas permukaan yg
akan dilapis
4 Angkutan aspal dan minyak Flux menggunakan Dump truck
2 ALAT
a Asphalt Sprayer ( E 03 )
Kapasitas alat V 800.00 Liter
Faktor efisiensi alat Fa 0.83 -
Waktu siklus ( termasuk proses pemanasan ) Ts 2.00 Jam
b Air Compresor ( E 05 )
Kapasitas alat . . . . . Diambil V 400.00 m2 / jam
Aplikasi Lapis Resap Pengikat Rata rata ( Spesifikasi ) Ap 0.40 Liter / m2
Analisa - E 263
No URAIAN KODE KOEF. SATUAN KET.
c Dump Truk ( DT ) ( E 08 )
Sebagai alat pengangkut bahan di lokasi pekerjaan Dump Truck melayani alat
Asphalt Sprayer
3 TENAGA
Produksi menentukan : ASPALT FINISHER Q4 332.00 Liter
Produksi Lapis Perekat / hari = Tk x Q4 Qt 2,324.00 Liter
Kebutuhan tenaga
- Pekerja P 10.00 orang
- Mandor M 2.00 orang
Rp #REF! / Liter
Analisa - E 264
FORMULIR STANDAR UNTUK PEREKAMAN ANALISA
MASING MASING HARGA SATUAN
HARGA JUMLAH
NO KOMPONEN SATUAN KUANTITAS SATUAN HARGA
(Rp.) (Rp.)
A TENAGA
1 Pekerja ( L 01 ) Jam 0.0161 2,500.00 40.16
2 Mandor ( L 02 ) Jam 0.0040 4,062.50 16.32
B BAHAN
C PERALATAN
1 Motor Grader ( E 13 ) Jam 0.0025 #REF! #REF!
2 Vibratory Roller ( E 19 ) Jam 0.0040 #REF! #REF!
3 Water Tank Truck ( E 23 ) Jam 0.0105 #REF! #REF!
4 Alat Bantu Ls 1.0000 500.00 500.00
JUMLAH #REF!
JASA 10 % #REF!
JUMLAH ( BELUM TERMASUK PPN ) #REF!
DIBULATKAN #REF!
1 Satuan dapat berdasarkan atas jam operasi untuk tenaga kerja dan peralatan, Volume dan / atau ukuran berat untuk bahan bahan
2 Kuantitas satuan adalah kuantitas setiap komponen untuk menyelesaikan satu satuan pekerjaan dari nomor mata pembayaran
3 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator
4 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan ( tetapi tidak termasuk PPN yang dibayar dari kontrak )
dan biaya biaya lainnya
Analisa - E 265
URAIAN ANALISA HARGA SATUAN PENYIAPAN BADAN JALAN
( PEMADATAN DAN PERATAAN )
SATUAN : M2 Analisa EI - 33
I ASUMSI
1 Pekerjaan dilakukan pada hanya pada tanah galian
2 Pekerjaan dilakukan secara mekanis
3 Lokasi pekerjaan : sepanjang jalan
4 Kondisi jalan : jelek / belum padat
5 Jam kerja efektif per hari Tk 7.00 Jam
II URUTAN KERJA
1 Motor Grader meratakan permukaan hasil galian
2 Vibro Roller memadatkan permukaan jalan yang telah diratakan oleh Motor grader
3 Sekelompok pekerja akan membanru meratakan badan jalan dengan alat bantu
permukaan dengan menggunakan alat bantu
2 ALAT
a Motor Grader ( E 13 )
Panjang hamparan Lh 50.00 m
Lebar efektif kerja blade b 2.40 m
Faktor Efisiensi alat Fa 0.83 -
Kecepatan rata rata alat v 2.00 km / jam
Jumlah lintasan n 6.00 Lintas 3 x pp
Waktu siklus Ts 1
- Perataan 1 Lintasan = Lh : ( v x 1000 x 60 menit ) T1 1.50 menit
- Lain lain T2 1.00 menit
Ts 1 2.50 menit
b Vibratory Roller ( E 19 )
Kecepatan rata rata alat v 2.00 km / jam
Lebar efektif pemadatan b 1.20 m
Jumlah lintasan n 8.00 lintasan
Faktor efisiensi alat Fa 0.83 -
Analisa - E 266
No URAIAN KODE KOEF. SATUAN KET.
g Alat Bantu
Diperlukan :
3 TENAGA
Produksi menentukan : VIBRATORY ROLLER Q2 249.00 m3 / jam
Produksi Pekerjaan / hari = Tk x Q2 Qt 1,743.00 m3
Kebutuhan tenaga
- Pekerja P 4.00 orang
- Mandor M 1.00 orang
Rp #REF! / M2
Analisa - E 267
REKAPITULASI ANALISA
PEKERJAAN PERSIAPAN
1 1M 2
Pekerjaan Pengukuran Gedung 5,423.00 - 542,300.00
2 1 M1 Pengukuran dan pemasangan bouwplank untuk gedung dan saluran 6,036.00 35,246.00 41,282.00
3 1 M2 Membersihkan lapangan dan perataan 3,987.00 - 3,987.00
4 1 buah Membuat Papan Nama Proyek 80x120 cm 143,158.00 182,293.00 325,451.00
5 1 M2 Pembuatan jalan sementara, tebal 25 cm 25,575.00 30,975.00 56,550.00
6 1M 2
Pembuatan kantor sementara, dengan lantai plesteran 152,762.00 507,042.00 659,804.00
7 1 M1 Pembuatan pagar sementara dari seng gelombang tinggi 2 meter 16,830.00 101,984.00 118,814.00
PEKERJAAN TANAH
1 1M 3
Galian tanah biasa sedalam sampai 1 meter 10,230.00 - 10,230.00
2 1 M3 Galian tanah biasa sedalam 1 - 2 meter 13,452.00 - 13,452.00
3 1 M3 Galian tanah biasa sedalam 2 - 3 meter 18,797.00 - 18,797.00
4 1M 3
Galian tanah keras sedalam sampai 1 meter 15,966.00 - 15,966.00
5 1 M3 Galian tanah cadas sedalam sampai 1 meter 31,968.00 - 31,968.00
6 1 M3 Galian tanah lumpur sedalam 1 meter 21,073.00 - 21,073.00
7 1 M1 Membuat sumur 57,187.00 70,400.00 127,587.00
8 1 M3 Mengangkut tanah sejauh 30 meter 7,617.00 - 7,617.00
9 1 M3 Pembuangan tanah sejauh 150 meter 13,139.00 - 13,139.00
10 1 M3 Membuang tanah dengan menghampar 5,857.00 - 5,857.00
11 1 M3 Urug kembali bekas galian 4,903.00 - 4,903.00
12 1M 2
Meratakan tanah ditumbuk halus 5,857.00 - 5,857.00
13 1 M3 Urug pasir 6,957.00 72,600.00 79,557.00
14 1 M3 Urug tanah mendatangkan 6,957.00 46,200.00 53,157.00
15 1M 3
Urugan sirtu 6,393.00 87,120.00 93,513.00
16 1 M3 Pemasangan lapisan ijuk 3,836.00 99,000.00 102,836.00
17 1 M2 Gebalan rumput 11,893.00 7,040.00 18,933.00
PEKERJAAN PASANGAN
1 1 M3 Pasangan pondasi batu kosong 31,638.00 123,750.00 155,388.00
2 1 M3 Pasangan pondasi 1 Kp : 1 Sm : 1 Ps 55,811.00 180,693.00 236,504.00
3 1M 3
Pasangan pondasi 1 Pc : 3 Kp : 5 Ps 55,811.00 235,988.00 291,800.00
4 1M 3
Pasangan pondasi 1 Pc : 3 Kp : 10 Ps 55,811.00 200,918.00 256,730.00
5 1 M3 Pasangan pondasi 1 Pc : 4 Ps 55,811.00 277,257.00 333,068.00
6 1 M2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Kp : 10 Ps 10,931.00 36,108.00 47,039.00
7 1M 2
Pasangan bata merah tebal 1/2 bata, 1 Pc : 4 Ps 10,931.00 40,209.00 51,140.00
8 1 M2 Pasangan bata merah tebal 1 bata, 1 Pc : 3 Kp : 10 Ps 22,082.00 72,297.00 94,379.00
9 1 M2 Pasangan bata merah tebal 1 bata, 1 Pc : 4 Ps 22,082.00 84,321.00 106,403.00
10 1 M2 Pasangan dinding bataco 15,248.00 34,474.00 49,722.00
11 1M 2
Pasangan roster 25/25 cm 15,248.00 49,049.00 64,297.00
PEKERJAAN BETON
1 1M 3
Membuat beton bertulang, 1 Pc : 2 Ps : 3 Kr 59,317.00 395,813.00 455,131.00
2 1 M3 Membuat beton tumbuk, 1 Pc : 3 Ps : 5 Kr 47,547.00 300,231.00 347,778.00
3 1 M3 Beton cyclope 1pc:3ps:5kr 176,275.00 202,749.00 379,024.00
4 1 M3 Membuat beton bertulang, 1 Pc : 1,5 Ps : 2,5 Kr 91,492.00 443,916.00 535,408.00
5 1M 3
Membuat beton dengan mutu K 225 176,275.00 434,504.00 610,779.00
6 1 M3 Membuat beton dengan mutu K 275 176,275.00 439,222.00 615,497.00
7 1 M3 Membuat beton dengan mutu K 300 176,275.00 462,502.00 638,777.00
8 1 kg Pembesian dengan besi polos 9,657.00 9,279.00 9,657.00
9 1 kg Pembesian dengan besi ulir 9,773.00 9,395.00 9,773.00
10 1 M2 Cetakan beton / begisting memakai papan 23,045.00 61,298.00 84,343.00
11 1 M2 Cetakan beton / begisting memakai multiplek 23,045.00 69,251.00 92,296.00
12 1M 3
Membongkar cetakan 88,000.00 - 88,000.00
Rekapitulasi - 268
HARGA HARGA JUMLAH
NO. SATUAN MACAM PEKERJAAN
UPAH BAHAN HARGA
13 1 M3 Stutwerk untuk 1 m3 beton, tinggi 3 - 4 m ( memakai dolken ) 467,293.00 770,000.00 1,237,293.00
14 1M 3
Stutwerk untuk 1 m3 beton, tinggi 3 - 4 m ( memakai scafolding ) 884,702.00 704,000.00 884,702.00
15 1 M3 Pek. Beton 1:2:3 tanpa dolken, 100 kg besi 415,569.00 1,936,759.00 2,352,328.00
16 1 M3 Pek. Beton 1:2:3 tanpa dolken, 125 kg besi 425,019.00 2,168,749.00 2,593,768.00
17 1 M3 Pek. Beton 1:2:3 tanpa dolken, 150 kg besi 434,469.00 2,400,739.00 2,835,209.00
18 1M 3
Pek. Beton 1:2:3 tanpa dolken, 175 kg besi 443,920.00 2,632,729.00 3,076,649.00
19 1 M3 Pek. Beton 1:2:3 tanpa dolken, 200 kg besi 453,370.00 2,864,719.00 3,318,090.00
20 1 M3 Pek. Beton 1:2:3 dengan memakai dolken, 100 kg besi 882,862.00 2,706,759.00 3,589,622.00
21 1M 3
Pek. Beton 1:2:3 dengan memakai dolken, 125 kg besi 892,313.00 2,938,749.00 3,831,062.00
22 1 M3 Pek. Beton 1:2:3 dengan memakai dolken, 150 kg besi 901,763.00 3,170,739.00 4,072,503.00
23 1 M3 Pek. Beton 1:2:3 dengan memakai dolken, 175 kg besi 911,213.00 3,402,729.00 4,313,943.00
24 1 M3 Pek. Beton 1:2:3 dengan memakai dolken, 200 kg besi 920,664.00 3,634,719.00 4,555,383.00
25 1M 3
Pek. Beton 1:2:3 dengan memakai scaffolding, 100 kg besi 596,271.00 2,640,759.00 3,237,031.00
26 1 M3 Pek. Beton 1:2:3 dengan memakai scaffolding, 125 kg besi 605,721.00 2,872,749.00 3,478,471.00
27 1 M3 Pek. Beton 1:2:3 dengan memakai scaffolding, 150 kg besi 615,172.00 3,104,739.00 3,719,911.00
28 1M 3
Pek. Beton 1:2:3 dengan memakai scaffolding, 175 kg besi 624,622.00 3,336,729.00 3,961,352.00
29 1 M3 Pek. Beton 1:2:3 dengan memakai scaffolding, 200 kg besi 634,073.00 3,568,719.00 4,202,792.00
PEKERJAAN PELESTERAN
1 1 M2 Plesteran batu kali 1pc:4ps 16,225.00 7,219.00 23,444.00
2 1 M2 Plesteran 1 Pc : 3 Kp : 10 Ps, tebal 15 mm 9,790.00 3,195.00 12,985.00
3 1M 2
Plesteran 1 Pc : 4 Ps, tebal 15 mm 9,790.00 6,042.00 15,832.00
4 1 M2 Plesteran beton 1 Pc : 3 Ps, tebal 15 mm 12,894.00 7,697.00 20,591.00
5 1 M1 Plesteran skoneng 1 Pc : 2 Ps ( untuk gedung ) 3,729.00 587.00 4,316.00
6 1 M2 Plesteran siar adukan 1 Pc : 2 Ps 5,934.00 4,968.00 10,902.00
7 1 M2 Plesteran Ciprat, 1 Pc : 2 Ps 9,391.00 4,598.00 13,989.00
8 1 M2 Acian dinding bata 2,772.00 2,941.00 5,713.00
9 1 M2 Pasang dinding batu hias tempel 27,115.00 82,100.00 109,215.00
PEKERJAAN KERAMIK
1 1 M2 Pasang ubin porselin 22,721.00 50,679.00 73,401.00
2 1 M2 Pasang tegel keramik 20/20 dan 30/30 22,721.00 51,797.00 74,519.00
3 1M 2
Pasang tegel keramik 10/20 berglasir 22,721.00 38,047.00 60,769.00
4 1 M2 Pasang tegel keramik 20/20 berglasir 22,721.00 40,247.00 62,969.00
5 1 M2 Pasang tegel keramik 30/30 berglasir 22,721.00 40,797.00 63,519.00
6 1M 1
Pasang plint keramik ukuran 10 x 40 cm 2,433.00 12,039.00 14,473.00
7 1 M1 Pasang plint keramik ukuran 10 x 30 cm 2,433.00 8,749.00 11,182.00
8 1 M1 Pasang keramik stepnosing granito 5/30 4,544.00 37,530.00 42,075.00
9 1 M1 Pasang list keramik dinding 5/20 4,544.00 28,004.00 32,549.00
10 1M 2
Pasang keramik dinding 20/25 29,419.00 52,736.00 82,155.00
PEKERJAAN CONBLOCK
1 1 M2 Pasang conblock tipe segi-empat abu-abu 6 cm, K-200 20,281.00 45,100.00 65,381.00
2 1M 2
Pasang conblock tipe segi-empat abu-abu 8 cm, K-200 20,281.00 54,395.00 74,676.00
3 1 M2 Pasang conblock tipe segi-enam abu-abu 6 cm, K-200 20,281.00 44,935.00 65,216.00
4 1 M2 Pasang conblock tipe segi-enam abu-abu 8 cm, K-200 20,281.00 54,395.00 74,676.00
5 1M 2
Pasang conblock tipe segi-empat warna 6 cm, K-200 20,281.00 50,875.00 71,156.00
6 1 M2 Pasang conblock tipe segi-empat warna 8 cm, K-200 20,281.00 60,225.00 80,506.00
7 1 M2 Pasang conblock tipe segi-enam warna 6 cm, K-200 20,281.00 50,875.00 71,156.00
8 1 M2 Pasang conblock tipe segi-enam warna 8 cm, K-200 20,281.00 60,225.00 80,506.00
9 1M 2
Pasang grassblock bulat tebal 10 cm 20,281.00 48,565.00 68,846.00
10 1 M2 Pasang grassblock tebal 10 cm 20,281.00 48,565.00 68,846.00
11 1 bh Pasang buis beton dia. 80 cm 9,693.00 35,200.00 44,893.00
Rekapitulasi - 269
HARGA HARGA JUMLAH
NO. SATUAN MACAM PEKERJAAN
UPAH BAHAN HARGA
PEKERJAAN RANGKA ATAP
1 1 M3 Membuat kuda-kuda kayu kamper 534,050.00 5,878,290.00 6,412,340.00
2 1 M3 Membuat kuda-kuda kayu kruing 534,050.00 5,394,290.00 5,928,340.00
3 1M 3
Membuat kuda-kuda kayu bengkirai 534,050.00 7,088,290.00 7,622,340.00
4 1M3 Pasang kuda-kuda kayu lama 534,050.00 130,790.00 664,840.00
5 1M3 Pasang Nook,Goording dan Jurai kayu bengkirai 534,050.00 6,964,540.00 7,498,590.00
6 1M3 Pasang Goording Lama 534,050.00 7,040.00 541,090.00
7 1M2 Pasang usuk 5/7, reng 2/3 lama 5,946.00 2,200.00 8,146.00
8 1 M2 Pasang usuk 5/7, reng 2/3 kayu jati 5,946.00 237,600.00 243,546.00
9 1 M2 Pasang usuk 5/7 kayu jati, reng 2/3 kayu bengkirai 5,946.00 190,575.00 196,521.00
10 1M 2
Pasang usuk 5/7 kayu bengkirai, reng 2/3 kayu jati 5,946.00 116,902.00 122,849.00
11 1M 2
Pasang usuk 5/7 kayu bengkirai, reng 2/3 kayu bengkirai 5,946.00 69,877.00 75,824.00
12 1 M2 Pasang usuk 5/7, reng 3/4 kayu jati 5,946.00 277,200.00 283,146.00
13 1 M2 Pasang usuk 5/7 kayu bengkirai, reng 3/4 kayu jati lokal 5,946.00 93,142.00 99,089.00
14 1M 2
Pasang usuk 5/7 kayu bengkirai, reng 3/4 kayu bengkirai 5,946.00 81,262.00 87,209.00
15 1 M3 Membuat kusen pintu / jendela kayu jati (klas plitur) 874,225.00 24,200,000.00 25,074,225.00
16 1 M3 Membuat kusen pintu / jendela kayu jati (lokal) 874,225.00 9,680,000.00 10,554,225.00
17 1 M3 Membuat kusen pintu / jendela kayu kamper 808,225.00 6,270,000.00 7,078,225.00
18 1M 3
Membuat kusen pintu / jendela kayu kruing 808,225.00 5,742,000.00 6,550,225.00
19 1 M3 Membuat kusen pintu / jendela kayu bengkirai 808,225.00 8,398,225.00 8,398,225.00
20 1 M2 Pasang pintu teakwood rangkap, rangka kayu jati 87,422.00 554,664.00 642,086.00
21 1M 2
Pasang pintu teakwood rangkap, rangka kayu jati lokal 87,422.00 257,136.00 344,558.00
22 1 M2 Pasang pintu teakwood rangkap, rangka kayu kamper 87,422.00 198,924.00 286,346.00
23 1 M2 Pasang pintu teakwood rangkap, rangka kayu kruing 87,422.00 182,754.00 270,176.00
24 1 M2 Pasang pintu teakwood rangkap, rangka kayu bengkirai 87,422.00 209,704.00 297,126.00
25 1M 2
Pasang pintu dan jendela kaca kayu jati 92,180.00 847,000.00 939,180.00
26 1 M2 Pasang pintu dan jendela kaca kayu jati lokal 92,180.00 315,700.00 407,880.00
27 1 M2 Pasang pintu dan jendela kaca kayu kamper 92,180.00 211,750.00 303,930.00
28 1M 2
Pasang pintu dan jendela kaca kayu kruing 92,180.00 182,875.00 275,055.00
29 1 M2 Pasang pintu dan jendela kaca kayu bengkirai 92,180.00 231,000.00 323,180.00
30 1 M2 Mengerjakan daun pintu / jendela panil kayu jati 115,225.00 968,000.00 1,083,225.00
31 1 M2 Mengerjakan daun pintu / jendela panil kayu jati lokal 115,225.00 360,800.00 476,025.00
32 1M 2
Mengerjakan daun pintu / jendela panil kayu kamper 115,225.00 242,000.00 357,225.00
33 1 M2 Mengerjakan daun pintu / jendela panil kayu kruing 115,225.00 209,000.00 324,225.00
34 1 M2 Mengerjakan daun pintu / jendela panil kayu bengkirai 115,225.00 264,000.00 379,225.00
35 1 M2 Pasang pintu dan jendela jalusi kayu jati 142,450.00 1,548,800.00 1,691,250.00
36 1 M2 Pasang pintu dan jendela jalusi kayu jati 142,450.00 577,280.00 719,730.00
37 1 M2 Pasang pintu dan jendela jalusi kayu kamper 133,512.00 387,200.00 520,712.00
38 1 M2 Pasang pintu dan jendela jalusi kayu kruing 133,512.00 334,400.00 467,912.00
39 1M 2
Pasang pintu dan jendela jalusi kayu bengkirai 133,512.00 422,400.00 555,912.00
40 1 M2 Pasang rangka langit-langit (1,00 x 1,00) m, kayu kamper 12,711.00 63,580.00 76,291.00
41 1 M2 Pasang rangka langit-langit (1,00 x 1,00) m, kayu kruing 12,711.00 58,300.00 71,011.00
42 1 M2 Pasang rangka langit-langit (1,00 x 1,00) m, kayu bengkirai 12,711.00 76,780.00 89,491.00
43 1 M2 Pasang rangka langit-langit (60 x 120) m, kayu kamper 13,919.00 68,981.00 82,900.00
44 1 M2 Pasang rangka langit-langit (60 x 120) m, kayu kruing 13,919.00 63,261.00 77,180.00
45 1 M2 Pasang rangka langit-langit (60 x 120) m, kayu bengkirai 13,919.00 83,281.00 97,200.00
46 1M 2
Langit-langit asbes (1,00 x 1,00) m tanpa plepet 3,273.00 12,226.00 15,500.00
47 1 M2 Langit-langit asbes (1,00 x 1,00) m memakai plepet 3,273.00 18,056.00 21,330.00
48 1 M2 Langit2 asbes (1,00 x 1,00) m, rangka kamper tanpa plepet 15,985.00 75,460.00 91,445.00
49 1 M2 Langit2 asbes (1,00 x 1,00) m, rangka kruing tanpa plepet 15,985.00 70,180.00 86,165.00
50 1M 2
Langit2 asbes (1,00 x 1,00) m, rangka bengkirai tanpa plepet 15,985.00 88,660.00 104,645.00
51 1 M2 Langit2 asbes (1,00 x 1,00) m, rangka kayu kamper dg plepet 15,985.00 81,416.00 97,402.00
52 1 M2 Langit2 asbes (1,00 x 1,00) m, rangka kayu kruing dg plepet 15,985.00 76,136.00 92,122.00
53 1M 2
Langit2 asbes (1,00 x 1,00) m, rangka ky bengkirai dg plepet 15,985.00 94,616.00 110,602.00
54 1 M2 Langit2 gypsum t; 9 mm, rangka 60 x 120 kayu kamper 19,241.00 89,985.00 109,227.00
55 1 M2 Langit2 gypsum t;l 9 mm, rangka 60 x 120 kayu kruing 19,241.00 84,265.00 103,507.00
56 1 M2 Langit2 gypsum t; 9 mm, rangka 60 x 120 ky bengkirai 19,241.00 104,285.00 123,527.00
57 1M 2
Langit-langit gypsum board tebal 9 mm, rangka hollow 19,241.00 71,329.00 90,571.00
58 1 M2 Langit2 kalsiboard t; 3.5 mm, rangka 60 x 120 ky kamper 19,241.00 91,648.00 110,890.00
59 1 M2 Langit2 kalsiboard t;l 3.5 mm, rangka 60 x 120 ky kruing 19,241.00 85,928.00 105,170.00
Rekapitulasi - 270
HARGA HARGA JUMLAH
NO. SATUAN MACAM PEKERJAAN
UPAH BAHAN HARGA
60 1 M2 Langit2 kalsiboard t; 3.5 mm, rangka 60 x 120 ky bengkirai 19,241.00 105,948.00 125,190.00
61 1M 2
Langit-langit kalsiboard tebal 3.5 mm, rangka hollow 19,241.00 72,992.00 92,234.00
62 1 M2 Langit-langit akustik 60 x 120 cm + rangka alumunium 21,855.00 289,767.00 311,623.00
63 1 M1 Pasang list profil cornees gypsum lebar sampai 5 cm 4,077.00 8,690.00 12,767.00
64 1 M1 Pasang list profil cornees gypsum lebar 5 - 10 cm 4,077.00 14,500.00 18,577.00
65 1M 1
Pasang list profil cornees gypsum lebar lebih dari 10 cm 4,170.00 23,941.00 28,111.00
66 1 M1 List langit-langit kayu profil 3,036.00 6,765.00 9,801.00
67 1 M1 Pasang lisplank ukuran (2 x 20) cm, kayu jati 6,036.00 116,688.00 122,724.00
68 1 M1 Pasang lisplank ukuran 2 x (2 x 20) cm, kayu jati 6,036.00 208,648.00 214,684.00
69 1 M1 Pasang lisplank ukuran (2 x 20) cm, kayu jati lokal 6,036.00 43,824.00 49,860.00
70 1 M1 Pasang lisplank ukuran (2 x 20) cm, kayu kamper 6,036.00 29,568.00 35,604.00
71 1 M1 Pasang lisplank ukuran 2 x (2 x 20) cm, kayu kamper 6,036.00 52,558.00 58,594.00
72 1M 1
Pasang lisplank ukuran (2 x 20) cm, kayu kruing 6,036.00 25,608.00 31,644.00
73 1 M1 Pasang lisplank ukuran 2 x (2 x 20) cm, kayu kruing 6,036.00 45,463.00 51,499.00
74 1 M1 Pasang lisplank ukuran (2 x 20) cm, kayu bengkirai 6,036.00 32,208.00 38,244.00
75 1M 1
Pasang lisplank ukuran 2 x (2 x 20) cm, kayu bengkirai 6,036.00 57,288.00 63,324.00
76 1 M2 Membuat listplank asbes plat ram kayu kamper 80,107.00 144,265.00 224,372.00
77 1 M2 Membuat listplank asbes plat ram kayu kruing 80,107.00 133,265.00 213,372.00
78 1 M2 Membuat listplank asbes plat ram kayu bengkirai 80,107.00 171,765.00 251,872.00
79 1M 1
Mengerjakan papan ruiter kayu kamper 2/20 3,592.00 24,376.00 27,968.00
80 1 M1 Mengerjakan papan ruiter kayu kruing 2/20 3,592.00 21,076.00 24,668.00
81 1 M1 Mengerjakan papan ruiter kayu bengkirai 2/20 3,592.00 26,576.00 30,168.00
82 1 M1 Pasang talang datar, seng BJLS 28, papan kayu kamper 17,438.00 92,037.00 109,475.00
83 1 M1 Pasang talang datar, seng BJLS 28, papan kayu kruing 17,438.00 84,117.00 101,555.00
84 1 M1 Pasang talang datar, seng BJLS 28, papan kayu bengkirai 17,438.00 97,317.00 114,755.00
85 1 M1 Pasang talang miring, seng BJLS 28, papan kayu kamper 15,018.00 148,907.00 163,925.00
86 1 M1 Pasang talang miring, seng BJLS 28, papan kayu kruing 15,018.00 133,232.00 148,250.00
87 1 M1 Pasang talang miring, seng BJLS 28, papan kayu bengkirai 15,018.00 159,357.00 174,375.00
88 1 M1 Pasang talang torong 16,769.00 31,900.00 48,669.00
89 1 M1 Pasang talang lingkaran D - 10 cm, seng BJLS 28 12,488.00 145,640.00 158,128.00
90 1 M2 Pasang dinding pemisah teakwood rangkap, rangka kayu kamper 22,440.00 151,893.00 174,333.00
91 1 M2 Pas. dinding pemisah plywoodwood rangkap, rangka ky kamper 26,702.00 197,268.00 223,971.00
92 1 M2 Pasang plywood tebal 4 mm, untuk dinding 3,339.00 18,590.00 21,929.00
PEKERJAAN ATAP
1 1 M2 Pasang genteng lama 8,112.00 - 8,112.00
2 1 M2 Pasang genteng paris 8,112.00 16,500.00 24,612.00
3 1 M2 Pasang genteng paris untuk rumah tingkat 10,491.00 16,500.00 26,991.00
4 1 M2 Pasang genteng beton besar Natural ( isi 9 / m2 ) 8,112.00 27,225.00 35,337.00
5 1 M2 Pas. genteng beton besar Natural ( isi 9 / m2 ) untuk r. tingkat 10,491.00 27,225.00 37,716.00
6 1 M2 Pasang genteng beton besar Warna ( isi 9 / m2 ) 8,112.00 43,758.00 51,870.00
7 1M 2
Pas. genteng beton besar Warna ( isi 9 / m2 ) untuk r. tingkat 10,491.00 43,758.00 54,249.00
8 1 M1 Pasang bubungan genteng paris 16,225.00 12,838.00 29,063.00
9 1 M1 Pasang bubungan genteng beton Natural 16,225.00 17,293.00 33,518.00
10 1M 1
Pasang bubungan genteng beton Warna 16,225.00 22,507.00 38,732.00
11 1 M2 Pasang atap asbes gelombang (2,5 x 0,92 m) x 5 mm 6,127.00 35,862.00 41,989.00
12 1 M2 Pasang atap asbes gelombang (2,00 x 0,92 m) x 5 mm 5,890.00 34,452.00 40,342.00
13 1 M2 Pasang atap asbes gelombang (1,80 x 0,92 m) x 5 mm 5,890.00 38,598.00 44,488.00
14 1M 2
Pasang atap asbes gelombang (300 x 1,05 m) x 4 mm 5,890.00 28,703.00 34,594.00
15 1 M2 Pasang atap asbes gelombang (2,40 x 1,05 m) x 4 mm 5,791.00 30,758.00 36,549.00
16 1 M2 Pasang atap asbes gelombang (2,10 x 1,05 m) x 4 mm 5,791.00 33,491.00 39,283.00
17 1M 2
Pasang atap asbes gelombang (1,50 x 1,05 m) x 4 mm 5,791.00 32,870.00 38,661.00
18 1 M2 Pasang atap asbes gelombang (3,00 x 1,08 m) x 6 mm 5,791.00 47,156.00 52,947.00
19 1 M2 Pasang atap sbes gelombang (2,40 x 1,08 m) x 6 mm 5,791.00 46,908.00 52,699.00
20 1 M2 Pasang atap asbes gelombang (2,10 x 1,08 m) x 6 mm 5,791.00 43,804.00 49,595.00
21 1M 2
Pasang atap asbes gelombang (1,80 x 1,08 m) x 6 mm 5,791.00 43,675.00 49,467.00
22 1 M1 Pasang bubung stel gelombang 0,92 m 6,580.00 81,510.00 88,090.00
Rekapitulasi - 271
HARGA HARGA JUMLAH
NO. SATUAN MACAM PEKERJAAN
UPAH BAHAN HARGA
23 1 M1 Pasang nok stel gelombang 1,05 m 6,580.00 71,940.00 78,520.00
24 1M 1
Pasang nok stel gelombang 1,08 m 6,580.00 70,345.00 76,925.00
25 1 M1 Pasang atap genteng metal zinc alume type prima roof 8,093.00 111,438.00 119,532.00
26 1 M1 Pasang atap metal gelombanmg 8,093.00 72,600.00 80,693.00
27 1 M2 Pasang alumunium foil / sisalation 5,414.00 28,875.00 34,289.00
28 1M 2
Pasang atap polikarbonat 26,324.00 339,515.00 365,839.00
PEKERJAAN CAT-CATAN
1 1M 2
Mengikis / mengerok permukaan cat tembok lama 3,389.00 825.00 4,214.00
2 1 M2 Pengecatan bidang kayu lama 3,914.00 13,948.00 17,862.00
3 1 M2 Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 2 lapis 4,282.00 19,756.00 24,038.00
cat penutup
4 1 M2 Pengecatan bidang kayu baru (1 lapis plamir), 1 lapis cat dasar, 3 lapis 4,635.00 22,924.00 27,559.00
cat penutup
5 1 M2 Pelaburan bidang kayu dengan politur 2,214.00 16,984.00 19,198.00
1 1 M2 Pelaburan bidang kayu dengan vernis 8,484.00 2,975.00 11,460.00
6 1M 2 Pengecatan tembok baru (1 lapis plamir, 1 lapis cat dasar, 2 lapis cat 2,448.00 4,697.00 7,145.00
penutup)
7 1 M2 Pengecatan tembok lama (1 lapis cat dasar, 2 lapis cat penutup) 1,985.00 3,135.00 5,120.00
8 1 M2 Pengecatan tembok tidak terlindung dari panas dan hujan 2,448.00 22,792.00 25,240.00
9 1 M2 Melabur tembok dengan kapur sirih 3,419.00 2,695.00 6,114.00
10 1M 2
Melabur tembok lama dengan kapur sirih (untuk pemeliharaan) 1,121.00 2,365.00 3,486.00
11 1 M2 Pengecatan bidang besi ( 3 x ) 4,635.00 11,224.00 15,860.00
12 1 M2 Pengecacatan permukaan baja dengan meni besi 6,891.00 2,563.00 9,454.00
13 1 M2 Pengecacatan permukaan baja dengan meni besi memakai perancah 12,073.00 4,763.00 16,836.00
14 1 M2 Pengetiran kayu ( 2 x ) 2,378.00 3,080.00 5,458.00
15 1 M2 Pekerjaan cat duco 3 x 14,173.00 28,865.00 43,038.00
16 1 M2 Mengerjakan Cat Sungging 252,311.00 17,644.00 269,955.00
17 1M 2
Mengecat genteng 2,448.00 16,632.00 19,080.00
PEKERJAAN BONGKARAN
1 1 M3 Membongkar pasangan batu kali 129,800.00 - 129,800.00
2 1M 3
Membongkar pasangan batu merah dan membersihkan 62,700.00 - 62,700.00
3 1 M3 Membongkar beton bertulang dan membersihkan 185,625.00 - 185,625.00
4 1 M2 Pekerjaan bongkar lantai tegel untuk dipergunakan lagi 4,757.00 - 4,757.00
5 1 M2 Mengupas plesteran lama 3,196.00 - 3,196.00
6 1M 2
Membongkar genteng / sirap untuk dipergunakan lagi 4,757.00 - 4,757.00
7 1 M2 Membongkar atap seng 3,575.00 - 3,575.00
8 1 M2 Membongkar usuk / reng dipakai lagi 6,952.00 - 6,952.00
9 1M 2
Membongkar usuk / reng tidak dipakai lagi 4,757.00 - 4,757.00
10 1 M3 Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan untuk 314,600.00 - 314,600.00
digunakan lagi
11 1 M3 Membongkar kayu balok loteng, kuda-kuda, dlurung, jembatan tidak 29,150.00 - 29,150.00
digunakan lagi
12 1 M3 Mengerjakan kembali bangunan kayu yang telah dibongkar 534,050.00 - 534,050.00
ANALISA SUPLEMEN
1 1M 1
Pengelasan Single ( las listrik ) 82,720.00 103,950.00 186,670.00
PEKERJAAN SANITASI
2 1 bh Memasang kloset duduk/monoblock 111,628.00 1,457,500.00 1,569,128.00
3 1 bh Memasang kloset jongkok porselen 122,595.00 88,378.00 210,973.00
4 1 bh Memasang urinoir 59,125.00 1,128,428.00 1,187,553.00
5 1 bh Memasang wastafel 78,787.00 340,169.00 418,956.00
6 1 bh Memasang bak mandi fiberglass volume 0,30 m3 143,027.00 356,950.00 499,977.00
7 1 bh Memasang badkip porselen 35,956.00 198,000.00 233,956.00
8 1 bh Memasang bak fiberglass volume 1 m3 air 264,000.00 1,016,400.00 1,280,400.00
9 1 M1 Memasang pipa beton, diameter 15 cm - 20 cm 5,678.00 44,627.00 50,306.00
10 1 M1 Memasang pipa beton, diameter 30 cm - 100 cm 15,413.00 175,230.00 190,643.00
Rekapitulasi - 272
HARGA HARGA JUMLAH
NO. SATUAN MACAM PEKERJAAN
UPAH BAHAN HARGA
11 1 bh Memasang bak kontrol pas.bata (30 x 30) cm, tinggi 35 cm 101,725.00 99,281.00 201,006.00
12 1 bh Memasang bak kontrol pas. bata (45 x 45) cm, tinggi 50 cm 49,637.00 164,359.00 213,997.00
13 1 bh Memasang bak kontrol pas. bata (60 x 60) cm, tingg 65 cm 75,251.00 250,437.00 325,688.00
14 1 M1 Memasang pipa galvanis diameter 1/2" 5,172.00 25,575.00 30,747.00
15 1 M1 Memasang pipa galvanis diameter 3/4" 5,172.00 42,625.00 47,797.00
16 1 M1 Memasang pipa galvanis diameter 1" 5,172.00 63,937.00 69,110.00
17 1 M1 Memasang pipa galvanis diameter 1 1/2" 8,608.00 85,250.00 93,858.00
18 1 M1 Memasang pipa PVC tipe AW diameter 1/2" 2,869.00 5,392.00 8,261.00
19 1 M1 Memasang pipa PVC tipe AW diameter 3/4" 2,869.00 7,246.00 10,115.00
20 1 M1 Memasang pipa PVC tipe AW diameter 1" 2,869.00 8,738.00 11,607.00
21 1M 1
Memasang pipa PVC tipe AW diameter 1 1/2" 2,869.00 19,181.00 22,050.00
22 1 M1 Memasang pipa PVC tipe AW diameter 2" 4,312.00 25,575.00 29,887.00
23 1 M1 Memasang pipa PVC tipe AW diameter 2 1/2" 2,869.00 34,952.00 37,821.00
24 1 M1 Memasang pipa PVC tipe AW diameter 3" 7,777.00 34,952.00 42,729.00
25 1M 1
Memasang pipa PVC tipe AW diameter 4" 7,777.00 57,543.00 65,320.00
26 1 bh Memasang bak cuci piring stainless steel 10,778.00 632,500.00 643,278.00
27 1 bh Memasang kran diameter 3/4" atau 1/2" 3,753.00 27,568.00 31,322.00
28 1 bh Memasang floor drain 3,753.00 60,500.00 64,253.00
Rekapitulasi - 273
No. Jenis Pekerjaan Volume Sat Harga Satuan Jumlah Harga
A Pekerjaan Persiapan
Uitzet bouplank
Brak, gudang, keet pengawas
Pembersihan dan penataan tanah
B Pekerjaan Tanah
1 Galian tanah foot plate
2 Galian tanah pondasi
3 Urug tanah kembali
4 Urug tanah peninggian peil 30 cm sisa tanah
5 Urug pasir bawah lantai dan pondasi