Jan-16 53.2
Feb-16 50.92
Mar-16 51.62
Apr-16 52.32
May-16 51.2
Jun-16 51.82
Jul-16 53
Aug-16 58.37
Sep-16 63.93
Oct-16 69.07
Nov-16 84.89
90
80
70
60
50
Axis Title
40
30
20
10
0
Dec-15 Jan-16 Mar-16 May-16 Ju
Axis Title
HBA (US $/TON)
Axis Title
No. Item
1 1 USD
2 Harga 1 liter solar
3 Harga 1 liter oli
4 Jumlah Jam Kerja Efektif
5 Jumlah Jam Kerja Per shift
6 Harga Batubara
7 Luas IUP
8 Luas Area Kantor, Workshop, Gudang
Harga Beli
1 Heavy Dump
2 Dump Truck
3 Excavator OB
4 Excavator BB
5 Dozer
6 Dozer
7 Water Truck
8 Fuel Truck
9 Aticulated Dump Truck
10 Motor Grader
11 Compactor
12 Water Pump
13 Mobil Operasional
14 Bus Karyawan
15 Crusher
16 Tower Lamp
17 Diesel Genset
18 Pipe HDPE
Fuel Consumption
1 Heavy Dump
2 Dump Truck
3 Excavator OB
4 Excavator BB
5 Dozer Pit
6 Dozer Disposal
7 Water Truck
8 Fuel Truck
9 Aticulated Dump Truck
10 Motor Grader
11 Compactor
12 Water Pump
13 Mobil Operasional
14 Bus Karyawan
15 Crusher
16 Tower Lamp
17 Diesel Genset
18 Pipe HDPE
Salary
1 Basic salary Project Manager
2 Basic salary Kepala Teknik Tambang
3 Basic Salary Manager
4 Basic salary Sekretaris
5 Basic salary Superintendent
6 Basic salary Supervisor
7 Basic salary Foreman
8 Basic salary operator Excavator
9 Basic salary driver Dumptruck
10 Basic salary operator Bulldozer
11 Basic salary operator Motor Grader
12 Basic salary driver Water truck
13 Basic salary driver Fuel truck
14 Basic salary mekanik
15 Basic salary surveyor
16 Basic salary helper
17 Basic salary security
18 Basic salary office boy / girl
19 Basic Salary Staf, etc
Target Produksi
1 Target Over Burden
2 Target Coal
Harga Pembelian Peralatan
1 Computer System
2 Engineering Software
3 Survey Equipment
4 Office Equipment
5 HT
6 Safety Equipment & Consumable
7 Diesel Genset
Biaya Tidak Langsung
1 Biaya Lingkungan, K3 dan Comdev
2 Iuran Tetap (KP Eksploitasi)
3 Iuran Pembangunan Daerah (US $ 0.5/ton)
4 PBB
5 Biaya Administrasi dan Lain-lain
6 Royalty (7% dari Penjualan)
ESTIMASI BIAYA PRA PENAMBANGAN
1 Biaya Perijinan
2 Biaya Kegiatan Eksplorasi
3 Biaya Studi AMDAL
4 Biaya Studi Kelayakan
5 Biaya Pembebasan Lahan ( Lokasi Tambang, Jalan, Stockpile, dll)
BIAYA PEMBANGUNAN FASILITAS DAN INFRASTRUKTUR
1 Pembangunan Kantor
2 Fasilitas dan perlengkapan kantor
3 Pembangunan Workshop
4 Stasiun Bahan Bakar
Kegiatan Penutupan Tambang
1 Pengelolaan lubang bukaan bekas tambang (void)
2 Reklamasi
3 Pembongkaran bekas fasilitas pengolahan
4 Pembongkaran bekas kolam pengendapan
5 Remidiasi tanah yang terkontaminasi minyak
6 Pembongkaran bekas jalan tambang
7 Pembongkaran bekas stockpile
8 Pembongkaran peralatan, mesin, dan tangki BBM
9 Pemantauan
1. Survey Equipment
No Alat
1 Total Station Sokkia SET 550X
2 prisma
3 Kompas Bunton 5008
4 GPS Gamin 78s
Total
2. Safety Equipment
No Nama
1 Safety Helm
2 Safety Vase/ Rompi
3 Safety Shoes
4 Masker
5 Safety Glasses
6 Ear Plug/ Pelindung Telinga
7 Hand Gloves/ Sarung Tangan
8 Lifevest/ Pelampung
9 Firex Fire Extinguisher/ APAR
10 Convex Mirror
11 First Aid Box / Kotak P3K
TOTAL
NO BULAN
1 Jan-17
2 Feb-17
3 Mar-17
4 Apr-17
5 May-17
6 Jun-17
7 Jul-17
8 Aug-17
9 Sep-17
10 Oct-17
11 Nov-17
12 Dec-17
TOTAL
34,000,000.00 Rp/Bulan
32,000,000.00 Rp/Bulan
30,000,000.00 Rp/Bulan
9,000,000.00 Rp/Bulan
12,000,000.00 Rp/Bulan
10,000,000.00 Rp/Bulan
9,000,000.00 Rp/Bulan
5,500,000.00 Rp/Bulan
5,500,000.00 Rp/Bulan
5,000,000.00 Rp/Bulan
5,000,000.00 Rp/Bulan
4,500,000.00 Rp/Bulan
4,500,000.00 Rp/Bulan
5,000,000.00 Rp/Bulan
6,000,000.00 Rp/Bulan
4,000,000.00 Rp/Bulan
3,500,000.00 Rp/Bulan
3,000,000.00 Rp/Bulan
5,000,000.00 Rp/Bulan
21,761,875 BCM
2,475,281 MT
5,000,000 Rp
3,500,000 Rp
234,390,000 Rp
10,000,000 Rp
2,328,000 Rp
600,000,000 Rp
Rp
0.50 US $/MT
0.10 US $ / Ha / BULAN
0.50 US $/MT
0.10 US $ / Ha / BULAN
1,500,000.00 Rp /BULAN
267,434 USD $/bulan
150,000,000 Rp
200,000,000 Rp
500,000,000 Rp
175,000,000 Rp
7,700,000,000 Rp
800,000,000 Rp
150,000,000 Rp
100,000,000 Rp
300,000,000 Rp
107,696,000 USD
161,544,000 USD
13,462,000 USD
20,193,000 USD
6,731,000 USD
20,193,000 USD
20,193,000 USD
6,731,000 USD
20,193,000 USD
JAM/HARI JAM/BULAN
17.86 447
17.86 429
17.86 447
17.86 447
17.86 411
17.86 429
17.86 464
17.86 464
17.86 429
17.86 482
17.86 464
17.86 464
5,376 JAM/TAHUN
JAM/HARI JAM/BULAN
8.3 208
8.3 199
8.3 216
8.3 199
8.3 191
8.3 199
8.3 224
8.3 224
8.3 208
8.3 224
8.3 224
8.3 216
2,532 JAM/TAHUN
Details Satuan
0.66 USD
4.09 USD
426.18 Jam/Bulan 5123,15 Jam/Tahun
84.89 USD/Ton
594,265.34 USD
59,426.53 USD
817,114.84 USD
237,727.60 USD
90,000.00 USD
107,071.68 USD
25,256.28 USD
18,570.79 USD
223,057.35 USD
102,571.68 USD
151,475.46 USD
22,284.95 USD
23,562.62 USD
20,799.29 USD
40,855.74 USD
6,038.11 USD
5943 USD
222.85 USD
13 USD
7 USD
23 USD
17 USD
10 USD
10 USD
5 USD
5 USD
7 USD
7 USD
10 USD
3 USD
3 USD
3 USD
3 USD
3 USD
3 USD
- -
2,525.63 USD/Bulan
2,377.06 USD/Bulan
2,228.50 USD/Bulan
668.55 USD/Bulan
891.40 USD/Bulan
742.83 USD/Bulan
668.55 USD/Bulan
408.56 USD/Bulan
408.56 USD/Bulan
371.42 USD/Bulan
371.42 USD/Bulan
334.27 USD/Bulan
334.27 USD/Bulan
371.42 USD/Bulan
445.70 USD/Bulan
297.13 USD/Bulan
259.99 USD/Bulan
222.85 USD/Bulan
371.42 USD/Bulan
329,725.38 BCM/Bulan
45,005.11 MT/ Bulan
371.42 USD
259.99 USD
17,411.23 USD
742.83 USD
172.93 USD
44,569.90 USD
- USD
111.42 USD
11142.48 USD
14856.63 USD
37141.58 USD
12999.55 USD
571980.39 USD
59426.5339474075 USD
11142.4751151389 USD
7428.3167434259 USD
22284.9502302778 USD
Rp 1,449,803,552,000.00
Rp 2,174,705,328,000.00
Rp 181,225,444,000.00
Rp 271,838,166,000.00
Rp 90,612,722,000.00
Rp 271,838,166,000.00
Rp 271,838,166,000.00
Rp 90,612,722,000.00
Rp 271,838,166,000.00
Satuan
BCM/Bulan
BCM/Bulan
BCM/Bulan
BCM/Bulan
BCM/Bulan
BCM/Bulan
MT/Sequence
MT/Sequence
MT/Sequence
MT/Sequence
MT/Sequence
MT/Sequence
TABEL
RENCANA BIAYA PEMBELIAN ALAT UNTUK KEGIATAN PENAMBANGAN PT. ABC
1. OVERBURDEN REMOVAL
NO ALAT MERK
1 Dumptruck Komatsu HD 465
2 Excavator Komatsu PC 2000
3 Aticulated Dump Truck Komatsu AST HM 400
4 Bulldozer Caterpillar CAT DSR
TOTAL
2. COAL ACTIVITY
NO ALAT MERK
1 Dumptruck Maz-Man 6151668
2 Excavator Komatsu PC 400
3 Bulldozer Caterpillar CAT DER
TOTAL
SUB TOTAL
113875537629
1. OVERBURDEN REMOVAL
NO BULAN
1 Jan-17
2 Feb-17
3 Mar-17
4 Apr-17
5 May-17
6 Jun-17
7 Jul-17
8 Aug-17
9 Sep-17
10 Oct-17
11 Nov-17
12 Dec-17
13 Jan-18
14 Feb-18
15 Mar-18
16 Apr-18
17 May-18
18 Jun-18
19 Jul-18
20 Aug-18
21 Sep-18
22 Oct-18
23 Nov-18
24 Dec-18
25 Jan-19
26 Feb-19
27 Mar-19
28 Apr-19
29 May-19
30 Jun-19
31 Jul-19
32 Aug-19
33 Sep-19
34 Oct-19
35 Nov-19
36 Dec-19
37 Jan-20
38 Feb-20
39 Mar-20
40 Apr-20
41 May-20
42 Jun-20
43 Jul-20
44 Aug-20
45 Sep-20
46 Oct-20
47 Nov-20
48 Dec-20
49 Jan-21
50 Feb-21
51 Mar-21
52 Apr-21
53 May-21
54 Jun-21
55 Jul-21
56 Aug-21
57 Sep-21
58 Oct-21
59 Nov-21
60 Dec-21
61 Jan-22
62 Feb-22
63 Mar-22
64 Apr-22
65 May-22
66 Jun-22
SUBTOTAL
2. COAL ACTIVITY
NO BULAN
1 Jan-17
2 Feb-17
3 Mar-17
4 Apr-17
5 May-17
6 Jun-17
7 Jul-17
8 Aug-17
9 Sep-17
10 Oct-17
11 Nov-17
12 Dec-17
13 Jan-18
14 Feb-18
15 Mar-18
16 Apr-18
17 May-18
18 Jun-18
19 Jul-18
20 Aug-18
21 Sep-18
22 Oct-18
23 Nov-18
24 Dec-18
25 Jan-18
26 Feb-18
27 Mar-18
28 Apr-18
29 May-18
30 Jun-18
31 Jul-18
32 Aug-18
33 Sep-18
34 Oct-18
35 Nov-18
36 Dec-18
37 Jan-19
38 Feb-19
39 Mar-19
40 Apr-19
41 May-19
42 Jun-19
43 Jul-19
44 Aug-19
45 Sep-19
46 Oct-19
47 Nov-19
48 Dec-19
49 Jan-20
50 Feb-20
51 Mar-20
52 Apr-20
53 May-20
54 Jun-20
55 Jul-20
56 Aug-20
57 Sep-20
TOTAL
NO NAMA ALAT
1 Water Truck
2 Fuel Truck
3 Motor Grader
4 Compactor
5 Water Pump
6 Mobil Operasional
7 Bus Karyawan
8 Diesel Genset
SUBTOTAL
JUMLAH UNIT
447 2
429 2
447 2
447 2
411 2
429 2
464 2
464 2
429 2
482 2
464 2
464 2
447 2
429 2
447 2
447 2
411 2
429 2
464 2
464 2
429 2
482 2
464 2
464 2
447 1
429 1
447 1
447 1
411 1
429 1
464 1
464 1
429 1
482 1
464 1
464 1
447 2
429 2
447 2
447 2
411 2
429 2
464 2
464 2
429 2
482 2
464 2
464 2
447 1
429 1
447 1
447 1
411 1
429 1
464 1
464 1
429 1
482 1
464 1
464 1
447 1
429 1
447 1
447 1
411 1
429 1
$ 105944340.369.42 $ 52972170.184.71
$ 16648396.343.77 $ 16648396.343.77
$ 242158492.272.96 $ 121079246.136.48
1 7
1 7
1 7
1 7
1 7
1 7
1 7
1 7
1 7
1 7
1 7
1 7
1 8
1 8
1 8
1 8
1 8
1 8
1 8
1 8
1 8
1 8
1 8
1 8
1 4
1 4
1 4
1 4
1 4
1 4
1 4
1 4
1 4
1 4
1 4
1 4
1 8
1 8
1 8
1 8
1 8
1 8
1 8
1 8
1 8
1 8
1 8
1 8
1 4
1 4
1 4
1 4
1 4
1 4
1 4
1 4
1 4
1 4
1 4
1 4
1 3
1 3
1 3
1 3
1 3
1 3
$ 105944340.369.42 $ 52972170.184.71
$ 16648396.343.77 $ 16648396.343.77
$ 242158492.272.96 $ 121079246.136.48
8,799,364 1,382,757
8,447,389 1,327,447
8,799,364 1,382,757
8,799,364 1,382,757
8,095,415 1,272,137
8,447,389 1,327,447
9,151,338 1,438,067
9,151,338 1,438,067
8,447,389 1,327,447
9,503,313 1,493,378
9,151,338 1,438,067
9,151,338 1,438,067
8,799,364 1,382,757
8,447,389 1,327,447
8,799,364 1,382,757
8,799,364 1,382,757
8,095,415 1,272,137
8,447,389 1,327,447
9,151,338 1,438,067
9,151,338 1,438,067
8,447,389 1,327,447
9,503,313 1,493,378
9,151,338 1,438,067
9,151,338 1,438,067
4,399,682 1,382,757
4,223,695 1,327,447
4,399,682 1,382,757
4,399,682 1,382,757
4,047,707 1,272,137
4,223,695 1,327,447
4,575,669 1,438,067
4,575,669 1,438,067
4,223,695 1,327,447
4,751,656 1,493,378
4,575,669 1,438,067
4,575,669 1,438,067
8,799,364 1,382,757
8,447,389 1,327,447
8,799,364 1,382,757
8,799,364 1,382,757
8,095,415 1,272,137
8,447,389 1,327,447
9,151,338 1,438,067
9,151,338 1,438,067
8,447,389 1,327,447
9,503,313 1,493,378
9,151,338 1,438,067
9,151,338 1,438,067
4,399,682 1,382,757
4,223,695 1,327,447
4,399,682 1,382,757
4,399,682 1,382,757
4,047,707 1,272,137
4,223,695 1,327,447
4,575,669 1,438,067
4,575,669 1,438,067
4,223,695 1,327,447
4,751,656 1,493,378
4,575,669 1,438,067
4,575,669 1,438,067
4,399,682 1,382,757
4,223,695 1,327,447
4,399,682 1,382,757
4,399,682 1,382,757
4,047,707 1,272,137
4,223,695 1,327,447
449,471,504 91,317,284
$ 25694142.348.73
$ 8075301.881.03
$ 44047101.169.25
17,598,728 590
16,894,779 566
17,598,728 590
17,598,728 590
16,190,829 543
16,894,779 566
18,302,677 614
18,302,677 614
16,894,779 566
19,006,626 637
18,302,677 614
18,302,677 614
20,112,832 590
19,308,318 566
20,112,832 590
20,112,832 590
18,503,805 543
19,308,318 566
20,917,345 614
20,917,345 614
19,308,318 566
21,721,858 637
20,917,345 614
20,917,345 614
10,056,416 295
9,654,159 283
10,056,416 295
10,056,416 295
9,251,903 271
9,654,159 283
10,458,672 307
10,458,672 307
9,654,159 283
10,860,929 319
10,458,672 307
10,458,672 307
20,112,832 590
19,308,318 566
20,112,832 590
20,112,832 590
18,503,805 543
19,308,318 566
20,917,345 614
20,917,345 614
19,308,318 566
21,721,858 637
20,917,345 614
20,917,345 614
10,056,416 295
9,654,159 283
10,056,416 295
10,056,416 295
9,251,903 271
9,654,159 283
10,458,672 307
10,458,672 307
9,654,159 283
10,860,929 319
10,458,672 307
10,458,672 307
7,542,312 295
7,240,619 283
7,542,312 295
7,542,312 295
6,938,927 271
7,240,619 283
982,411,259
a Oli ($/ltr)
Maz-Man 6151668
411
395
428
395
378
395
444
444
411
444
444
428
411
395
428
395
378
395
444
444
411
444
444
428
411
395
428
395
378
395
444
444
411
444
444
428
411
395
428
395
378
395
444
444
411
444
444
428
411
526
570
526
504
526
592
592
548
Biaya Oli ($/ltr)
295 2,065
283 1,982
295 2,065
295 2,065
271 1,900
283 1,982
307 2,147
307 2,147
283 1,982
319 2,230
307 2,147
307 2,147
295 2,360
283 2,265
295 2,360
295 2,360
271 2,171
283 2,265
307 2,454
307 2,454
283 2,265
319 2,548
307 2,454
307 2,454
295 1,180
283 1,133
295 1,180
295 1,180
271 1,085
283 1,133
307 1,227
307 1,227
283 1,133
319 1,274
307 1,227
307 1,227
295 2,360
283 2,265
295 2,360
295 2,360
271 2,171
283 2,265
307 2,454
307 2,454
283 2,265
319 2,548
307 2,454
307 2,454
295 1,180
283 1,133
295 1,180
295 1,180
271 1,085
283 1,133
307 1,227
307 1,227
283 1,133
319 1,274
307 1,227
307 1,227
295 885
283 849
295 885
295 885
271 814
283 849
NO URAIAN
A BIAYA LANGSUNG
I Overburden Removal
Biaya BBM Excavator KOMATSU PC 2000-7
Biaya BBM ADT Komatsu AST HM 400
Biaya BBM HD 465
Biaya OLI Excavator KOMATSU PC 2000-7
Biaya OLI ADT Komatsu AST HM 400
Biaya OLI HD 465
SUBTOTAL I
II Coal Activity
Biaya BBM Excavator KOMATSU PC 400-7
Biaya BBM DT Maz-Man 6151668
Biaya OLI Excavator KOMATSU PC 400-7
Biaya OLI DT Maz-Man 6151668
SUBTOTAL II
NO URAIAN
1 BIAYA PRODUKSI OB PER BULAN (Rp/BCM)
2 BIAYA PRODUKSI BB PER BULAN (Rp/BCM)
BIAYA SEQUENCE I (JANUARI 2016 S.D DESEMBER 2016)
105,944,340
16,648,396
211,888,681
7,103
3,551
24,859
334,516,930
29,442,888
19,432,306
3,345
5,017
48,883,556
$ 334516930.394.37
$ 48883555.821.12
BIAYA PRODUKSI SEQUENCE II ( JANUARI 2017 S.D DESEMBER 2017)
105,944,340
16,648,396
242,158,492
7,103
3,551
28,410
364,790,293
26,405,130
17,427,386
2,478
3,717
43,838,711
$ 364,790,293.22
$ 43,838,711.27
BIAYA PRODUKSI SEQUENCE III ( JANUARI 2018 S.D DESEMBER 2018)
52,972,170
16,648,396
121,079,246
4,991
3,551
121,079,246
311,787,601
32,480,646
21,437,227
3,049
4,573
53,925,494
$ 311,787,600.78
$ 53,925,494.39
BIAYA PRODUKSI SEQUENCE IV (JANUARI 2019 S.D DESEMBER 2019)
105,944,34
16,648,39
242,158,49
7,10
3,55
242,158,49
606,920,37
30,143,90
19,894,98
2,82
4,24
50,045,96
$ 606,920,375.1
$ 50,045,962.4
BIAYA PRODUKSI SEQUENCE V (JANUARI 2020 S.D DESEMBER 2020)
$
$
BIAYA PRODUKSI SEQUENCE VI (JANUARI 2021 S.D JULI 2021)
25,694,142
8,075,302
44,047,101
1,723
1,723
44,047,101
121,867,092
20,563,287
18,095,693
4,082
2,041
38,665,103
$ 121867091.677.62
$ 38665102.772.80
total
449,471,504
91,317,284
982,411,259
31,572
19,479
528,417,355
2,051,668,453
168,829,259
116,568,133
18,579
23,918
285,439,890
TOTAL
$ 2051668452.611.35
$ 285439889.504.34
NO URAIAN
11297420.29407
1945967.13199
15533952.90434
8027114.41947
9729835.65996
22919168.44346
8473065.22055
3,977
3,130
2,489
1,346
5,191
3,294
4,389
77,950,339
BIAYA PRODUKSI SEQUENCE II ( JANUARI 2017 S.D DESEMBER 2017)
11297420.29407
1945967.13199
15533952.90434
8027114.41947
9729835.65996
22919168.44346
8473065.22055
3,977
3,130
2,489
1,346
5,191
3,294
4,389
77,950,339
BIAYA PRODUKSI SEQUENCE III ( JANUARI 2018 S.D DESEMBER 2018)
11297420.29407
1945967.13199
15533952.90434
8027114.41947
9729835.65996
22919168.44346
8473065.22055
3,977
3,130
2,489
1,346
5,191
3,294
4,389
77,950,339
BIAYA PRODUKSI SEQUENCE IV (JANUARI 2019 S.D DESEMBER 2019)
11297420.29407
1945967.13199
15533952.90434
8027114.41947
9729835.65996
22919168.44346
8473065.22055
3,977
3,130
2,489
1,346
5,191
3,294
4,389
77,950,339
BIAYA PRODUKSI SEQUENCE V (JANUARI 2020 S.D DESEMBER 2020)
11297420.2
1945967.1
15533952.9
8027114.4
9729835.6
22919168.4
8473065.2
3
3
2
1
5
3
4
77,950
BIAYA PRODUKSI SEQUENCE VI (JANUARI 2021 S.D JULI 2021)
5648710.147033
972983.5659961
7766976.452170
4864917.829980
11459584.22173
22919168.44346
706088.7683791
662
52
414.75333333
224.26666666
865.13333333
549.06666666
731
54,342,39
TOTAL BIAYA
56,487,101 17,886
9,729,836 17,886
77,669,765 17,886
40,135,572 17,886
48,649,178 17,886
114,595,842 17,886
42,365,326 17,886
19,885 17,886
15,648 17,886
12,857 17,886
6,728 17,886
25,954 17,886
16,472 17,886
21,943 17,886
389,752,108
1. OVERBURDEN REMOVAL
1 Jan-17 447
2 Feb-17 429
3 Mar-17 447
4 Apr-17 447
5 May-17 411
6 Jun-17 429
7 Jul-17 464
8 Aug-17 464
9 Sep-17 429
10 Oct-17 482
11 Nov-17 464
12 Dec-17 464
13 Jan-18 447
14 Feb-18 429
15 Mar-18 447
16 Apr-18 447
17 May-18 411
18 Jun-18 429
19 Jul-18 464
20 Aug-18 464
21 Sep-18 429
22 Oct-18 482
23 Nov-18 464
24 Dec-18 464
25 Jan-19 447
26 Feb-19 429
27 Mar-19 447
28 Apr-19 447
29 May-19 411
30 Jun-19 429
31 Jul-19 464
32 Aug-19 464
33 Sep-19 429
34 Oct-19 482
35 Nov-19 464
36 Dec-19 464
37 Jan-20 447
38 Feb-20 429
39 Mar-20 447
40 Apr-20 447
41 May-20 411
42 Jun-20 429
43 Jul-20 464
44 Aug-20 464
45 Sep-20 429
46 Oct-20 482
47 Nov-20 464
48 Dec-20 464
49 Jan-21 447
50 Feb-21 429
51 Mar-21 447
52 Apr-21 447
53 May-21 411
54 Jun-21 429
55 Jul-21 464
56 Aug-21 464
57 Sep-21 429
58 Oct-21 482
59 Nov-21 464
60 Dec-21 464
61 Jan-22 447
62 Feb-22 429
63 Mar-22 447
64 Apr-22 447
65 May-22 411
66 Jun-22 429
SUBTOTAL
1 Jan-17 208
2 Feb-17 199
3 Mar-17 216
4 Apr-17 199
5 May-17 191
6 Jun-17 199
7 Jul-17 224
8 Aug-17 224
9 Sep-17 208
10 Oct-17 224
11 Nov-17 224
12 Dec-17 216
13 Jan-18 208
14 Feb-18 199
15 Mar-18 216
16 Apr-18 199
17 May-18 191
18 Jun-18 199
19 Jul-18 224
20 Aug-18 224
21 Sep-18 208
22 Oct-18 224
23 Nov-18 224
24 Dec-18 216
25 Jan-18 208
26 Feb-18 199
27 Mar-18 216
28 Apr-18 199
29 May-18 191
30 Jun-18 199
31 Jul-18 224
32 Aug-18 224
33 Sep-18 208
34 Oct-18 224
35 Nov-18 224
36 Dec-18 216
37 Jan-19 208
38 Feb-19 199
39 Mar-19 216
40 Apr-19 199
41 May-19 191
42 Jun-19 199
43 Jul-19 224
44 Aug-19 224
45 Sep-19 208
46 Oct-19 224
47 Nov-19 224
48 Dec-19 216
49 Jan-20 208
50 Feb-20 199
51 Mar-20 216
52 Apr-20 199
53 May-20 191
54 Jun-20 199
55 Jul-20 224
56 Aug-20 224
57 Sep-20 208
SUBTOTAL
JUMLAH UNIT
2 1
2 1
2 1
2 1
2 1
2 1
2 1
2 1
2 1
2 1
2 1
2 1
2 1
2 1
2 1
2 1
2 1
2 1
2 1
2 1
2 1
2 1
2 1
2 1
### 1
### 1
### 1
### 1
### 1
### 1
### 1
### 1
### 1
### 1
### 1
### 1
2 1
2 1
2 1
2 1
2 1
2 1
2 1
2 1
2 1
2 1
2 1
2 1
### 1
### 1
### 1
### 1
### 1
### 1
### 1
### 1
### 1
### 1
### 1
### 1
### 1
### 1
### 1
### 1
### 1
### 1
JUMLAH UNIT
2 3
2 3
2 3
2 3
2 3
2 3
2 3
2 3
2 3
2 3
2 3
2 3
2 3
2 3
2 3
2 3
2 3
2 3
2 3
2 3
2 3
2 3
2 3
2 3
2 3
2 3
2 3
2 3
2 3
2 3
2 3
2 3
2 3
2 3
2 3
2 3
2 3
2 3
2 3
2 3
2 3
2 3
2 3
2 3
2 3
2 3
2 3
2 3
2 3
2 4
2 4
2 4
2 4
2 4
2 4
2 4
2 4
7 0.05
7 0.05
7 0.05
7 0.05
7 0.05
7 0.05
7 0.05
7 0.05
7 0.05
7 0.05
7 0.05
7 0.05
8 0.05
8 0.05
8 0.05
8 0.05
8 0.05
8 0.05
8 0.05
8 0.05
8 0.05
8 0.05
8 0.05
8 0.05
4 0.05
4 0.05
4 0.05
4 0.05
4 0.05
4 0.05
4 0.05
4 0.05
4 0.05
4 0.05
4 0.05
4 0.05
8 0.05
8 0.05
8 0.05
8 0.05
8 0.05
8 0.05
8 0.05
8 0.05
8 0.05
8 0.05
8 0.05
8 0.05
4 0.05
4 0.05
4 0.05
4 0.05
4 0.05
4 0.05
4 0.05
4 0.05
4 0.05
4 0.05
4 0.05
4 0.05
3 0.05
3 0.05
3 0.05
3 0.05
3 0.05
3 0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
6 505
6 186
34 1,026
15 446
63 1,885
21 624
50 1,515
6,186
HARGA (Rp)
150,000,000
21,000,000
234,390,000
10,000,000
116,400,000
600,000,000,000
184,395,000.00
600,716,185,000
BIAYA TIDAK LANGSUNG
URAIAN BIAYA $
Biaya Lingkungan dan Masyarakat
Biaya Lingkungan, K3 dan Comdev 0.5
Iuran dan Royalti
Iuran Tetap (KP Eksploitasi) 0.10
Iuran Pembangunan Daerah (US $ 0.5/ton) 0.50
PBB 0.10
Biaya Administrasi dan Lain-lain 1,500,000.00
Royalty (7% dari Penjualan) 267,433.86
TOTAL
IDAK LANGSUNG
BIAYA
UNIT TOTAL BIAYA (USD)
(USD/Bulan)
US $ / Ha / BULAN 3.187 96
US $/MT 164,863 4,945,880.68
US $ / Ha / BULAN 96 2,868.15
Rp/BULAN 111 3,342.74
US $/bulan 267,434 8,023,015.79
$ 17,921,083.65
Rp 241,253,628,146
NO
1
2
3
4
5
TOTAL
NO
1
2
3
4
TOTAL
ESTIMASI BIAYA PRA PENAMBANGAN
URAIAN
Biaya Perijinan
Biaya Kegiatan Eksplorasi
Biaya Studi AMDAL
Biaya Studi Kelayakan
Biaya Pembebasan Lahan ( Lokasi Tambang, Jalan, Stockpile, dll) 385,79 ha x Rp 10.000.000
TOTAL
URAIAN
Pembangunan Kantor
Fasilitas dan perlengkapan kantor
Pembangunan Workshop
Stasiun Bahan Bakar
TOTAL
SUBTOTAL
BIAYA ($) UMUR
11,142 6
14,857 6
37,142 6
13,000 6
571,980 6
648,121
UKTUR
748402.911.90
JUMLAH KARYAWAN PT. RICOAL MAHAKAM SEJAHTERA
Jumlah
No Karyawan
(Orang)
1 Direktur 1
2 Manager Proyek 1
3 Manager General 1
4 Manager Keuangan 1
5 Sekretaris General 1
6 Sekretaris Keuangan 1
7 Manajer Tambang (KTT) 1
11 Kabag. Engineering 1
12 Spv. Mine Plan 2
13 Helper Survey 3
14 Spv. Pit Control 2
15 Spv. Survey 1
16 Spv. Cost Control 1
17 Kabag. HR & GA 1
18 Spv. Finance & Administration 1
19 Spv. HR 1
20 Spv. Logistic Maintenance 1
21 Spv. Marketting 2
22 Spv. GA 2
23 Foreman Logistik 2
24 Foreman GA 1
25 Driver Water Truck 2
26 Kabag. HSE & Comdev 1
27 Spv. Comdev 1
28 Safety Officer 2
29 Spv. HSE 2
30 Staff HSE 3
31 Kabag. Mine Production 1
32 Spv. Mine Production 2
33 Foreman Operasi Produksi 2
34 Adm. Produksi 2
35 Operator DT Hauling OB 16
36 Operator Excavator 6
37 Operator Dozer 4
38 Operator Grader 2
39 Operator HD 14
40 Operator ADT 2
41 Checker 3
42 Pump Man 4
43 Driver DT Hauling Coal 8
44 Operator Excavator Coal 2
45 Spv. Peledakan 0
46 Helper Peledakan 0
47 Kabag. Repair & Maintenance 1
48 Mekanik 2
49 Helper Mekanik 2
50 Electric 2
51 Foreman Maintenance 2
Jumlah 116
AKAM SEJAHTERA
NO
Divisi
- I
-
-
-
-
-
-
Engineering
Engineering II
Engineering
Engineering
Engineering
Engineering
HR & GA
HR & GA
HR & GA
HR & GA
HR & GA III
HR & GA
HR & GA
HR & GA
HR & GA
HSE & Comdev
HSE & Comdev
HSE & Comdev
HSE & Comdev
HSE & Comdev
Mine Production
Mine Production IV
Mine Production
Mine Production
Mine Production
Mine Production
Mine Production
Mine Production
Mine Production
Mine Production V
Mine Production
Mine Production
Mine Production
Mine Production
Mine Production
Mine Production
Repair & Maintenance
Repair & Maintenance
Repair & Maintenance
Repair & Maintenance
Repair & Maintenance
VI
DESCRIPTION TOTAL GAJI PERBULAN
ENGINEERING
Kabag. Engineering 1 12,000,000
Spv. Mine Plan 2 10,000,000
Helper Survey 3 4,000,000.00
Spv. Pit Control 2 10,000,000
Spv. Survey 1 10,000,000
Spv. Cost Control 1 10,000,000
SUB TOTAL II 10
HR & GA
Kabag. HR & GA 1 12,000,000
Spv. Finance & Administration 1 10,000,000
Spv. HR 1 10,000,000
Spv. Logistic Maintenance 1 10,000,000
Spv. Marketting 2 10,000,000
Spv. GA 2 10,000,000
Foreman Logistik 2 9,000,000
Foreman GA 1 9,000,000
SUB TOTAL III 11
Mine Production
Kabag. Mine Production 1 12,000,000
Spv. Mine Production 2 10,000,000
Foreman Operasi Produksi 2 9,000,000
Adm. Produksi 2 9,000,000
Operator DT Hauling OB 16 5,500,000
Operator Excavator OB 6 5,500,000
Operator Dozer 4 5,000,000
Operator Grader 2 5,000,000
Checker 3 4,000,000
Pump Man 4 4,000,000
Driver DT Hauling Coal 8 5,500,000
Operator Excavator Coal 2 5,500,000
SUB TOTAL V 52
Biaya
Asuransi Konsumsi Rp Rp
(Rp/Bulan)
5% 0 36,388,889 2,401,666,666.67
5% 0 32,166,667 2,123,000,000.00
5% 0 32,166,667 2,123,000,000.00
5% 0 9,750,000 643,500,000.00
5% 0 9,750,000 643,500,000.00
5% 0 34,227,778 2,259,033,333.33
154,450,000 10,193,700,000
5% 0 12,966,667 855,800,000.00
5% 0 21,355,556 1,409,466,666.67
5% 0 12,922,222 852,866,666.67
5% 0 21,455,556 1,416,066,666.67
5% 0 10,755,556 709,866,666.67
5% 0 10,755,556 709,866,666.67
90,211,111 5,953,933,333
5% 0 12,916,667 852,500,000.00
5% 0 10,755,556 709,866,666.67
5% 0 10,755,556 709,866,666.67
5% 0 10,755,556 709,866,666.67
5% 0 21,455,556 1,416,066,666.67
5% 0 21,455,556 1,416,066,666.67
5% 0 19,250,000 1,270,500,000.00
5% 0 9,650,000 636,900,000.00
116,994,444 7,721,633,333
5% 0 13,116,667 865,700,000.00
5% 0 10,755,556 709,866,666.67
5% 0 10,827,778 714,633,333.33
5% 0 21,555,556 1,422,666,666.67
5% 0 16,227,778 1,071,033,333.33
72,483,333 4,783,900,000
5% 0 13,016,667 859,100,000.00
5% 0 21,555,556 1,422,666,666.67
5% 0 19,350,000 1,277,100,000.00
5% 0 19,350,000 1,277,100,000.00
5% 0 95,630,556 6,311,616,666.67
5% 0 35,880,556 2,368,116,666.67
5% 0 21,827,778 1,440,633,333.33
5% 0 10,927,778 721,233,333.33
5% 0 13,222,222 872,666,666.67
5% 0 17,622,222 1,163,066,666.67
5% 0 47,830,556 3,156,816,666.67
5% 0 11,980,556 790,716,666.67
328,194,444 21,660,833,333
5% 0 13,116,667 872,250,000
5% 0 10,927,778 726,900,000
5% 0 8,822,222 581,600,000
5% 0 10,927,778 726,900,000
5% 0 19,350,000 1,308,100,000
63,144,444 4,215,750,000
PERKIRAAN PENDAPATAN DARI PENJUALAN DENGAN HARGA BATUBAR
Pendapatan 51,431,351,714
-
AN DENGAN HARGA BATUBARA
MT/BULAN
Prod. Turun 10% Produksi Tetap Prod. Turun 10% Prod. Naik 10%
Harga Tetap Harga Turun 10% Harga Turun 10% Harga Tetap
40,505 45,005 40,505 49,505.62
1,142,789 1,028,510 1,028,510 1,142,789.18
56,574,486,885 62,231,935,574
NO ACTIVITIES
1 Computer System
2 Engineering Software
3 Survey Equipment
4 Office Equipment
5 Handy Talky
7 Diesel Genset
NO ACTIVITIES
Dumptruck HD 465
Dumptruck Maz-Man 6151668
Dumptruck Artic A35D
Excavator PC 400 -7
Excavator PC 2000-7
Bulldozer D-155
Water Truck Mitsubishi 220 PS
Fuel Truck Renault K350
Motor Grader GD555 -3
Compactor Vibro Bomag BW 212D
Water Pump Multiflow MF 490
Mobil Operasional FORD RANGER DC BASE+ 4x4 MT
Bus Karyawan ISUZU EL NKR 55 MICROBUS LWB
10 5000000 50,000,000
1 3500000 3,500,000
234,390,000 234,390,000
10,000,000 10,000,000
35 2328000 81,480,000
1 600000000 600,000,000
TOTAL (Rp)
TOTAL ($)
40,910,171,289 15,909,511,057
530,317,035.22
TABEL
PERALATAN PERTAHUN & NILAI SISA PERALATAN
/TAHUN
Tahun 5 Tahun 6 Depresiasi Per-Tahun
114,259,833
Tahun 5 Tahun 6
Depresiasi Per-Tahun
30% 30%
43,333,333,333 31,200,000,000 12,133,333,333
1,000,000,000 720,000,000 280,000,000
1,251,165,833 900,839,400 350,326,433
1,333,453,750 960,086,700 373,367,050
4,583,333,333 3,300,000,000 1,283,333,333
1,201,165,833 864,839,400 336,326,433
141,666,667 102,000,000 39,666,667
104,166,667 75,000,000 29,166,667
575,341,667 414,246,000 161,095,667
849,651,095 611,748,789 237,902,307
250,000,000 180,000,000 70,000,000
1,321,666,667 951,600,000 370,066,667
466,666,667 336,000,000 130,666,667
15,795,251,223
UMUR ALAT
NILAI SISA
(Tahun)
6.00 15,000,000
6.00 1,050,000
6.00 70,317,000
6.00 3,000,000
6.00 24,444,000
6.00 180,000,000
293,811,000
UMUR ALAT
NILAI SISA
(Tahun)
6 31,200,000,000.00
6 720,000,000.00
6 900,839,400.00
6 960,086,700.00
6 3,300,000,000.00
6 864,839,400.00
6 102,000,000.00
6 75,000,000.00
6 414,246,000.00
6 611,748,788.70
6 180,000,000.00
6 951,600,000.00
6 336,000,000.00
40,616,360,289
ESTIMASI KEBUTUHAN INV
No.
I.
-
-
-
-
-
Biaya Produksi
-
-
-
-
-
-
Uraian
MODAL TETAP
Biaya Pra penambangan
Biaya Perijinan IUP
Biaya Kegiatan Eksplorasi
Biaya Studi AMDAL
Biaya Studi Kelayakan
Biaya Pembebasan Lahan ( Lokasi Tmbang, Jalan, Stockpile, dll) 35 ha x Rp 10.000.000
Biaya Produksi
Overburden Removal
Coal Activity
Supporting & General
Upah Karyawan
Biaya Tidak Langsung ( Iuran, Royalty, dll)
Biaya Repair & Maintenance
Total Modal Tetap
11,142
14,857
37,142
13,000
571,980
11,142
1,560
17,411
743
8,647
44,569,900
13,697
59,427
11,142
7,428
22,285
2,051,668,453
285,439,890
28,952
4,050,643
597,369
44958311.9192326
2,432,115,122
2,432,115,122
1,216,057,560.96
1,216,057,560.96
152,007,195
$ 2584122317.043.43
Biaya Langsung Rencana Penutupan Tambang
NO Komponen Biaya
3 Pengelolaan lubang bukaan bekas tambang (void)
4 Reklamasi
6 Pembongkaran bekas fasilitas pengolahan
7 Pembongkaran bekas kolam pengendapan
8 Remidiasi tanah yang terkontaminasi minyak
10 Pembongkaran bekas jalan tambang
11 Pembongkaran bekas stockpile
12 Pembongkaran peralatan, mesin, dan tangki BBM
13 Pemantauan
Jumlah
Jumlah (US $)
$ 942,340.00
$ 942,340.00
$ 1,884,680.00
$ 942,340.00
$ 4,711,700.00
381,647,700.00
Rp5,137,741,337,400
Bunga Pinjama
Bunga Cicilan
Rp 42,631,684,598 Rp 383,685,161,383
Rp 42,631,684,598 Rp 383,685,161,383
Rp 42,631,684,598 Rp 383,685,161,383
Rp 42,631,684,598 Rp 383,685,161,383
Rp 42,631,684,598 Rp 383,685,161,383
Rp 42,631,684,598 Rp 383,685,161,383
Sisa Hutang
Rp 2,046,320,860,708
Rp 1,705,267,383,923
Rp 1,364,213,907,139
Rp 1,023,160,430,354
Rp 682,106,953,569
Rp 341,053,476,785
Rp -
URAIAN
- Produksi Overburden (BCM) 21,833,975.00
- Produksi Batubara (MT) 2475281
- SR
Biaya Produksi Overburden 27619560709054
Biaya Produksi Batubara 3842591792507
Baya pembelian peralatan 113875537629
Total Biaya Produksi
Biaya Supporting & General 389752108
Upah Karyawan 54529750000
Biaya Repair & Maintenance 1,348,749,358
Amortisasi 10075000000
Pembangunan Infrastruktur 600,716,185,000
Depresiasi Peralatan 15,909,511,056.72
Biaya Tidak Langsung (Iuran, Royalty,dll) 31819022113.4333
Cicilan Pinjaman Bank 383685161383
Biaya Reklamasi 5137741337400
Modal Pinjaman Bank 16370566885665.300
Modal Sendiri 16,370,566,885,665.30
TOTAL PENGELUARAN 70,553,400,588,195.20
Rp
Rp 20049
Rp 0 870644612
Rp 621815456183122 -559645928993
Rp 186544636854937 -167893778698
Rp 435270819328186 -391752150295
Rp 435270819328186 -391752150295
- - -
279114229 279114229 279114229
558228458 558228458 558228458
6731318621 6731318621 6731318621
- - -
- - -
- - -
560516573605 560516573605 560516573605
13% %/tahun
Rp382,528,157,982,367 Rp
100% %
-1.4307938659 Bln
2,475,281.01 MT
Cashflow Tahun 6
-6310046868342
Produksi Tahun 6
43426
bulan ke- 5 bulan ke- 6 bulan ke- 7
419884 419884 419884
43426 43426 43426
10 10 10
484553696650 484553696650 484553696650
67413891097 67413891097 67413891097
- -
279114229 279114229 279114229
558228458 558228458 558228458
6731318621 6731318621 6731318621
-
- -
- -
560516573605 560516573605 560516573605
2,475,281.00 2,475,281.25
-13.0000% 13.000%
bulan ke- 8 bulan ke- 9 bulan ke- 10
419884 419884 419884
43426 43426 43426
10 10 10
484553696650 484553696650 484553696650
67413891097 67413891097 67413891097
40910171289
20049 20049 20049 20049
870644612 870644612 870644612 41780815901