‘Chapcer Il
‘Strategy, Planning, Execution
‘AS previously mentioned, FMEA development is the
responsibility of 2 multi-disciplinary (or cross-functional) team
whose members encompass the necessary subject matter
Knowledge, This showld include facililation expertise and
Knowledge of the FMEA process. A team approach is
recomended ta benefit the FMEA development process. to
snsure input and collaboration from all affected functional arcas.
‘The FMEA team lester should select team members with the
relevant experience ‘and necessary authority. In addition to the
design and process engineers, the following are examples of
additions] resources:
__ FMEA development topic
Seope
Relevant Resources or Expertise
| Program Management, Cusiomer, Integration responsible |
individual(s)
Fonetions, requirements and expectations
(Customer, Program Management, Integration tesponsible |
individual(s), Service Operations, Safety, Manufacturing
And Assembly, Packaging, Logistics, Materials
Potential faifure mode — the way a process oF
product might fail
‘Customer, Program Management, Integration responsible
individuel(s), Service Operations, Safety, Manufactaring
and Assembly, Packaging, Logistics, Materials, Quality
Effects and consequences of the failure - 19
both the organization's processes or to 8
downstream customer.
Customer, Program Management, Integration responsible
individual(s), Service Operations, Safely, Manwfacturing:
and Assembly, Packaging, Logistics, Materials, Quality
‘Calises off the potential failure
Customer, Manufecraring and Assembly, Packaging,
Logistics, Materials, Quality, Reliability, Engineering.
Analysis, Equipment Manufacturer, Maintenance
Frequency of ecumrence of potential failure
‘Customer, Manufacturing und Asscmbly, Packaging,
Logistics, Materials, Quality, Reliability, Engineering
Analysis, Statistical Analysis, Equipment Manufacturer,
‘Maintenance |
Application of coment controls-prevention
‘Manufacturing and Assembly, Packaging, Logistics,
Materials, Quolity, Equipment Manufacturer, Maintenance
“Application of current controls detection
| Recommended actions required
‘Customer, Manufacturing and Assembly, Packaging,
Logistics, Materials, Quality, Maintenance
‘Customer, Program Management, Integration responsible |
individual(s), Manafacturing and Assembly, Packaging,
Logistics, Materials, Quality, Reliability, Engineering
Analysis, Statistical Analysis, Equipment Manufacturer,
Maintenance