You are on page 1of 1

Description of Station and Tower of Kalinchowk Cable Car Project

Chainage at Chainage at Angle of RL of RL of Height of Formation Level


top center of center of inclination Ground Track Tower/C.l of Level of difference
tower tower of tower at Level (m) Cable (m) Drum Station in C.l
foundation plate of
foundation
Lower 1400 3402.21
Station 3404.57
0+64.7
drum 1.4
Lower 0+70.0 3403.86 3402.21 1.40
Station 3406.71
sheave
Bottom 0+81.3 3404.36 3410.41 6050 3404.36 2.15
guiding
tower
0+110 3408.977 3419.5 3408.96 4.83
Tower no.1 10539

Tower no. 2 0+310 3442.834 3479.50 36351 3443.15 34

Tower no. 3 0+862 0+864.06 15 3696.25 3704.76 Front- 253.59


1 3695.99
8446 Center-
3696.31
Back-
Top Guiding 0+885 0+886.63 15 3707.404 3712.45 5213 Front-
3707.11
Tower Center-
3707.23
Upper 0+900 3713.62 3715.45 3713.00
Station
floor
Upper 0+900 3708.00 5.0
Station
down ward
floor

You might also like