Professional Documents
Culture Documents
Keterangan Distance
Mother Vassel 178.8 mil
Barging PT. Manusela Prima Mining 4.04 mil
Barging PTTBP 3.94 mil
BARGING COST
2. Crane Barge
Jumlah voyage/bln
Jumlah coal yg diangkut /bln
TOTAL LOADING
TOTAL UNLOADING
MV Transp
4
2,000 1
5,000 Konsumsi BBM 2
2 2.00 jam 492.00 3
4 1.14 jam 281.14 4
- jam - 5
- jam - 6
- jam 7
3.14 jam 773.14 Liter 8
0.13 hari 1.20 $/liter 9
BBM Cost 931.03 $/voyage 10
229 11
1,145,455 12
13
$ 57,979 14
$ 213,290 15
$ 40,690 16
$ 311,959 17
$ 0.27 18
1 USD = 11600
IDR USD USD/ton
1,500,000 129.3
18,000,000 1,551.7 $ 0.03
21,000,000 1,810.3 $ 0.03
2.2
145,000.0 2.42
175,000.0 $ 2.92
3,100 0.3
205,000,000 17,672.4 0.29
239,000,000 20,603.4 $ 0.34
$ 3.57 85%
$ 4.20 100%
MV Transport
MV Cap ton wmt 65,000.0 1
Time charter USD/day 12,750.0 2
Distance mil 178.8 3
Speed Knots 4.0
Travel time days 1.62
Loading rate wmt/day 11,000.0
Pekerjaan Muat dan Bongkar 11.8
MV travel time/voyage 14.9
Charter Cost 189,915.8
FO 35,274.1
DO 4,597.0
BBM di Pelabuhan 16,772.4
Total BBM 56,643.5
Total Cost/voyage USD/voyage 246,559.3
Voyage / bln 2.0
Muatan 130,913.3
Biaya angkut 496,582.8
Total Cost $/ton 3.8
7408
ng Activities cost is 75% -
rom total cost of Shipment
al 2013 is 5.12)
TOTAL
Barging from Jetty to MV 100% $ 4.87
MV Transport to Kawasi 100% $ 3.79
Barging from MV to Jetty Kawasi 0% $ -
$ 8.67
FID Shape * Id Ket Lenght
0 Polyline 0 To GPS 192066.6
1 Polyline 0 To TBP 195366
119.3701
121.4208