PERHITUNGAN JUMLAH BERAT TULANGAN PER M3 BETON

Pnjng Ekivalen=1m3 Kbthn. Tul Brt Tul Berat per Kbthn


No. Tipe konstruksi
lbr tg panj (mm) (Kg/m') 1m' (kg) per m3 (kg)
A. Tulangan Pokok
1 Balok sloof s1 25 X 15 0.15 0.25 26.67 4 10.0 0.617 2.468 65.81
2 8.0 0.395 0.790 21.07
2 Balok sloof s2 30 X 20 0.30 0.20 16.67 7 12.0 0.888 6.216 103.60
2 8.0 0.395 0.790 13.17
3 Balok BL1 30 X 20 0.30 0.20 16.67 7 12.0 0.888 6.216 103.60
2 8.0 0.395 0.790 13.17
4 Balok RB1 15 X 25 0.15 0.25 26.67 4 10.0 0.617 2.468 65.81
2 8.0 0.395 0.790 21.07
5 kolom KL1 15 x 20 0.15 0.20 33.33 6 12.0 0.888 5.328 177.600
6 kolom KL2 15 x 15 0.15 0.15 44.44 4 10.0 0.617 2.468 109.689
7 kolom KL3 20 x 20 0.20 0.20 25.00 8 12.0 0.888 7.104 177.600
8 balok K1 25 x 35 0.25 0.35 11.43 7 12.0 0.888 6.216 71.040
9 balok K2 20 x 30 0.20 0.30 16.67 7 12.0 0.888 6.216 103.600
8 Plat tebal 12 cm 1.00 0.12 8.43 10 10.0 0.617 6.170 52.034
84 10.0 0.617 52.034 52.034
10 Tangga Beton 1.00 0.12 6.82 13 12.0 0.888 11.840 80.729
91 10.0 0.617 56.092 56.092
12 Poer tebal 25 cm 1.00 0.25 4.10 13 12.0 0.888 11.840 48.544
82 10.0 0.617 50.594 50.594

PERHITUNGAN JUMLAH BERAT SENGKANG PER M3 BETON PADA TIAP ELEMEN KONSTRUKSI

Pnjng Ekivalen=1m3 Kbthn. Tul Brt Tul Berat per Kbthn


No. Tipe konstruksi
lbr tg panj (mm) (Kg/m') 1m' (kg) per m3 (kg)
B. Beugel/sengkang dan tul. bagi
1 Balok sloof s1 25 X 15 0.13 0.23 0.80 133 8.0 0.395 52.69 42.15
2 Balok sloof s2 30 X 20 0.28 0.18 1.00 84 8.0 0.395 33.18 33.18
3 Balok BL1 30 X 20 0.28 0.18 1.00 84 8.0 0.395 33.18 33.18
4 Balok RB1 15 X 25 0.13 0.23 0.80 134 8.0 0.395 52.93 42.34
5 kolom KL1 15 x 20 0.13 0.18 0.70 167 8.0 0.395 65.97 46.18
6 kolom KL2 15 x 15 0.13 0.13 0.60 223 8.0 0.395 88.09 52.85
7 kolom KL3 20 x 20 0.18 0.18 0.80 125 8.0 0.395 49.38 39.50
8 balok K1 25 x 35 0.23 0.33 1.20 58 9.0 0.499 28.94 34.73
9 balok K2 20 x 30 0.18 0.28 1.00 84 10.0 0.617 51.83 51.83
ON

jumlah lonjor Luasan JUMLAH TULANGAN (LONJOR)


Jumlah Begel
Per M3 bkstng (m2) volume beton d12 d10 p8

8.89 13.3333 133.33 133.40


4.44 13.3333 2.770125 36.935 56.145359347
13.99 13.3333 83.33 84.00
2.78 6.6667 1.698 23.759157212 25.86518018
9.72 13.3333 83.33 84.00
2.78 6.6667 1.4706 14.2975 27.460032432
8.89 14.6667 133.33 134.00
4.44 13.3333 7.5506025 67.116466667 153.57426646
16.667 16.667 166.67 167.00 0.732 12.2 12.687862613
14.815 20.000 222.22 223.00 1.31175 21.8625 26.02376098
16.667 15.000 125.00 125.00 1.52 25.333333333 22.537537538
6.667 9.714 57.14 58.00 0.84 14 10.951027027
9.722 11.667 83.33 84.00 0.84 14 16.342162162
7.028
8.433
7.028 2.71410636 38.148272727
7.576
6.818 55.56 56.00
7.576 0.456 6.9092165312
4.556
4.100
6.833 0.762 8.6783333333

JUMLAH 229.50395721 53.735822591 351.58718874


PEMBULATAN 230 54 352

P ELEMEN KONSTRUKSI

Pnjng Kebutuhan Kawat


Per M3 Beton
0.18
15.82 1.6008 Kg
12.45 1.0080 Kg
12.45 1.0080 Kg
15.89 1.6080 Kg
17.33 2.0040 Kg
19.84 2.6760 Kg
14.83 1.5000 Kg
13.04 0.6960 Kg
19.45 1.0080 Kg
kebutuhan besi D12 per M3 beton 118.16 lonjor
kebutuhan besi D10 per M3 beton 28.465 lonjor
kebutuhan besi P8 per M3 beton 123.07 lonjor
kawat beton 11.4048 kg