CLIENTE: FERNADO YVENES U.

Fecha: 27-12-2006
PROYECTO: Contrato No.________
Ing. Civil/Estructural
AREA: Por: _____ Rev: _____
TTULO: Pg. No. 1 de 9
CLCULOS Y ESQUEMAS

1.0 DESCRIPTION:
BEARING PRESSURES FOR RECTANGULAR FOOTINGS WITH BIAXIAL UPLIFT.

Purpose

The purpose of this calculation sheet is to solve for design parameters of a footing, which will result in easier
design of footing. The footing is subject to axial load and bearing (biaxial moment). The footing can have a
portion of their footing area that does not act in bearing.

The parameters calculated are:


Combined Forces and Moment at centroid of footing.
Soil bearing pressure.
Maximum bearing pressure.
Bearing pressure at remaining foundation corners.
Location of line of zero pressure.
Percentage of footing area acting in bearing.
Factors of Security (Overturning and Sliding).

Assumptions

The following assumptions are made in the derivation of the results presented in this calculation sheet:
The foundation is rectangular.
The foundation behaves as a rigid body.
The foundation has a planar stress distribution, and the location of zero pressure is therefore linear.
The bearing pressure can only be compressive in nature, and there are no tensile bearing stresses.

Referees

"Bearing Pressures For Rectangular Footings With Biaxial Uplift " by Kenneth E. Wilson. Journal of Bridge
Engineering / February 1997.

Materials

Steel Reinforcing Bars


kgf
(ASTM-A615, Grade 60) fy := 4200 E := 29000ksi
2
cm

Concrete kgf kgf tonf


fc := 300 Ec := 15100 fc c := 2.40
2 2 3
cm cm m

Soil tonf tonf tonf


q all := 40 Esoil := 9000 soil := 1.82
2 2 3
m m m

tonf tonf
q all.quake := 52 c := 1 := 38deg
2 2
m m soil := 0.2
FSslidingall := 1.5 FSOTall := 2 %InContactall := 80%

D:\My Documents\FYEVENES\PERSONAL Doc. No.____________________


CLIENTE: FERNADO YVENES U. Fecha: 27-12-2006
PROYECTO: Contrato No.________
Ing. Civil/Estructural
AREA: Por: _____ Rev: _____
TTULO: Pg. No. 2 de 9
CLCULOS Y ESQUEMAS

2.0 INPUT DATA:

M yy

P
ey
Ly M xx
X
ex

Lx

Length along X axis Lx := 7m


Length along Z axis Ly := 6m

Lx
Footing centroid CGx := 1.664m CGx = 1.84 m
2
CGy := 0m
Bottom of footing level BOF := 2672.675m
Top of pedestal level TOP := 2679.553m
Finish grade level Grade := 2678.475m
Thickness of footing FootingThickness := 1.1m
FootingWeight := c FootingThickness Lx Ly FootingWeight = 110.88 tonf
Soil thickness above footing SoilAboveFooting := Grade BOF FootingThickness
SoilAboveFooting = 4.70 m
SoilWeight := soil SoilAboveFooting Lx Ly SoilWeight = 359.27 tonf

==> SoilAboveFooting + FootingThickness = 5.80 m


Total No of pedestals on the footing NoOfPedestal := 1
Total No of loads NoOfLoad := 12
Total No of load combinations NoOfComb := 31

D:\My Documents\FYEVENES\PERSONAL Doc. No.____________________


CLIENTE: FERNADO YVENES U. Fecha: 27-12-2006
PROYECTO: Contrato No.________
Ing. Civil/Estructural
AREA: Por: _____ Rev: _____
TTULO: Pg. No. 3 de 9
CLCULOS Y ESQUEMAS

Pedestal coordinates
Pedestal Joint Coordinates [m]
No. No. X Y
1 1 0.00 0.00

Relocated footing centroid and pedestals


Loads on pedestal

Joint Forces [tonf] Moments [tonf-m]


Load
No. P Vx Vy Mxx Myy
DL 15 84.83 -115.59 6.08 3.55 0.00
DLe 15 17.64 -19.30 3.47 2.03 0.00
LL 15 3.81 -6.07 0.12 0.07 0.00
LLo 15 1.50 -2.42 0.35 0.21 0.00
LLr 15 21.45 -29.17 1.68 0.98 0.00
CL 15 1.83 -2.85 0.68 0.40 0.00
WLx 15 -2.24 8.01 17.87 10.52 0.00
WLy 15 -8.44 4.93 6.23 3.67 0.00
ELx 15 -4.63 8.14 7.70 4.53 0.00
ELy 15 11.92 -20.31 3.91 2.30 0.00
ELz 15 15.59 -20.01 1.55 0.91 0.00
TL 15 0.43 -11.59 17.77 10.34 0.00

Note : a) joint numbers are SAP2000 model nodes.


b) for establishing coordinates of the pedestals refer to previous page.

D:\My Documents\FYEVENES\PERSONAL Doc. No.____________________


CLIENTE: FERNADO YVENES U. Fecha: 27-12-2006
PROYECTO: Contrato No.________
Ing. Civil/Estructural
AREA: Por: _____ Rev: _____
TTULO: Pg. No. 4 de 9
CLCULOS Y ESQUEMAS

Combination factors

Loads
Comb
DL DLe LL LLo LLr CL WLx WLy ELx ELy ELz TL
1 1.00 1.00
2 1.00 1.00 1.00 1.00 1.00
3 0.75 0.75 0.75 0.75 0.75 0.75
4 0.75 0.75 0.75 0.75 0.75 0.75
5 0.75 0.75 0.75 0.75 0.75 -0.75
6 0.75 0.75 0.75 0.75 -0.75 0.75
7 0.75 0.75 0.75 0.75 -0.75 -0.75
8 0.75 0.75 0.38
9 0.68 0.68 0.75 0.75
10 0.68 0.68 0.75 -0.75
11 0.68 0.68 -0.75 0.75
12 0.68 0.68 -0.75 -0.75
13 0.75 0.75 0.75 0.75 0.75 0.75
14 0.75 0.75 0.75 0.75 0.75 -0.75
15 0.67 0.67 0.67 0.67 0.67 0.67 0.67
16 0.67 0.67 0.67 0.67 0.67 0.67 -0.67
17 0.75 0.75 0.75 0.75 0.75 0.75
18 0.75 0.75 0.75 0.75 0.75 0.75
19 0.75 0.75 0.75 0.75 0.75 -0.75
20 0.75 0.75 0.75 0.75 -0.75 0.75
21 0.75 0.75 0.75 0.75 -0.75 -0.75
22 0.75 0.75 0.38
23 0.68 0.68 0.75 0.75
24 0.68 0.68 0.75 -0.75
25 0.68 0.68 -0.75 0.75
26 0.68 0.68 -0.75 -0.75
27 0.67 0.67 0.67 0.67 0.67 0.67 0.67
28 0.67 0.67 0.67 0.67 0.67 0.67 -0.67
29 0.75 0.75 0.75 0.75 0.75 0.75
30 0.75 0.75 0.75 0.75 0.75 0.75 0.75
31 0.75 0.75 0.75 0.75 0.75 0.75 -0.75

where,
DL : dead load
LL : live load
CL : crane load
WL : wind load
EL : earthquake load
TL : temperature load

D:\My Documents\FYEVENES\PERSONAL Doc. No.____________________


CLIENTE: FERNADO YVENES U. Fecha: 27-12-2006
PROYECTO: Contrato No.________
Ing. Civil/Estructural
AREA: Por: _____ Rev: _____
TTULO: Pg. No. 5 de 9
CLCULOS Y ESQUEMAS

Pedestal data

3.5

3.5
4 0 4

3.0 CALCULATIONS:
Calculations
Pedestal coordinates
Pedestal Joint Coordinates [m]
No. No. X Y
1 1 1.84 0.00

D:\My Documents\FYEVENES\PERSONAL Doc. No.____________________


CLIENTE: FERNADO YVENES U. Fecha: 27-12-2006
PROYECTO: Contrato No.________
Ing. Civil/Estructural
AREA: Por: _____ Rev: _____
TTULO: Pg. No. 6 de 9
CLCULOS Y ESQUEMAS

Forces and Moment at centroid of footing seal

Forces [tonf] Moments [tonf-m]


Comb
P Vx Vy Mxx Myy
1 572.62 -134.89 9.55 71.26 -739.64
2 599.38 -172.55 11.70 87.31 -949.53
3 560.74 -125.72 13.45 100.37 -698.34
4 571.62 -137.78 11.61 86.66 -761.32
5 548.23 -107.76 9.29 69.30 -597.81
6 553.74 -107.31 5.75 42.87 -584.61
7 530.35 -77.30 3.42 25.51 -421.10
8 543.84 -99.32 9.50 70.89 -547.82
9 559.95 -121.29 10.54 78.68 -669.37
10 536.56 -91.28 8.22 61.32 -505.86
11 542.07 -90.83 4.68 34.89 -492.65
12 518.68 -60.81 2.35 17.53 -329.15
13 567.39 -138.11 22.10 164.91 -771.34
14 566.75 -120.72 -4.55 -33.94 -652.95
15 551.37 -120.07 23.92 178.48 -676.73
16 550.79 -104.54 0.11 0.85 -570.97
17 565.39 -123.41 22.18 165.56 -673.91
18 559.20 -116.44 14.45 107.88 -637.35
19 535.82 -86.42 12.13 90.52 -473.84
20 566.15 -128.65 2.90 21.64 -708.58
21 542.76 -98.63 0.58 4.29 -545.07
22 546.16 -98.16 13.86 103.48 -535.61
23 547.54 -99.95 13.38 99.90 -545.40
24 524.15 -69.94 11.06 82.54 -381.89
25 554.48 -112.16 1.83 13.66 -616.62
26 531.10 -82.15 -0.49 -3.69 -453.12
27 555.52 -118.01 31.72 236.71 -654.91
28 554.94 -102.48 7.91 59.08 -549.15
29 568.44 -131.55 9.29 69.29 -724.33
30 568.77 -140.24 22.61 168.71 -783.53
31 568.12 -122.86 -4.04 -30.13 -665.14

D:\My Documents\FYEVENES\PERSONAL Doc. No.____________________


CLIENTE: FERNADO YVENES U. Fecha: 27-12-2006
PROYECTO: Contrato No.________
Ing. Civil/Estructural
AREA: Por: _____ Rev: _____
TTULO: Pg. No. 7 de 9
CLCULOS Y ESQUEMAS

Bearing pressure at remaining foundation corners and Maximum Bearing pressure

q3
q0

q1
q2

Bearing Corner [tonf/m2]


Comb NBC
q0 q1 q2 q3 qmax
1 2 30.55 27.14 0.00 0.00 30.55
2 2 37.36 32.28 0.00 0.00 37.36
3 3 30.19 25.21 0.00 1.39 30.19
4 2 31.58 27.12 0.00 0.00 31.58
5 3 26.91 23.60 0.00 2.50 26.91
6 4 26.14 24.09 0.23 2.27 26.14
7 4 21.83 20.61 3.43 4.64 21.83
8 4 25.82 22.44 0.08 3.46 25.82
9 3 28.94 25.12 0.00 1.51 28.94
10 4 24.56 21.64 0.99 3.91 24.56
11 4 23.79 22.13 2.02 3.68 23.79
12 4 19.48 18.65 5.21 6.05 19.48
13 3 34.00 25.31 0.00 1.22 34.00
14 3 27.63 26.01 0.00 0.97 27.63
15 3 31.62 22.65 0.00 3.38 31.62
16 4 24.79 24.75 1.44 1.48 24.79
17 3 31.45 23.24 0.00 3.53 31.45
18 3 28.96 23.75 0.00 2.85 28.96
19 4 24.58 20.27 0.93 5.24 24.58
20 2 28.52 27.45 0.00 0.00 28.52
21 4 24.15 23.94 1.70 1.90 24.15
22 3 26.40 21.47 0.00 4.54 26.40
23 3 26.55 21.79 0.00 4.28 26.55
24 4 22.24 18.31 2.72 6.65 22.24
25 4 26.11 25.46 0.29 0.94 26.11
26 4 21.98 21.80 3.31 3.49 21.98
27 3 32.79 20.88 0.00 5.28 32.79
28 4 25.83 23.01 0.60 3.41 25.83
29 2 29.82 26.98 0.00 0.00 29.82
30 3 34.47 25.51 0.00 1.02 34.47
31 3 27.83 26.38 0.00 0.67 27.83

D:\My Documents\FYEVENES\PERSONAL Doc. No.____________________


CLIENTE: FERNADO YVENES U. Fecha: 27-12-2006
PROYECTO: Contrato No.________
Ing. Civil/Estructural
AREA: Por: _____ Rev: _____
TTULO: Pg. No. 8 de 9
CLCULOS Y ESQUEMAS

tonf
(
q max := max q BearingMax ) q max = 37.36
2
m
tonf
q net := q all + soil SoilAboveFooting ... q net = 48.74
2
+ FootingThickness 1m m

Footing in contact with soil, Sliding and Overturning Factors of Safety

Factor of Safety
Comb NBC %InContact
Sliding OTx OTz
1 2 94.42 2.24 24.11 2.71
2 2 81.82 1.80 20.59 2.21
3 3 95.49 2.35 16.76 2.81
4 2 92.56 2.18 19.79 2.63
5 3 99.60 2.71 23.73 3.21
6 4 100.00 2.75 38.75 3.32
7 4 100.00 3.68 62.37 4.41
8 4 100.00 2.92 23.01 3.47
9 3 97.44 2.45 21.35 2.93
10 4 100.00 3.14 26.25 3.71
11 4 100.00 3.19 46.61 3.85
12 4 100.00 4.59 88.76 5.52
13 3 90.21 2.14 10.32 2.57
14 3 99.52 2.50 50.10 3.04
15 3 93.82 2.39 9.27 2.85
16 4 100.00 2.82 100.00 3.38
17 3 95.24 2.39 10.25 2.94
18 3 97.95 2.54 15.55 3.07
19 4 100.00 3.29 17.76 3.96
20 2 96.34 2.33 78.47 2.80
21 4 100.00 2.95 100.00 3.49
22 3 99.93 2.95 15.83 3.57
23 3 99.89 2.90 16.44 3.51
24 4 100.00 3.98 19.05 4.80
25 4 100.00 2.64 100.00 3.15
26 4 100.00 3.47 100.00 4.10
27 3 93.28 2.41 7.04 2.97
28 4 100.00 2.88 28.18 3.54
29 2 95.23 2.28 24.61 2.75
30 3 89.47 2.11 10.11 2.54
31 3 99.23 2.46 56.57 2.99

%InContactmin := min( %InContact) %InContactmin = 81.82 %


FSslidingmin := min( FSsliding) FSslidingmin = 1.80

(
FSOTx.min := min FSOTx ) FSOTx.min = 7.04

(
FSOTz.min := min FSOTz ) FSOTz.min = 2.21

D:\My Documents\FYEVENES\PERSONAL Doc. No.____________________


CLIENTE: FERNADO YVENES U. Fecha: 27-12-2006
PROYECTO: Contrato No.________
Ing. Civil/Estructural
AREA: Por: _____ Rev: _____
TTULO: Pg. No. 9 de 9
CLCULOS Y ESQUEMAS

4.0 RESULTS:

( ( )
Maximum Bearing pressure if max q BearingMax q net , "X" , "ok" = "ok" )
(
Footing in contact with soil if min( %InContact) < %InContactall , "X" , "ok" = "ok" )
Sliding Factor of Safety if ( min( FSsliding) < FSslidingall , "X" , "ok" ) = "ok"
Overturning Factor of Safety if ( min( FSOTx ) < FSOTall , "X" , "ok" ) = "ok"
if ( min( FSOTz) < FSOTall , "X" , "ok" ) = "ok"

D:\My Documents\FYEVENES\PERSONAL Doc. No.____________________