You are on page 1of 2

$KEW.

PA 4
SENARAI DAFTAR HARTA MODAL
HARGA
BI NOMBOR SIRI NAMA ASET TARIK PEROLEHAN
L. PENDAFTARAN H ASAL (RM)
PEROL
EHAN
1. KPM/SMVAS12/BB/H/10/1 MINI CONCRETE MIXER - PETROL 7.6.201 1,356.00X2=
-2 0 2,712.00
2. KPM/SMVAS12/BB/H/10/3 DEMOLATION HAMMER 7.6.201 2,425.00X2=
-4 0 4,850.00
3. KPM/SMVAS12/BB/H/10/5 HYDRAULIC PIPE BENDING MACHINE 7.6.201 3,270.00
0
4. KPM/SMVAS12/BB/H/10/6 PIPE TREADING MACHINE 7.6.201 14,700.00
0
5. KPM/SMVAS12/BB/H/10/7 AIR COMPRESSOR 7.6.201 2,435.00
0
6. KPM/SMVAS12/BB/H/10/8 VIBRATOR POKER (Japan/Mikasa M Series/MGX28) 6.12.10 1,680.00
7. KPM/SMVAS12/BB/H/10/9 SCAFFOLDING and Accessories (Malaysia /KWK 6.12.10 2,220.00
BS 1139)
8. KPM/SMVAS12/BB/H/10/1 AUTOMATIC LEVEL INSTRUMENT X 1,035.00X3=3,10
0-12 (Singapore/Horizon/3025) terima 5.00
9. KPM/SMVAS12/BB/H/10/1 PIPE REAMER (USA/RIDGID/Model 3 6.12.10 3,290.00x5=16,4
3-17 CODES34950) 50.00
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
45.
JUMLAH 27,967.00
Disediakan oleh :
Disahkan oleh :

.
(MOHAMAD DAHARI BIN JALI)
Tarikh :
Tarikh :

You might also like