You are on page 1of 18

Design One Way Slab

input data
edge span = 300 cm
Middle span = 300 cm
cantilever span = 120 cm
F.C = 200 kg/cm2
L.L = 300 kg/cm2
Fcu = 250 kg/cm2
Fy = 3600 kg/cm2
Fy = 2400 kg/cm2
Equivalent Wall load = 0 t/m2

k= 0.2 (where k=max)

calculation of loads
t min = 8.6 cm
t min use= 8.6 cm
o.w of slab= 0.21429 kg/cm2
D.L on slab = 0.41429 t/m2
Wu = 1.06 t/m2

For edg slab


Mu +ve = 0.954 m.t
Mu -ve = 0.954 m.t

For Mid slab


Mu +ve = 0.795 m.t
Mu -ve = 0.795 m.t

For cantilever slab Fy = 3600 max =


Mu -ve = 0.7632 m.t Fy = 2400 max =
Fy = 4000 max =
For steel 3600
= 0.0025

For steel 2400 or 4000


= 0.00216

for two case


Ru = 7.55195

for edg slab


d= 11.2 cm
t= 14 cm
t for design = 14 cm
d for design = 12 cm
o.w of slab= 0.34349 t/m2
D.L on slab = 0.54349 t/m2
Wu = 1.24088 t/m2

For edg slab


Mu +ve = 1.11679 m.t
Mu -ve = 1.11679 m.t

For Mid slab


Mu +ve = 0.93066 m.t
Mu -ve = 0.93066 m.t

For cantilever slab


Mu -ve = 0.89343 m.t

Out Put Data

reinfocementt steel by using steel 3600

for edg slab


Ru = 7.4550
= 0.00247
check on 1(=.0015) 0.00247
check on 2 (=1.3<.0031) 0.0031

used = 0.0031
As = 3.79422 cm 2 used 5
No of bars 5
for middle slab
Ru = 6.2125
= 0.00205
check on 1(=.0015) 0.00205
check on 2 (=1.3<.0031) 0.00266

used = 0.00266
As = 3.25815 used 4
No of bars 5
for cantilever slab

Ru = 5.9640
= 0.00196
check on 1(=.0015) 0.00196
check on 2 (=1.3<.0031) 0.00255

used = 0.00255
As = 3.12403 used 4
No of bars 5

reinfocementt steel by using steel 4000 & 2400


for edg slab

Ru = 7.4550
= 0.00247
check on 1(=.0015) 0.00247
check on 2 (=1.3<.0031) 0.0031

used = 0.0031
As = 3.79422 used 5
No of bars 5
for middle slab
Ru = 6.2125
= 0.00205
check on 1(=.0015) 0.00205
check on 2 (=1.3<.0031) 0.00266

used = 0.00266
As = 3.25815 used 4
No of bars 5
for cantilever slab

Ru = 5.9640
= 0.00196
check on 1(=.0015) 0.00196
check on 2 (=1.3<.0031) 0.00255

used = 0.00255
As = 3.12403 used 4
No of bars 5
0.0125
0.0214
0.01078
10

10
10

0 & 2400

10

10

10
DESIGN OF ANY BEAMS
input data
edge span = 1000 cm
Middle span = 600 cm
cantilever span = 125 cm
F.C = 200 kg/cm2
L.L = 300 kg/cm2
Fcu = 250 kg/cm2
Fy = 3600 kg/cm2
Fy = 2400 kg/cm2
wall load /m = 0.5 t/m2
height of floor = 3m
k= 0.4 (where k=max)
b= 30.0 cm
calculation of loads
t min = 100.0 cm
t min use= 100.0 cm

o.w of beam= 0.75 kg/cm2


D.L on beam = 1.325 t/m2
Wu = 2.335 t/m2

For edg beam


Mu +ve = 19.4583 m.t
Mu -ve = 23.35 m.t

For Mid beam


Mu +ve = 5.25375 m.t
Mu -ve = 7.005 m.t
For cantilever beam Fy = 3600 max = 0.0125
Mu -ve = 1.82422 m.t Fy = 2400 max = 0.0214
Fy = 4000 max = 0.01078
For steel 3600
= 0.005

For steel 2400 or 4000


= 0.00431

for two case


Ru = 14.5556

for edg beam


d= 73.1 cm
t= 78 cm

t for design = 100 cm


d for design = 95 cm
o.w of beam= 0.75 t/m2
D.L on beam = 1.45 t/m2
Wu = 2.51 t/m2

For edg beam


Mu +ve = 20.9167 m.t
Mu -ve = 25.1 m.t
For Mid slab
Mu +ve = 5.6475 m.t
Mu -ve = 7.53 m.t

For cantilever slab


Mu -ve = 1.96094 m.t

Out Put Data

reinfocementt steel by using steel 3600

for edg beam


Ru = 2.3176
= 0.00075
check on 1(=.0015) 0.0015
check on 2 (=1.3<.0031) 0.00097

used = 0.0015
As = 14.25 cm 2 used 3
No of bars 3 18
for middle beam
Ru = 0.6258
= 0.0002
check on 1(=.0015) 0.0015
check on 2 (=1.3<.0031) 0.00026

used = 0.0015
As = 14.25 used 3
No of bars 3 18
for cantilever beam

Ru = 0.2173
= 0.00007
check on 1(=.0015) 0.0015
check on 2 (=1.3<.0031) 9E-005

used = 0.0015
As = 14.25 used 3
No of bars 3 18

reinfocementt steel by using steel 4000 & 2400


for edg beam

Ru = 2.3176
= 0.00075
check on 1(=.0015) 0.0015
check on 2 (=1.3<.0031) 0.00097

used = 0.0015
As = 14.25 used 3
No of bars 3 18
for middle beam
Ru = 0.6258
= 0.0002
check on 1(=.0015) 0.0015
check on 2 (=1.3<.0031) 0.00026
used = 0.0015
As = 14.25 used 3
No of bars 3 18
for cantilever beam

Ru = 0.2173
= 0.00007
check on 1(=.0015) 0.0015
check on 2 (=1.3<.0031) 9E-005

used = 0.0015
As = 14.25 used 3
No of bars 3 18

Check on the shear for the beam


For edge span :-
from right span :-

Qu = 10.04 t
qu = 3.52281 kg/cm2
qcu = 9.68246 kg/cm2 use 5#8/m

qsu = 0 kg/cm2 distance between strips = 10 cm


fy for strips = 2400 kg/cm2
Ast = 0 cm2
lets number of stirps / m = 10
Ast "for one branch" = 0
diameter of bars = 0

final diameter = 0 cm

Distance for used strips = 0m

from left of span :-

Qu = 15.06 t
qu = 5.28421 kg/cm2
qcu = 9.68246 kg/cm2 use 5#8/m

qsu = 0 kg/cm2 distance between strips = 10 cm


fy for strips = 2400 kg/cm2
Ast = 0 cm2
lets number of stirps / m = 10
Ast "for one branch" = 0

diameter of bars = 0

final diameter = 0 cm

Distance for used strips = 0m

between them we use 5 # 8 / m .

For middel span :-


from two sides :-

Qu = 9.036 t
qu = 3.17053 kg/cm2
qcu = 9.68246 kg/cm2 use 5#8/m

qsu = 0 kg/cm2 distance between strips = 10 cm


fy for strips = 2400 kg/cm2
Ast = 0 cm2
lets number of stirps / m = 10
Ast "for one branch" = 0

diameter of bars = 0

final diameter = 0 cm

Distance for used strips = 0m

between them we use 5 # 8 / m .

For cantilever span :-

Qu = 313.75 t
qu = 110.088 kg/cm2
qcu = 9.68246 kg/cm2 need steel

qsu = 105.246 kg/cm2 distance between strips = 10 cm


fy for strips = 2400 kg/cm2
Ast = 15.1292 cm2
lets number of stirps / m = 10
Ast "for one branch" = 7.56459

diameter of bars = 3.10426

final diameter = 31.0426 cm

Distance for used strips = 1.135 m

between them we use 5 # 8 / m .


DESIGN OF ANY BEAMS
input data
span = 1000 cm two way solid slabe :-
F.C = 200 kg/cm2 dimension of slab
L.L = 300 kg/cm2 L1 = 4 m tslab = 10 cm

Fcu = 250 kg/cm2 L2 = 4 m w slab = 1.125 t/m2


Fy = 3600 kg/cm2 r = (L1/L2) 1 no. of side 2 1 or 2
Fy = 2400 kg/cm2 PH = 0.667
wall load /m = 0.5 t/m2 BE = 0.5
height of floor = 3m w ph= 3.0015 t/m2
k= 0.7 (where k=max) w be= 2.25 t/m2
b= 30.0 cm
calculation of loads
t min = 100.0 cm
t min use= 100.0 cm

o.w of beam= 0.75 kg/cm2


D.L on beam = 1.6875 t/m2
Wu total = 6.003 t/m2

For beam
Mu +ve = 75.0375 m.t
Mu -ve = 37.5188 m.t

For steel 3600


= 0.00875
Fy = 3600 max = 0.0125
For steel 2400 or 4000 Fy = 2400 max = 0.0214
= 0.00754 Fy = 4000 max = 0.01078

for two case


Ru = 24.0332

for beam
d= 102.0 cm
t= 107 cm

t for design = 107 cm


d for design = 102 cm
o.w of beam= 0.80263 t/m2
D.L on beam = 1.76644 t/m2
Wu = 4.76794 t/m2

For beam
Mu +ve = 59.5993 m.t
Mu -ve = 29.7996 m.t

Out Put Data

reinfocementt steel by using steel 3600

for beam
Ru = 5.7266
= 0.00188
check on 1(=.0015) 0.00188
check on 2 (=1.3<.0031) 0.00245

used = 0.00245
As = 24.9736 cm 2 used 5
No of bars 5 18

reinfocementt steel by using steel 4000 & 2400


for beam

Ru = 5.7266
= 0.00188
check on 1(=.0015) 0.00188
check on 2 (=1.3<.0031) 0.00245

used = 0.00245
As = 24.9736 used 5
No of bars 5 18

Check on the shear for the beam


For span :-
Wu total = 7.0179421
Qu = 35.0897 t
qu = 11.4653 kg/cm2
qcu = 9.68246 kg/cm2 need steel
qsu = 6.62408 kg/cm2 distance between strips = 10 cm
fy for strips = 2400 kg/cm2
Ast = 0.95221 cm2
lets number of stirps / m = 10
Ast "for one branch" = 0.47611

diameter of bars = 0.77878

final diameter = 7.78784 cm

Distance for used strips = 1.26347 m