DA house

Project: Residential remodel - Under Construction


Seattle - WA
Role: Lead Designer @ CITYSTRUCTURE
Tasks: SD, Permit drawings and submission,
CD and CA

The design of this house was rethought


based on the lifestyle of the new Capitol Hill de-
mography. The new house is representative for
the current social paradigm shift where a family
of same sex couple decides to move into a larger
home to start their entrepreneurial adventure.
As the designer for the project, I transformed
a traditional single-family home in a live-work life-
style environment. The design challenge was to
mitigate the existing layout of the house with the
RECESSED SHELF

requirements of an office space with the privacy of


the residential area. While preserving privacy be-
tween programs, I open the house into itself and to
the beautiful views to Lake Washington.
NEW HOUSE: UNDER CONSTRUCTION
LOWER FLOOR PRODUCED BY AN AUTODESK STUDENT PRODUCT
2
AA-3.5
3.9

H F E D C B A

DA HOUSE
DA HOUSE
6' - 4" 6' - 4"

DN
DN
9

10' - 2"
1' - 1" 15' - 9 3/4" 3' - 6" 3' - 6"
CIRCULATION AND VIEWS DIAGRAM

PRODUCED BY AN AUTODESK STUDENT PRODUCT


PRODUCED BY AN AUTODESK STUDENT PRODUCT

PRODUCED BY AN AUTODESK STUDENT PRODUCT


8
UP
UP

8' - 0"
1

2425 E HELEN ST., SEATTLE WA 98112


2425 E HELEN ST., SEATTLE WA 98112
A 1.6 1

15' - 11"

15' - 11"
7
AA-3.5
3.9

DINING DINING
8' - 0"
UP

ADAM HERSCHER and DUSTIN BYHRE


ADAM HERSCHER and DUSTIN BYHRE
6

KITCHEN
8' - 0"

8' - 0"

8' - 0"

RANGE
DW
5 KITCHEN
RANGE

REF
8' - 0"

4
REF

8' - 5 3/4" 2' - 6"


9 1/2"

3
NEW
TERRACE

8' - 0"

TERRACE
FURNICE

POWDER LOCATION
TBD CONSTRUCTION POWDER CONSTRUCTION
3' - 0"

ROOM SET ROOM SET

25' - 9 1/2"
PROJECT 1001 PROJECT 1001
DATE NOVEMBER 26, 2012 DATE NOVEMBER 26, 2012
N0. DESCRIPTION DATE N0. DESCRIPTION DATE
FLOOR PLANS:

LIVING ROOM LIVING ROOM


12' - 2 3/4" 11' - 9 1/4" 3 Revision 3 10/01/201
2
18' - 0"

8' - 0"

UP
UP
UP

2
DN
ALL RIGHTS RESERVED. NO DN
ALL RIGHTS RESERVED. NO
OLD

NEW
PORTION OFUPTHIS DRAWING MAY BE PORTION OF THIS DRAWING MAY BE
4' - 9"

USED, ALTERED OR DUPLICATED USED, ALTERED OR DUPLICATED


WITHOUT THE EXPRESS WRITTEN WITHOUT THE EXPRESS WRITTEN
PERMISSION OF THE OWNER PERMISSION OF THE OWNER
6' - 4" 8' - 2" 5' - 6" 4' - 0"

ENTRY
1
ENTRY
12/9/2012 2:22:53 AM

(E) BASEMENT AND 1ST (N) LOWER FLOOR PLAN


- FLOOR PLANS
---

1 (E) BASEMENT
1/4" = 1'-0"
A 1.2 2 NEW MAIN FLOOR
1/4" = 1'-0"
A - 3.1
PRODUCED BY AN AUTODESK STUDENT PRODUCT

2x4
INSULATION
2x10
2x6

2x2 BLOCKING
3 1/2"

2x10
2"
3 3/4"

2425 E HELEN ST., SEATTLE WA 98112


LIVINGROOM WALL Detail 1
1 1 1/2" = 1'-0"

ADAM HERSCHER and DUSTIN BYHRE


INSULATION

2x4
1 1/2"

DA HOUSE
2x6
1/2"

7 1/4"
1 1/2"

2x8 2x4 1/2" EL. GLASS SHIMMING

LIVINGROOM WALL Detail 2


2 1 1/2" = 1'-0"

PROJECT 1001
GLASS DATE
1 1/2"

AUGUST 22, 2012


SHIMMING

2x6 LUMBER

The original design of the house was of-


PAPER SIZE - 11" X 17"

2x4 LUMBER
2x10 LUMBER

2x4 LUMBER

fered a unidirectional experience without con-


LIVING ROOM
10/28/2012 5:02:57 PM

DETAILS

3 LIVINGROOM _DETAIL 3
1 1/2" = 1'-0" A - 4.1 nectivity between programs and divorced from
WALL DETAILS
the activities happening at the other floors.
The new design offers a fluid floor plan and
visual connection with the upper floor.
BEFORE NEW HOUSE: UNDER CONSTRUCTION
UPPER FLOOR

DA HOUSE
DA HOUSE

PRODUCED BY AN AUTODESK STUDENT PRODUCT


PRODUCED BY AN AUTODESK STUDENT PRODUCT
CIRCULATION AND VIEWS DIAGRAM

PRODUCED BY AN AUTODESK STUDENT PRODUCT


OFFICE 2 OFFICE 2 OPEN
OPEN TO
BELOW

2425 E HELEN ST., SEATTLE WA 98112


2425 E HELEN ST., SEATTLE WA 98112
CLOSET
OPEN

ADAM HERSCHER and DUSTIN BYHRE


BEDROOM BEDROOM

ADAM HERSCHER and DUSTIN BYHRE


BATHROOM
BATHROOM

ATTIC

CLOSET SAUNA SAUNA


OPEN
TO BELOW
CONSTRUCTION
SET
PROJECT 1001
NOVEMBER 26, 2012
CONSTRUCTION DATE
FLOOR PLANS:

SET 1
N0. DESCRIPTION
Revision 1
DATE
09/05/201
OPEN PROJECT 1001 2

OFFICE 1 DN OFFICE 1 DN
WC DATE NOVEMBER 26, 2012
OPEN TO
2 Revision 2 09/17/201
2
N0. DESCRIPTION DATE BELOW
NEW
OLD

ALL RIGHTS RESERVED. NO


PORTION OF THIS DRAWING MAY BE
USED, ALTERED OR DUPLICATED
WITHOUT THE EXPRESS WRITTEN
PERMISSION OF THE OWNER
ALL RIGHTS RESERVED. NO
PORTION OF THIS DRAWING MAY BE
USED, ALTERED OR DUPLICATED
WITHOUT THE EXPRESS WRITTEN
12/9/2012 2:25:11 AM

PERMISSION OF THE OWNER


(N) UPPER FLOOR PLANS
(N) UPPER FLOOR NEW ATTIC
1 1/4" = 1'-0"
2 1/4" = 1'-0"

A - 3.2
(E) 2ND FLOOR PLAN (E) ATTIC
1 1/4" = 1'-0"
2 1/4" = 1'-0" (E) FLOOR PLANS

A 1.3
PRODUCED BY AN AUTODESK STUDENT PRODUCT
BEFORE

NEW HOUSE: UNDER CONSTRUCTION

ARCHITECTURES ARTISTIC TASK IS TO GIVE STILL EXPEC-


TANCY A FORM
PETER ZUMTHOR
LIVING ROOM - view to KITCHEN
BATHROOM

NEW HOUSE: UNDER CONSTRUCTION

The bathing experience has been changed to fit a dynamic The kitchen openness to the living room and to the second floor office space required a redefinition of what this area rep-
modern couple. From the traditional bathtub bathing ritual to a 30sf resents in the overall experience of the house.
walk-in shower experience. The flat walls have become part of the In the new design, the kitchen area besides the cooking tasks, it also supports social activities in an environment that re-
program offering display, storage and a backdrop for indirect lighting sembles more as an extension of the living room area.
areas.

2425 E HELEN ST., SEATTLE WA 98112


1x4
3 1/2"

ADAM HERSCHER and DUSTIN BYHRE


2x4 2x2
2 3/4"

LIGHTING
STRIP
5 3/4"

DA HOUSE
1"

MIRROR
2"

2x6

MASTER BATHROOM - DETAIL NEW KITCHEN: RENDERING BEFORE


1
PROJECT 1001
DATE
3" = 1'-0"
AUGUST 22, 2012
02
COULD THE PASSIVE
HOUSE BE AN ACTIVE
STATEMENT IN ARCHI-
TECTURE?

EMPOWERHOUSE

Project: Design-built Residential


New York/Solar Decathlon 2011
Role: Designer, PARSONS THE NEW SCHOOL
Award: Winning Project - Solar Decathlon 2011
Tasks: Designer and Student Project Manager

Despite the general belief that a sustainable


project is also expensive to build, my multi-disci-
plinary studio team put together an affordable pas-
sive house for low income people. In collaboration
with Habitat for Humanity and DC local government
we were able to design and build two houses that
will be offered to low income families in Deanwood,
Washington DC.
The goal for this project was to create an en-
ergy efficient design that meets financial and con-
ductibility constrains of Habitat for Humanity.
Window U-Value R-Value Safety Glass Low - E SHGC VTTypesSplay Type Types C.
1 .22 8.0 .50 .65 B.
DW

OUT OUT
2 GLARE AND.22 SHADING STRATEGY
8.0 .50 .65 C.
3 .22 8.0 .50 .65 C.
2nd Floor

Summ
4 Glare and Shading.22Strategy The 1st Floor .50 .65 B.

Summ
8.0energy performance
Wi
5 seconds the natural lighting comfort in the house
.43 .56 Wint D.

er
nte
.22the glare or8.0
UP

er
through reducing shade. er r
6 .22 8.0 .43 .56 D.

NORTH FACADE SPLAY

WEST FACADE SPLAY

EAST FACADE SPLAY


DN
7
W D .22 8.0W D DN
.43 .56 A.
8 .22 8.0 .43 .56 Ext. A. Ext.

REF.
9
REF.

.22 8.0 .43 .56 A.


10 .20 9.0 .50 .65 A.
11 D.
.20 9.0 .50 .65 A.
A
DW

A.
DW

12 .20 9.0 East.50 .65 A. West


2 3 3 5 6
13 .20 9.0
1 4
.50 .65
2nd Floor 2nd FloorA.
1st Floor 1st Floor

North South
7 8 9 10 11 12 13

East Window
1 3 2 3 4
East R-Value Safety Glass
U-Value West
5
Low
6
-E SHGC West VT Splay Type
B. B
3 3 4
1 5
.22
6
8.0 .50 .65 B.
2 .22 8.0 .50 .65 C.
3 .22 8.0 .50 .65 C.
4 .22 8.0 .50 .65 B.
5 .22North 8.0 .43South .56 D.
7 North South 10
8 9
6 .22 8.0
10 11 12 13
11 12 13
.43 .56 D.
7 .22 8.0 .43 .56 A.
8 .22 8.0 .43 .56 A.
9 R-Value Safety
.22 Glass 8.0Low - E
Window U-ValueLow
R-Value Safety Glass
1 10 - E SHGC
.20 9.0
VT SHGC
Splay Type VT .43
Splay Type
.50 B.
.56
.65
A.
A.
C.
.22 8.0 .50 .65 .50 .65
8.0 11 B.
2 .22 8.0 .20 9.0 .50 .65 .50 C. .65 A.
8.0 12 .20.50 .65 C. .65
3 9.0 .65 .65 .50 C. A.
8.0
.22
13
8.0 .50 C. .50
.20 .65
7
11
10
5

8
9
6

2
1

WALL ASSEMBLY EXPLODED AXON


3
1 DRY WALL
2 2X3 STUDS
3 2X6 SILL BLOCKING
4 OSB SHEATHING
5 12 TJI KING STUD
6 2X6 BLOCKING
7 2X6 HEADER
8 ZIP SHEATHING
9 2X3 STUDS \ FRAME
10 2X3 STUDS
11 HARDY BOARD

FREE OF THERMAL BRIDGE WINDOW MOCK-UP


SUPER-INSULATED ENVELOPE PROCESS PICTURES

Our design strategy was to control heat


gain and losses though the superinsulated
skin and size the openings in relation to
the house orientation and obstructions on
the site.
PASSIVE HOUSE - WALL SECTION
C
A

The 14 TJI PASSIVE HOUSE wall system as-


sembly features: no thermal bridging, easy contraction
PASSIVE HOUSE WALL TYPE - STUDIES system, affordable, high thermal performance (R-40
walls), easy to assemble - disassemble, structural integ-
rity as well as environmentally friendly (ZIP sheathing,
A DOUBLE STUD: DIFFICULT TO BUILD blown-in cellulose insulation)
POINTS OF THERMAL BRIDGING PHPP calculations played a decisive role in de-
EXPENSIVE TO BUILD ciding the size of the floor plan, the openings, the house
B OFFSET STUD DIFFICULT TO BUILD geometry, wall structure and the R-values of the house.
LESS STRUCTURAL STABILITY

C TJI PANELS EASY TO BUILD PRE-FAB PANELS


ALLOWS FOR MORE INSULATION
LEAST EXPENSIVE
03
COULD THE CONTEM-
PORARY ARCHITEC-
TURE REVIVE THE
NOSTALGIC STATE OF
MIND AS THE HISTOR-
IC BUILDINGS EMBODY
FOR CENTURIES?

PEASANT BEACH VILLAGE

Project: Master Plan, Mixed-Use and Residential


Buildings
Bainbridge Island - Under Construction
Role: Architect Intern and Lead Interior Designer MASTER PLAN - FIGURE GROUND
for the Inn, Wenzlau Architects 1 COMMERCIAL AND MIXED-USE BUILDINGS
Tasks: Site Planing, Zoning and IBC/IRC Code 2 APARTMENTS
3 SINGLE FAMILY HOMES
analysis, Permit and Construction drawings 4 VILLAGE/FINAL MASTER PLAN
Lead Interior Designer for the Inn

This project covers 18-acre and it was de-


1 2 3
signed to foster a pedestrian-oriented neighbor- 4
hood. Situated on a hillside above the Historic Lyn-
wood Center, it includes an Inn, retail spaces with
housing above to complement the existing Tudor
style building across the street. The residences are
a mix of various housing types to address different
demographic typology. The pedestrian connectivity
between the residential community and commercial
area is supported by an extensive network of trails
and open spaces.
P 206.780.9288
W W W . W E N Z LA U A R C H I T E C T S . C O M
4 9 0 M A D I SO N A V E N . , S U I T E 1 0 5
B A I N B RI D G E I SL A N D , W A 9 8 11 0
OFFICE/RETAIL 19' - 10"

SINGLE-STORY TI. SPACE


(NFPA 13 SPRINKLER)
OCCUPANCY GROUP B/M
19' - 10"

T . 2 0 6 . 78 0 . 6 8 8 2
SEE CIVIL DWG. FOR SIDEWALK
16' - 6" 3' - 4" 13' - 4" 3' - 4" 16' - 6" REQUIREMENTS

CL

TYP
6"CONC. WALL

3"
5' - 0"
6' - 2" 7' - 6" 6' - 2" W/ GUARD RAIL
12' - 0" 19' - 10" 13' - 4" 19' - 10" 20' - 6" 6' - 2" 7' - 6" 6' - 2" 3' - 0"
@ 42"AFF

2' - 0"
4"

2' - 0"
6" 6"
F L O O R P L A N N O T E S (SEE " " SYMBOLS) : 3' - 0" 9' - 0"

1' - 2"
P30084 P48084 P30084

2' - 0"
EXIT

1' - 6"
CLR
1. ALL NOTES IN THIS OUTLINE SHALL BE TYPICAL FOR INDICATED LOCATIONS AND ALL SIMILAR LOCATIONS UNLESS EXPLICITLY NOTED C30066 P30066 C30066 C30066 P30066 C30066
CL

OTHERWISE.

CL
C30066

C30066 C30066
2. SEE A0.1 GENERAL NOTES FOR ADD. INFO. 300
1-HR MIN INCIDENTAL CONVENIENCE STAIR,

S.C.
3. SEE COVER PAGE A0.0 FOR DEFERRED SUBMITTALS. DEFERRED SUBMITTAL INFORMATION NOT SHOWN.

7' - 2"
WOMEN

8' - 11"
USE SEPARATION NOT MEANS OF EGRESS

5' - 0"
4. * NOT USED * 3' - 2 1/2" 3' - 2 1/2"
PER IBC TABLE 508.2 CONVENIENCE STAIR,
1' - 8"

5. SEE "TYPICAL UNIT" FOR ADDITIONAL NOTES AND DIMENSIONS. NOTES AND DIMENSIONS ARE APPLICABLE TO ALL SII. UNITS. UNLESS NOT MEANS OF EGRESS 39 SF

C30066
NOTED OTHERWISE. 311

13' - 4"
6. LOCATIONS OF ALL SMOKE DETECTORS & EXHAUST FANS ARE SHOWN FOR REFERENCE ONLY. CONTRACTOR SHALL FIELD VERIFY LAYOUT 2X8 P.T. WHEELSTOP @

T=11"
R=7"
BUMPER @ EA. STALL, TYP. 10

13' - 10 1/2"
17' - 8"

WITH A.H.J. AND SHALL INSTALL ALL SMOKE DETECTION & VENTILATION SYSTEMS PER CODE. 2.5:12
7. SEE INT. ELEV. FOR ADD. INFO & MOUNTING HEIGHTS. ALL WALL GARAGE 2 4" 21
T=11"

3' - 0"

4' - 0"
R=7"

8. * NOT USED * STRIPE EA. S-2 INCIDENTAL USE TO B/M UNISEX


14' - 0"
16' - 10"

9. ALL PENETRATIONS THRU RATED WALLS, FLR.-CLG. & ROOF ASSM. SHALL BE PROTECTED PER IBC SECTION 712. STALL, TYP. PER IBC TABLE 508.2 (NFPA 13 CHANGING

6' - 6 1/2"
3' - 0"
21' - 4"
10.ALL DOORS ARE DIMENSIONED TO FINISH DOOR SIZE UNLESS NOTED OTHERWISE; ALL VINYL WINDOWS ARE NOMINAL UNIT SIZE REFUSE 2 4A SPRINKLERED); UNHEATED 320 GUARD
DIMENSIONS & INCLUDE ROUGH OPNG; WOOD & METAL WINDOWS ARE DIMENSIONED TO ROUGH OPENING. CONTRACTOR SHALL FIELD VERIFY 250 SF RAIL @ LOBBY PATIO STAIR # 1

C30066 C30066
STAIR # 1 10
ALL ROUGH OPENINGS W/ WINDOW-DOOR MANUFACTURER PRIOR TO FRAMING. S-2 INCIDENTAL USE TO B/M PER UP 4A SEE A 0.6 42"AFF 589 SF SEE A 0.6
11.PLUMBING SHOWN IS FOR DESIGN INTENT ONLY; COORD. ALL FIXTURE REQUIREMENTS W/ PLUMBING CONTRACTOR PRIOR TO FRMG. SEE IBC TABLE 508.2 CL CL 6' - 2" 5 1/2" 4
31

5' - 0"
ENLARGED PLANS FOR ADD. INFO. (UNSPRINKLERED PER TABLE 4
12.MECHANICAL SHOWN IS FOR DESIGN INTENT ONLY, COORD. ALL FIXTURE REQUIREMENTS W/MECH. CONTRACTOR PRIOR TO FRMG. COORD. 508.2); UNHEATED 31 4' - 1" 4' - 3 1/2" 4' - 1" STAIR 302

3' - 0"
103 SF

1' - 0"
ALL ELEC. / PLUMBING SERVICES.
13.FIRE-RATED ASSM.: MAINTAIN CONT. FIRE-RATING OF CLG.-FLR. ASSM. ABOVE ALL FURRED/DROPPED CEILINGS; MAINTAIN CONT. FIRE- 312 DN
3' - 8"

9' - 5"
RATING OF WALL ASSM. BEHIND SHOWERS & TUB ENCLOSURES. ADA STALL (1) 7' - 6"
40
14.CONCEALED SPACES SUCH AS WALLS, STAIRS, SOFFITS, DROPPED CEILING ETC. SHALL BE FIRE-BLOCKED & DRAFT-STOPPED PER IBC

7' - 2"
COMPACT CAR MEN
717. 53 5 1/2"
43 SF ACCESSIBLE TOILETS PER

5' - 0"

5' - 0"
15.DRYER VENT & KITCHEN EXHAUST HOOD: CONTRACTOR TO COORDINATE WITH MECHANICAL CONTRACTOR REGARDING ADDITIONAL
90MIN/SC

8' - 6" 8' - 6" 7' - 6" APPROX 31 9' - 0" 9' - 0" ICC/ANSI 117.1
BOOSTER FAN; POWER CIRCUIT & ACCESS PANEL IN ACCORDANCE W/MECHANICAL CODES AND MANUFACTURER'S REQUIREMENTS. 2' - 10"
16.PROVIDE WALL PORTS AS NEEDED TO MEET OUTSIDE AIR INLET REQUIREMENTS PER WS-VIAQ 303.4.1.5; CONTRACTOR TO COORDINATE 4 CLR CLR CLR 4" 330
WITH MECHANICAL SUBCONTRACTOR FOR FRESH OR OUTSIDE AIR DUCTING FOR HVAC EQUIPMENT. CL CL CL CL

12' - 2"
17.* NOT USED * 38
1' - 4"

38
18.PROVIDE HANGING ROD & TOP SHELF AT ALL CLOSETS U.N.O. 8 61'-4" EXIT ACCESS TRAVEL DISTANCE
19.VERIFY ACTUAL SHOWER/TUB ENCLOSURE DIMENSIONS PRIOR TO FRAMING. MAKE ALLOWANCE FOR G.W.B. TO MAINTAIN CONT. FIRE- 38 68
2' - 3" 16' - 0" 2' - 3" '
RATING OF WALL ASSM. BEHIND SHOWERS & TUB ENCLOSURES. STL. GALV. CHANNEL GUARD @ (1) EXIT REQUIRED PER IBC TABLE 1015.1 & DIA - 4 21
1/2

PLEASANT BEACH VILLAGE


20.PROVIDE CONTINUOUS FLOOR FINISH UNDER BATH LAVATORY CABINETRY FOR TYPE 'A' & 'B' A.D.A. UNITS (SHOULD THE CABINET BE EA. COLUMN 1021.2 G " 4
ON
REMOVED); PER ICC/ANSI SEC. #1004.11.3.1.1 EX-2. 4 1/2" (OCCUPANCT < 50; AL 1-HR TYP
21.ALL DOORS ARE MIN 4" FROM WALL TO ALLOW FOR INTERIOR TRIM. U.N.O. CL 25' - 2 1/2" 8' - 5" 19' - 4 1/2" 4 EXIT ACCESS DISTANCE < 75FT)
22.PROVIDE 42" HT. GUARD RAILS AT ALL EXTERIOR BALCONIES, DECKS, PATIOS PER IBC SEC. 1012.

C30072
23.PROVIDE SAFETY GLAZING AT ALL HAZARDOUS LOCATIONS PER IBC SEC. 2406 STL. GALV. CHANNEL

C30072
24.EMERGENCY ESCAPE & RESCUE OPENINGS NOT REQ. IN BUILDINGS EQUIPPED THROUGHOUT WITH NFPA 13 OR NFPA 13R SPRINKLERS GUARD @ EA. JAMB, TYP
SYSTEM PER IBC 1026.1EX(1)
12' - 0"
OF (4).
53' - 0" 2

28' - 8"
25.HOT WATER HEATER TO BE INSTALLED W/ DRIP PAN & SEISMIC STRAP. SEE A0.1 GENERAL NOTES FOR ADD. INFO.

5' - 0"
26.PROVIDE CONT. HANDRAILS AT BOTH SIDES OF STAIRS W/12" EXTENSIONS AT TOP AND BOTTOM LANDINGS OF ALL STAIRS IN ALL COMMON

P30072

C30072 P30072 P30072


AND PUBLIC AREAS PER IBC 1009.10 & 1012.5. STAIRS WITHIN DWELLING UNITS SHALL HAVE HANDRAILS ON (1) SIDE OF STAIR WITH NO
EXTENSIONS PER IBC 1009.10 EX(2). & 1012.5 EX(1). NON-COMBUSTIBLE FLR.

23' - 8"
21' - 0"

27.L.P. FIREPLACE & APPLIANCES NOT PART OF THIS PERMIT APPLICATION; SHOWN FOR ARCHITECTURAL INTENT ONLY. CONTRACTOR TO SURFACE PER 406.2.6
BE RESPONSIBLE FOR SEPARATE PERMIT APPLICATION. LOCATE POWER & GAS PER MANUF. - INSTALL GAS VALVE (THROUGH BRICK AT +/-6"

P30072
STUDIO

5 1/2"
ABOVE FIN. FL.
28.PROVIDE - 12" DEEP CABINET SEE INTERIOR ELEVATIONS. 22 GARAGE 1200 SF

5' - 0"
29.* NOT USED * S-2 INCIDENTAL USE TO B/M OCCUPANCY USE GROUP B/M
30.PROVIDE CW SUPPLY AT ALL REFRIGERATOR LOCATIONS. PER IBC TABLE 508.2 (NFPA 13 NFPA 13 SPRINKLER SYSTEM 2

C30072
31.PROVIDE BLOCKING AT ALL TOWEL BAR LOCATIONS AT +45". SPRINKLERED); UNHEATED
STRIPE A.D.A.

BAINBRIDGE ISLAND, WA 98110


32.PROVIDE BLOCKING AT ALL GRAB BAR LOCATIONS - FOLLOW ANSI A117.1 FOR GRAB BARS (TOILET AND BATHTUB). VEHICLE BARRIER PER
A.D.A. ROUTE
33.PROVIDE BLOCKING AT ALL WALL MOUNTED TOILET PAPER DISPENSERS AT +24" TYP. ACCESS IBC 406.2.4 6
IBL
34.PROVIDED BLOCKING AT SHOWER AND BATH TUB ACCESSORIES: SHOWER HEAD AT +81"; SHOWER CONTROLS AT +45"; SHOWER HAND- ROUTE E 2 A 10.9
HELD AT +45" - SEE INTERIOR ELEVATIONS FOR HORIZONTAL LOCATIONS. CL

6' - 4 1/2"
35.* NOT USED * 2-HRF ASSM BASED 1' - 6" 14' - 9"
P L AON
N PER
3' - 0"

LOOR N O T E S (SEE " " SYMBOLS) :


1' - 4"

36.COUNTER HEIGHT AT A.D.A. UNIT AT +34" 4 1/2"


38 ADA ROUTE GA FILE#WP3820
37.PROVIDE BLOCKING AT ALL LOCATIONS OF WALL MOUNTED CONTROLS IN MASTER BATHROOMS (SINK CONTROL AND BATHTUB CONTROLS 7
8 1. ALL NOTES IN THIS OUTLINE SHALL BE TYPICAL FOR INDICATED LOCATIONS AND ALL SIMILAR LOCATIONS UNLESS EXPLICITLY NOTED 4

1' - 0"

1' - 6"
AND FAUCETS COUNTER HEIGHT AT A.D.A. UNIT AT VARIES. SEE FLOOR PLAN & INTERIOR ELEVATIONS. ADA LIF 90MIN/SC
T 1' - 5 1/2 OTHERWISE. 304 C30066 P30066 P30066 C30066 C30066 P30066 P30066 C30066 303 8 TYP
38.* NOT USED * " CONT
2. SEE A0.1 GENERAL NOTES FOR ADD. INFO. . RIDGE
39.INSTALL MIN. 20"x30" FIRE-RATED ACCESS PANEL (1/2" PLYWD. W/ GWB EA. SIDE) INTO ALL ATTIC SPACES OR CONCEALED SPACES PER IBC 002 VENT
1209.2. VERIFY HVAC UNIT SIZES & ENLARGE HATCH AS NEEDED, UNLESS A HINGED DOOR IS SPECIFIED. INSTALL W/ TAMPER-PROOF SCREW 3. SEE COVER PAGE A0.0 FOR DEFERRED SUBMITTALS. DEFERRED SUBMITTAL INFORMATION NOT SHOWN.

10:12
4. * NOT USED * 3 1/2" 17C

1' - 6"
FASTENERS @ 10"O.C.. PER C.O.B.I. REQ. 8A RIDGE 4 10
5. SEE "TYPICAL UNIT" FOR ADDITIONAL NOTES 1' - 8" AND DIMENSIONS. NOTES AND DIMENSIONS ARE APPLICABLE TO ALL SII. UNITS. UNLESS 11' - 3 1/2" 3' - 0" 24' - 5 3/4" 3' - 0" 3' - 2" 3' - 2" 13' - 10 1/2"
EXT.
1-HR FIR NOTED OTHERWISE. 8A
STORAGE
3' - 7 1/2"

WALL @

5:12
CEILIN E RATED VENTED

2' - 6"
LYNWOOD CENTER RD
4 ATT 6. LOCATIONS OF ALL SMOKE DETECTORS & EXHAUST FANS ARE SHOWN FOR REFERENCE ONLY. CONTRACTOR SHALL FIELD VERIFY LAYOUT
G BELO
WITH A.H.J. AND SHALL INSTALL ALL SMOKE DETECTION &TOILET
42" AFF
VIF

IC S-2 INCIDENTAL USE TO A-2/B/M VENTILATION SYSTEMS PER CODE.


W AREA B AREA C

R=6 3/4"
21 EY

T=11"
PER IBC TABLE 508.2 (NFPA 13 7. SEE21INT. ELEV. FOR ADD. INFO & MOUNTING HEIGHTS. LL 5:12 PATIO B
3' - 2"

VA PARTIO A

RAIL EXT.
1

2' - 6"
SPRINKLERED); UNHEATED 8. * NOT USED * 5:12

343
10:12
A 10.9

VA
9. ALL PENETRATIONS THRU RATED WALLS, FLR.-CLG. & ROOF ASSM. SHALL 8A BE PROTECTED PER IBC SECTION 712.

11"
31

LL
10.ALL DOORS ARE DIMENSIONED TO FINISH DOOR SIZE UNLESS NOTED OTHERWISE; ALL VINYL WINDOWS ARE NOMINAL UNIT SIZE
1' - 6"

RIDGE

1' - 6"
EY
DIMENSIONS & INCLUDE ROUGH OPNG; WOOD & METAL WINDOWS ARE DIMENSIONED TO ROUGH OPENING. CONTRACTOR SHALL FIELD VERIFY

5:12
ALL ROUGH OPENINGS W/ WINDOW-DOOR MANUFACTURER PRIOR TO FRAMING.
1' - 6" 3' - 0"

31
300

11.PLUMBING SHOWN IS FOR DESIGN INTENT ONLY; COORD. ALL FIXTURE REQUIREMENTS W/ PLUMBING CONTRACTOR PRIOR TO FRMG. SEE 10:12 CONT DN 8
1' - 6" 6' - 0"
2' - 5 1/2"

ENLARGED PLANS FOR ADD. INFO. . RIDGE


UP ENTRY
R=6 3/4" 2' - 6" VENT PARAPET &
2-HR FIR 12.MECHANICAL SHOWN IS FOR DESIGN INTENT 10:12 2' - 6"
T=11" ONLY, COORD. ALL FIXTURE REQUIREMENTS W/MECH. CONTRACTOR PRIOR TO FRMG. COORD.

OWNER: JOHN JACOBI


1' - 6" GUARD RAIL
ASSM. E RATED ALL ELEC. / PLUMBING SERVICES. DOOR

(1) EXIT ALLOWED PER TABLE 1019.2


BELOW
ROOF 13.FIRE-RATED ASSM.: MAINTAIN CONT. FIRE-RATING OF CLG.-FLR. ASSM. ABOVE ALL FURRED/DROPPED CEILINGS; MAINTAIN CONT. FIRE- @ FLR.

EXIT ACCESS DIST. = 57'-9" (<75')


1-HR FIR RATING OF WALL ASSM. BEHIND SHOWERS & TUB ENCLOSURES. BELOW
CEILIN E RATED 14.CONCEALED SPACES SUCH AS WALLS, STAIRS, SOFFITS, DROPPED CEILING ETC. SHALL BE FIRE-BLOCKED & DRAFT-STOPPED
STAIR #1 PER IBC STAIR # 1
G BELO 2' - 6" 3' - 0" 4' - 10" 3' - 0" 6' - 8 1/2" 3' - 0" 3' - 0" 21 6' - 0"
W 717. SEE A 0.6 SEE RO SEE A 0.6
15.DRYER VENT & KITCHEN EXHAUST HOOD: CONTRACTOR TO COORDINATE WITH MECHANICAL CONTRACTOR REGARDING ADDITIONAL
5 1/2" NOTES OF PLAN 6 4
4
2:12

ON DW
2' - 6"

BOOSTER FAN; POWER CIRCUIT & ACCESS PANEL IN ACCORDANCE W/MECHANICAL CODES AND 14AMANUFACTURER'S REQUIREMENTS. G A.5 EY

.
A 10.9

5' - 0" O.H


LL

VA
RIDGE
16.PROVIDE WALL PORTS AS NEEDED TO MEET OUTSIDE AIR INLET REQUIREMENTS PER WS-VIAQ 303.4.1.5; CONTRACTOR TO COORDINATE
VA

LL
WITH MECHANICAL SUBCONTRACTOR FOR FRESH OR OUTSIDE AIR DUCTING FOR HVAC EQUIPMENT.

6:12

EY
17.* NOT USED * AREA A 12:12
18.PROVIDE HANGING ROD & TOP SHELF AT ALL CLOSETS U.N.O. AREA D

2:12
12:12
6' - 1 1/2"

19.VERIFY ACTUAL SHOWER/TUB ENCLOSURE DIMENSIONS PRIOR TO FRAMING. MAKE ALLOWANCE FOR G.W.B. TO MAINTAIN CONT. FIRE- 12:12
RATING OF WALL ASSM. BEHIND SHOWERS & TUB ENCLOSURES. 12:12
20.PROVIDE CONTINUOUS FLOOR FINISH UNDER BATH LAVATORY CABINETRY FOR TYPE 'A' & 'B' A.D.A. UNITS (SHOULD THE CABINET BE
EXIT ACCESS DIST. = 50'-5" (<75FT)
REMOVED); PER ICC/ANSI SEC. #1004.11.3.1.1 EX-2.
2:12

(1) EXIT ALLOWED PER TABLE 1019.2 21.ALL DOORS ARE MIN 4" FROM WALL TO ALLOW FOR INTERIOR TRIM. U.N.O.
22.PROVIDE 42" HT. GUARD RAILS AT ALL EXTERIOR BALCONIES, DECKS, PATIOS PER IBC SEC. 1012. 1
2' - 6"

23.PROVIDE SAFETY GLAZING AT ALL HAZARDOUS LOCATIONS PER IBC SEC. 2406 A 10.9 5' HEAD CLR.
14
24.EMERGENCY ESCAPE & RESCUE OPENINGS NOT REQ. IN BUILDINGS EQUIPPED THROUGHOUT WITH NFPA 13 OR NFPA 13R SPRINKLERS SHOWN DASHED
10 5A
SYSTEM PER IBC 1026.1EX(1) 1
25.HOT WATER HEATER TO BE INSTALLED W/ DRIP PAN & SEISMIC STRAP. SEE A0.1 GENERAL NOTES FOR ADD. INFO. A 10.11
5:12

2' - 11"

4 26.PROVIDE CONT. HANDRAILS AT BOTH SIDES OF


P30072 STAIRS
P30072 W/12" EXTENSIONS AT TOP AND BOTTOM LANDINGS OF ALL STAIRS IN ALL COMMON
P30072 C30048 C30048
AND PUBLIC AREAS PER IBC 1009.10 & 1012.5. STAIRS WITHIN DWELLING UNITS SHALL HAVE HANDRAILS ON (1) SIDE OF STAIR WITH NO
EXTENSIONS PER IBC 1009.10 EX(2). & 1012.5 EX(1).
27.L.P. FIREPLACE & APPLIANCES NOT 14 PART OF THIS PERMIT APPLICATION; 14A SHOWN FOR ARCHITECTURAL INTENT ONLY. CONTRACTOR TO 1
BE RESPONSIBLE FOR SEPARATE PERMIT APPLICATION. LOCATE POWER & GAS PER MANUF. - INSTALL GAS VALVE (THROUGH BRICK AT +/-6"
OFFICE 3' - 11 1/2" 7' - 6" 4' - 4" ABOVE
2' - 6" 1' - 3"FL.
FIN. 7' - 0 1/4" 2' - 6" 7' - 6" 2' - 6" 7' - 0 1/4"
7' - 0 1/4" 2' - 6" 5 1/2" 7' - 6" 5 1/2" 2' - 6" 7' - 0 1/4"
/RETAI
L/REST 28.PROVIDE - 12" DEEP CABINET SEE INTERIOR 5 1/2"ELEVATIONS.
5 1/2"
SINGL
E-STO AURANT 29.* NOT USED *
RY T.I. 30.PROVIDE CW SUPPLY AT ALL REFRIGERATOR LOCATIONS.
(NFPA SPACE @
13 SPR FLR 31.PROVIDE BLOCKING AT ALL TOWEL BAR LOCATIONS AT +45".
OCCU INKLER . BELOW
PANCY ) 32.PROVIDE BLOCKING AT ALL GRAB BAR LOCATIONS - FOLLOW ANSI A117.1 FOR GRAB BARS (TOILET AND BATHTUB).
GROU
P A-2/B/M 33.PROVIDE BLOCKING AT ALL WALL MOUNTED TOILET PAPER DISPENSERS AT +24" TYP.
34.PROVIDED BLOCKING OFFICE/RETAIL
AT SHOWER AND BATH TUB ACCESSORIES: SHOWER HEAD AT +81"; SHOWER CONTROLS AT +45"; SHOWER HAND-

BUILDING 1
HELD AT +45" - SEE INTERIOR
35.* NOT USED *
36.COUNTER HEIGHT AT
ELEVATIONS
2-STORY FOR HORIZONTAL LOCATIONS.
T.I. SPACE
(NFPA 13 SPRINKLER)
A.D.A. UNITGROUP
AT +34"B/M
ASI OFFICE/RETAIL

BUILDING 1
OCCUPANCY 2-STORY T.I. SPACE
37.PROVIDE BLOCKING AT ALL LOCATIONS OF WALL MOUNTED CONTROLS IN MASTER BATHROOMS (SINK CONTROL AND BATHTUB CONTROLS (NFPA 13 SPRINKLER)
SEE A0.2 & A0.3 CODE ANALYSIS FOR
AND FAUCETS COUNTER HEIGHT AT A.D.A. UNIT AT VARIES. SEE FLOOR PLAN & INTERIOR ELEVATIONS. OCCUPANCY GROUP B/M
AREA CALCULATIONS & ADD. INFO.
38.* NOT USED * SEE A0.2 & A0.3 CODE ANALYSIS FOR
39.INSTALL MIN. 20"x30" FIRE-RATED ACCESS PANEL (1/2" PLYWD. W/ GWB EA. SIDE) INTO ALL ATTIC SPACES OR CONCEALED SPACES PER IBC
1209.2. VERIFY HVAC UNIT SIZES & ENLARGE HATCH AS NEEDED, UNLESS A HINGED DOOR IS SPECIFIED. INSTALL W/ TAMPER-PROOF SCREW
PROJECT 1108 AREA CALCULATIONS & ADD. INFO.

FASTENERS @ 10"O.C.. PER C.O.B.I. REQ.


DATE 06/15/08
N0. DESCRIPTION DATE
1 ASI#101 12/23/11
2 ASI#101 (REV1) - PERMIT REV. 1/27/12
0 1 2 VENT
3.1
3 3.7 4 5 6
80

80

1 - 4"
FPR-E (PL)
32' - 8"
9' - 6"

STAIR LOBBY STUDIO


103 SF 589 SF 1200 SF R21
52
FP3-W (ROOF)
25' - 3 1/2" B/M
FP3-E (PLY)

S-2 FP2-W (PL)


21' - 6"

2-HR FIRE BARRIER

B/M

9' - 0"
S-
7'- 8''
52

B/M
FP2-W (PLY)
12' - 6"
A-2/B/M AVG. GRD.
265' - 10"
2-HR FIRE BARRIER

12' - 6"
FP1 (TOC)
0"
EAST - WEST SECTION
PENTH-HOUSE FLOOR PLAN

The interior space planing was programed to


match the requirements of a couple with one or two
children. It has an open plan kitchen and a large
dining area to accommodate a family and guests.
Each bedroom has access to its own bathroom and
a lot of storage space.
I was involved in space planing, kitchen and
bathroom design and materials specification.
CONT. GWB. LID

FLUE

T&G WD. PANEL

GWB.

CLR. TO
COMBUSTIBLE
MATERIALS

(2) 2X8 HDR.

CLR. TO COMBUSTIBLE MATERIALS

BUILT-UP WD. MANTLE

GWB. BACKER

STONE VENEER

5'-2 1/8"
L3"X3"1/4" STL ANGLE

4'-0 3/8"
CLR.
FIREPLACE
1-1/2" CONC. TOPPING

P.T. 2X BLK.

T.O.PLY

6 1/8"
VIF
INN INTERIORS SECTION @ FIREPLACE
04
WHAT ARE THE NEW
REAL ESTATE DEVEL-
OPMENTS? AN INVA-
SION OF THE NATURE
BY THE HUMAN NA-
TURE OR JUST A NATU-
RAL EVOLUTION?

VISCONSI PROJECT

Project: Commercial Master Plan - Mall


Bainbridge Island - WA 2012
Role: Architect Intern, Wenzlau Architects
Tasks: Site Planing Design, Renderings

Visconsi project has been a controversy on


Bainbridge Island since day one, making the first
page of the local newspaper for months. The core
of the controversy lays in the discrepancy between
the commercial zoning regulations and residents
vision about islands residential character.
My studio faced a design challenge that had
to speak for both sides. Our response was to de-
sign a pedestrian friendly village-like commercial
center. The scale of the new development, its
footprint and the architectural character of the retail
buildings create a social environment for the neigh-
borhood wived into the existing green space.
VILLAGE-LIKE MALL

SITE PLAN
Despite the general belief that a sustainable project
is also expensive to build, my multi-disciplinary studio
team put together an affordable passive house for low
income people. In collaboration with Habitat for Hu-

PROPOSED:
manity and DC local government we were able to de-
sign and build two houses that will be offered to low in-
come families in Deanwood, Washington DC.
VISCONSI PROJECT
SITE CONTEXT
JUNE 18TH, 2012
05
BUILDINGS EMBRACE
THAT MYSTERIOUS
VOID CALLED SPACE
IN A SPECIAL WAY AND
MAKE IT VIBRATE
PETER ZUMTHOR

GREEN FUSION FERRY TERMINAL

Project: Mixed-use High Rise


New York City 2010
Role: Student project, MArch Parsons

The project proposes a sustainable and faster com-


muting option (cuts the time in half) for professionals and
a year-long attraction for the neighborhood. The urbanism,
landscape and architecture fuse together in a structural mor-
phology that celebrates each other.
In todays society, connectivity and urgency are very
valued. The neighborhood has been culturally revived though
a new Lincoln Center but it is still far away from many New
Yorks points of interest like Financial District, NJ, Brooklyn,
beaches, Upstate New York, etc..
Hudson Highlands

Bronx Terminal Bronx Terminal

NJ
Ferry Routs
Walking Routs
NJ
Public Trans Routs
Subway Station
Edgewater Landing Boat Basin Cafe Edgewater Landing Fusion Ferry

90th St. Terminal 90th St. Terminal


Port Imperial Port Imperial
Marine Terminal Lincoln Center Marine Terminal
8 min.

8 min.
15 min

15 min
35
m
.

in Midtown/

.
Linconln Harbor Linconln Harbor
Midtown . 39th Street
18 m

18 m
Jacob K Javis
39th Street
.

Convension
in
in.

Center

in.
m

Queens
67

Chelsie

Queens
Hoboken /14th Hoboken /14th
E 34th St. Chelsie Pier E 34th St.
Terminal Terminal
Meatpacking
District

Hoboken / Hoboken
NJ Transit Terminal NJ Transit Terminal

Newport Newport
35
49 m

m
in
.

20min.
in.

Paullus Hook Paullus Hook

Liberty Harbor
Brooklyn Liberty Harbor WTC

Brooklyn
Port Liberte Port Liberte Center
WTC Wall St.
Wall St.
Whitehall Empire-Fulton Whitehall Empire-Fulton
Terminal Terminal .
Terminal in Terminal
m
Ellis Island Ellis Island
25
Terminal Terminal

Statue of Liberty Statue of Liberty


Terminal
Governors Island
Terminal Governors Island
Terminal Terminal

Belford / Belford /
St. George / Red Hook Ikea St. George / Ikea
Staten Island Beach Staten Island
Red Hook
Beach

EXISTING: FERRY ROUTES EXISTING: CIRCULATION

FAST AND GREEN TRANSPORTATION

NY Waterway has invested in new modern and fast


ferryboats. This new type of public transportation that
connections with main destinations, both for leisure
and business, would help offset the carbon footprint
created by car traffic.

35 m World Financial
in.
Hudson Highlands

Boat Cafe
18 m Center
Fusion Ferry in. Bronx Terminal Bronx Terminal

NJ
49 m Pier 11 / NJ
Boat Cafe in. Ferry Routs
Walking Routs
Public Trans Routs
Edgewater Landing Boat Basin Cafe Edgewater Landing Fusion Ferry

Wall St.
Subway Station

30 m Port Imperial
90th St. Terminal

Marine Terminal
Port Imperial
Lincoln Center
90th St. Terminal

Marine Terminal

in.

8 min.

8 min.
Fusion Ferry

15 min

15 min
35
m

.
in Midtown/

.
Linconln Harbor Linconln Harbor
Midtown . 39th Street

18 m

18 m
Jacob K Javis
39th Street

.
Convension

in
in.
Center

in.
m
Queens

67
Chelsie

Queens
Hoboken /14th Hoboken /14th
E 34th St. Chelsie Pier E 34th St.
Terminal Terminal
Meatpacking
District

102 m
Hoboken / Hoboken
NJ Transit Terminal NJ Transit Terminal

in. Belford / Newport Newport

35
Boat Cafe

49 m

m
in
.

20min.
in
Sandy Beach
Paullus Hook Paullus Hook

Brooklyn

.
Liberty Harbor Liberty Harbor WTC

75 m Brooklyn
Port Liberte Port Liberte Center
WTC Wall St.
Wall St.

in.
Whitehall Empire-Fulton Whitehall Empire-Fulton
Terminal Terminal .
Terminal in Terminal
m
25

Fusion Ferry
Ellis Island Ellis Island
Terminal Terminal

COMMUTING TIMES
Statue of Liberty Statue of Liberty
Terminal
Governors Island
Terminal Governors Island
Terminal Terminal

Belford / Belford /
St. George / Red Hook Ikea St. George / Ikea
Staten Island Beach Staten Island
Red Hook
Beach

PROPOSED: CIRCULATION PROPOSED: FERRY ROUTES


YEAR-ROUND ATTRACTION

Riverside Park users are very diverse, from moms


with babies to professionals turned amateur athletes.
However, the park is a seasonal attraction. The Fusion
Ferry Terminal would be all-day, year-round point of
interest by offering entertainment spaces and sweep-
ing views of the Hudson River and surroundings.
_2nd level

_3rd level

DO
WN

N
W
DO

N
W
DO
N
W

UP
UP DO

UP
open to
below
WN
DO

ope w
open

belo
below

n to
UP
UP

to
open to
below
EN
UP TR UP
AN

op
CE

op

en
en

to
to

be
be

low
lo
w
N
DOW

UP
N
UP

W
DO
UP

Reastaurant
1. interior sitting
UP

2. outdoor sitting
3. kitchen
10,000 sqft.
UNDERGROUND FLOOR GROUND FLOOR 2ND FLOOR 3RD FLOOR
Garage Reception / Ticketing area / Waiting area Bar outdoor terrace Restaurant outdoor terrace
Pond Administration Offices Rest rooms Restaurant indoor area
Underground round-about Main entrance Bar Elevator
Docks Exit to ferries / docks Elevator Ramp
Lounge
Green ramp Park Ramp
1. interior sitting
Freeway entrance
2. outdoor sitting
Car exit to 79th Street 3. kitcken
8,000 sqft.
1. car traffic round about
2._1st level
parking (car pool 1. ferry terminal main entrance
only)
3. living machine pool ticket booth and waiting area
2.
3. administrative
4. ferry docks (capacity - 3 ferrys) terminal offices
30,000 sqft. 4. machanical room
14,000 sqft.
arcStart = Rhino.GetPoint(Start
point of arc)
arcEnd = Rhino.GetPoint(End PARAMETRIC CANOPY
point of arc)
arcMiddle = Rhino. The design of the canopy serves structural and environmental
requirements. From the structural perspective, the canopy pattern is ef-
GetPoint(Point on arc) ficient and it can enclose a large area with minimum number of columns.
If (IsArray(arcStart) The parametric design allowed multiple iterations of the canopy
so that size of the apertures would control the quantity of light in relation
And IsArray(arcEnd) And with the program requirement.
IsArray(arcMiddle)) Then
arc = Rhino.AddArc3Pt(arcStart,
arcEnd, arcMiddle)
mirroredArc = Rhino.
MirrorObject(arc, arcStart, ar-
cEnd, True)
End If
axisPoint = Rhino.
PointAdd(arcStart)
If IsArray(axisPoint) Then
Rhino.AddPoint axisPoint
End If
If Rhino.IsArc(arc)Then
dblAngle = Rhino.
GetReal(enter angle,5,0,10)
Rhino.Print Arc angle: &
CStr(dblAngle)
intNumCrvs = Rhino.
GetInteger(enter number of
curves,20,0,50)
dblAngle2 = Rhino.
GetReal(enter second an-
gle,2,0,5)
z = Rhino.GetReal(input thick-
ness,1,0,5)
End If
If Rhino.IsArc(arc)Then
dblAngle3 = Rhino.GetReal(enter
angle,5,0,10)
Rhino.Print Arc angle: &
CStr(dblAngle)
dblAngle = Rhino.GetReal(enter
angle,5,0,10)
intNumCrvs = Rhino.
GetInteger(enter number of
06
SCHOOLS ARE INNO-
VATION INCUBATORS.
HOW CAN ALSO THE
EDUCATIONAL FACILI-
TIES BE REINVENTED
TO REFLECT THEIR VI-
SIONARY IDENTITY?

PARSONS THE NEW SCHOOL shanghai

Project: Design School


Shanghai 2011
Role: Student project, MArch Parsons
Prof. Henry Smith Miller,
Principal at MS+ Architects Studio

Parsons The New School intends to open a new


branch in Shanghai. The Chinese government is favorable to
this proposal since it will grow local design talent.
The Elevated School was designed to make an envi-
ronmental statement and to create an educational tool for stu-
dents and public. The school was specifically located over the
freeway to minimize the footprint while getting a lot of public
exposure.
SHANGHAI MAP

OLD SINGLE-FAMILY
Natural Riverbed

Pollution of the water is one of the main concern

HOMES
in Shanghai. The design of the New School project
tries to minimize the impact at the ground level and
further the pollution of the water. YANGPU BUILDINGS FABRIC

MID-SIZE BUILDINGS
YANGPU
Shanghai City
Area

Ea
400 ft

tCs

HIGH-RISE BUILDINGS
hin
Man-made Riverbed
Greater Shanghai

aS

EMPTY LOTS AND


ea

STREETS
YANGPU BUILDINGS FABRIC

URBAN FABRIC
Physical Model 400 ft

YANGPU AREA
2 Student Exhibition /Public Escalator Entrance
1 Student Exhibition | Coffee Shop

3 Student Studio Space


PROCCESS 1
SKETCHES

PROCCESS

PROCCESS

2
PEDESTRIAN BRIDGES IN
SHANGHAI

PEDESTRIAN BRIDGE

The public could learn about students work through


creating a place of direct knowledge transfer be- 3
tween them enabled by a pedestrian bridge that
passes through the schools exhibitions.
2ND FLOOR 3RD FLOOR 4TH FLOOR 5TH FLOOR

DORMITORY CAFETERIA
DORM
UP

EXHIBITION AREA MAIN STAIRS STUDIO Open

Up
MAIN STAIRS

CLASSROOM ELEVATOR
LIBRARY CLASSROOM

Down
Down STUDIO Open

Down

OUTDOOR AREA
RECEPTION CRIT AREA SHOP
Up

MULTIMEDIA

ENERGY-GENERATING
FACADE
The South, East and West facades of
the building have solar panels curtain
walls. The translucent solar panels fol-
low the sun path and are completely
exposed to the sun while proving
shade to the interior spaces.
07
FORM AND CON-
STRUCTION, APPEAR-
ANCE AND FUNCTION
ARE NO LONGER SEP-
ARATE, THEY BELONG
TOGETHER AND FORM
A WHOLE
PETER ZUMTHOR
RESIDENTIAL
87,075 sft

COMMERCIAL
16,153 sft.
$

$
RESIDENTIAL
92,638 sft.

COMMERCIAL
13,234 sft.
15
,15
0s
ft.
RESIDENTIAL
143,624 sft. ...over FAR

COMMERCIAL
15,862 sft.
RESIDENTIAL
91,513 sft.

COMMERCIAL
12,599 sft.

ST
RE
ET
/R
AM
P IN
TO
WER
RAM
P

PR
IME
STO
ST
R
RE
RESIDENTIAL

ET
EF
91,513 sft.

COMMERCIAL
12,599 sft.

RO
NT

SIDEWALK IN TOWER

Project: Mixed-use High Rise


New York City 2010
Role: Student project, MArch Parsons

ssalG 8/3
eliforP munimulA

eliforP lacitreV LA
etanobracyloP

noitalusnI
srenretsaf leetS
enarbmeM gnifoorpretaW
balS etercnoC

Low-income housing in New York has proven not to


be sustainable. Generally, low-income housing projects bring
together a homogenous group of people both from a financial
and social perspective. This collusion increases rather than
decreases crime and irresponsible social behavior. To prevent
the inevitable self-implosion of such communities, cities incur
unplanned and on-going clean-up costs, comparable to the
initial investment.
01
02
03

01 private residential stairs


02 core structure and main stairs
03 exterior structure
CORE STRUCTURE AND CIRCULATION
CULTURAL AREA / BUILDINGS SOCIAL ENVIRONMENT

The small size amphitheater is located at the 5th floor, at the upper end
of the publicly accessible ramp. Here, people living in the building, in
particular kids and elderly people can safely interact with the public in a
cultural nurturing environment.

AMPHITHEATER

PHYSICAL MODEL
EAST -WEST SECTION WITH PROGRAM FLOOR PLANS
MARKET - RATE
HOUSING

RESIDENCES
AFFORDABLE Comm. WORK/
HOUSING STUDY
ADULT
CARE NURSERY
CULTURE/
ART

ADULT CARE TEMP HOUSING


RETAIL

RETAIL FLOOR WITH RAMP


FACADE SHADING STUDIES

The intensity of the sunlight, required for each


program, as well as solar gains are controlled
by the size and density of the openings/pat-
terns of the facade

RESIDENTIAL _LARGE PATTERN

May 21st 12.00pm May 21st 4.00pm


COMMERCIAL _ SMALL PATTERN
08
...A BUILDING MUST
BE CAPABLE OF AB-
SORBING THE TRAC-
ES OF HUMAN LIFE
AND THUS OF TAKING
ON SPECIFIC RICH-
NESS
PETER ZUMTHOR

the VILLAGE SKYSCRAPER

Project: Mixed-use Skyscraper


Manhattan 2011
Role: Student project, MArch Parsons
Prof. Astrid Lipka - Principal at Lyn Rice
Architects
Prof. Reid Freeman - Senior Associate at
James Carpenter Design Associates

86 Greenwich St., New York is not just a parking ga-


rage, it has potential to bring together people from Battery
Park City, Financial District, Staten Island and tourists, in a
cultural, artistic and business community. Studying neigh-
borhoods that are most valued by New Yorkers, I implement-
ed design strategies that have the potential to increase the
desirability of tall buildings while maintaining their environ-
mental advantages.
The programmatic organization of the VillageSky-
scraper investigates how programs could be interlinked so
that a tall building could nurture human interaction similar to
the West Village community.
SITE STUDIES

alk
in. w
alk
alk

in. w
in. w

5m
5m
5m

RESID ENTAL
MIXED-U
SE MIXED-
USE

OFFICES
RE

BUILDINGS FORMAL DESIGN


RESID
SIDEN

ORT
ES
ENTIA

RESIDENTAL
MIXED-U TIAL

ORT
RESIDENTAL
MIXED-U

OFFIC
L
SE SE

TRANSP
MIMIXXED-U
ED-USESE
MIXED-

P
MIXED- USE

OFFICES
RESID

TRANS
USE

OFFICES
RE
RESID

ORT
SIDEN ENTIA

ES
ORT
ES ENTIA

ORT
TIAL L
ORT

OFFIC
OFFIC
L

ES
TRANSP
TRANSP

MIMIXXED-U MIXED-U
SE

P
ED-USESE
RESIDENTAL
P

IC
TRANS
TRANS

OFF
MIXED-
USE

ES
ES
OFFICES

-USE
RESIDENTAL

IC
RESIDENTAL

E
IC

MIXED-US
OFF
MIXED-USE
OFF

MIXED-
USE

MIXED
OFFICES OFFICES

-USE
OFFICES
-USE

E
E

MIXED-US
MIXED-US

MIXED
MIXED

OFFICES OFFICES

MUSEUM
MUSEUM
MUSEUM

Form follows Environment. The formal large gestures are


a response to the locations environmental challenges
and secondary to the program

COMMERCIAL & OFFICES WITHIN 5MIN. WALK RESIDENCIES WITHIN 5MIN. WALK

SUNL
IGHT

N
SELF-SHAD

FORM DIAGRAM
ING

SUNL
IGHT

N
05 Cut through the base of the building to connect parallel

SELF-SHAD
ING GR
04 Multiple south facing gardens as a cooling strategy =

EEN
03 The shared facade is pushed in for views and light

SUNL
IGHT

N
CORE
SELF-SHAD
SUNL ING
IGHT
GR
EEN
SUNL
01 Lot Extrusion = classic tower

N IGH
SELF-SHATD
ING
CORE
02 Self-shading strategy

N GR
EEN
06 Structural Diagram

SELF-SHAD
ING
TRANSER
PLATES
GR CORE
the SkyPark

SUNL
IGHT EEN
streets

01 02 GR 03 04 05 TRANSER06
N
SELF-SHAD EEN CORE
ING
Financial District West Village

MAPPING WEST VILLAGE THE VILLAGESKYSCRAPER | SECTION

FOUR
VILLAGE 1,000,000 SFT. SIZE OF A
BLOCKS SKYSCRAPER

Private Private Terraces


Public Sky Park/Cooling
GREEN AREAS
M
Local Elevators
M

M
M
M

M
Express Elevators

M
Bus
M
M
Subway
M

PUBLIC TRANSPORTATION

Community Services
Community
Services
Art/Cultural
Area Art/Cultural Center
West Village Midtown Financial District
West Village Midtown Financial District West Village Midtown Financial District West Village Midtown Financial District West Village Midtown Financial District West Village Midtown Financial District
$ 2.4M $ 2.4M $ 2.4M $ 2.4M $ 2.4M $ 2.4M
Boutiques
$ 2.4M
Retail
$ 2M $ 2M $ 2M $ 2M $ 2M $ 2M
$ 2M
COMMERCIAL SPACES
$ 1.6M
Food
$ 1.6M $ 1.6M $ 1.6M $ 1.6M $ 1.6M $ 1.6M

$ 1.2M
$ 1.2M $ 1.2M $ 1.2M $ 1.2M Food Store $ 1.2M $ 1.2M

$ .8M
$ .8M $ .8M $ .8M $ .8M Mix-use Floors $ .8M $ .8M

$ .4M $ .4M $ .4M $ .4M $ .4M $ .4M


$ .4M 2007 2008 2009 2010 2011
2010 2011 2007 2008 2009 2010 2011 2007 2008 2009 2010 2011 2007 2008 2009 2010 2011 2007 2008 2009 2010 2011 2007 2008 2009 2010 2011

Street
Avenue
West Village Midtown Financial District

Public Promenade
West Village Midtown Financial District $ 2.4M West Village Midtown Financial District West Village Midtown Financial District

CIRCULATION $ 2M

$ 1.6M
$ 1.6M $ 1.6M

$ 1.2M

$ .8M
$ .8M $ .8M

Real Estate Property Value Real Estate Property


$ .4M Value
2007 2008 2009 2010 2011
2010 2011 2007 2008 2009 2010 2011 WEST VILLAGE LOWER MANHATTAN 2007 2008 2009 2010 2011 2007 2008 2009 2010 2011
PUBLIC PROMENADE

The public and private programs are linked by


a pedestrian path the street throughout the
building to create a similar experience as the
streets in the West Village neighborhood.
ATE Threshold PUBLIC Threshold
STORE FRONT
PUBLIC - PRIVATE INTERLINKED

HIGHT CHANGEThreshold PRIVATE


Street Shared Garden
Threshold

arden The public library (mid levels of the build-


ing) and the Performance Sky Neighborhood are
linked through a series of small size art galleries,
HIGHT CHANGE

boutiques, coffee shops and convenience stores.


All the public programs share the floor plan with the
two-story residential units.

RESIDENTIAL RESIDENTIAL
PRIVATE
ed Garden

RESIDENTIAL
Threshold
HIGHT CHANGE
PUBLIC
Street
Threshold
STORE FRONT
RESIDEN

THE VILLAGE SKYSCRAPER


RESIDENTIAL RESIDENTIAL COMMER
WEST VILLAGE

COMMERCIAL
Exposed / Public Semi - Exposed / Semi-Public

PUBLIC - PRIVATE INTERACTION PRIVACY STRATEGY


SKY VILLAGE COMMUNITIES
The Sky Village community neighborhood Com-
munity area of the building consists in a mixed-
use program floor plans. The load of public traf-
fic is compensated by a ramp that links all the
retail and community services programs.