Professional Documents
Culture Documents
Portfolio Felicia Nitu PDF
Portfolio Felicia Nitu PDF
L I -
C I -
A
N I -
T U
S E L E C T E D W O R K S
01
I TRY TO ENHANCE
WHAT SEEMS TO BE
VALUABLE, TO COR-
RECT WHAT IS DIS-
TURBING, AND TO CRE-
ATE ANEW WHAT WE
FEEL IS MISSING
PETER ZUMTHOR
DA house
H F E D C B A
DA HOUSE
DA HOUSE
6' - 4" 6' - 4"
DN
DN
9
10' - 2"
1' - 1" 15' - 9 3/4" 3' - 6" 3' - 6"
CIRCULATION AND VIEWS DIAGRAM
8' - 0"
1
15' - 11"
15' - 11"
7
AA-3.5
3.9
DINING DINING
8' - 0"
UP
KITCHEN
8' - 0"
8' - 0"
8' - 0"
RANGE
DW
5 KITCHEN
RANGE
REF
8' - 0"
4
REF
3
NEW
TERRACE
8' - 0"
TERRACE
FURNICE
POWDER LOCATION
TBD CONSTRUCTION POWDER CONSTRUCTION
3' - 0"
25' - 9 1/2"
PROJECT 1001 PROJECT 1001
DATE NOVEMBER 26, 2012 DATE NOVEMBER 26, 2012
N0. DESCRIPTION DATE N0. DESCRIPTION DATE
FLOOR PLANS:
8' - 0"
UP
UP
UP
2
DN
ALL RIGHTS RESERVED. NO DN
ALL RIGHTS RESERVED. NO
OLD
NEW
PORTION OFUPTHIS DRAWING MAY BE PORTION OF THIS DRAWING MAY BE
4' - 9"
ENTRY
1
ENTRY
12/9/2012 2:22:53 AM
1 (E) BASEMENT
1/4" = 1'-0"
A 1.2 2 NEW MAIN FLOOR
1/4" = 1'-0"
A - 3.1
PRODUCED BY AN AUTODESK STUDENT PRODUCT
2x4
INSULATION
2x10
2x6
2x2 BLOCKING
3 1/2"
2x10
2"
3 3/4"
2x4
1 1/2"
DA HOUSE
2x6
1/2"
7 1/4"
1 1/2"
PROJECT 1001
GLASS DATE
1 1/2"
2x6 LUMBER
2x4 LUMBER
2x10 LUMBER
2x4 LUMBER
DETAILS
3 LIVINGROOM _DETAIL 3
1 1/2" = 1'-0" A - 4.1 nectivity between programs and divorced from
WALL DETAILS
the activities happening at the other floors.
The new design offers a fluid floor plan and
visual connection with the upper floor.
BEFORE NEW HOUSE: UNDER CONSTRUCTION
UPPER FLOOR
DA HOUSE
DA HOUSE
ATTIC
SET 1
N0. DESCRIPTION
Revision 1
DATE
09/05/201
OPEN PROJECT 1001 2
OFFICE 1 DN OFFICE 1 DN
WC DATE NOVEMBER 26, 2012
OPEN TO
2 Revision 2 09/17/201
2
N0. DESCRIPTION DATE BELOW
NEW
OLD
A - 3.2
(E) 2ND FLOOR PLAN (E) ATTIC
1 1/4" = 1'-0"
2 1/4" = 1'-0" (E) FLOOR PLANS
A 1.3
PRODUCED BY AN AUTODESK STUDENT PRODUCT
BEFORE
The bathing experience has been changed to fit a dynamic The kitchen openness to the living room and to the second floor office space required a redefinition of what this area rep-
modern couple. From the traditional bathtub bathing ritual to a 30sf resents in the overall experience of the house.
walk-in shower experience. The flat walls have become part of the In the new design, the kitchen area besides the cooking tasks, it also supports social activities in an environment that re-
program offering display, storage and a backdrop for indirect lighting sembles more as an extension of the living room area.
areas.
LIGHTING
STRIP
5 3/4"
DA HOUSE
1"
MIRROR
2"
2x6
EMPOWERHOUSE
OUT OUT
2 GLARE AND.22 SHADING STRATEGY
8.0 .50 .65 C.
3 .22 8.0 .50 .65 C.
2nd Floor
Summ
4 Glare and Shading.22Strategy The 1st Floor .50 .65 B.
Summ
8.0energy performance
Wi
5 seconds the natural lighting comfort in the house
.43 .56 Wint D.
er
nte
.22the glare or8.0
UP
er
through reducing shade. er r
6 .22 8.0 .43 .56 D.
REF.
9
REF.
A.
DW
North South
7 8 9 10 11 12 13
East Window
1 3 2 3 4
East R-Value Safety Glass
U-Value West
5
Low
6
-E SHGC West VT Splay Type
B. B
3 3 4
1 5
.22
6
8.0 .50 .65 B.
2 .22 8.0 .50 .65 C.
3 .22 8.0 .50 .65 C.
4 .22 8.0 .50 .65 B.
5 .22North 8.0 .43South .56 D.
7 North South 10
8 9
6 .22 8.0
10 11 12 13
11 12 13
.43 .56 D.
7 .22 8.0 .43 .56 A.
8 .22 8.0 .43 .56 A.
9 R-Value Safety
.22 Glass 8.0Low - E
Window U-ValueLow
R-Value Safety Glass
1 10 - E SHGC
.20 9.0
VT SHGC
Splay Type VT .43
Splay Type
.50 B.
.56
.65
A.
A.
C.
.22 8.0 .50 .65 .50 .65
8.0 11 B.
2 .22 8.0 .20 9.0 .50 .65 .50 C. .65 A.
8.0 12 .20.50 .65 C. .65
3 9.0 .65 .65 .50 C. A.
8.0
.22
13
8.0 .50 C. .50
.20 .65
7
11
10
5
8
9
6
2
1
T . 2 0 6 . 78 0 . 6 8 8 2
SEE CIVIL DWG. FOR SIDEWALK
16' - 6" 3' - 4" 13' - 4" 3' - 4" 16' - 6" REQUIREMENTS
CL
TYP
6"CONC. WALL
3"
5' - 0"
6' - 2" 7' - 6" 6' - 2" W/ GUARD RAIL
12' - 0" 19' - 10" 13' - 4" 19' - 10" 20' - 6" 6' - 2" 7' - 6" 6' - 2" 3' - 0"
@ 42"AFF
2' - 0"
4"
2' - 0"
6" 6"
F L O O R P L A N N O T E S (SEE " " SYMBOLS) : 3' - 0" 9' - 0"
1' - 2"
P30084 P48084 P30084
2' - 0"
EXIT
1' - 6"
CLR
1. ALL NOTES IN THIS OUTLINE SHALL BE TYPICAL FOR INDICATED LOCATIONS AND ALL SIMILAR LOCATIONS UNLESS EXPLICITLY NOTED C30066 P30066 C30066 C30066 P30066 C30066
CL
OTHERWISE.
CL
C30066
C30066 C30066
2. SEE A0.1 GENERAL NOTES FOR ADD. INFO. 300
1-HR MIN INCIDENTAL CONVENIENCE STAIR,
S.C.
3. SEE COVER PAGE A0.0 FOR DEFERRED SUBMITTALS. DEFERRED SUBMITTAL INFORMATION NOT SHOWN.
7' - 2"
WOMEN
8' - 11"
USE SEPARATION NOT MEANS OF EGRESS
5' - 0"
4. * NOT USED * 3' - 2 1/2" 3' - 2 1/2"
PER IBC TABLE 508.2 CONVENIENCE STAIR,
1' - 8"
5. SEE "TYPICAL UNIT" FOR ADDITIONAL NOTES AND DIMENSIONS. NOTES AND DIMENSIONS ARE APPLICABLE TO ALL SII. UNITS. UNLESS NOT MEANS OF EGRESS 39 SF
C30066
NOTED OTHERWISE. 311
13' - 4"
6. LOCATIONS OF ALL SMOKE DETECTORS & EXHAUST FANS ARE SHOWN FOR REFERENCE ONLY. CONTRACTOR SHALL FIELD VERIFY LAYOUT 2X8 P.T. WHEELSTOP @
T=11"
R=7"
BUMPER @ EA. STALL, TYP. 10
13' - 10 1/2"
17' - 8"
WITH A.H.J. AND SHALL INSTALL ALL SMOKE DETECTION & VENTILATION SYSTEMS PER CODE. 2.5:12
7. SEE INT. ELEV. FOR ADD. INFO & MOUNTING HEIGHTS. ALL WALL GARAGE 2 4" 21
T=11"
3' - 0"
4' - 0"
R=7"
9. ALL PENETRATIONS THRU RATED WALLS, FLR.-CLG. & ROOF ASSM. SHALL BE PROTECTED PER IBC SECTION 712. STALL, TYP. PER IBC TABLE 508.2 (NFPA 13 CHANGING
6' - 6 1/2"
3' - 0"
21' - 4"
10.ALL DOORS ARE DIMENSIONED TO FINISH DOOR SIZE UNLESS NOTED OTHERWISE; ALL VINYL WINDOWS ARE NOMINAL UNIT SIZE REFUSE 2 4A SPRINKLERED); UNHEATED 320 GUARD
DIMENSIONS & INCLUDE ROUGH OPNG; WOOD & METAL WINDOWS ARE DIMENSIONED TO ROUGH OPENING. CONTRACTOR SHALL FIELD VERIFY 250 SF RAIL @ LOBBY PATIO STAIR # 1
C30066 C30066
STAIR # 1 10
ALL ROUGH OPENINGS W/ WINDOW-DOOR MANUFACTURER PRIOR TO FRAMING. S-2 INCIDENTAL USE TO B/M PER UP 4A SEE A 0.6 42"AFF 589 SF SEE A 0.6
11.PLUMBING SHOWN IS FOR DESIGN INTENT ONLY; COORD. ALL FIXTURE REQUIREMENTS W/ PLUMBING CONTRACTOR PRIOR TO FRMG. SEE IBC TABLE 508.2 CL CL 6' - 2" 5 1/2" 4
31
5' - 0"
ENLARGED PLANS FOR ADD. INFO. (UNSPRINKLERED PER TABLE 4
12.MECHANICAL SHOWN IS FOR DESIGN INTENT ONLY, COORD. ALL FIXTURE REQUIREMENTS W/MECH. CONTRACTOR PRIOR TO FRMG. COORD. 508.2); UNHEATED 31 4' - 1" 4' - 3 1/2" 4' - 1" STAIR 302
3' - 0"
103 SF
1' - 0"
ALL ELEC. / PLUMBING SERVICES.
13.FIRE-RATED ASSM.: MAINTAIN CONT. FIRE-RATING OF CLG.-FLR. ASSM. ABOVE ALL FURRED/DROPPED CEILINGS; MAINTAIN CONT. FIRE- 312 DN
3' - 8"
9' - 5"
RATING OF WALL ASSM. BEHIND SHOWERS & TUB ENCLOSURES. ADA STALL (1) 7' - 6"
40
14.CONCEALED SPACES SUCH AS WALLS, STAIRS, SOFFITS, DROPPED CEILING ETC. SHALL BE FIRE-BLOCKED & DRAFT-STOPPED PER IBC
7' - 2"
COMPACT CAR MEN
717. 53 5 1/2"
43 SF ACCESSIBLE TOILETS PER
5' - 0"
5' - 0"
15.DRYER VENT & KITCHEN EXHAUST HOOD: CONTRACTOR TO COORDINATE WITH MECHANICAL CONTRACTOR REGARDING ADDITIONAL
90MIN/SC
8' - 6" 8' - 6" 7' - 6" APPROX 31 9' - 0" 9' - 0" ICC/ANSI 117.1
BOOSTER FAN; POWER CIRCUIT & ACCESS PANEL IN ACCORDANCE W/MECHANICAL CODES AND MANUFACTURER'S REQUIREMENTS. 2' - 10"
16.PROVIDE WALL PORTS AS NEEDED TO MEET OUTSIDE AIR INLET REQUIREMENTS PER WS-VIAQ 303.4.1.5; CONTRACTOR TO COORDINATE 4 CLR CLR CLR 4" 330
WITH MECHANICAL SUBCONTRACTOR FOR FRESH OR OUTSIDE AIR DUCTING FOR HVAC EQUIPMENT. CL CL CL CL
12' - 2"
17.* NOT USED * 38
1' - 4"
38
18.PROVIDE HANGING ROD & TOP SHELF AT ALL CLOSETS U.N.O. 8 61'-4" EXIT ACCESS TRAVEL DISTANCE
19.VERIFY ACTUAL SHOWER/TUB ENCLOSURE DIMENSIONS PRIOR TO FRAMING. MAKE ALLOWANCE FOR G.W.B. TO MAINTAIN CONT. FIRE- 38 68
2' - 3" 16' - 0" 2' - 3" '
RATING OF WALL ASSM. BEHIND SHOWERS & TUB ENCLOSURES. STL. GALV. CHANNEL GUARD @ (1) EXIT REQUIRED PER IBC TABLE 1015.1 & DIA - 4 21
1/2
C30072
23.PROVIDE SAFETY GLAZING AT ALL HAZARDOUS LOCATIONS PER IBC SEC. 2406 STL. GALV. CHANNEL
C30072
24.EMERGENCY ESCAPE & RESCUE OPENINGS NOT REQ. IN BUILDINGS EQUIPPED THROUGHOUT WITH NFPA 13 OR NFPA 13R SPRINKLERS GUARD @ EA. JAMB, TYP
SYSTEM PER IBC 1026.1EX(1)
12' - 0"
OF (4).
53' - 0" 2
28' - 8"
25.HOT WATER HEATER TO BE INSTALLED W/ DRIP PAN & SEISMIC STRAP. SEE A0.1 GENERAL NOTES FOR ADD. INFO.
5' - 0"
26.PROVIDE CONT. HANDRAILS AT BOTH SIDES OF STAIRS W/12" EXTENSIONS AT TOP AND BOTTOM LANDINGS OF ALL STAIRS IN ALL COMMON
P30072
23' - 8"
21' - 0"
27.L.P. FIREPLACE & APPLIANCES NOT PART OF THIS PERMIT APPLICATION; SHOWN FOR ARCHITECTURAL INTENT ONLY. CONTRACTOR TO SURFACE PER 406.2.6
BE RESPONSIBLE FOR SEPARATE PERMIT APPLICATION. LOCATE POWER & GAS PER MANUF. - INSTALL GAS VALVE (THROUGH BRICK AT +/-6"
P30072
STUDIO
5 1/2"
ABOVE FIN. FL.
28.PROVIDE - 12" DEEP CABINET SEE INTERIOR ELEVATIONS. 22 GARAGE 1200 SF
5' - 0"
29.* NOT USED * S-2 INCIDENTAL USE TO B/M OCCUPANCY USE GROUP B/M
30.PROVIDE CW SUPPLY AT ALL REFRIGERATOR LOCATIONS. PER IBC TABLE 508.2 (NFPA 13 NFPA 13 SPRINKLER SYSTEM 2
C30072
31.PROVIDE BLOCKING AT ALL TOWEL BAR LOCATIONS AT +45". SPRINKLERED); UNHEATED
STRIPE A.D.A.
6' - 4 1/2"
35.* NOT USED * 2-HRF ASSM BASED 1' - 6" 14' - 9"
P L AON
N PER
3' - 0"
1' - 0"
1' - 6"
AND FAUCETS COUNTER HEIGHT AT A.D.A. UNIT AT VARIES. SEE FLOOR PLAN & INTERIOR ELEVATIONS. ADA LIF 90MIN/SC
T 1' - 5 1/2 OTHERWISE. 304 C30066 P30066 P30066 C30066 C30066 P30066 P30066 C30066 303 8 TYP
38.* NOT USED * " CONT
2. SEE A0.1 GENERAL NOTES FOR ADD. INFO. . RIDGE
39.INSTALL MIN. 20"x30" FIRE-RATED ACCESS PANEL (1/2" PLYWD. W/ GWB EA. SIDE) INTO ALL ATTIC SPACES OR CONCEALED SPACES PER IBC 002 VENT
1209.2. VERIFY HVAC UNIT SIZES & ENLARGE HATCH AS NEEDED, UNLESS A HINGED DOOR IS SPECIFIED. INSTALL W/ TAMPER-PROOF SCREW 3. SEE COVER PAGE A0.0 FOR DEFERRED SUBMITTALS. DEFERRED SUBMITTAL INFORMATION NOT SHOWN.
10:12
4. * NOT USED * 3 1/2" 17C
1' - 6"
FASTENERS @ 10"O.C.. PER C.O.B.I. REQ. 8A RIDGE 4 10
5. SEE "TYPICAL UNIT" FOR ADDITIONAL NOTES 1' - 8" AND DIMENSIONS. NOTES AND DIMENSIONS ARE APPLICABLE TO ALL SII. UNITS. UNLESS 11' - 3 1/2" 3' - 0" 24' - 5 3/4" 3' - 0" 3' - 2" 3' - 2" 13' - 10 1/2"
EXT.
1-HR FIR NOTED OTHERWISE. 8A
STORAGE
3' - 7 1/2"
WALL @
5:12
CEILIN E RATED VENTED
2' - 6"
LYNWOOD CENTER RD
4 ATT 6. LOCATIONS OF ALL SMOKE DETECTORS & EXHAUST FANS ARE SHOWN FOR REFERENCE ONLY. CONTRACTOR SHALL FIELD VERIFY LAYOUT
G BELO
WITH A.H.J. AND SHALL INSTALL ALL SMOKE DETECTION &TOILET
42" AFF
VIF
R=6 3/4"
21 EY
T=11"
PER IBC TABLE 508.2 (NFPA 13 7. SEE21INT. ELEV. FOR ADD. INFO & MOUNTING HEIGHTS. LL 5:12 PATIO B
3' - 2"
VA PARTIO A
RAIL EXT.
1
2' - 6"
SPRINKLERED); UNHEATED 8. * NOT USED * 5:12
343
10:12
A 10.9
VA
9. ALL PENETRATIONS THRU RATED WALLS, FLR.-CLG. & ROOF ASSM. SHALL 8A BE PROTECTED PER IBC SECTION 712.
11"
31
LL
10.ALL DOORS ARE DIMENSIONED TO FINISH DOOR SIZE UNLESS NOTED OTHERWISE; ALL VINYL WINDOWS ARE NOMINAL UNIT SIZE
1' - 6"
RIDGE
1' - 6"
EY
DIMENSIONS & INCLUDE ROUGH OPNG; WOOD & METAL WINDOWS ARE DIMENSIONED TO ROUGH OPENING. CONTRACTOR SHALL FIELD VERIFY
5:12
ALL ROUGH OPENINGS W/ WINDOW-DOOR MANUFACTURER PRIOR TO FRAMING.
1' - 6" 3' - 0"
31
300
11.PLUMBING SHOWN IS FOR DESIGN INTENT ONLY; COORD. ALL FIXTURE REQUIREMENTS W/ PLUMBING CONTRACTOR PRIOR TO FRMG. SEE 10:12 CONT DN 8
1' - 6" 6' - 0"
2' - 5 1/2"
ON DW
2' - 6"
BOOSTER FAN; POWER CIRCUIT & ACCESS PANEL IN ACCORDANCE W/MECHANICAL CODES AND 14AMANUFACTURER'S REQUIREMENTS. G A.5 EY
.
A 10.9
VA
RIDGE
16.PROVIDE WALL PORTS AS NEEDED TO MEET OUTSIDE AIR INLET REQUIREMENTS PER WS-VIAQ 303.4.1.5; CONTRACTOR TO COORDINATE
VA
LL
WITH MECHANICAL SUBCONTRACTOR FOR FRESH OR OUTSIDE AIR DUCTING FOR HVAC EQUIPMENT.
6:12
EY
17.* NOT USED * AREA A 12:12
18.PROVIDE HANGING ROD & TOP SHELF AT ALL CLOSETS U.N.O. AREA D
2:12
12:12
6' - 1 1/2"
19.VERIFY ACTUAL SHOWER/TUB ENCLOSURE DIMENSIONS PRIOR TO FRAMING. MAKE ALLOWANCE FOR G.W.B. TO MAINTAIN CONT. FIRE- 12:12
RATING OF WALL ASSM. BEHIND SHOWERS & TUB ENCLOSURES. 12:12
20.PROVIDE CONTINUOUS FLOOR FINISH UNDER BATH LAVATORY CABINETRY FOR TYPE 'A' & 'B' A.D.A. UNITS (SHOULD THE CABINET BE
EXIT ACCESS DIST. = 50'-5" (<75FT)
REMOVED); PER ICC/ANSI SEC. #1004.11.3.1.1 EX-2.
2:12
(1) EXIT ALLOWED PER TABLE 1019.2 21.ALL DOORS ARE MIN 4" FROM WALL TO ALLOW FOR INTERIOR TRIM. U.N.O.
22.PROVIDE 42" HT. GUARD RAILS AT ALL EXTERIOR BALCONIES, DECKS, PATIOS PER IBC SEC. 1012. 1
2' - 6"
23.PROVIDE SAFETY GLAZING AT ALL HAZARDOUS LOCATIONS PER IBC SEC. 2406 A 10.9 5' HEAD CLR.
14
24.EMERGENCY ESCAPE & RESCUE OPENINGS NOT REQ. IN BUILDINGS EQUIPPED THROUGHOUT WITH NFPA 13 OR NFPA 13R SPRINKLERS SHOWN DASHED
10 5A
SYSTEM PER IBC 1026.1EX(1) 1
25.HOT WATER HEATER TO BE INSTALLED W/ DRIP PAN & SEISMIC STRAP. SEE A0.1 GENERAL NOTES FOR ADD. INFO. A 10.11
5:12
2' - 11"
BUILDING 1
HELD AT +45" - SEE INTERIOR
35.* NOT USED *
36.COUNTER HEIGHT AT
ELEVATIONS
2-STORY FOR HORIZONTAL LOCATIONS.
T.I. SPACE
(NFPA 13 SPRINKLER)
A.D.A. UNITGROUP
AT +34"B/M
ASI OFFICE/RETAIL
BUILDING 1
OCCUPANCY 2-STORY T.I. SPACE
37.PROVIDE BLOCKING AT ALL LOCATIONS OF WALL MOUNTED CONTROLS IN MASTER BATHROOMS (SINK CONTROL AND BATHTUB CONTROLS (NFPA 13 SPRINKLER)
SEE A0.2 & A0.3 CODE ANALYSIS FOR
AND FAUCETS COUNTER HEIGHT AT A.D.A. UNIT AT VARIES. SEE FLOOR PLAN & INTERIOR ELEVATIONS. OCCUPANCY GROUP B/M
AREA CALCULATIONS & ADD. INFO.
38.* NOT USED * SEE A0.2 & A0.3 CODE ANALYSIS FOR
39.INSTALL MIN. 20"x30" FIRE-RATED ACCESS PANEL (1/2" PLYWD. W/ GWB EA. SIDE) INTO ALL ATTIC SPACES OR CONCEALED SPACES PER IBC
1209.2. VERIFY HVAC UNIT SIZES & ENLARGE HATCH AS NEEDED, UNLESS A HINGED DOOR IS SPECIFIED. INSTALL W/ TAMPER-PROOF SCREW
PROJECT 1108 AREA CALCULATIONS & ADD. INFO.
80
1 - 4"
FPR-E (PL)
32' - 8"
9' - 6"
B/M
9' - 0"
S-
7'- 8''
52
B/M
FP2-W (PLY)
12' - 6"
A-2/B/M AVG. GRD.
265' - 10"
2-HR FIRE BARRIER
12' - 6"
FP1 (TOC)
0"
EAST - WEST SECTION
PENTH-HOUSE FLOOR PLAN
FLUE
GWB.
CLR. TO
COMBUSTIBLE
MATERIALS
GWB. BACKER
STONE VENEER
5'-2 1/8"
L3"X3"1/4" STL ANGLE
4'-0 3/8"
CLR.
FIREPLACE
1-1/2" CONC. TOPPING
P.T. 2X BLK.
T.O.PLY
6 1/8"
VIF
INN INTERIORS SECTION @ FIREPLACE
04
WHAT ARE THE NEW
REAL ESTATE DEVEL-
OPMENTS? AN INVA-
SION OF THE NATURE
BY THE HUMAN NA-
TURE OR JUST A NATU-
RAL EVOLUTION?
VISCONSI PROJECT
SITE PLAN
Despite the general belief that a sustainable project
is also expensive to build, my multi-disciplinary studio
team put together an affordable passive house for low
income people. In collaboration with Habitat for Hu-
PROPOSED:
manity and DC local government we were able to de-
sign and build two houses that will be offered to low in-
come families in Deanwood, Washington DC.
VISCONSI PROJECT
SITE CONTEXT
JUNE 18TH, 2012
05
BUILDINGS EMBRACE
THAT MYSTERIOUS
VOID CALLED SPACE
IN A SPECIAL WAY AND
MAKE IT VIBRATE
PETER ZUMTHOR
NJ
Ferry Routs
Walking Routs
NJ
Public Trans Routs
Subway Station
Edgewater Landing Boat Basin Cafe Edgewater Landing Fusion Ferry
8 min.
15 min
15 min
35
m
.
in Midtown/
.
Linconln Harbor Linconln Harbor
Midtown . 39th Street
18 m
18 m
Jacob K Javis
39th Street
.
Convension
in
in.
Center
in.
m
Queens
67
Chelsie
Queens
Hoboken /14th Hoboken /14th
E 34th St. Chelsie Pier E 34th St.
Terminal Terminal
Meatpacking
District
Hoboken / Hoboken
NJ Transit Terminal NJ Transit Terminal
Newport Newport
35
49 m
m
in
.
20min.
in.
Liberty Harbor
Brooklyn Liberty Harbor WTC
Brooklyn
Port Liberte Port Liberte Center
WTC Wall St.
Wall St.
Whitehall Empire-Fulton Whitehall Empire-Fulton
Terminal Terminal .
Terminal in Terminal
m
Ellis Island Ellis Island
25
Terminal Terminal
Belford / Belford /
St. George / Red Hook Ikea St. George / Ikea
Staten Island Beach Staten Island
Red Hook
Beach
35 m World Financial
in.
Hudson Highlands
Boat Cafe
18 m Center
Fusion Ferry in. Bronx Terminal Bronx Terminal
NJ
49 m Pier 11 / NJ
Boat Cafe in. Ferry Routs
Walking Routs
Public Trans Routs
Edgewater Landing Boat Basin Cafe Edgewater Landing Fusion Ferry
Wall St.
Subway Station
30 m Port Imperial
90th St. Terminal
Marine Terminal
Port Imperial
Lincoln Center
90th St. Terminal
Marine Terminal
in.
8 min.
8 min.
Fusion Ferry
15 min
15 min
35
m
.
in Midtown/
.
Linconln Harbor Linconln Harbor
Midtown . 39th Street
18 m
18 m
Jacob K Javis
39th Street
.
Convension
in
in.
Center
in.
m
Queens
67
Chelsie
Queens
Hoboken /14th Hoboken /14th
E 34th St. Chelsie Pier E 34th St.
Terminal Terminal
Meatpacking
District
102 m
Hoboken / Hoboken
NJ Transit Terminal NJ Transit Terminal
35
Boat Cafe
49 m
m
in
.
20min.
in
Sandy Beach
Paullus Hook Paullus Hook
Brooklyn
.
Liberty Harbor Liberty Harbor WTC
75 m Brooklyn
Port Liberte Port Liberte Center
WTC Wall St.
Wall St.
in.
Whitehall Empire-Fulton Whitehall Empire-Fulton
Terminal Terminal .
Terminal in Terminal
m
25
Fusion Ferry
Ellis Island Ellis Island
Terminal Terminal
COMMUTING TIMES
Statue of Liberty Statue of Liberty
Terminal
Governors Island
Terminal Governors Island
Terminal Terminal
Belford / Belford /
St. George / Red Hook Ikea St. George / Ikea
Staten Island Beach Staten Island
Red Hook
Beach
_3rd level
DO
WN
N
W
DO
N
W
DO
N
W
UP
UP DO
UP
open to
below
WN
DO
ope w
open
belo
below
n to
UP
UP
to
open to
below
EN
UP TR UP
AN
op
CE
op
en
en
to
to
be
be
low
lo
w
N
DOW
UP
N
UP
W
DO
UP
Reastaurant
1. interior sitting
UP
2. outdoor sitting
3. kitchen
10,000 sqft.
UNDERGROUND FLOOR GROUND FLOOR 2ND FLOOR 3RD FLOOR
Garage Reception / Ticketing area / Waiting area Bar outdoor terrace Restaurant outdoor terrace
Pond Administration Offices Rest rooms Restaurant indoor area
Underground round-about Main entrance Bar Elevator
Docks Exit to ferries / docks Elevator Ramp
Lounge
Green ramp Park Ramp
1. interior sitting
Freeway entrance
2. outdoor sitting
Car exit to 79th Street 3. kitcken
8,000 sqft.
1. car traffic round about
2._1st level
parking (car pool 1. ferry terminal main entrance
only)
3. living machine pool ticket booth and waiting area
2.
3. administrative
4. ferry docks (capacity - 3 ferrys) terminal offices
30,000 sqft. 4. machanical room
14,000 sqft.
arcStart = Rhino.GetPoint(Start
point of arc)
arcEnd = Rhino.GetPoint(End PARAMETRIC CANOPY
point of arc)
arcMiddle = Rhino. The design of the canopy serves structural and environmental
requirements. From the structural perspective, the canopy pattern is ef-
GetPoint(Point on arc) ficient and it can enclose a large area with minimum number of columns.
If (IsArray(arcStart) The parametric design allowed multiple iterations of the canopy
so that size of the apertures would control the quantity of light in relation
And IsArray(arcEnd) And with the program requirement.
IsArray(arcMiddle)) Then
arc = Rhino.AddArc3Pt(arcStart,
arcEnd, arcMiddle)
mirroredArc = Rhino.
MirrorObject(arc, arcStart, ar-
cEnd, True)
End If
axisPoint = Rhino.
PointAdd(arcStart)
If IsArray(axisPoint) Then
Rhino.AddPoint axisPoint
End If
If Rhino.IsArc(arc)Then
dblAngle = Rhino.
GetReal(enter angle,5,0,10)
Rhino.Print Arc angle: &
CStr(dblAngle)
intNumCrvs = Rhino.
GetInteger(enter number of
curves,20,0,50)
dblAngle2 = Rhino.
GetReal(enter second an-
gle,2,0,5)
z = Rhino.GetReal(input thick-
ness,1,0,5)
End If
If Rhino.IsArc(arc)Then
dblAngle3 = Rhino.GetReal(enter
angle,5,0,10)
Rhino.Print Arc angle: &
CStr(dblAngle)
dblAngle = Rhino.GetReal(enter
angle,5,0,10)
intNumCrvs = Rhino.
GetInteger(enter number of
06
SCHOOLS ARE INNO-
VATION INCUBATORS.
HOW CAN ALSO THE
EDUCATIONAL FACILI-
TIES BE REINVENTED
TO REFLECT THEIR VI-
SIONARY IDENTITY?
OLD SINGLE-FAMILY
Natural Riverbed
HOMES
in Shanghai. The design of the New School project
tries to minimize the impact at the ground level and
further the pollution of the water. YANGPU BUILDINGS FABRIC
MID-SIZE BUILDINGS
YANGPU
Shanghai City
Area
Ea
400 ft
tCs
HIGH-RISE BUILDINGS
hin
Man-made Riverbed
Greater Shanghai
aS
STREETS
YANGPU BUILDINGS FABRIC
URBAN FABRIC
Physical Model 400 ft
YANGPU AREA
2 Student Exhibition /Public Escalator Entrance
1 Student Exhibition | Coffee Shop
PROCCESS
PROCCESS
2
PEDESTRIAN BRIDGES IN
SHANGHAI
PEDESTRIAN BRIDGE
DORMITORY CAFETERIA
DORM
UP
Up
MAIN STAIRS
CLASSROOM ELEVATOR
LIBRARY CLASSROOM
Down
Down STUDIO Open
Down
OUTDOOR AREA
RECEPTION CRIT AREA SHOP
Up
MULTIMEDIA
ENERGY-GENERATING
FACADE
The South, East and West facades of
the building have solar panels curtain
walls. The translucent solar panels fol-
low the sun path and are completely
exposed to the sun while proving
shade to the interior spaces.
07
FORM AND CON-
STRUCTION, APPEAR-
ANCE AND FUNCTION
ARE NO LONGER SEP-
ARATE, THEY BELONG
TOGETHER AND FORM
A WHOLE
PETER ZUMTHOR
RESIDENTIAL
87,075 sft
COMMERCIAL
16,153 sft.
$
$
RESIDENTIAL
92,638 sft.
COMMERCIAL
13,234 sft.
15
,15
0s
ft.
RESIDENTIAL
143,624 sft. ...over FAR
COMMERCIAL
15,862 sft.
RESIDENTIAL
91,513 sft.
COMMERCIAL
12,599 sft.
ST
RE
ET
/R
AM
P IN
TO
WER
RAM
P
PR
IME
STO
ST
R
RE
RESIDENTIAL
ET
EF
91,513 sft.
COMMERCIAL
12,599 sft.
RO
NT
SIDEWALK IN TOWER
ssalG 8/3
eliforP munimulA
eliforP lacitreV LA
etanobracyloP
noitalusnI
srenretsaf leetS
enarbmeM gnifoorpretaW
balS etercnoC
The small size amphitheater is located at the 5th floor, at the upper end
of the publicly accessible ramp. Here, people living in the building, in
particular kids and elderly people can safely interact with the public in a
cultural nurturing environment.
AMPHITHEATER
PHYSICAL MODEL
EAST -WEST SECTION WITH PROGRAM FLOOR PLANS
MARKET - RATE
HOUSING
RESIDENCES
AFFORDABLE Comm. WORK/
HOUSING STUDY
ADULT
CARE NURSERY
CULTURE/
ART
alk
in. w
alk
alk
in. w
in. w
5m
5m
5m
RESID ENTAL
MIXED-U
SE MIXED-
USE
OFFICES
RE
ORT
ES
ENTIA
RESIDENTAL
MIXED-U TIAL
ORT
RESIDENTAL
MIXED-U
OFFIC
L
SE SE
TRANSP
MIMIXXED-U
ED-USESE
MIXED-
P
MIXED- USE
OFFICES
RESID
TRANS
USE
OFFICES
RE
RESID
ORT
SIDEN ENTIA
ES
ORT
ES ENTIA
ORT
TIAL L
ORT
OFFIC
OFFIC
L
ES
TRANSP
TRANSP
MIMIXXED-U MIXED-U
SE
P
ED-USESE
RESIDENTAL
P
IC
TRANS
TRANS
OFF
MIXED-
USE
ES
ES
OFFICES
-USE
RESIDENTAL
IC
RESIDENTAL
E
IC
MIXED-US
OFF
MIXED-USE
OFF
MIXED-
USE
MIXED
OFFICES OFFICES
-USE
OFFICES
-USE
E
E
MIXED-US
MIXED-US
MIXED
MIXED
OFFICES OFFICES
MUSEUM
MUSEUM
MUSEUM
COMMERCIAL & OFFICES WITHIN 5MIN. WALK RESIDENCIES WITHIN 5MIN. WALK
SUNL
IGHT
N
SELF-SHAD
FORM DIAGRAM
ING
SUNL
IGHT
N
05 Cut through the base of the building to connect parallel
SELF-SHAD
ING GR
04 Multiple south facing gardens as a cooling strategy =
EEN
03 The shared facade is pushed in for views and light
SUNL
IGHT
N
CORE
SELF-SHAD
SUNL ING
IGHT
GR
EEN
SUNL
01 Lot Extrusion = classic tower
N IGH
SELF-SHATD
ING
CORE
02 Self-shading strategy
N GR
EEN
06 Structural Diagram
SELF-SHAD
ING
TRANSER
PLATES
GR CORE
the SkyPark
SUNL
IGHT EEN
streets
01 02 GR 03 04 05 TRANSER06
N
SELF-SHAD EEN CORE
ING
Financial District West Village
FOUR
VILLAGE 1,000,000 SFT. SIZE OF A
BLOCKS SKYSCRAPER
M
M
M
M
Express Elevators
M
Bus
M
M
Subway
M
PUBLIC TRANSPORTATION
Community Services
Community
Services
Art/Cultural
Area Art/Cultural Center
West Village Midtown Financial District
West Village Midtown Financial District West Village Midtown Financial District West Village Midtown Financial District West Village Midtown Financial District West Village Midtown Financial District
$ 2.4M $ 2.4M $ 2.4M $ 2.4M $ 2.4M $ 2.4M
Boutiques
$ 2.4M
Retail
$ 2M $ 2M $ 2M $ 2M $ 2M $ 2M
$ 2M
COMMERCIAL SPACES
$ 1.6M
Food
$ 1.6M $ 1.6M $ 1.6M $ 1.6M $ 1.6M $ 1.6M
$ 1.2M
$ 1.2M $ 1.2M $ 1.2M $ 1.2M Food Store $ 1.2M $ 1.2M
$ .8M
$ .8M $ .8M $ .8M $ .8M Mix-use Floors $ .8M $ .8M
Street
Avenue
West Village Midtown Financial District
Public Promenade
West Village Midtown Financial District $ 2.4M West Village Midtown Financial District West Village Midtown Financial District
CIRCULATION $ 2M
$ 1.6M
$ 1.6M $ 1.6M
$ 1.2M
$ .8M
$ .8M $ .8M
RESIDENTIAL RESIDENTIAL
PRIVATE
ed Garden
RESIDENTIAL
Threshold
HIGHT CHANGE
PUBLIC
Street
Threshold
STORE FRONT
RESIDEN
COMMERCIAL
Exposed / Public Semi - Exposed / Semi-Public