You are on page 1of 353

SOLO - MANTINGAN - NGAWI TOLL ROAD

SUMMARY OF PEDESTRIAN BRIDGE

Pay Item Description Unit Unit Price (IDR) TOTAL PEDESTRIAN BRIDGE Title : Pedestrian Title : Pedestrian Title : Pedestrian Title : Pedestrian Title : Pedestrian Title : Pedestrian Title : Pedestrian
Bridge Acces Bridge Waru-4 Bridge Bridge Bridge Kauman-1 Bridge Bridge Sidolaju
Sragen Sta. Sta. 24+600 Singopadu Sta. Kebonromo Sta. Sta. 62+844.125 Widodaren Sta. Sta. 70+029.469
5+363.700 36+783.703 46+246.030 66+044.074

Total Quantity Sub Price Weight (%)

SECTION 1 GENERAL
TOTAL BID PRICE OF SECTION - -
(Move to Recapitulation)
SECTION 2 SITE CLEARING
TOTAL BID PRICE OF SECTION - -
(Move to Recapitulation)
SECTION 3 DEMOLITION
TOTAL BID PRICE OF SECTION - -
(Move to Recapitulation)
SECTION 4 ROAD EARTHWORK
TOTAL BID PRICE OF SECTION - -
(Move to Recapitulation)
SECTION 5 STRUCTURE EXAVATION
5.01 (1) Structure excavation to a depth not exceeding 200 mm Cu.m 109,880 886.3 97,391,833 0.68 121.1 136.4 141.0 113.6 133.8 104.9 135.6
5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm Cu.m 373,605 19.9 7,449,987 0.05 7.8 3.5 5.9 - 2.6 - 0.1
TOTAL BID PRICE OF SECTION 104,841,820 0.74
(Move to Recapitulation)
SECTION 6 DRAINAGE
TOTAL BID PRICE OF SECTION - -
(Move to Recapitulation)
SECTION 7 SUBGRADE
TOTAL BID PRICE OF SECTION - -
(Move to Recapitulation)
SECTION 8 SUB BASE
TOTAL BID PRICE OF SECTION - -
(Move to Recapitulation)
SECTION 9 PAVEMENTS
TOTAL BID PRICE OF SECTION - -
(Move to Recapitulation)
SECTION 10 CONCRETE STRUCTURES
10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames) Cu.m 2,247,400 150.0 337,048,105 2.36 20.2 20.2 25.3 20.2 20.2 18.7 25.3
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab ) Cu.m 2,019,833 740.1 1,494,945,794 10.48 81.7 106.4 120.0 107.4 106.4 96.4 121.8
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert) Cu.m 1,689,951 724.8 1,224,949,763 8.59 100.2 100.2 111.9 100.2 100.2 100.2 111.9
10.01(8) Structural Concrete Class E, fc' = 10 Mpa Cu.m 1,217,421 38.4 46,807,411 0.33 5.3 5.3 6.0 5.3 5.3 5.3 6.0
10.02(2) Reinforcing Steel Deformed Bars BJTD-40 Kg 15,861 279,729.3 4,436,894,874 31.12 35,453.2 38,897.8 45,023.4 39,077.7 38,897.8 37,041.2 45,338.3
10.03(1) PC-T Girder Nominal Span Length 16.00 m to 17.00 m Each 172,012,469 1.0 172,012,469 1.21 1.0 - - - - - -
10.03(5) PC-T Girder Nominal Span Length 35.00 m to 37.00 m. Each 419,536,452 6.0 2,517,218,711 17.65 - 1.0 1.0 1.0 1.0 1.0 1.0
10.05 (1) Furnish Pretensioned Spun Concrete Pile D=50 cm Ln.m 795,611 1,898.0 1,510,069,128 10.59 264.0 298.0 276.0 270.0 200.0 260.0 330.0
10.05 (2) Drive Pretensioned Spun Concrete Pile D=50 cm Ln.m 143,296 1,898.0 271,976,548 1.91 264.0 298.0 276.0 270.0 200.0 260.0 330.0
10.09 (3) Chainlink Fence, H=2,60 Ln.m Ln.m 1,959,163 463.2 907,484,251 6.36 33.6 71.6 71.6 71.6 71.6 71.6 71.6
10.09 (4) Railing Fence Ln.m 1,132,428 1,016.0 1,150,592,531 8.07 131.5 131.5 158.9 143.9 143.9 147.4 158.9
TOTAL BID PRICE OF SECTION 14,069,999,586 98.68
(Move to Recapitulation)
SECTION 11 STRUCTURAL STEEL WORK
TOTAL BID PRICE OF SECTION - -
(Move to Recapitulation)
SECTION 12 MISCELLANEOUS
12.02(3) Stone Masonry Cu.m 740,545 112.4 83,265,672 0.58 26.2 18.2 18.2 26.2 17.0 1.6 5.0
TOTAL BID PRICE OF SECTION 83,265,672 0.58
(Move to Recapitulation)
SECTION 13 UTILITIES
TOTAL BID PRICE OF SECTION - -
(Move to Recapitulation)
SECTION 14 TOLL PLAZAS
TOTAL BID PRICE OF SECTION - -
(Move to Recapitulation)
SECTION 15 DIVERSION AND PROTECTION OF EXISTING UTILITIES
TOTAL BID PRICE OF SECTION - -
(Move to Recapitulation)
SECTION 16 TOLL OFFICE AND FACILITIES
TOTAL BID PRICE OF SECTION - -
###
TOTAL BID PRICE 14,258,107,078 100.00

file:///var/www/apps/conversion/tmp/scratch_2/350197787.xlsx350197787.xlsxSummary
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.

CALCULATION SHEET June ,20 2014, General Arranggement 501524-VIK-PB-3176 R1

Title : Pedestrian Bridge Acces Sragen Sta. 5+363.700

Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity

(ln.m) (ln.m) (ln.m) (ln.m) (cu.m)


ABUTMENT 1
Elev. Existing Ground Level (A) Ln. m -
Bottom Of Footing (B) Ln. m -
(A-B) Ln. m 0.65

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Abutment
Parapet Cu.m 2.68 0.25 0.32 2.00 0.43

Stair
Seg. 1 Cu.m 0.63 0.20 0.15 2.00 0.04
Seg. 2 Cu.m 0.63 0.80 0.15 2.00 0.15
Seg. 3 Cu.m 0.63 1.40 0.15 2.00 0.26

Seg. 4 Cu.m 2.68 0.80 0.20 1.00 0.43

Footing
Seg. 5 Cu.m 2.60 4.00 0.80 1.00 8.32
Deduction Cu.m 0.35 0.35 0.20 1.00 (0.02)
Seg. 6 Cu.m 3.00 4.50 0.50 1.00 6.75
Sub total Cu.m 16.35

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 4.70 0.05 1.00 0.75
Total Cu.m 0.75

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to abutment (kg/m) Kg 16.35 67.0 1,095.66
Total Kg 1,095.66

12.02(3) Stone Masonry Area


Cu.m 2.68 5.78 1.00 15.49
Cu.m 15.49

ABUTMENT 2
Elev. Existing Ground Level (A) Ln. m -
Bottom Of Footing (B) Ln. m -
(A-B) Ln. m 0.46

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Abutment
Parapet Cu.m 2.68 0.25 0.32 2.00 0.43

Stair
Seg. 1 Cu.m 0.63 0.20 0.15 2.00 0.04
Seg. 2 Cu.m 0.63 0.80 0.15 2.00 0.15
Seg. 3 Cu.m 0.63 1.40 0.15 2.00 0.26

Seg. 4 Cu.m 2.68 0.80 0.20 1.00 0.43

Footing
Seg. 5 Cu.m 2.60 4.00 0.80 1.00 8.32
Deduction Cu.m 0.35 0.35 0.20 1.00 (0.02)
Seg. 6 Cu.m 3.00 4.50 0.50 1.00 6.75
Sub total Cu.m 16.35

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 4.70 0.05 1.00 0.75
Total Cu.m 0.75

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to abutment (kg/m) Kg 16.35 67.0 1,095.66
Total Kg 1,095.66

12.02(3) Stone Masonry Area


Cu.m 2.68 3.99 1.00 10.68
Cu.m 10.68

PIER 1
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.92

5.01 (1) Structure excavation to a depth not exceeding 200 mm


Cu.m 3.20 3.20 1.92 1.00 19.66

5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -

5.01 (3) Structure excavation at a depth greater than 400 mm


Cu.m 3.20 3.20 - 1.00 -

10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 1.50 1.42 1.00 3.20

Deduction Cu.m 0.90 1.50 0.47 1.00 (0.63)


Cu.m 0.35 0.35 0.15 1.00 (0.02)
Cu.m 2.54

10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 3.00 1.00 1.51
Total Cu.m 1.51

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 3.20 0.05 1.00 0.51
Total Cu.m 0.51

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to pier head (kg/m) Kg 2.54 218.0 554.18
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.

CALCULATION SHEET June ,20 2014, General Arranggement 501524-VIK-PB-3176 R1

Title : Pedestrian Bridge Acces Sragen Sta. 5+363.700

Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity

(ln.m) (ln.m) (ln.m) (ln.m) (cu.m)


Reinforcement bars to column (kg/m) Kg 1.51 179.0 269.93
Reinforcement bars to footing (kg/m) Kg 9.00 254.0 2,286.00
Total Kg 3,110.11

10.05 (1) Furnish Pretensioned Spun Concrete Pile D=50 cm


Ln.m 15.00 2.00 30.00
Ln.m 30.00

10.05 (2) Drive Pretensioned Spun Concrete Pile D=50 cm


Ln.m 15.00 2.00 30.00
Ln.m 30.00

PIER 2
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 2.38

5.01 (1) Structure excavation to a depth not exceeding 200 mm


Cu.m 3.20 3.20 2.00 1.00 20.48

5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 0.38 1.00 3.89

5.01 (3) Structure excavation at a depth greater than 400 mm


Cu.m 3.20 3.20 - 1.00 -

10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 2.05 0.47 1.00 1.45
Cu.m 1.50 2.05 0.75 1.00 2.31
Cu.m 1.50 2.05 0.20 1.00 0.62

Deduction Cu.m 1.75 1.20 0.47 1.00 (0.99)


Cu.m 0.40 0.35 0.15 2.00 (0.04)

Area (triangle)
Cu.m 1.50 0.06 1.00 (0.08)
Cu.m 3.26

10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 6.00 1.00 3.02
Total Cu.m 3.02

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 3.20 0.05 1.00 0.51
Total Cu.m 0.51

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to pier head (kg/m) Kg 3.26 218.0 709.59
Reinforcement bars to column (kg/m) Kg 3.02 179.0 539.85
Reinforcement bars to footing (kg/m) Kg 9.00 254.0 2,286.00
Total Kg 3,535.44

10.05 (1) Furnish Pretensioned Spun Concrete Pile D=50 cm


Ln.m 15.00 2.00 30.00
Ln.m 30.00

10.05 (2) Drive Pretensioned Spun Concrete Pile D=50 cm


Ln.m 15.00 2.00 30.00
Ln.m 30.00

PIER 3
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.23

5.01 (1) Structure excavation to a depth not exceeding 200 mm


Cu.m 5.45 3.20 1.23 1.00 21.45

5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 5.45 3.20 - 1.00 -

5.01 (3) Structure excavation at a depth greater than 400 mm


Cu.m 5.45 3.20 - 1.00 -

10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete (I)
Cu.m 1.50 1.50 2.18 1.00 4.91

Deduction
Seg.1 Cu.m 0.90 0.75 0.29 1.00 (0.20)
Seg.2 Cu.m 0.35 0.35 0.15 1.00 (0.02)

Area (triangle)
Seg.3 Cu.m 0.75 0.01 2.00 (0.02)

Seg.4 Cu.m 0.75 0.85 1.68 1.00 (1.07)

Area
Pier head concrete (II) Cu.m 1.38 0.50 1.00 0.69
Cu.m 4.29

10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 5.00 1.00 2.51
Total Cu.m 2.51

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 5.25 1.00 1.00 15.75
15.75

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.

CALCULATION SHEET June ,20 2014, General Arranggement 501524-VIK-PB-3176 R1

Title : Pedestrian Bridge Acces Sragen Sta. 5+363.700

Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity

(ln.m) (ln.m) (ln.m) (ln.m) (cu.m)


Footing Cu.m 3.20 5.45 0.05 1.00 0.87
Total Cu.m 0.87

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to pier head (kg/m) Kg 4.29 218.0 935.38
Reinforcement bars to column (kg/m) Kg 2.51 179.0 449.88
Reinforcement bars to footing (kg/m) Kg 15.75 254.0 4,000.50
Total Kg 5,385.75

10.05 (1) Furnish Pretensioned Spun Concrete Pile D=50 cm


Ln.m 12.00 6.00 72.00
Ln.m 72.00

10.05 (2) Drive Pretensioned Spun Concrete Pile D=50 cm


Ln.m 12.00 6.00 72.00
Ln.m 72.00

PIER 4
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.15

5.01 (1) Structure excavation to a depth not exceeding 200 mm


Cu.m 5.45 3.20 1.15 1.00 20.06

5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 5.45 3.20 - 1.00 -

5.01 (3) Structure excavation at a depth greater than 400 mm


Cu.m 5.45 3.20 - 1.00 -

10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete (I)
Cu.m 1.50 1.50 2.18 1.00 4.91

Deduction
Seg.1 Cu.m 0.90 0.75 0.29 1.00 (0.20)
Seg.2 Cu.m 0.35 0.35 0.15 1.00 (0.02)

Area (triangle)
Seg.3 Cu.m 0.75 0.01 2.00 (0.02)

Seg.4 Cu.m 0.75 0.85 1.68 1.00 (1.07)

Area
Pier head concrete (II) Cu.m 1.38 0.50 1.00 0.69
Cu.m 4.29

10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 5.00 1.00 2.51
Total Cu.m 2.51

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 5.25 1.00 1.00 15.75
15.75

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 5.45 0.05 1.00 0.87
Total Cu.m 0.87

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to pier head (kg/m) Kg 4.29 218.0 935.38
Reinforcement bars to column (kg/m) Kg 2.51 179.0 449.88
Reinforcement bars to footing (kg/m) Kg 15.75 254.0 4,000.50
Total Kg 5,385.75

10.05 (1) Furnish Pretensioned Spun Concrete Pile D=50 cm


Ln.m 12.00 6.00 72.00
Ln.m 72.00

10.05 (2) Drive Pretensioned Spun Concrete Pile D=50 cm


Ln.m 12.00 6.00 72.00
Ln.m 72.00

PIER 5
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 2.38

5.01 (1) Structure excavation to a depth not exceeding 200 mm


Cu.m 3.20 3.20 2.00 1.00 20.48

5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 0.38 1.00 3.89

5.01 (3) Structure excavation at a depth greater than 400 mm


Cu.m 3.20 3.20 - 1.00 -

10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 2.05 0.47 1.00 1.45
Cu.m 1.50 2.05 0.75 1.00 2.31
Cu.m 1.50 2.05 0.20 1.00 0.62

Deduction Cu.m 1.75 1.20 0.47 1.00 (0.99)


Cu.m 0.40 0.35 0.15 2.00 (0.04)

Area (triangle)
Cu.m 1.50 0.06 1.00 (0.08)
Cu.m 3.26

10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 6.00 1.00 3.02
Total Cu.m 3.02

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.

CALCULATION SHEET June ,20 2014, General Arranggement 501524-VIK-PB-3176 R1

Title : Pedestrian Bridge Acces Sragen Sta. 5+363.700

Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity

(ln.m) (ln.m) (ln.m) (ln.m) (cu.m)


Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 3.20 0.05 1.00 0.51
Total Cu.m 0.51

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to pier head (kg/m) Kg 3.26 218.0 709.59
Reinforcement bars to column (kg/m) Kg 3.02 179.0 539.85
Reinforcement bars to footing (kg/m) Kg 9.00 254.0 2,286.00
Total Kg 3,535.44

10.05 (1) Furnish Pretensioned Spun Concrete Pile D=50 cm


Ln.m 15.00 2.00 30.00
Ln.m 30.00

10.05 (2) Drive Pretensioned Spun Concrete Pile D=50 cm


Ln.m 15.00 2.00 30.00
Ln.m 30.00

PIER 6
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.85

5.01 (1) Structure excavation to a depth not exceeding 200 mm


Cu.m 3.20 3.20 1.85 1.00 18.94

5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -

5.01 (3) Structure excavation at a depth greater than 400 mm


Cu.m 3.20 3.20 - 1.00 -

10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 1.50 1.42 1.00 3.20

Deduction Cu.m 0.90 1.50 0.47 1.00 (0.63)


Cu.m 0.35 0.35 0.15 1.00 (0.02)
Cu.m 2.54

10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 3.00 1.00 1.51
Total Cu.m 1.51

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 3.20 0.05 1.00 0.51
Total Cu.m 0.51

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to pier head (kg/m) Kg 2.54 218.0 554.18
Reinforcement bars to column (kg/m) Kg 1.51 179.0 269.93
Reinforcement bars to footing (kg/m) Kg 9.00 254.0 2,286.00
Total Kg 3,110.11

10.05 (1) Furnish Pretensioned Spun Concrete Pile D=50 cm


Ln.m 15.00 2.00 30.00
Ln.m 30.00

10.05 (2) Drive Pretensioned Spun Concrete Pile D=50 cm


Ln.m 15.00 2.00 30.00
Ln.m 30.00

SUPER STRUCTURE
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
10.01(3) (Abutment 1 - Pier 1 - Pier 2) & (Abutment 2 - Pier 6 - Pier 5)
Parapet Cu.m 20.75 0.25 0.30 4.00 6.23
Slabs Cu.m 20.75 0.90 0.15 4.00 11.21

Area (Triangle)
Stair Cu.m 0.63 0.05 132.00 3.71

Beams Cu.m 20.75 0.80 0.71 2.00 23.57


Nail Cu.m 0.35 0.35 0.20 8.00 0.20

Bordes Cu.m
Parapet Cu.m 1.50 0.25 0.30 4.00 0.45
Slabs Cu.m 1.50 0.90 0.15 4.00 0.81
Beams Cu.m 1.50 0.80 0.71 2.00 1.70

(Pier 2 - Pier 3) & (Pier 4 -Pier 5)


Parapet Cu.m 3.76 0.25 0.30 4.00 1.13
Slabs Cu.m 3.76 0.90 0.15 4.00 2.03

Area (Triangle)
Stair Cu.m 0.63 0.05 24.00 0.68

Beams Cu.m 3.76 0.80 0.71 2.00 4.27


Nail Cu.m 0.20 0.35 0.35 2.00 0.05

Bordes Cu.m
Parapet Cu.m 1.15 0.25 0.30 4.00 0.35
Slabs Cu.m 1.15 0.90 0.15 4.00 0.62
Beams Cu.m 1.15 0.80 0.71 2.00 1.31

Pier 3 to Pier 4
Parapet Cu.m 16.80 0.25 0.30 2.00 2.52
Slabs (1) Cu.m 16.80 2.60 0.15 1.00 6.55

Area (triangle)
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.

CALCULATION SHEET June ,20 2014, General Arranggement 501524-VIK-PB-3176 R1

Title : Pedestrian Bridge Acces Sragen Sta. 5+363.700

Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity

(ln.m) (ln.m) (ln.m) (ln.m) (cu.m)


Slabs (2) Cu.m 16.80 0.01 2.00 0.27
Total Cu.m 67.64

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to deck slabs (kg/m) Kg 67.64 136.00 9,199.24
Total Kg 9,199.24

10.03(1) PC-T Girder Nominal Span Length 16.00 m to 17.00 m


Pier 3 to Pier 4 Each 1.00 1.00
Total Each 1.00

10.09 (3) Chainlink Fence, H=2,60 Ln.m


Pier 3 to Pier 4 Ln.m 16.80 2.00 33.60
Total Ln.m 33.60

10.09 (4) Railing Fence


(Abutment1 - Pier1) & (Abutment2 - Pier6) Ln.m 10.41 4.00 41.64
(Pier1 - Pier2) & (Pier6 - Pier5) Ln.m 8.58 4.00 34.32
(Pier2 - Pier3) & (Pier4 - Pier5) Ln.m 7.62 4.00 30.48

Abutmnet 1 Ln.m 2.59 2.00 5.18


Abutmnet 2 Ln.m 2.59 2.00 5.18
Bordes Pier 1 Ln.m 1.40 2.00 2.80
Bordes Pier 2 Ln.m 4.55 1.00 4.55
Bordes Pier 5 Ln.m 4.55 1.00 4.55
Bordes Pier 6 Ln.m 1.40 2.00 2.80
Total Ln.m 131.50
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pedes
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pedes
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pedes

SECTION 2
-
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pedes
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pedes

ABT2

AREA 3.9852 m2
PT. VIRAMA KARYA

ABT2
CALCULATION SHEET June ,2

Title : Pedes

AREA 3.9852 m2
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pedes

0.20

0.60
0.65 0.80
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

0.60 Title : Pedes


0.65 0.80

0.47
0.40
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pedes
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pedes

0 .7 8
0 .2 5
2 .3 7

1 .2 5
0.46 0.92 0.30
1 .3 3

0.50 0.58 0.65

0 .3 3
0.58 1.33 0.58 0.92
2.92
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pedes
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pedes
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pedes

1.50
0.75 0.75
0.35

0 .30
0 .35

0 .35
0 .80

0 .90
0 .35

0 .30
PLAN

0.75
0.75 0.35 0
0 .29

0.20 0.20
0 .15
.68
8
PLAN

PT. VIRAMA KARYA


0.75
0.75 0.35
CALCULATION SHEET June 0
,2

0 .29
0.20 0.20
Title : Pedes

0 .15
1 .68
2 .18

1 .89
0 .50

0 .50
0.35 0.80 0.35 0
1.50

SECTION 1
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pedes
Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-3176

Title : Pedestrian Bridge Acces Sragen Sta. 5+363.700

SKETCH 1
C PT 117
Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-3176

Title : Pedestrian Bridge Acces Sragen Sta. 5+363.700

5%

ELEVATION

2.00
Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-3176

Title : Pedestrian Bridge Acces Sragen Sta. 5+363.700 2.00

ON 2 SECTION 1
- -
Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-3176

Title : Pedestrian Bridge Acces Sragen Sta. 5+363.700

SKETCH 2
Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-3176

Title : Pedestrian Bridge Acces Sragen Sta. 5+363.700

ABT1

AREA 5.7751 m2
Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement ABT1


501524-VIK-PB-3176

Title : Pedestrian Bridge Acces Sragen Sta. 5+363.700

AREA 5.7751 m2
Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-3176

Title : Pedestrian Bridge Acces Sragen Sta. 5+363.700

SKETCH 3

0.32
0.15

0.60
Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-3176

Title : Pedestrian Bridge Acces Sragen Sta. 5+363.700

0.15
0.60
Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-3176

Title : Pedestrian Bridge Acces Sragen Sta. 5+363.700


Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-3176

Title : Pedestrian Bridge Acces Sragen Sta. 5+363.700

SKETCH 4
0 .7 8
0 .2 5
1 .2 5

30 0.56 0.24
1 .3 3

0.50 0.65 0.55


0 .3 3

1.33
2.00
Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-3176

Title : Pedestrian Bridge Acces Sragen Sta. 5+363.700


Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-3176

Title : Pedestrian Bridge Acces Sragen Sta. 5+363.700


Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-3176

Title : Pedestrian Bridge Acces Sragen Sta. 5+363.700

SKETCH 5
0 .30
0 .35

0 .90
0 .30

0.33 0.85 0.33 1.50


0 .07
0 .29

0.30 0.90
.68
Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June 0.33 0.85


,20 2014, General Arranggement 0.33 501524-VIK-PB-3176 1.50

0 .07
0 .29

0.30 0.90
Title : Pedestrian Bridge Acces Sragen Sta. 5+363.700

1 .68
1 .89

0 .50
0 .50

0 .50
0.35 0.80 0.35 0.35 0.80
1.50 1.50

SECTION 2 SECTION
Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-3176

Title : Pedestrian Bridge Acces Sragen Sta. 5+363.700


gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-3176 R1
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-3176 R1

2.00
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-3176 R1

2.00

ECTION 1
-
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-3176 R1
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-3176 R1

ABT1

AREA 5.7751 m2
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

ABT1
501524-VIK-PB-3176 R1

AREA 5.7751 m2
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-3176 R1
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-3176 R1
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-3176 R1
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-3176 R1
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-3176 R1
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-3176 R1
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-3176 R1

1.50
0 .29

0.30 0.90 0.30


.15
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-3176 1.50 R1

0 .29
0.30 0.90 0.30

0 .15
1 .89
0 .50

0.35 0.80 0.35


1.50

SECTION 3
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-3176 R1
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.

CALCULATION SHEET June ,20 2014, General Arranggement 501524-VIK-PB-2251 R2

Title : Pedestrian Bridge Waru-4 Sta. 24+600

Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity

(ln.m) (ln.m) (ln.m) (ln.m) (cu.m)


ABUTMENT 1
Elev. Existing Ground Level (A) Ln. m -
Bottom Of Footing (B) Ln. m -
(A-B) Ln. m 0.09

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Abutment
Parapet Cu.m 2.68 0.25 0.32 2.00 0.43

Stair
Seg. 1 Cu.m 0.63 0.20 0.15 2.00 0.04
Seg. 2 Cu.m 0.63 0.80 0.15 2.00 0.15
Seg. 3 Cu.m 0.63 1.40 0.15 2.00 0.26

Seg. 4 Cu.m 2.68 0.80 0.20 1.00 0.43

Footing
Seg. 5 Cu.m 2.60 4.00 0.80 1.00 8.32
Deduction Cu.m 0.35 0.35 0.20 1.00 (0.02)
Seg. 6 Cu.m 3.00 4.50 0.50 1.00 6.75
Sub total Cu.m 16.35

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 4.70 0.05 1.00 0.75
Total Cu.m 0.75

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to abutment (kg/m) Kg 16.35 67.0 1,095.66
Total Kg 1,095.66

12.02(3) Stone Masonry Area


Cu.m 2.68 5.48 1.00 14.69
Cu.m 14.69

ABUTMENT 2
Elev. Existing Ground Level (A) Ln. m -
Bottom Of Footing (B) Ln. m -
(A-B) Ln. m 0.24

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Abutment
Parapet Cu.m 2.68 0.25 0.32 2.00 0.43

Stair
Seg. 1 Cu.m 0.63 0.20 0.15 2.00 0.04
Seg. 2 Cu.m 0.63 0.80 0.15 2.00 0.15
Seg. 3 Cu.m 0.63 1.40 0.15 2.00 0.26

Seg. 4 Cu.m 2.68 0.80 0.20 1.00 0.43

Footing
Seg. 5 Cu.m 2.60 4.00 0.80 1.00 8.32
Deduction Cu.m 0.35 0.35 0.20 1.00 (0.02)
Seg. 6 Cu.m 3.00 4.50 0.50 1.00 6.75
Sub total Cu.m 16.35

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 4.70 0.05 1.00 0.75
Total Cu.m 0.75

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to abutment (kg/m) Kg 16.35 67.0 1,095.66
Total Kg 1,095.66

12.02(3) Stone Masonry Area


Cu.m 2.68 1.32 1.00 3.54
Cu.m 3.54

PIER 1
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.35

5.01 (1) Structure excavation to a depth not exceeding 200 mm


Cu.m 3.20 3.20 1.35 1.00 13.82

5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -

5.01 (3) Structure excavation at a depth greater than 400 mm


Cu.m 3.20 3.20 - 1.00 -

10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 1.50 1.42 1.00 3.20

Deduction Cu.m 0.90 1.50 0.47 1.00 (0.63)


Cu.m 0.35 0.35 0.15 1.00 (0.02)
Cu.m 2.54

10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 3.00 1.00 1.51
Total Cu.m 1.51

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 3.20 0.05 1.00 0.51
Total Cu.m 0.51
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.

CALCULATION SHEET June ,20 2014, General Arranggement 501524-VIK-PB-2251 R2

Title : Pedestrian Bridge Waru-4 Sta. 24+600

Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity

(ln.m) (ln.m) (ln.m) (ln.m) (cu.m)


10.02(2) Reinforcing Steel Deformed Bars BJTD-40
Reinforcement bars to pier head (kg/m) Kg 2.54 218.0 554.18
Reinforcement bars to column (kg/m) Kg 1.51 179.0 269.93
Reinforcement bars to footing (kg/m) Kg 9.00 254.0 2,286.00
Total Kg 3,110.11

10.05 (1) Furnish Pretensioned Spun Concrete Pile D=50 cm


Ln.m 15.00 2.00 30.00
Ln.m 30.00

10.05 (2) Drive Pretensioned Spun Concrete Pile D=50 cm


Ln.m 15.00 2.00 30.00
Ln.m 30.00

PIER 2
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.81

5.01 (1) Structure excavation to a depth not exceeding 200 mm


Cu.m 3.20 3.20 1.81 1.00 18.53

5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -

5.01 (3) Structure excavation at a depth greater than 400 mm


Cu.m 3.20 3.20 - 1.00 -

10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 2.05 0.47 1.00 1.45
Cu.m 1.50 2.05 0.75 1.00 2.31
Cu.m 1.50 2.05 0.20 1.00 0.62

Deduction Cu.m 1.75 1.20 0.47 1.00 (0.99)


Cu.m 0.40 0.35 0.15 2.00 (0.04)

Area (triangle)
Cu.m 1.50 0.06 1.00 (0.08)
Cu.m 3.26

10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 6.00 1.00 3.02
Total Cu.m 3.02

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 3.20 0.05 1.00 0.51
Total Cu.m 0.51

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to pier head (kg/m) Kg 3.26 218.0 709.59
Reinforcement bars to column (kg/m) Kg 3.02 179.0 539.85
Reinforcement bars to footing (kg/m) Kg 9.00 254.0 2,286.00
Total Kg 3,535.44

10.05 (1) Furnish Pretensioned Spun Concrete Pile D=50 cm


Ln.m 15.00 2.00 30.00
Ln.m 30.00

10.05 (2) Drive Pretensioned Spun Concrete Pile D=50 cm


Ln.m 15.00 2.00 30.00
Ln.m 30.00

PIER 3
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 2.07

5.01 (1) Structure excavation to a depth not exceeding 200 mm


Cu.m 5.45 3.20 2.00 1.00 34.88

5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 5.45 3.20 0.07 1.00 1.22

5.01 (3) Structure excavation at a depth greater than 400 mm


Cu.m 5.45 3.20 - 1.00 -

10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete (I)
Cu.m 1.50 1.50 2.18 1.00 4.91

Deduction
Seg.1 Cu.m 0.90 0.75 0.29 1.00 (0.20)
Seg.2 Cu.m 0.35 0.35 0.15 1.00 (0.02)

Area (triangle)
Seg.3 Cu.m 0.75 0.01 2.00 (0.02)

Seg.4 Cu.m 0.75 0.85 1.68 1.00 (1.07)

Area
Pier head concrete (II) Cu.m 1.38 0.50 1.00 0.69
Cu.m 4.29

10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 7.00 1.00 3.52
Total Cu.m 3.52

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 5.25 1.00 1.00 15.75
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.

CALCULATION SHEET June ,20 2014, General Arranggement 501524-VIK-PB-2251 R2

Title : Pedestrian Bridge Waru-4 Sta. 24+600

Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity

(ln.m) (ln.m) (ln.m) (ln.m) (cu.m)


15.75

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 5.45 0.05 1.00 0.87
Total Cu.m 0.87

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to pier head (kg/m) Kg 4.29 218.0 935.38
Reinforcement bars to column (kg/m) Kg 3.52 179.0 629.83
Reinforcement bars to footing (kg/m) Kg 15.75 254.0 4,000.50
Total Kg 5,565.70

10.05 (1) Furnish Pretensioned Spun Concrete Pile D=50 cm


Ln.m 15.00 6.00 90.00
Ln.m 90.00

10.05 (2) Drive Pretensioned Spun Concrete Pile D=50 cm


Ln.m 15.00 6.00 90.00
Ln.m 90.00

PIER 4
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 2.13

5.01 (1) Structure excavation to a depth not exceeding 200 mm


Cu.m 5.45 3.20 2.00 1.00 34.88

5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 5.45 3.20 0.13 1.00 2.27

5.01 (3) Structure excavation at a depth greater than 400 mm


Cu.m 5.45 3.20 - 1.00 -

10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete (I)
Cu.m 1.50 1.50 2.18 1.00 4.91

Deduction
Seg.1 Cu.m 0.90 0.75 0.29 1.00 (0.20)
Seg.2 Cu.m 0.35 0.35 0.15 1.00 (0.02)

Area (triangle)
Seg.3 Cu.m 0.75 0.01 2.00 (0.02)

Seg.4 Cu.m 0.75 0.85 1.68 1.00 (1.07)

Area
Pier head concrete (II) Cu.m 1.38 0.50 1.00 0.69
Cu.m 4.29

10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 7.00 1.00 3.52
Total Cu.m 3.52

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 5.25 1.00 1.00 15.75
15.75

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 5.45 0.05 1.00 0.87
Total Cu.m 0.87

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to pier head (kg/m) Kg 4.29 218.0 935.38
Reinforcement bars to column (kg/m) Kg 3.52 179.0 629.83
Reinforcement bars to footing (kg/m) Kg 15.75 254.0 4,000.50
Total Kg 5,565.70

10.05 (1) Furnish Pretensioned Spun Concrete Pile D=50 cm


Ln.m 13.00 6.00 78.00
Ln.m 78.00

10.05 (2) Drive Pretensioned Spun Concrete Pile D=50 cm


Ln.m 13.00 6.00 78.00
Ln.m 78.00

PIER 5
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.89

5.01 (1) Structure excavation to a depth not exceeding 200 mm


Cu.m 3.20 3.20 1.89 1.00 19.35

5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -

5.01 (3) Structure excavation at a depth greater than 400 mm


Cu.m 3.20 3.20 - 1.00 -

10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 2.05 0.47 1.00 1.45
Cu.m 1.50 2.05 0.75 1.00 2.31
Cu.m 1.50 2.05 0.20 1.00 0.62

Deduction Cu.m 1.75 1.20 0.47 1.00 (0.99)


Cu.m 0.40 0.35 0.15 2.00 (0.04)

Area (triangle)
Cu.m 1.50 0.06 1.00 (0.08)
Cu.m 3.26

10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.

CALCULATION SHEET June ,20 2014, General Arranggement 501524-VIK-PB-2251 R2

Title : Pedestrian Bridge Waru-4 Sta. 24+600

Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity

(ln.m) (ln.m) (ln.m) (ln.m) (cu.m)


Cu.m 0.50 6.00 1.00 3.02
Total Cu.m 3.02

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 3.20 0.05 1.00 0.51
Total Cu.m 0.51

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to pier head (kg/m) Kg 3.26 218.0 709.59
Reinforcement bars to column (kg/m) Kg 3.02 179.0 539.85
Reinforcement bars to footing (kg/m) Kg 9.00 254.0 2,286.00
Total Kg 3,535.44

10.05 (1) Furnish Pretensioned Spun Concrete Pile D=50 cm


Ln.m 15.00 2.00 30.00
Ln.m 30.00

10.05 (2) Drive Pretensioned Spun Concrete Pile D=50 cm


Ln.m 15.00 2.00 30.00
Ln.m 30.00

PIER 6
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.46

5.01 (1) Structure excavation to a depth not exceeding 200 mm


Cu.m 3.20 3.20 1.46 1.00 14.95

5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -

5.01 (3) Structure excavation at a depth greater than 400 mm


Cu.m 3.20 3.20 - 1.00 -

10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 1.50 1.42 1.00 3.20

Deduction Cu.m 0.90 1.50 0.47 1.00 (0.63)


Cu.m 0.35 0.35 0.15 1.00 (0.02)
Cu.m 2.54

10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 3.00 1.00 1.51
Total Cu.m 1.51

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 3.20 0.05 1.00 0.51
Total Cu.m 0.51

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to pier head (kg/m) Kg 2.54 218.0 554.18
Reinforcement bars to column (kg/m) Kg 1.51 179.0 269.93
Reinforcement bars to footing (kg/m) Kg 9.00 254.0 2,286.00
Total Kg 3,110.11

10.05 (1) Furnish Pretensioned Spun Concrete Pile D=50 cm


Ln.m 10.00 4.00 40.00
Ln.m 40.00

10.05 (2) Drive Pretensioned Spun Concrete Pile D=50 cm


Ln.m 10.00 4.00 40.00
Ln.m 40.00

SUPER STRUCTURE
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
10.01(3) (Abutment 1 - Pier 1 - Pier 2) & (Abutment 2 - Pier 6 - Pier 5)
Parapet Cu.m 20.75 0.25 0.30 4.00 6.23
Slabs Cu.m 20.75 0.90 0.15 4.00 11.21

Area (Triangle)
Stair Cu.m 0.63 0.05 132.00 3.71

Beams Cu.m 20.75 0.80 0.71 2.00 23.57


Nail Cu.m 0.35 0.35 0.20 8.00 0.20

Bordes Cu.m
Parapet Cu.m 1.50 0.25 0.30 4.00 0.45
Slabs Cu.m 1.50 0.90 0.15 4.00 0.81
Beams Cu.m 1.50 0.80 0.71 2.00 1.70

(Pier 2 - Pier 3) & (Pier 4 -Pier 5)


Parapet Cu.m 9.32 0.25 0.30 4.00 2.80
Slabs Cu.m 9.32 0.90 0.15 4.00 5.03

Area (Triangle)
Stair Cu.m 0.63 0.05 60.00 1.69

Beams Cu.m 9.32 0.80 0.71 2.00 10.59


Nail Cu.m 0.20 0.35 0.35 2.00 0.05

Bordes Cu.m
Parapet Cu.m 1.21 0.25 0.30 4.00 0.36
Slabs Cu.m 1.21 0.90 0.15 4.00 0.65
Beams Cu.m 1.21 0.80 0.71 2.00 1.37
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.

CALCULATION SHEET June ,20 2014, General Arranggement 501524-VIK-PB-2251 R2

Title : Pedestrian Bridge Waru-4 Sta. 24+600

Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity

(ln.m) (ln.m) (ln.m) (ln.m) (cu.m)


Pier 3 to Pier 4
Parapet Cu.m 35.80 0.25 0.30 2.00 5.37
Slabs (1) Cu.m 35.80 2.60 0.15 1.00 13.96

Area (triangle)
Slabs (2) Cu.m 35.80 0.01 2.00 0.57
Total Cu.m 90.32

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to deck slabs (kg/m) Kg 90.32 136.00 12,283.94
Total Kg 12,283.94

10.03(5) PC-T Girder Nominal Span Length 35.00 m to 37.00 m.


Pier 3 to Pier 4 Each 1.00 1.00
Total Each 1.00

10.09 (3) Chainlink Fence, H=2,60 Ln.m


Pier 3 to Pier 4 Ln.m 35.80 2.00 71.60
Total Ln.m 71.60

10.09 (4) Railing Fence


(Abutment1 - Pier1) & (Abutment2 - Pier6) Ln.m 10.41 4.00 41.64
(Pier1 - Pier2) & (Pier6 - Pier5) Ln.m 8.58 4.00 34.32
(Pier2 - Pier3) & (Pier4 - Pier5) Ln.m 7.62 4.00 30.48

Abutmnet 1 Ln.m 2.59 2.00 5.18


Abutmnet 2 Ln.m 2.59 2.00 5.18
Bordes Pier 1 Ln.m 1.40 2.00 2.80
Bordes Pier 2 Ln.m 4.55 1.00 4.55
Bordes Pier 5 Ln.m 4.55 1.00 4.55
Bordes Pier 6 Ln.m 1.40 2.00 2.80
Total Ln.m 131.50
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : P
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : P

-2%
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : P
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : P
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : P
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : P
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : P
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : P
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : P
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : P
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : P
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : P
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : P

PLAN
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : P

SECTION 1 SEC
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : P
Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-2251

Title : Pedestrian Bridge Waru-4 Sta. 24+600

SKETCH 1
Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-2251

Title : Pedestrian Bridge Waru-4 Sta. 24+600

-2% -2%
Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-2251

Title : Pedestrian Bridge Waru-4 Sta. 24+600


Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-2251

Title : Pedestrian Bridge Waru-4 Sta. 24+600

SKETCH 2
Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-2251

Title : Pedestrian Bridge Waru-4 Sta. 24+600


Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-2251

Title : Pedestrian Bridge Waru-4 Sta. 24+600


Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-2251

Title : Pedestrian Bridge Waru-4 Sta. 24+600

SKETCH 3

P5

P2
Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-2251

Title : Pedestrian Bridge Waru-4 Sta. 24+600


Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-2251

Title : Pedestrian Bridge Waru-4 Sta. 24+600


Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-2251

Title : Pedestrian Bridge Waru-4 Sta. 24+600

SKETCH 4
Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-2251

Title : Pedestrian Bridge Waru-4 Sta. 24+600


Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-2251

Title : Pedestrian Bridge Waru-4 Sta. 24+600


Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-2251

Title : Pedestrian Bridge Waru-4 Sta. 24+600

SKETCH 5

SECTION 4
Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-2251

Title : Pedestrian Bridge Waru-4 Sta. 24+600

SECTION 2 SECTION
Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-2251

Title : Pedestrian Bridge Waru-4 Sta. 24+600


gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-2251 R2
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-2251 R2

%
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-2251 R2
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-2251 R2
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-2251 R2
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-2251 R2
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-2251 R2

P5

P2
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-2251 R2
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-2251 R2
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-2251 R2
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-2251 R2
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-2251 R2
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-2251 R2

ON 4
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-2251 R2

SECTION 3
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-2251 R2
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.

CALCULATION SHEET June, 20 2014, General Arranggement 501524-VIK-PB-3301 R2

Title : Pedestrian Bridge Singopadu Sta. 36+783.703

Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity

(ln.m) (ln.m) (ln.m) (ln.m) (cu.m)


ABUTMENT 1
Elev. Existing Ground Level (A) Ln. m -
Bottom Of Footing (B) Ln. m -
(A-B) Ln. m 0.09

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Abutment
Parapet Cu.m 2.68 0.25 0.32 2.00 0.43

Stair
Seg. 1 Cu.m 0.63 0.20 0.15 2.00 0.04
Seg. 2 Cu.m 0.63 0.80 0.15 2.00 0.15
Seg. 3 Cu.m 0.63 1.40 0.15 2.00 0.26

Seg. 4 Cu.m 2.68 0.80 0.20 1.00 0.43

Footing
Seg. 5 Cu.m 2.60 4.00 0.80 1.00 8.32
Deduction Cu.m 0.35 0.35 0.20 1.00 (0.02)
Seg. 6 Cu.m 3.00 4.50 0.50 1.00 6.75
Sub total Cu.m 16.35

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 4.70 0.05 1.00 0.75
Total Cu.m 0.75

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to abutment (kg/m) Kg 16.35 67.0 1,095.66
Total Kg 1,095.66

12.02(3) Stone Masonry Area


Cu.m 2.68 5.48 1.00 14.69
Cu.m 14.69

ABUTMENT 2
Elev. Existing Ground Level (A) Ln. m -
Bottom Of Footing (B) Ln. m -
(A-B) Ln. m 0.45

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Abutment
Parapet Cu.m 2.68 0.25 0.32 2.00 0.43

Stair
Seg. 1 Cu.m 0.63 0.20 0.15 2.00 0.04
Seg. 2 Cu.m 0.63 0.80 0.15 2.00 0.15
Seg. 3 Cu.m 0.63 1.40 0.15 2.00 0.26

Seg. 4 Cu.m 2.68 0.80 0.20 1.00 0.43

Footing
Seg. 5 Cu.m 2.60 4.00 0.80 1.00 8.32
Deduction Cu.m 0.35 0.35 0.20 1.00 (0.02)
Seg. 6 Cu.m 3.00 4.50 0.50 1.00 6.75
Sub total Cu.m 16.35

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 4.70 0.05 1.00 0.75
Total Cu.m 0.75

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to abutment (kg/m) Kg 16.35 67.0 1,095.66
Total Kg 1,095.66

12.02(3) Stone Masonry Area


Cu.m 2.68 1.32 1.00 3.54
Cu.m 3.54

PIER 1
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.26

5.01 (1) Structure excavation to a depth not exceeding 200 mm


Cu.m 3.20 3.20 1.26 1.00 12.90

5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -

5.01 (3) Structure excavation at a depth greater than 400 mm


Cu.m 3.20 3.20 - 1.00 -

10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 1.50 1.42 1.00 3.20

Deduction Cu.m 0.90 1.50 0.47 1.00 (0.63)


Cu.m 0.35 0.35 0.15 1.00 (0.02)
Cu.m 2.54

10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 2.00 1.00 1.01
Total Cu.m 1.01

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 3.20 0.05 1.00 0.51
Total Cu.m 0.51
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.

CALCULATION SHEET June, 20 2014, General Arranggement 501524-VIK-PB-3301 R2

Title : Pedestrian Bridge Singopadu Sta. 36+783.703

Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity

(ln.m) (ln.m) (ln.m) (ln.m) (cu.m)


10.02(2) Reinforcing Steel Deformed Bars BJTD-40
Reinforcement bars to pier head (kg/m) Kg 2.54 218.0 554.18
Reinforcement bars to column (kg/m) Kg 1.01 179.0 179.95
Reinforcement bars to footing (kg/m) Kg 9.00 254.0 2,286.00
Total Kg 3,020.13

10.05 (1) Furnish Pretensioned Spun Concrete Pile D=50 cm


Ln.m 15.00 2.00 30.00
Ln.m 30.00

10.05 (2) Drive Pretensioned Spun Concrete Pile D=50 cm


Ln.m 15.00 2.00 30.00
Ln.m 30.00

PIER 2
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.45

5.01 (1) Structure excavation to a depth not exceeding 200 mm


Cu.m 3.20 3.20 1.45 1.00 14.85

5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -

5.01 (3) Structure excavation at a depth greater than 400 mm


Cu.m 3.20 3.20 - 1.00 -

10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 1.50 1.42 1.00 3.20

Deduction Cu.m 0.90 1.50 0.47 1.00 (0.63)


Cu.m 0.35 0.35 0.15 1.00 (0.02)
Cu.m 2.54

10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 4.50 1.00 2.26
Total Cu.m 2.26

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 3.20 0.05 1.00 0.51
Total Cu.m 0.51

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to pier head (kg/m) Kg 2.54 218.0 554.18
Reinforcement bars to column (kg/m) Kg 2.26 179.0 404.89
Reinforcement bars to footing (kg/m) Kg 9.00 254.0 2,286.00
Total Kg 3,245.07

10.05 (1) Furnish Pretensioned Spun Concrete Pile D=50 cm


Ln.m 15.00 2.00 30.00
Ln.m 30.00

10.05 (2) Drive Pretensioned Spun Concrete Pile D=50 cm


Ln.m 15.00 2.00 30.00
Ln.m 30.00

PIER 3
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.67

5.01 (1) Structure excavation to a depth not exceeding 200 mm


Cu.m 3.20 3.20 1.67 1.00 17.10

5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -

5.01 (3) Structure excavation at a depth greater than 400 mm


Cu.m 3.20 3.20 - 1.00 -

10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 2.05 0.47 1.00 1.45
Cu.m 1.50 2.05 0.75 1.00 2.31
Cu.m 1.50 2.05 0.20 1.00 0.62

Deduction Cu.m 1.75 1.20 0.47 1.00 (0.99)


Cu.m 0.40 0.35 0.15 2.00 (0.04)

Area (triangle)
Cu.m 1.50 0.06 1.00 (0.08)
Cu.m 3.26

10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 7.00 1.00 3.52
Total Cu.m 3.52

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 3.20 0.05 1.00 0.51
Total Cu.m 0.51

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to pier head (kg/m) Kg 3.26 218.0 709.59
Reinforcement bars to column (kg/m) Kg 3.52 179.0 629.83
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.

CALCULATION SHEET June, 20 2014, General Arranggement 501524-VIK-PB-3301 R2

Title : Pedestrian Bridge Singopadu Sta. 36+783.703

Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity

(ln.m) (ln.m) (ln.m) (ln.m) (cu.m)


Reinforcement bars to footing (kg/m) Kg 9.00 254.0 2,286.00
Total Kg 3,625.42

10.05 (1) Furnish Pretensioned Spun Concrete Pile D=50 cm


Ln.m 15.00 2.00 30.00
Ln.m 30.00

10.05 (2) Drive Pretensioned Spun Concrete Pile D=50 cm


Ln.m 15.00 2.00 30.00
Ln.m 30.00

PIER 4
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 2.24

5.01 (1) Structure excavation to a depth not exceeding 200 mm


Cu.m 4.40 3.20 2.00 1.00 28.16

5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 4.40 3.20 0.24 1.00 3.38

5.01 (3) Structure excavation at a depth greater than 400 mm


Cu.m 4.40 3.20 - 1.00 -

10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete (I)
Cu.m 1.50 1.50 2.18 1.00 4.91

Deduction
Seg.1 Cu.m 0.90 0.75 0.29 1.00 (0.20)
Seg.2 Cu.m 0.35 0.35 0.15 1.00 (0.02)

Area (triangle)
Seg.3 Cu.m 0.75 0.01 2.00 (0.02)

Seg.4 Cu.m 0.75 0.85 1.68 1.00 (1.07)

Area
Pier head concrete (II) Cu.m 1.38 0.50 1.00 0.69
Cu.m 4.29

10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 7.00 1.00 3.52
Total Cu.m 3.52

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 4.20 1.00 1.00 12.60
12.60

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 4.40 0.05 1.00 0.70
Total Cu.m 0.70

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to pier head (kg/m) Kg 4.29 218.0 935.38
Reinforcement bars to column (kg/m) Kg 3.52 179.0 629.83
Reinforcement bars to footing (kg/m) Kg 12.60 254.0 3,200.40
Total Kg 4,765.60

10.05 (1) Furnish Pretensioned Spun Concrete Pile D=50 cm


Ln.m 11.00 6.00 66.00
Ln.m 66.00

10.05 (2) Drive Pretensioned Spun Concrete Pile D=50 cm


Ln.m 11.00 6.00 66.00
Ln.m 66.00

PIER 5
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 2.18

5.01 (1) Structure excavation to a depth not exceeding 200 mm


Cu.m 4.40 3.20 2.00 1.00 28.16

5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 4.40 3.20 0.18 1.00 2.53

5.01 (3) Structure excavation at a depth greater than 400 mm


Cu.m 4.40 3.20 - 1.00 -

10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete (I)
Cu.m 1.50 1.50 2.18 1.00 4.91

Deduction
Seg.1 Cu.m 0.90 0.75 0.29 1.00 (0.20)
Seg.2 Cu.m 0.35 0.35 0.15 1.00 (0.02)

Area (triangle)
Seg.3 Cu.m 0.75 0.01 2.00 (0.02)

Seg.4 Cu.m 0.75 0.85 1.68 1.00 (1.07)

Area
Pier head concrete (II) Cu.m 1.38 0.50 1.00 0.69
Cu.m 4.29

10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 7.00 1.00 3.52
Total Cu.m 3.52

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.

CALCULATION SHEET June, 20 2014, General Arranggement 501524-VIK-PB-3301 R2

Title : Pedestrian Bridge Singopadu Sta. 36+783.703

Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity

(ln.m) (ln.m) (ln.m) (ln.m) (cu.m)


Cu.m 3.00 4.20 1.00 1.00 12.60
12.60

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 4.40 0.05 1.00 0.70
Total Cu.m 0.70

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to pier head (kg/m) Kg 4.29 218.0 935.38
Reinforcement bars to column (kg/m) Kg 3.52 179.0 629.83
Reinforcement bars to footing (kg/m) Kg 12.60 254.0 3,200.40
Total Kg 4,765.60

10.05 (1) Furnish Pretensioned Spun Concrete Pile D=50 cm


Ln.m 10.00 6.00 60.00
Ln.m 60.00

10.05 (2) Drive Pretensioned Spun Concrete Pile D=50 cm


Ln.m 10.00 6.00 60.00
Ln.m 60.00

PIER 6
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.49

5.01 (1) Structure excavation to a depth not exceeding 200 mm


Cu.m 3.20 3.20 1.49 1.00 15.26

5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -

5.01 (3) Structure excavation at a depth greater than 400 mm


Cu.m 3.20 3.20 - 1.00 -

10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 2.05 0.47 1.00 1.45
Cu.m 1.50 2.05 0.75 1.00 2.31
Cu.m 1.50 2.05 0.20 1.00 0.62

Deduction Cu.m 1.75 1.20 0.47 1.00 (0.99)


Cu.m 0.40 0.35 0.15 2.00 (0.04)

Area (triangle)
Cu.m 1.50 0.06 1.00 (0.08)
Cu.m 3.26

10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 7.00 1.00 3.52
Total Cu.m 3.52

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 3.20 0.05 1.00 0.51
Total Cu.m 0.51

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to pier head (kg/m) Kg 3.26 218.0 709.59
Reinforcement bars to column (kg/m) Kg 3.52 179.0 629.83
Reinforcement bars to footing (kg/m) Kg 9.00 254.0 2,286.00
Total Kg 3,625.42

10.05 (1) Furnish Pretensioned Spun Concrete Pile D=50 cm


Ln.m 10.00 2.00 20.00
Ln.m 20.00

10.05 (2) Drive Pretensioned Spun Concrete Pile D=50 cm


Ln.m 10.00 2.00 20.00
Ln.m 20.00

PIER 7
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.32

5.01 (1) Structure excavation to a depth not exceeding 200 mm


Cu.m 3.20 3.20 1.32 1.00 13.52

5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -

5.01 (3) Structure excavation at a depth greater than 400 mm


Cu.m 3.20 3.20 - 1.00 -

10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 1.50 1.42 1.00 3.20

Deduction Cu.m 0.90 1.50 0.47 1.00 (0.63)


Cu.m 0.35 0.35 0.15 1.00 (0.02)
Cu.m 2.54

10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 4.50 1.00 2.26
Total Cu.m 2.26

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.

CALCULATION SHEET June, 20 2014, General Arranggement 501524-VIK-PB-3301 R2

Title : Pedestrian Bridge Singopadu Sta. 36+783.703

Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity

(ln.m) (ln.m) (ln.m) (ln.m) (cu.m)


10.01(8) Structural Concrete Class E, fc' = 10 Mpa
Footing Cu.m 3.20 3.20 0.05 1.00 0.51
Total Cu.m 0.51

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to pier head (kg/m) Kg 2.54 218.0 554.18
Reinforcement bars to column (kg/m) Kg 2.26 179.0 404.89
Reinforcement bars to footing (kg/m) Kg 9.00 254.0 2,286.00
Total Kg 3,245.07

10.05 (1) Furnish Pretensioned Spun Concrete Pile D=50 cm


Ln.m 10.00 2.00 20.00
Ln.m 20.00

10.05 (2) Drive Pretensioned Spun Concrete Pile D=50 cm


Ln.m 10.00 2.00 20.00
Ln.m 20.00

PIER 8
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.08

5.01 (1) Structure excavation to a depth not exceeding 200 mm


Cu.m 3.20 3.20 1.08 1.00 11.06

5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -

5.01 (3) Structure excavation at a depth greater than 400 mm


Cu.m 3.20 3.20 - 1.00 -

10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 1.50 1.42 1.00 3.20

Deduction Cu.m 0.90 1.50 0.47 1.00 (0.63)


Cu.m 0.35 0.35 0.15 1.00 (0.02)
Cu.m 2.54

10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 2.00 1.00 1.01
Total Cu.m 1.01

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 3.20 0.05 1.00 0.51
Total Cu.m 0.51

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to pier head (kg/m) Kg 2.54 218.0 554.18
Reinforcement bars to column (kg/m) Kg 1.01 179.0 179.95
Reinforcement bars to footing (kg/m) Kg 9.00 254.0 2,286.00
Total Kg 3,020.13

10.05 (1) Furnish Pretensioned Spun Concrete Pile D=50 cm


Ln.m 10.00 2.00 20.00
Ln.m 20.00

10.05 (2) Drive Pretensioned Spun Concrete Pile D=50 cm


Ln.m 10.00 2.00 20.00
Ln.m 20.00

SUPER STRUCTURE
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
10.01(3) (Abutment 1 - Pier 1 - Pier 2 - Pier 3) & (Abutment 2 - Pier 8 - Pier 7 - Pier 6)
Parapet Cu.m 27.46 0.25 0.30 4.00 8.24
Slabs Cu.m 27.46 0.90 0.15 4.00 14.83

Area (Triangle)
Stair Cu.m 0.63 0.05 180.00 5.06

Beams Cu.m 27.46 0.80 0.71 2.00 31.19


Nail Cu.m 0.35 0.35 0.20 12.00 0.29

Bordes Cu.m
Parapet Cu.m 6.00 0.25 0.30 4.00 1.80
Slabs Cu.m 6.00 0.90 0.15 4.00 3.24
Beams Cu.m 6.00 0.80 0.71 1.00 3.41

(Pier 3 - Pier 4) & (Pier 5 -Pier 6)


Parapet Cu.m 3.76 0.25 0.30 4.00 1.13
Slabs Cu.m 3.76 0.90 0.15 4.00 2.03

Area (Triangle)
Stair Cu.m 0.63 0.05 60.00 1.69

Beams Cu.m 3.76 0.80 0.71 2.00 4.27


Nail Cu.m 0.20 0.35 0.35 2.00 0.05

Bordes Cu.m
Parapet Cu.m 1.15 0.25 0.30 4.00 0.35
Slabs Cu.m 1.15 0.90 0.15 4.00 0.62
Beams Cu.m 1.15 0.80 0.71 2.00 1.31

Pier 3 to Pier 4
Parapet Cu.m 35.80 0.25 0.30 2.00 5.37
Slabs (1) Cu.m 35.80 2.60 0.15 1.00 13.96

Area (triangle)
Slabs (2) Cu.m 35.80 0.01 2.00 0.57
Total Cu.m 99.41
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.

CALCULATION SHEET June, 20 2014, General Arranggement 501524-VIK-PB-3301 R2

Title : Pedestrian Bridge Singopadu Sta. 36+783.703

Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity

(ln.m) (ln.m) (ln.m) (ln.m) (cu.m)


10.02(2) Reinforcing Steel Deformed Bars BJTD-40
Reinforcement bars to deck slabs (kg/m) Kg 99.41 136.00 13,519.61
Total Kg 13,519.61

10.03(5) PC-T Girder Nominal Span Length 35.00 m to 37.00 m.


Pier 3 to Pier 4 Each 1.00 1.00
Total Each 1.00

10.09 (3) Chainlink Fence, H=2,60 Ln.m


Pier 3 to Pier 4 Ln.m 35.80 2.00 71.60
Total Ln.m 71.60

10.09 (4) Railing Fence


(A1-P1) & (A2-P8) Ln.m 10.41 4.00 41.64
(Pier1 - Pier2) & (Pier8 - Pier7) Ln.m 8.58 4.00 34.32
(Pier2 - Pier3) & (Pier7 - Pier6) Ln.m 7.62 4.00 30.48
(Pier3 - Pier4) & (Pier6 - Pier5) Ln.m 5.46 4.00 21.84

Abutmnet 1 Ln.m 2.59 2.00 5.18


Abutmnet 2 Ln.m 2.59 2.00 5.18
Bordes Pier 1 Ln.m 1.40 2.00 2.80
Bordes Pier 2 Ln.m 1.40 2.00 2.80
Bordes Pier 3 Ln.m 4.55 1.00 4.55
Bordes Pier 6 Ln.m 4.55 1.00 4.55
Bordes Pier 7 Ln.m 1.40 2.00 2.80
Bordes Pier 8 Ln.m 1.40 2.00 2.80
Total Ln.m 158.94
PT. VIRAMA KARYA

CALCULATION SHEET June, 2

Title : Pede
PT. VIRAMA KARYA

CALCULATION SHEET June, 2

Title : Pede
PT. VIRAMA KARYA

CALCULATION SHEET June, 2

Title : Pede
PT. VIRAMA KARYA

CALCULATION SHEET June, 2

Title : Pede
PT. VIRAMA KARYA

CALCULATION SHEET June, 2

Title : Pede
PT. VIRAMA KARYA

CALCULATION SHEET June, 2

Title : Pede
PT. VIRAMA KARYA

CALCULATION SHEET June, 2

Title : Pede
PT. VIRAMA KARYA

CALCULATION SHEET June, 2

Title : Pede
PT. VIRAMA KARYA

CALCULATION SHEET June, 2

Title : Pede
PT. VIRAMA KARYA

CALCULATION SHEET June, 2

Title : Pede
PT. VIRAMA KARYA

CALCULATION SHEET June, 2

Title : Pede
PT. VIRAMA KARYA

CALCULATION SHEET June, 2

Title : Pede
PT. VIRAMA KARYA

CALCULATION SHEET June, 2

Title : Pede
PT. VIRAMA KARYA

CALCULATION SHEET June, 2

Title : Pede
PT. VIRAMA KARYA

CALCULATION SHEET June, 2

Title : Pede
Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June, 20 2014, General Arranggement 501524-VIK-PB-3301

Title : Pedestrian Bridge Singopadu Sta. 36+783.703

SKETCH 1
Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June, 20 2014, General Arranggement 501524-VIK-PB-3301

Title : Pedestrian Bridge Singopadu Sta. 36+783.703


Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June, 20 2014, General Arranggement 501524-VIK-PB-3301

Title : Pedestrian Bridge Singopadu Sta. 36+783.703


Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June, 20 2014, General Arranggement 501524-VIK-PB-3301

Title : Pedestrian Bridge Singopadu Sta. 36+783.703

SKETCH 2
Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June, 20 2014, General Arranggement 501524-VIK-PB-3301

Title : Pedestrian Bridge Singopadu Sta. 36+783.703


Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June, 20 2014, General Arranggement 501524-VIK-PB-3301

Title : Pedestrian Bridge Singopadu Sta. 36+783.703


Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June, 20 2014, General Arranggement 501524-VIK-PB-3301

Title : Pedestrian Bridge Singopadu Sta. 36+783.703

SKETCH 3
Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June, 20 2014, General Arranggement 501524-VIK-PB-3301

Title : Pedestrian Bridge Singopadu Sta. 36+783.703


Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June, 20 2014, General Arranggement 501524-VIK-PB-3301

Title : Pedestrian Bridge Singopadu Sta. 36+783.703


Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June, 20 2014, General Arranggement 501524-VIK-PB-3301

Title : Pedestrian Bridge Singopadu Sta. 36+783.703

SKETCH 4
Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June, 20 2014, General Arranggement 501524-VIK-PB-3301

Title : Pedestrian Bridge Singopadu Sta. 36+783.703


Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June, 20 2014, General Arranggement 501524-VIK-PB-3301

Title : Pedestrian Bridge Singopadu Sta. 36+783.703


Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June, 20 2014, General Arranggement 501524-VIK-PB-3301

Title : Pedestrian Bridge Singopadu Sta. 36+783.703

SKETCH 5
Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June, 20 2014, General Arranggement 501524-VIK-PB-3301

Title : Pedestrian Bridge Singopadu Sta. 36+783.703


Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June, 20 2014, General Arranggement 501524-VIK-PB-3301

Title : Pedestrian Bridge Singopadu Sta. 36+783.703


gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-3301 R2
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-3301 R2
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-3301 R2
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-3301 R2
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-3301 R2
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-3301 R2
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-3301 R2
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-3301 R2
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-3301 R2
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-3301 R2
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-3301 R2
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-3301 R2
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-3301 R2
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-3301 R2
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-3301 R2
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.

CALCULATION SHEET June ,20 2014, General Arranggement 501524-VIK-PB-3951 R2

Title : Pedestrian Bridge Kebonromo Sta. 46+246.030

Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity

(ln.m) (ln.m) (ln.m) (ln.m) (cu.m)


ABUTMENT 1
Elev. Existing Ground Level (A) Ln. m -
Bottom Of Footing (B) Ln. m -
(A-B) Ln. m -

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Abutment
Parapet Cu.m 2.68 0.25 0.32 2.00 0.43

Stair
Seg. 1 Cu.m 0.63 0.20 0.15 2.00 0.04
Seg. 2 Cu.m 0.63 0.80 0.15 2.00 0.15
Seg. 3 Cu.m 0.63 1.40 0.15 2.00 0.26

Seg. 4 Cu.m 2.68 0.80 0.20 1.00 0.43

Footing
Seg. 5 Cu.m 2.60 4.00 0.80 1.00 8.32
Deduction Cu.m 0.35 0.35 0.20 1.00 (0.02)
Seg. 6 Cu.m 3.00 4.50 0.50 1.00 6.75
Sub total Cu.m 16.35

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 4.70 0.05 1.00 0.75
Total Cu.m 0.75

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to abutment (kg/m) Kg 16.35 67.0 1,095.66
Total Kg 1,095.66

12.02(3) Stone Masonry Area


Cu.m 2.68 5.78 1.00 15.49
Cu.m 15.49

ABUTMENT 2
Elev. Existing Ground Level (A) Ln. m -
Bottom Of Footing (B) Ln. m -
(A-B) Ln. m -

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Abutment
Parapet Cu.m 2.68 0.25 0.32 2.00 0.43

Stair
Seg. 1 Cu.m 0.63 0.20 0.15 2.00 0.04
Seg. 2 Cu.m 0.63 0.80 0.15 2.00 0.15
Seg. 3 Cu.m 0.63 1.40 0.15 2.00 0.26

Seg. 4 Cu.m 2.68 0.80 0.20 1.00 0.43

Footing
Seg. 5 Cu.m 2.60 4.00 0.80 1.00 8.32
Deduction Cu.m 0.35 0.35 0.20 1.00 (0.02)
Seg. 6 Cu.m 3.00 4.50 0.50 1.00 6.75
Sub total Cu.m 16.35

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 4.70 0.05 1.00 0.75
Total Cu.m 0.75

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to abutment (kg/m) Kg 16.35 67.0 1,095.66
Total Kg 1,095.66

12.02(3) Stone Masonry Area


Cu.m 2.68 3.99 1.00 10.68
Cu.m 10.68

PIER 1
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.74

5.01 (1) Structure excavation to a depth not exceeding 200 mm


Cu.m 3.20 3.20 1.74 1.00 17.82

5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -

5.01 (3) Structure excavation at a depth greater than 400 mm


Cu.m 3.20 3.20 - 1.00 -

10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 1.50 1.42 1.00 3.20

Deduction Cu.m 0.90 1.50 0.47 1.00 (0.63)


Cu.m 0.35 0.35 0.15 1.00 (0.02)
Cu.m 2.54

10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 4.00 1.00 2.01
Total Cu.m 2.01

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 3.20 0.05 1.00 0.51
Total Cu.m 0.51
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.

CALCULATION SHEET June ,20 2014, General Arranggement 501524-VIK-PB-3951 R2

Title : Pedestrian Bridge Kebonromo Sta. 46+246.030

Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity

(ln.m) (ln.m) (ln.m) (ln.m) (cu.m)


10.02(2) Reinforcing Steel Deformed Bars BJTD-40
Reinforcement bars to pier head (kg/m) Kg 2.54 218.0 554.18
Reinforcement bars to column (kg/m) Kg 2.01 179.0 359.90
Reinforcement bars to footing (kg/m) Kg 9.00 254.0 2,286.00
Total Kg 3,200.08

10.05 (1) Furnish Pretensioned Spun Concrete Pile D=50 cm


Ln.m 15.00 2.00 30.00
Ln.m 30.00

10.05 (2) Drive Pretensioned Spun Concrete Pile D=50 cm


Ln.m 15.00 2.00 30.00
Ln.m 30.00

PIER 2
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.23

5.01 (1) Structure excavation to a depth not exceeding 200 mm


Cu.m 3.20 3.20 1.23 1.00 12.60

5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -

5.01 (3) Structure excavation at a depth greater than 400 mm


Cu.m 3.20 3.20 - 1.00 -

10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 2.05 0.47 1.00 1.45
Cu.m 1.50 2.05 0.75 1.00 2.31
Cu.m 1.50 2.05 0.20 1.00 0.62

Deduction Cu.m 1.75 1.20 0.47 1.00 (0.99)


Cu.m 0.40 0.35 0.15 2.00 (0.04)

Area (triangle)
Cu.m 1.50 0.06 1.00 (0.08)
Cu.m 3.26

10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 6.00 1.00 3.02
Total Cu.m 3.02

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 3.20 0.05 1.00 0.51
Total Cu.m 0.51

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to pier head (kg/m) Kg 3.26 218.0 709.59
Reinforcement bars to column (kg/m) Kg 3.02 179.0 539.85
Reinforcement bars to footing (kg/m) Kg 9.00 254.0 2,286.00
Total Kg 3,535.44

10.05 (1) Furnish Pretensioned Spun Concrete Pile D=50 cm


Ln.m 15.00 2.00 30.00
Ln.m 30.00

10.05 (2) Drive Pretensioned Spun Concrete Pile D=50 cm


Ln.m 15.00 2.00 30.00
Ln.m 30.00

PIER 3
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.45

5.01 (1) Structure excavation to a depth not exceeding 200 mm


Cu.m 5.45 3.20 1.45 1.00 25.29

5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 5.45 3.20 - 1.00 -

5.01 (3) Structure excavation at a depth greater than 400 mm


Cu.m 5.45 3.20 - 1.00 -

10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete (I)
Cu.m 1.50 1.50 2.18 1.00 4.91

Deduction
Seg.1 Cu.m 0.90 0.75 0.29 1.00 (0.20)
Seg.2 Cu.m 0.35 0.35 0.15 1.00 (0.02)

Area (triangle)
Seg.3 Cu.m 0.75 0.01 2.00 (0.02)

Seg.4 Cu.m 0.75 0.85 1.68 1.00 (1.07)

Area
Pier head concrete (II) Cu.m 1.38 0.50 1.00 0.69
Cu.m 4.29

10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 7.00 1.00 3.52
Total Cu.m 3.52

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 5.25 1.00 1.00 15.75
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.

CALCULATION SHEET June ,20 2014, General Arranggement 501524-VIK-PB-3951 R2

Title : Pedestrian Bridge Kebonromo Sta. 46+246.030

Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity

(ln.m) (ln.m) (ln.m) (ln.m) (cu.m)


15.75

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 5.45 0.05 1.00 0.87
Total Cu.m 0.87

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to pier head (kg/m) Kg 4.29 218.0 935.38
Reinforcement bars to column (kg/m) Kg 3.52 179.0 629.83
Reinforcement bars to footing (kg/m) Kg 15.75 254.0 4,000.50
Total Kg 5,565.70

10.05 (1) Furnish Pretensioned Spun Concrete Pile D=50 cm


Ln.m 15.00 6.00 90.00
Ln.m 90.00

10.05 (2) Drive Pretensioned Spun Concrete Pile D=50 cm


Ln.m 15.00 6.00 90.00
Ln.m 90.00

PIER 4
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.48

5.01 (1) Structure excavation to a depth not exceeding 200 mm


Cu.m 5.45 3.20 1.48 1.00 25.81

5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 5.45 3.20 - 1.00 -

5.01 (3) Structure excavation at a depth greater than 400 mm


Cu.m 5.45 3.20 - 1.00 -

10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete (I)
Cu.m 1.50 1.50 2.18 1.00 4.91

Deduction
Seg.1 Cu.m 0.90 0.75 0.29 1.00 (0.20)
Seg.2 Cu.m 0.35 0.35 0.15 1.00 (0.02)

Area (triangle)
Seg.3 Cu.m 0.75 0.01 2.00 (0.02)

Seg.4 Cu.m 0.75 0.85 1.68 1.00 (1.07)

Area
Pier head concrete (II) Cu.m 1.38 0.50 1.00 0.69
Cu.m 4.29

10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 7.00 1.00 3.52
Total Cu.m 3.52

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 5.25 1.00 1.00 15.75
15.75

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 5.45 0.05 1.00 0.87
Total Cu.m 0.87

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to pier head (kg/m) Kg 4.29 218.0 935.38
Reinforcement bars to column (kg/m) Kg 3.52 179.0 629.83
Reinforcement bars to footing (kg/m) Kg 15.75 254.0 4,000.50
Total Kg 5,565.70

10.05 (1) Furnish Pretensioned Spun Concrete Pile D=50 cm


Ln.m 10.00 6.00 60.00
Ln.m 60.00

10.05 (2) Drive Pretensioned Spun Concrete Pile D=50 cm


Ln.m 10.00 6.00 60.00
Ln.m 60.00

PIER 5
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.36

5.01 (1) Structure excavation to a depth not exceeding 200 mm


Cu.m 3.20 3.20 1.36 1.00 13.93

5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -

5.01 (3) Structure excavation at a depth greater than 400 mm


Cu.m 3.20 3.20 - 1.00 -

10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 2.05 0.47 1.00 1.45
Cu.m 1.50 2.05 0.75 1.00 2.31
Cu.m 1.50 2.05 0.20 1.00 0.62

Deduction Cu.m 1.75 1.20 0.47 1.00 (0.99)


Cu.m 0.40 0.35 0.15 2.00 (0.04)

Area (triangle)
Cu.m 1.50 0.06 1.00 (0.08)
Cu.m 3.26

10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.

CALCULATION SHEET June ,20 2014, General Arranggement 501524-VIK-PB-3951 R2

Title : Pedestrian Bridge Kebonromo Sta. 46+246.030

Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity

(ln.m) (ln.m) (ln.m) (ln.m) (cu.m)


Cu.m 0.50 6.00 1.00 3.02
Total Cu.m 3.02

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 3.20 0.05 1.00 0.51
Total Cu.m 0.51

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to pier head (kg/m) Kg 3.26 218.0 709.59
Reinforcement bars to column (kg/m) Kg 3.02 179.0 539.85
Reinforcement bars to footing (kg/m) Kg 9.00 254.0 2,286.00
Total Kg 3,535.44

10.05 (1) Furnish Pretensioned Spun Concrete Pile D=50 cm


Ln.m 15.00 2.00 30.00
Ln.m 30.00

10.05 (2) Drive Pretensioned Spun Concrete Pile D=50 cm


Ln.m 15.00 2.00 30.00
Ln.m 30.00

PIER 6
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.77

5.01 (1) Structure excavation to a depth not exceeding 200 mm


Cu.m 3.20 3.20 1.77 1.00 18.12

5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -

5.01 (3) Structure excavation at a depth greater than 400 mm


Cu.m 3.20 3.20 - 1.00 -

10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 1.50 1.42 1.00 3.20

Deduction Cu.m 0.90 1.50 0.47 1.00 (0.63)


Cu.m 0.35 0.35 0.15 1.00 (0.02)
Cu.m 2.54

10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 4.00 1.00 2.01
Total Cu.m 2.01

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 3.20 0.05 1.00 0.51
Total Cu.m 0.51

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to pier head (kg/m) Kg 2.54 218.0 554.18
Reinforcement bars to column (kg/m) Kg 2.01 179.0 359.90
Reinforcement bars to footing (kg/m) Kg 9.00 254.0 2,286.00
Total Kg 3,200.08

10.05 (1) Furnish Pretensioned Spun Concrete Pile D=50 cm


Ln.m 15.00 2.00 30.00
Ln.m 30.00

10.05 (2) Drive Pretensioned Spun Concrete Pile D=50 cm


Ln.m 15.00 2.00 30.00
Ln.m 30.00

SUPER STRUCTURE
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
10.01(3) (Abutment 1 - Pier 1 - Pier 2) & (Abutment 2 - Pier 6 - Pier 5)
Parapet Cu.m 20.75 0.25 0.30 4.00 6.23
Slabs Cu.m 20.75 0.90 0.15 4.00 11.21

Area (Triangle)
Stair Cu.m 0.63 0.05 132.00 3.71

Beams Cu.m 20.75 0.80 0.71 2.00 23.57


Nail Cu.m 0.35 0.35 0.20 8.00 0.20

Bordes Cu.m
Parapet Cu.m 1.50 0.25 0.30 4.00 0.45
Slabs Cu.m 1.50 0.90 0.15 4.00 0.81
Beams Cu.m 1.50 0.80 0.71 2.00 1.70

(Pier 2 - Pier 3) & (Pier 4 -Pier 5)


Parapet Cu.m 9.32 0.25 0.30 4.00 2.80
Slabs Cu.m 9.32 0.90 0.15 4.00 5.03

Area (Triangle)
Stair Cu.m 0.63 0.05 60.00 1.69

Beams Cu.m 9.32 0.80 0.71 2.00 10.59


Nail Cu.m 0.20 0.35 0.35 2.00 0.05

Bordes Cu.m
Parapet Cu.m 1.21 0.25 0.30 4.00 0.36
Slabs Cu.m 1.21 0.90 0.15 4.00 0.65
Beams Cu.m 1.21 0.80 0.71 2.00 1.37
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.

CALCULATION SHEET June ,20 2014, General Arranggement 501524-VIK-PB-3951 R2

Title : Pedestrian Bridge Kebonromo Sta. 46+246.030

Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity

(ln.m) (ln.m) (ln.m) (ln.m) (cu.m)


Pier 3 to Pier 4
Parapet Cu.m 35.80 0.25 0.30 2.00 5.37
Slabs (1) Cu.m 35.80 2.60 0.15 1.00 13.96

Area (triangle)
Slabs (2) Cu.m 35.80 0.01 2.00 0.57
Total Cu.m 90.32

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to deck slabs (kg/m) Kg 90.32 136.00 12,283.94
Total Kg 12,283.94

10.03(5) PC-T Girder Nominal Span Length 35.00 m to 37.00 m.


Pier 3 to Pier 4 Each 1.00 1.00
Total Each 1.00

10.09 (3) Chainlink Fence, H=2,60 Ln.m


Pier 3 to Pier 4 Ln.m 35.80 2.00 71.60
Total Ln.m 71.60

10.09 (4) Railing Fence


(Abutment1 - Pier1) & (Abutment2 - Pier6) Ln.m 10.41 4.00 41.64
(Pier1 - Pier2) & (Pier6 - Pier5) Ln.m 10.43 4.00 41.72
(Pier2 - Pier3) & (Pier4 - Pier5) Ln.m 8.86 4.00 35.44

Abutmnet 1 Ln.m 2.59 2.00 5.18


Abutmnet 2 Ln.m 2.59 2.00 5.18
Bordes Pier 1 Ln.m 1.40 2.00 2.80
Bordes Pier 2 Ln.m 4.55 1.00 4.55
Bordes Pier 5 Ln.m 4.55 1.00 4.55
Bordes Pier 6 Ln.m 1.40 2.00 2.80
Total Ln.m 143.86
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pedes
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pedes
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pedes
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pedes
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pedes
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pedes
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pedes
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pedes
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pedes
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pedes
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pedes
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pedes
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pedes
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pedes
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pedes
Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-3951

Title : Pedestrian Bridge Kebonromo Sta. 46+246.030

SKETCH 1
Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-3951

Title : Pedestrian Bridge Kebonromo Sta. 46+246.030


Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-3951

Title : Pedestrian Bridge Kebonromo Sta. 46+246.030


Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-3951

Title : Pedestrian Bridge Kebonromo Sta. 46+246.030

SKETCH 2
Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-3951

Title : Pedestrian Bridge Kebonromo Sta. 46+246.030


Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-3951

Title : Pedestrian Bridge Kebonromo Sta. 46+246.030


Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-3951

Title : Pedestrian Bridge Kebonromo Sta. 46+246.030

SKETCH 3
Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-3951

Title : Pedestrian Bridge Kebonromo Sta. 46+246.030


Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-3951

Title : Pedestrian Bridge Kebonromo Sta. 46+246.030


Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-3951

Title : Pedestrian Bridge Kebonromo Sta. 46+246.030

SKETCH 4
Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-3951

Title : Pedestrian Bridge Kebonromo Sta. 46+246.030


Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-3951

Title : Pedestrian Bridge Kebonromo Sta. 46+246.030


Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-3951

Title : Pedestrian Bridge Kebonromo Sta. 46+246.030

SKETCH 5
Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-3951

Title : Pedestrian Bridge Kebonromo Sta. 46+246.030


Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-3951

Title : Pedestrian Bridge Kebonromo Sta. 46+246.030


gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-3951 R2
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-3951 R2
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-3951 R2
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-3951 R2
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-3951 R2
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-3951 R2
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-3951 R2
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-3951 R2
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-3951 R2
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-3951 R2
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-3951 R2
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-3951 R2
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-3951 R2
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-3951 R2
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-3951 R2
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.

CALCULATION SHEET June ,20 2014, General Arranggement 501524-VIK-PB-4901 R2

Title : Pedestrian Bridge Kauman-1 Sta. 62+844.125

Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity

(ln.m) (ln.m) (ln.m) (ln.m) (cu.m)


ABUTMENT 1
Elev. Existing Ground Level (A) Ln. m -
Bottom Of Footing (B) Ln. m -
(A-B) Ln. m 0.22

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Abutment
Parapet Cu.m 2.68 0.25 0.32 2.00 0.43

Stair
Seg. 1 Cu.m 0.63 0.20 0.15 2.00 0.04
Seg. 2 Cu.m 0.63 0.80 0.15 2.00 0.15
Seg. 3 Cu.m 0.63 1.40 0.15 2.00 0.26

Seg. 4 Cu.m 2.68 0.80 0.20 1.00 0.43

Footing
Seg. 5 Cu.m 2.60 4.00 0.80 1.00 8.32
Deduction Cu.m 0.35 0.35 0.20 1.00 (0.02)
Seg. 6 Cu.m 3.00 4.50 0.50 1.00 6.75
Sub total Cu.m 16.35

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 4.70 0.05 1.00 0.75
Total Cu.m 0.75

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to abutment (kg/m) Kg 16.35 67.0 1,095.66
Total Kg 1,095.66

12.02(3) Stone Masonry Area


Cu.m 2.68 2.26 1.00 6.04
Cu.m 6.04

ABUTMENT 2
Elev. Existing Ground Level (A) Ln. m -
Bottom Of Footing (B) Ln. m -
(A-B) Ln. m 0.05

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Abutment
Parapet Cu.m 2.68 0.25 0.32 2.00 0.43

Stair
Seg. 1 Cu.m 0.63 0.20 0.15 2.00 0.04
Seg. 2 Cu.m 0.63 0.80 0.15 2.00 0.15
Seg. 3 Cu.m 0.63 1.40 0.15 2.00 0.26

Seg. 4 Cu.m 2.68 0.80 0.20 1.00 0.43

Footing
Seg. 5 Cu.m 2.60 4.00 0.80 1.00 8.32
Deduction Cu.m 0.35 0.35 0.20 1.00 (0.02)
Seg. 6 Cu.m 3.00 4.50 0.50 1.00 6.75
Sub total Cu.m 16.35

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 4.70 0.05 1.00 0.75
Total Cu.m 0.75

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to abutment (kg/m) Kg 16.35 67.0 1,095.66
Total Kg 1,095.66

12.02(3) Stone Masonry Area


Cu.m 2.68 4.11 1.00 11.00
Cu.m 11.00

PIER 1
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.41

5.01 (1) Structure excavation to a depth not exceeding 200 mm


Cu.m 3.20 3.20 1.41 1.00 14.44

5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -

5.01 (3) Structure excavation at a depth greater than 400 mm


Cu.m 3.20 3.20 - 1.00 -

10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 1.50 1.42 1.00 3.20

Deduction Cu.m 0.90 1.50 0.47 1.00 (0.63)


Cu.m 0.35 0.35 0.15 1.00 (0.02)
Cu.m 2.54

10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 3.00 1.00 1.51
Total Cu.m 1.51

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 3.20 0.05 1.00 0.51
Total Cu.m 0.51
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.

CALCULATION SHEET June ,20 2014, General Arranggement 501524-VIK-PB-4901 R2

Title : Pedestrian Bridge Kauman-1 Sta. 62+844.125

Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity

(ln.m) (ln.m) (ln.m) (ln.m) (cu.m)


10.02(2) Reinforcing Steel Deformed Bars BJTD-40
Reinforcement bars to pier head (kg/m) Kg 2.54 218.0 554.18
Reinforcement bars to column (kg/m) Kg 1.51 179.0 269.93
Reinforcement bars to footing (kg/m) Kg 9.00 254.0 2,286.00
Total Kg 3,110.11

10.05 (1) Furnish Pretensioned Spun Concrete Pile D=50 cm


Ln.m 10.00 2.00 20.00
Ln.m 20.00

10.05 (2) Drive Pretensioned Spun Concrete Pile D=50 cm


Ln.m 10.00 2.00 20.00
Ln.m 20.00

PIER 2
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.84

5.01 (1) Structure excavation to a depth not exceeding 200 mm


Cu.m 3.20 3.20 1.84 1.00 18.84

5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -

5.01 (3) Structure excavation at a depth greater than 400 mm


Cu.m 3.20 3.20 - 1.00 -

10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 2.05 0.47 1.00 1.45
Cu.m 1.50 2.05 0.75 1.00 2.31
Cu.m 1.50 2.05 0.20 1.00 0.62

Deduction Cu.m 1.75 1.20 0.47 1.00 (0.99)


Cu.m 0.40 0.35 0.15 2.00 (0.04)

Area (triangle)
Cu.m 1.50 0.06 1.00 (0.08)
Cu.m 3.26

10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 6.00 1.00 3.02
Total Cu.m 3.02

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 3.20 0.05 1.00 0.51
Total Cu.m 0.51

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to pier head (kg/m) Kg 3.26 218.0 709.59
Reinforcement bars to column (kg/m) Kg 3.02 179.0 539.85
Reinforcement bars to footing (kg/m) Kg 9.00 254.0 2,286.00
Total Kg 3,535.44

10.05 (1) Furnish Pretensioned Spun Concrete Pile D=50 cm


Ln.m 10.00 2.00 20.00
Ln.m 20.00

10.05 (2) Drive Pretensioned Spun Concrete Pile D=50 cm


Ln.m 10.00 2.00 20.00
Ln.m 20.00

PIER 3
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 2.03

5.01 (1) Structure excavation to a depth not exceeding 200 mm


Cu.m 5.45 3.20 2.00 1.00 34.88

5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 5.45 3.20 0.03 1.00 0.52

5.01 (3) Structure excavation at a depth greater than 400 mm


Cu.m 5.45 3.20 - 1.00 -

10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete (I)
Cu.m 1.50 1.50 2.18 1.00 4.91

Deduction
Seg.1 Cu.m 0.90 0.75 0.29 1.00 (0.20)
Seg.2 Cu.m 0.35 0.35 0.15 1.00 (0.02)

Area (triangle)
Seg.3 Cu.m 0.75 0.01 2.00 (0.02)

Seg.4 Cu.m 0.75 0.85 1.68 1.00 (1.07)

Area
Pier head concrete (II) Cu.m 1.38 0.50 1.00 0.69
Cu.m 4.29

10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 7.00 1.00 3.52
Total Cu.m 3.52

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 5.25 1.00 1.00 15.75
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.

CALCULATION SHEET June ,20 2014, General Arranggement 501524-VIK-PB-4901 R2

Title : Pedestrian Bridge Kauman-1 Sta. 62+844.125

Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity

(ln.m) (ln.m) (ln.m) (ln.m) (cu.m)


15.75

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 5.45 0.05 1.00 0.87
Total Cu.m 0.87

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to pier head (kg/m) Kg 4.29 218.0 935.38
Reinforcement bars to column (kg/m) Kg 3.52 179.0 629.83
Reinforcement bars to footing (kg/m) Kg 15.75 254.0 4,000.50
Total Kg 5,565.70

10.05 (1) Furnish Pretensioned Spun Concrete Pile D=50 cm


Ln.m 10.00 6.00 60.00
Ln.m 60.00

10.05 (2) Drive Pretensioned Spun Concrete Pile D=50 cm


Ln.m 10.00 6.00 60.00
Ln.m 60.00

PIER 4
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 2.12

5.01 (1) Structure excavation to a depth not exceeding 200 mm


Cu.m 5.45 3.20 2.00 1.00 34.88

5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 5.45 3.20 0.12 1.00 2.09

5.01 (3) Structure excavation at a depth greater than 400 mm


Cu.m 5.45 3.20 - 1.00 -

10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete (I)
Cu.m 1.50 1.50 2.18 1.00 4.91

Deduction
Seg.1 Cu.m 0.90 0.75 0.29 1.00 (0.20)
Seg.2 Cu.m 0.35 0.35 0.15 1.00 (0.02)

Area (triangle)
Seg.3 Cu.m 0.75 0.01 2.00 (0.02)

Seg.4 Cu.m 0.75 0.85 1.68 1.00 (1.07)

Area
Pier head concrete (II) Cu.m 1.38 0.50 1.00 0.69
Cu.m 4.29

10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 7.00 1.00 3.52
Total Cu.m 3.52

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 5.25 1.00 1.00 15.75
15.75

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 5.45 0.05 1.00 0.87
Total Cu.m 0.87

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to pier head (kg/m) Kg 4.29 218.0 935.38
Reinforcement bars to column (kg/m) Kg 3.52 179.0 629.83
Reinforcement bars to footing (kg/m) Kg 15.75 254.0 4,000.50
Total Kg 5,565.70

10.05 (1) Furnish Pretensioned Spun Concrete Pile D=50 cm


Ln.m 10.00 6.00 60.00
Ln.m 60.00

10.05 (2) Drive Pretensioned Spun Concrete Pile D=50 cm


Ln.m 10.00 6.00 60.00
Ln.m 60.00

PIER 5
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.72

5.01 (1) Structure excavation to a depth not exceeding 200 mm


Cu.m 3.20 3.20 1.72 1.00 17.61

5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -

5.01 (3) Structure excavation at a depth greater than 400 mm


Cu.m 3.20 3.20 - 1.00 -

10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 2.05 0.47 1.00 1.45
Cu.m 1.50 2.05 0.75 1.00 2.31
Cu.m 1.50 2.05 0.20 1.00 0.62

Deduction Cu.m 1.75 1.20 0.47 1.00 (0.99)


Cu.m 0.40 0.35 0.15 2.00 (0.04)

Area (triangle)
Cu.m 1.50 0.06 1.00 (0.08)
Cu.m 3.26

10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.

CALCULATION SHEET June ,20 2014, General Arranggement 501524-VIK-PB-4901 R2

Title : Pedestrian Bridge Kauman-1 Sta. 62+844.125

Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity

(ln.m) (ln.m) (ln.m) (ln.m) (cu.m)


Cu.m 0.50 6.00 1.00 3.02
Total Cu.m 3.02

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 3.20 0.05 1.00 0.51
Total Cu.m 0.51

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to pier head (kg/m) Kg 3.26 218.0 709.59
Reinforcement bars to column (kg/m) Kg 3.02 179.0 539.85
Reinforcement bars to footing (kg/m) Kg 9.00 254.0 2,286.00
Total Kg 3,535.44

10.05 (1) Furnish Pretensioned Spun Concrete Pile D=50 cm


Ln.m 10.00 2.00 20.00
Ln.m 20.00

10.05 (2) Drive Pretensioned Spun Concrete Pile D=50 cm


Ln.m 10.00 2.00 20.00
Ln.m 20.00

PIER 6
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.28

5.01 (1) Structure excavation to a depth not exceeding 200 mm


Cu.m 3.20 3.20 1.28 1.00 13.11

5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -

5.01 (3) Structure excavation at a depth greater than 400 mm


Cu.m 3.20 3.20 - 1.00 -

10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 1.50 1.42 1.00 3.20

Deduction Cu.m 0.90 1.50 0.47 1.00 (0.63)


Cu.m 0.35 0.35 0.15 1.00 (0.02)
Cu.m 2.54

10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 3.00 1.00 1.51
Total Cu.m 1.51

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 3.20 0.05 1.00 0.51
Total Cu.m 0.51

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to pier head (kg/m) Kg 2.54 218.0 554.18
Reinforcement bars to column (kg/m) Kg 1.51 179.0 269.93
Reinforcement bars to footing (kg/m) Kg 9.00 254.0 2,286.00
Total Kg 3,110.11

10.05 (1) Furnish Pretensioned Spun Concrete Pile D=50 cm


Ln.m 10.00 2.00 20.00
Ln.m 20.00

10.05 (2) Drive Pretensioned Spun Concrete Pile D=50 cm


Ln.m 10.00 2.00 20.00
Ln.m 20.00

SUPER STRUCTURE
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
10.01(3) (Abutment 1 - Pier 1 - Pier 2) & (Abutment 2 - Pier 6 - Pier 5)
Parapet Cu.m 20.75 0.25 0.30 4.00 6.23
Slabs Cu.m 20.75 0.90 0.15 4.00 11.21

Area (Triangle)
Stair Cu.m 0.63 0.05 132.00 3.71

Beams Cu.m 20.75 0.80 0.71 2.00 23.57


Nail Cu.m 0.35 0.35 0.20 8.00 0.20

Bordes Cu.m
Parapet Cu.m 1.50 0.25 0.30 4.00 0.45
Slabs Cu.m 1.50 0.90 0.15 4.00 0.81
Beams Cu.m 1.50 0.80 0.71 2.00 1.70

(Pier 2 - Pier 3) & (Pier 4 -Pier 5)


Parapet Cu.m 9.32 0.25 0.30 4.00 2.80
Slabs Cu.m 9.32 0.90 0.15 4.00 5.03

Area (Triangle)
Stair Cu.m 0.63 0.05 60.00 1.69

Beams Cu.m 9.32 0.80 0.71 2.00 10.59


Nail Cu.m 0.20 0.35 0.35 2.00 0.05

Bordes Cu.m
Parapet Cu.m 1.21 0.25 0.30 4.00 0.36
Slabs Cu.m 1.21 0.90 0.15 4.00 0.65
Beams Cu.m 1.21 0.80 0.71 2.00 1.37
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.

CALCULATION SHEET June ,20 2014, General Arranggement 501524-VIK-PB-4901 R2

Title : Pedestrian Bridge Kauman-1 Sta. 62+844.125

Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity

(ln.m) (ln.m) (ln.m) (ln.m) (cu.m)


Pier 3 to Pier 4
Parapet Cu.m 35.80 0.25 0.30 2.00 5.37
Slabs (1) Cu.m 35.80 2.60 0.15 1.00 13.96

Area (triangle)
Slabs (2) Cu.m 35.80 0.01 2.00 0.57
Total Cu.m 90.32

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to deck slabs (kg/m) Kg 90.32 136.00 12,283.94
Total Kg 12,283.94

10.03(5) PC-T Girder Nominal Span Length 35.00 m to 37.00 m.


Pier 3 to Pier 4 Each 1.00 1.00
Total Each 1.00

10.09 (3) Chainlink Fence, H=2,60 Ln.m


Pier 3 to Pier 4 Ln.m 35.80 2.00 71.60
Total Ln.m 71.60

10.09 (4) Railing Fence


(Abutment1 - Pier1) & (Abutment2 - Pier6) Ln.m 10.41 4.00 41.64
(Pier1 - Pier2) & (Pier6 - Pier5) Ln.m 10.43 4.00 41.72
(Pier2 - Pier3) & (Pier4 - Pier5) Ln.m 8.86 4.00 35.44

Abutmnet 1 Ln.m 2.59 2.00 5.18


Abutmnet 2 Ln.m 2.59 2.00 5.18
Bordes Pier 1 Ln.m 1.40 2.00 2.80
Bordes Pier 2 Ln.m 4.55 1.00 4.55
Bordes Pier 5 Ln.m 4.55 1.00 4.55
Bordes Pier 6 Ln.m 1.40 2.00 2.80
Total Ln.m 143.86
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pede
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pede
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pede
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pede
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pede
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pede
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pede
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pede
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pede
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pede
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pede
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pede
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pede
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pede
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pede
Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-4901

Title : Pedestrian Bridge Kauman-1 Sta. 62+844.125

SKETCH 1
Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-4901

Title : Pedestrian Bridge Kauman-1 Sta. 62+844.125


Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-4901

Title : Pedestrian Bridge Kauman-1 Sta. 62+844.125


Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-4901

Title : Pedestrian Bridge Kauman-1 Sta. 62+844.125

SKETCH 2
Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-4901

Title : Pedestrian Bridge Kauman-1 Sta. 62+844.125


Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-4901

Title : Pedestrian Bridge Kauman-1 Sta. 62+844.125


Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-4901

Title : Pedestrian Bridge Kauman-1 Sta. 62+844.125

SKETCH 3
Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-4901

Title : Pedestrian Bridge Kauman-1 Sta. 62+844.125


Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-4901

Title : Pedestrian Bridge Kauman-1 Sta. 62+844.125


Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-4901

Title : Pedestrian Bridge Kauman-1 Sta. 62+844.125

SKETCH 4
Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-4901

Title : Pedestrian Bridge Kauman-1 Sta. 62+844.125


Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-4901

Title : Pedestrian Bridge Kauman-1 Sta. 62+844.125


Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-4901

Title : Pedestrian Bridge Kauman-1 Sta. 62+844.125

SKETCH 5
Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-4901

Title : Pedestrian Bridge Kauman-1 Sta. 62+844.125


Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-4901

Title : Pedestrian Bridge Kauman-1 Sta. 62+844.125


gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-4901 R2
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-4901 R2
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-4901 R2
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-4901 R2
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-4901 R2
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-4901 R2
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-4901 R2
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-4901 R2
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-4901 R2
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-4901 R2
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-4901 R2
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-4901 R2
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-4901 R2
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-4901 R2
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-4901 R2
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.

CALCULATION SHEET June ,20 2014, General Arranggement 501524-VIK-PB-5076 R1

Title : Pedestrian Bridge Widodaren Sta. 66+044.074

Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity

(ln.m) (ln.m) (ln.m) (ln.m) (cu.m)


ABUTMENT 1
Elev. Existing Ground Level (A) Ln. m -
Bottom Of Footing (B) Ln. m -
(A-B) Ln. m 0.65

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Abutment
Parapet Cu.m 2.68 0.25 0.32 2.00 0.43

Stair
Seg. 1 Cu.m 0.63 0.20 0.15 2.00 0.04
Seg. 2 Cu.m 0.63 0.80 0.15 2.00 0.15
Seg. 3 Cu.m 0.63 1.40 0.15 2.00 0.26

Seg. 4 Cu.m 2.68 0.80 0.20 1.00 0.43

Footing
Seg. 5 Cu.m 2.60 4.00 0.80 1.00 8.32
Deduction Cu.m 0.35 0.35 0.20 1.00 (0.02)
Seg. 6 Cu.m 3.00 4.50 0.50 1.00 6.75
Sub total Cu.m 16.35

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 4.70 0.05 1.00 0.75
Total Cu.m 0.75

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to abutment (kg/m) Kg 16.35 67.0 1,095.66
Total Kg 1,095.66

12.02(3) Stone Masonry Area


Cu.m 2.68 0.58 1.00 1.57
Cu.m 1.57

ABUTMENT 2
Elev. Existing Ground Level (A) Ln. m -
Bottom Of Footing (B) Ln. m -
(A-B) Ln. m 1.27

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Abutment
Parapet Cu.m 2.68 0.25 0.32 2.00 0.43

Stair
Seg. 1 Cu.m 0.63 0.20 0.15 2.00 0.04
Seg. 2 Cu.m 0.63 0.80 0.15 2.00 0.15
Seg. 3 Cu.m 0.63 1.40 0.15 2.00 0.26

Seg. 4 Cu.m 2.68 0.80 0.20 1.00 0.43

Footing
Seg. 5 Cu.m 2.60 4.00 0.80 1.00 8.32
Deduction Cu.m 0.35 0.35 0.20 1.00 (0.02)
Seg. 6 Cu.m 3.00 4.50 0.50 1.00 6.75
Sub total Cu.m 16.35

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 4.70 0.05 1.00 0.75
Total Cu.m 0.75

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to abutment (kg/m) Kg 16.35 67.0 1,095.66
Total Kg 1,095.66

12.02(3) Stone Masonry Area


Cu.m 2.68 - 1.00 -
Cu.m -

PIER 1
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.01

5.01 (1) Structure excavation to a depth not exceeding 200 mm


Cu.m 3.20 3.20 1.01 1.00 10.34

5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -

5.01 (3) Structure excavation at a depth greater than 400 mm


Cu.m 3.20 3.20 - 1.00 -

10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 1.50 1.42 1.00 3.20

Deduction Cu.m 0.90 1.50 0.47 1.00 (0.63)


Cu.m 0.35 0.35 0.15 1.00 (0.02)
Cu.m 2.54

10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 2.00 1.00 1.01
Total Cu.m 1.01

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 3.20 0.05 1.00 0.51
Total Cu.m 0.51
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.

CALCULATION SHEET June ,20 2014, General Arranggement 501524-VIK-PB-5076 R1

Title : Pedestrian Bridge Widodaren Sta. 66+044.074

Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity

(ln.m) (ln.m) (ln.m) (ln.m) (cu.m)


10.02(2) Reinforcing Steel Deformed Bars BJTD-40
Reinforcement bars to pier head (kg/m) Kg 2.54 218.0 554.18
Reinforcement bars to column (kg/m) Kg 1.01 179.0 179.95
Reinforcement bars to footing (kg/m) Kg 9.00 254.0 2,286.00
Total Kg 3,020.13

10.05 (1) Furnish Pretensioned Spun Concrete Pile D=50 cm


Ln.m 13.00 2.00 26.00
Ln.m 26.00

10.05 (2) Drive Pretensioned Spun Concrete Pile D=50 cm


Ln.m 13.00 2.00 26.00
Ln.m 26.00

PIER 2
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.72

5.01 (1) Structure excavation to a depth not exceeding 200 mm


Cu.m 3.20 3.20 1.72 1.00 17.61

5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -

5.01 (3) Structure excavation at a depth greater than 400 mm


Cu.m 3.20 3.20 - 1.00 -

10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 1.50 1.42 1.00 3.20

Deduction Cu.m 0.90 1.50 0.47 1.00 (0.63)


Cu.m 0.35 0.35 0.15 1.00 (0.02)
Cu.m 2.54

10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 5.00 1.00 2.51
Total Cu.m 2.51

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 3.20 0.05 1.00 0.51
Total Cu.m 0.51

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to pier head (kg/m) Kg 2.54 218.0 554.18
Reinforcement bars to column (kg/m) Kg 2.51 179.0 449.88
Reinforcement bars to footing (kg/m) Kg 9.00 254.0 2,286.00
Total Kg 3,290.06

10.05 (1) Furnish Pretensioned Spun Concrete Pile D=50 cm


Ln.m 13.00 2.00 26.00
Ln.m 26.00

10.05 (2) Drive Pretensioned Spun Concrete Pile D=50 cm


Ln.m 13.00 2.00 26.00
Ln.m 26.00

PIER 3
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.48

5.01 (1) Structure excavation to a depth not exceeding 200 mm


Cu.m 5.45 3.20 1.48 1.00 25.81

5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 5.45 3.20 - 1.00 -

5.01 (3) Structure excavation at a depth greater than 400 mm


Cu.m 5.45 3.20 - 1.00 -

10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete (I)
Cu.m 1.50 1.50 2.18 1.00 4.91

Deduction
Seg.1 Cu.m 0.90 0.75 0.29 1.00 (0.20)
Seg.2 Cu.m 0.35 0.35 0.15 1.00 (0.02)

Area (triangle)
Seg.3 Cu.m 0.75 0.01 2.00 (0.02)

Seg.4 Cu.m 0.75 0.85 1.68 1.00 (1.07)

Area
Pier head concrete (II) Cu.m 1.38 0.50 1.00 0.69
Cu.m 4.29

10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 5.50 1.00 2.76
Total Cu.m 2.76

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 5.25 1.00 1.00 15.75
15.75

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 5.45 0.05 1.00 0.87
Total Cu.m 0.87
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.

CALCULATION SHEET June ,20 2014, General Arranggement 501524-VIK-PB-5076 R1

Title : Pedestrian Bridge Widodaren Sta. 66+044.074

Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity

(ln.m) (ln.m) (ln.m) (ln.m) (cu.m)

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to pier head (kg/m) Kg 4.29 218.0 935.38
Reinforcement bars to column (kg/m) Kg 2.76 179.0 494.86
Reinforcement bars to footing (kg/m) Kg 15.75 254.0 4,000.50
Total Kg 5,430.74

10.05 (1) Furnish Pretensioned Spun Concrete Pile D=50 cm


Ln.m 13.00 6.00 78.00
Ln.m 78.00

10.05 (2) Drive Pretensioned Spun Concrete Pile D=50 cm


Ln.m 13.00 6.00 78.00
Ln.m 78.00

PIER 4
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.22

5.01 (1) Structure excavation to a depth not exceeding 200 mm


Cu.m 5.45 3.20 1.22 1.00 21.28

5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 5.45 3.20 - 1.00 -

5.01 (3) Structure excavation at a depth greater than 400 mm


Cu.m 5.45 3.20 - 1.00 -

10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete (I)
Cu.m 1.50 1.50 2.18 1.00 4.91

Deduction
Seg.1 Cu.m 0.90 0.75 0.29 1.00 (0.20)
Seg.2 Cu.m 0.35 0.35 0.15 1.00 (0.02)

Area (triangle)
Seg.3 Cu.m 0.75 0.01 2.00 (0.02)

Seg.4 Cu.m 0.75 0.85 1.68 1.00 (1.07)

Area
Pier head concrete (II) Cu.m 1.38 0.50 1.00 0.69
Cu.m 4.29

10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 5.00 1.00 2.51
Total Cu.m 2.51

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 5.25 1.00 1.00 15.75
15.75

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 5.45 0.05 1.00 0.87
Total Cu.m 0.87

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to pier head (kg/m) Kg 4.29 218.0 935.38
Reinforcement bars to column (kg/m) Kg 2.51 179.0 449.88
Reinforcement bars to footing (kg/m) Kg 15.75 254.0 4,000.50
Total Kg 5,385.75

10.05 (1) Furnish Pretensioned Spun Concrete Pile D=50 cm


Ln.m 13.00 6.00 78.00
Ln.m 78.00

10.05 (2) Drive Pretensioned Spun Concrete Pile D=50 cm


Ln.m 13.00 6.00 78.00
Ln.m 78.00

PIER 5
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.20

5.01 (1) Structure excavation to a depth not exceeding 200 mm


Cu.m 3.20 3.20 1.20 1.00 12.29

5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -

5.01 (3) Structure excavation at a depth greater than 400 mm


Cu.m 3.20 3.20 - 1.00 -

10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 1.50 1.42 1.00 3.20

Deduction Cu.m 0.90 1.50 0.47 1.00 (0.63)


Cu.m 0.35 0.35 0.15 1.00 (0.02)
Cu.m 2.54

10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 4.00 1.00 2.01
Total Cu.m 2.01

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 3.20 0.05 1.00 0.51
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.

CALCULATION SHEET June ,20 2014, General Arranggement 501524-VIK-PB-5076 R1

Title : Pedestrian Bridge Widodaren Sta. 66+044.074

Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity

(ln.m) (ln.m) (ln.m) (ln.m) (cu.m)


Total Cu.m 0.51

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to pier head (kg/m) Kg 2.54 218.0 554.18
Reinforcement bars to column (kg/m) Kg 2.01 179.0 359.90
Reinforcement bars to footing (kg/m) Kg 9.00 254.0 2,286.00
Total Kg 3,200.08

10.05 (1) Furnish Pretensioned Spun Concrete Pile D=50 cm


Ln.m 13.00 2.00 26.00
Ln.m 26.00

10.05 (2) Drive Pretensioned Spun Concrete Pile D=50 cm


Ln.m 13.00 2.00 26.00
Ln.m 26.00

PIER 6
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.72

5.01 (1) Structure excavation to a depth not exceeding 200 mm


Cu.m 3.20 3.20 1.72 1.00 17.61

5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -

5.01 (3) Structure excavation at a depth greater than 400 mm


Cu.m 3.20 3.20 - 1.00 -

10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 1.50 1.42 1.00 3.20

Deduction Cu.m 0.90 1.50 0.47 1.00 (0.63)


Cu.m 0.35 0.35 0.15 1.00 (0.02)
Cu.m 2.54

10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 2.00 1.00 1.01
Total Cu.m 1.01

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 3.20 0.05 1.00 0.51
Total Cu.m 0.51

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to pier head (kg/m) Kg 2.54 218.0 554.18
Reinforcement bars to column (kg/m) Kg 1.01 179.0 179.95
Reinforcement bars to footing (kg/m) Kg 9.00 254.0 2,286.00
Total Kg 3,020.13

10.05 (1) Furnish Pretensioned Spun Concrete Pile D=50 cm


Ln.m 13.00 2.00 26.00
Ln.m 26.00

10.05 (2) Drive Pretensioned Spun Concrete Pile D=50 cm


Ln.m 13.00 2.00 26.00
Ln.m 26.00

SUPER STRUCTURE
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
10.01(3) (Abutment 1 - Pier 1 - Pier 2 - Pier 3) & (Abutment 2 - Pier 6 - Pier 5 - Pier 4)
Parapet Cu.m 27.77 0.25 0.30 4.00 8.33
Slabs Cu.m 27.77 0.90 0.15 4.00 15.00

Area (Triangle)
Stair Cu.m 0.63 0.05 180.00 5.06

Beams Cu.m 27.77 0.80 0.71 2.00 31.55


Nail Cu.m 0.35 0.35 0.20 12.00 0.29

Bordes Cu.m
Parapet Cu.m 1.50 0.25 0.30 6.00 0.68
Slabs Cu.m 1.50 0.90 0.15 6.00 1.22
Beams Cu.m 1.50 0.80 0.71 3.00 2.56

Pier 3 to Pier 4
Parapet Cu.m 35.80 0.25 0.30 2.00 5.37
Slabs (1) Cu.m 35.80 2.60 0.15 1.00 13.96

Area (triangle)
Slabs (2) Cu.m 35.80 0.01 2.00 0.57
Total Cu.m 84.58

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to deck slabs (kg/m) Kg 84.58 136.00 11,502.99
Total Kg 11,502.99

10.03(5) PC-T Girder Nominal Span Length 35.00 m to 37.00 m.


Pier 3 to Pier 4 Each 1.00 1.00
Total Each 1.00

10.09 (3) Chainlink Fence, H=2,60 Ln.m


Pier 3 to Pier 4 Ln.m 35.80 2.00 71.60
Total Ln.m 71.60

10.09 (4) Railing Fence


(Abutment1 - Pier1) & (Abutment2 - Pier6) Ln.m 9.18 4.00 36.72
(Pier1 - Pier2) & (Pier6 - Pier5) Ln.m 9.28 4.00 37.12
(Pier2 - Pier3) & (Pier4 - Pier5) Ln.m 9.02 4.00 36.08
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.

CALCULATION SHEET June ,20 2014, General Arranggement 501524-VIK-PB-5076 R1

Title : Pedestrian Bridge Widodaren Sta. 66+044.074

Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity

(ln.m) (ln.m) (ln.m) (ln.m) (cu.m)


Abutmnet 1 Ln.m 2.59 4.00 10.36
Abutmnet 2 Ln.m 2.59 4.00 10.36
Bordes Pier 1 & Pier 6 Ln.m 1.40 4.00 5.60
Bordes Pier 2 & Pier 5 Ln.m 1.40 4.00 5.60
Bordes Pier 3 & Pier 4 Ln.m 1.40 4.00 5.60
Total Ln.m 147.44
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pede
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pede
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pede
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pede
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pede
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pede
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pede
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pede
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pede
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pede
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pede
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pede
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pede
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pede
PT. VIRAMA KARYA

CALCULATION SHEET June ,2

Title : Pede
Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-5076

Title : Pedestrian Bridge Widodaren Sta. 66+044.074

SKETCH 1
Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-5076

Title : Pedestrian Bridge Widodaren Sta. 66+044.074


Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-5076

Title : Pedestrian Bridge Widodaren Sta. 66+044.074


Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-5076

Title : Pedestrian Bridge Widodaren Sta. 66+044.074

SKETCH 2
Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-5076

Title : Pedestrian Bridge Widodaren Sta. 66+044.074


Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-5076

Title : Pedestrian Bridge Widodaren Sta. 66+044.074


Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-5076

Title : Pedestrian Bridge Widodaren Sta. 66+044.074

SKETCH 3
Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-5076

Title : Pedestrian Bridge Widodaren Sta. 66+044.074


Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-5076

Title : Pedestrian Bridge Widodaren Sta. 66+044.074


Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-5076

Title : Pedestrian Bridge Widodaren Sta. 66+044.074

SKETCH 4
Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-5076

Title : Pedestrian Bridge Widodaren Sta. 66+044.074


Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-5076

Title : Pedestrian Bridge Widodaren Sta. 66+044.074


Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-5076

Title : Pedestrian Bridge Widodaren Sta. 66+044.074

SKETCH 5
Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-5076

Title : Pedestrian Bridge Widodaren Sta. 66+044.074


Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June ,20 2014, General Arranggement 501524-VIK-PB-5076

Title : Pedestrian Bridge Widodaren Sta. 66+044.074


gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-5076 R1
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-5076 R1
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-5076 R1
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-5076 R1
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-5076 R1
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-5076 R1
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-5076 R1
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-5076 R1
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-5076 R1
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-5076 R1
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-5076 R1
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-5076 R1
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-5076 R1
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-5076 R1
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-5076 R1
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.

CALCULATION SHEET June, 20 2014, General Arranggement 501524-VIK-PB-5276 R1

Title : Pedestrian Bridge Sidolaju Sta. 70+029.469

Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity

(ln.m) (ln.m) (ln.m) (ln.m) (cu.m)


ABUTMENT 1
Elev. Existing Ground Level (A) Ln. m -
Bottom Of Footing (B) Ln. m -
(A-B) Ln. m 1.24

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Abutment
Parapet Cu.m 2.68 0.25 0.32 2.00 0.43

Stair
Seg. 1 Cu.m 0.63 0.20 0.15 2.00 0.04
Seg. 2 Cu.m 0.63 0.80 0.15 2.00 0.15
Seg. 3 Cu.m 0.63 1.40 0.15 2.00 0.26

Seg. 4 Cu.m 2.68 0.80 0.20 1.00 0.43

Footing
Seg. 5 Cu.m 2.60 4.00 0.80 1.00 8.32
Deduction Cu.m 0.35 0.35 0.20 1.00 (0.02)
Seg. 6 Cu.m 3.00 4.50 0.50 1.00 6.75
Sub total Cu.m 16.35

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 4.70 0.05 1.00 0.75
Total Cu.m 0.75

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to abutment (kg/m) Kg 16.35 67.0 1,095.66
Total Kg 1,095.66

12.02(3) Stone Masonry Area


Cu.m 2.68 0.50 1.00 1.34
Cu.m 1.34

ABUTMENT 2
Elev. Existing Ground Level (A) Ln. m -
Bottom Of Footing (B) Ln. m -
(A-B) Ln. m 0.30

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Abutment
Parapet Cu.m 2.68 0.25 0.32 2.00 0.43

Stair
Seg. 1 Cu.m 0.63 0.20 0.15 2.00 0.04
Seg. 2 Cu.m 0.63 0.80 0.15 2.00 0.15
Seg. 3 Cu.m 0.63 1.40 0.15 2.00 0.26

Seg. 4 Cu.m 2.68 0.80 0.20 1.00 0.43

Footing
Seg. 5 Cu.m 2.60 4.00 0.80 1.00 8.32
Deduction Cu.m 0.35 0.35 0.20 1.00 (0.02)
Seg. 6 Cu.m 3.00 4.50 0.50 1.00 6.75
Sub total Cu.m 16.35

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 4.70 0.05 1.00 0.75
Total Cu.m 0.75

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to abutment (kg/m) Kg 16.35 67.0 1,095.66
Total Kg 1,095.66

12.02(3) Stone Masonry Area


Cu.m 2.68 1.38 1.00 3.69
Cu.m 3.69

PIER 1
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.84

5.01 (1) Structure excavation to a depth not exceeding 200 mm


Cu.m 3.20 3.20 1.84 1.00 18.84

5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -

5.01 (3) Structure excavation at a depth greater than 400 mm


Cu.m 3.20 3.20 - 1.00 -

10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 1.50 1.42 1.00 3.20

Deduction Cu.m 0.90 1.50 0.47 1.00 (0.63)


Cu.m 0.35 0.35 0.15 1.00 (0.02)
Cu.m 2.54

10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 3.00 1.00 1.51
Total Cu.m 1.51

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 3.20 0.05 1.00 0.51
Total Cu.m 0.51
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.

CALCULATION SHEET June, 20 2014, General Arranggement 501524-VIK-PB-5276 R1

Title : Pedestrian Bridge Sidolaju Sta. 70+029.469

Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity

(ln.m) (ln.m) (ln.m) (ln.m) (cu.m)


10.02(2) Reinforcing Steel Deformed Bars BJTD-40
Reinforcement bars to pier head (kg/m) Kg 2.54 218.0 554.18
Reinforcement bars to column (kg/m) Kg 1.51 179.0 269.93
Reinforcement bars to footing (kg/m) Kg 9.00 254.0 2,286.00
Total Kg 3,110.11

10.05 (1) Furnish Pretensioned Spun Concrete Pile D=50 cm


Ln.m 15.00 2.00 30.00
Ln.m 30.00

10.05 (2) Drive Pretensioned Spun Concrete Pile D=50 cm


Ln.m 15.00 2.00 30.00
Ln.m 30.00

PIER 2
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.63

5.01 (1) Structure excavation to a depth not exceeding 200 mm


Cu.m 3.20 3.20 1.63 1.00 16.69

5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -

5.01 (3) Structure excavation at a depth greater than 400 mm


Cu.m 3.20 3.20 - 1.00 -

10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 1.50 1.42 1.00 3.20

Deduction Cu.m 0.90 1.50 0.47 1.00 (0.63)


Cu.m 0.35 0.35 0.15 1.00 (0.02)
Cu.m 2.54

10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 5.00 1.00 2.51
Total Cu.m 2.51

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 3.20 0.05 1.00 0.51
Total Cu.m 0.51

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to pier head (kg/m) Kg 2.54 218.0 554.18
Reinforcement bars to column (kg/m) Kg 2.51 179.0 449.88
Reinforcement bars to footing (kg/m) Kg 9.00 254.0 2,286.00
Total Kg 3,290.06

10.05 (1) Furnish Pretensioned Spun Concrete Pile D=50 cm


Ln.m 15.00 2.00 30.00
Ln.m 30.00

10.05 (2) Drive Pretensioned Spun Concrete Pile D=50 cm


Ln.m 15.00 2.00 30.00
Ln.m 30.00

PIER 3
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.39

5.01 (1) Structure excavation to a depth not exceeding 200 mm


Cu.m 3.20 3.20 1.39 1.00 14.23

5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -

5.01 (3) Structure excavation at a depth greater than 400 mm


Cu.m 3.20 3.20 - 1.00 -

10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 2.05 0.47 1.00 1.45
Cu.m 1.50 2.05 0.75 1.00 2.31
Cu.m 1.50 2.05 0.20 1.00 0.62

Deduction Cu.m 1.75 1.20 0.47 1.00 (0.99)


Cu.m 0.40 0.35 0.15 2.00 (0.04)

Area (triangle)
Cu.m 1.50 0.06 1.00 (0.08)
Cu.m 3.26

10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 7.00 1.00 3.52
Total Cu.m 3.52

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 3.20 0.05 1.00 0.51
Total Cu.m 0.51

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to pier head (kg/m) Kg 3.26 218.0 709.59
Reinforcement bars to column (kg/m) Kg 3.52 179.0 629.83
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.

CALCULATION SHEET June, 20 2014, General Arranggement 501524-VIK-PB-5276 R1

Title : Pedestrian Bridge Sidolaju Sta. 70+029.469

Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity

(ln.m) (ln.m) (ln.m) (ln.m) (cu.m)


Reinforcement bars to footing (kg/m) Kg 9.00 254.0 2,286.00
Total Kg 3,625.42

10.05 (1) Furnish Pretensioned Spun Concrete Pile D=50 cm


Ln.m 15.00 2.00 30.00
Ln.m 30.00

10.05 (2) Drive Pretensioned Spun Concrete Pile D=50 cm


Ln.m 15.00 2.00 30.00
Ln.m 30.00

PIER 4
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 2.01

5.01 (1) Structure excavation to a depth not exceeding 200 mm


Cu.m 4.40 3.20 2.00 1.00 28.16

5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 4.40 3.20 0.01 1.00 0.14

5.01 (3) Structure excavation at a depth greater than 400 mm


Cu.m 4.40 3.20 - 1.00 -

10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete (I)
Cu.m 1.50 1.50 2.18 1.00 4.91

Deduction
Seg.1 Cu.m 0.90 0.75 0.29 1.00 (0.20)
Seg.2 Cu.m 0.35 0.35 0.15 1.00 (0.02)

Area (triangle)
Seg.3 Cu.m 0.75 0.01 2.00 (0.02)

Seg.4 Cu.m 0.75 0.85 1.68 1.00 (1.07)

Area
Pier head concrete (II) Cu.m 1.38 0.50 1.00 0.69
Cu.m 4.29

10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 7.00 1.00 3.52
Total Cu.m 3.52

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 4.20 1.00 1.00 12.60
12.60

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 4.40 0.05 1.00 0.70
Total Cu.m 0.70

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to pier head (kg/m) Kg 4.29 218.0 935.38
Reinforcement bars to column (kg/m) Kg 3.52 179.0 629.83
Reinforcement bars to footing (kg/m) Kg 12.60 254.0 3,200.40
Total Kg 4,765.60

10.05 (1) Furnish Pretensioned Spun Concrete Pile D=50 cm


Ln.m 15.00 6.00 90.00
Ln.m 90.00

10.05 (2) Drive Pretensioned Spun Concrete Pile D=50 cm


Ln.m 15.00 6.00 90.00
Ln.m 90.00

PIER 5
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.52

5.01 (1) Structure excavation to a depth not exceeding 200 mm


Cu.m 4.40 3.20 1.52 1.00 21.40

5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 4.40 3.20 - 1.00 -

5.01 (3) Structure excavation at a depth greater than 400 mm


Cu.m 4.40 3.20 - 1.00 -

10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete (I)
Cu.m 1.50 1.50 2.18 1.00 4.91

Deduction
Seg.1 Cu.m 0.90 0.75 0.29 1.00 (0.20)
Seg.2 Cu.m 0.35 0.35 0.15 1.00 (0.02)

Area (triangle)
Seg.3 Cu.m 0.75 0.01 2.00 (0.02)

Seg.4 Cu.m 0.75 0.85 1.68 1.00 (1.07)

Area
Pier head concrete (II) Cu.m 1.38 0.50 1.00 0.69
Cu.m 4.29

10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 7.00 1.00 3.52
Total Cu.m 3.52

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.

CALCULATION SHEET June, 20 2014, General Arranggement 501524-VIK-PB-5276 R1

Title : Pedestrian Bridge Sidolaju Sta. 70+029.469

Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity

(ln.m) (ln.m) (ln.m) (ln.m) (cu.m)


Cu.m 3.00 4.20 1.00 1.00 12.60
12.60

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 4.40 0.05 1.00 0.70
Total Cu.m 0.70

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to pier head (kg/m) Kg 4.29 218.0 935.38
Reinforcement bars to column (kg/m) Kg 3.52 179.0 629.83
Reinforcement bars to footing (kg/m) Kg 12.60 254.0 3,200.40
Total Kg 4,765.60

10.05 (1) Furnish Pretensioned Spun Concrete Pile D=50 cm


Ln.m 10.00 6.00 60.00
Ln.m 60.00

10.05 (2) Drive Pretensioned Spun Concrete Pile D=50 cm


Ln.m 10.00 6.00 60.00
Ln.m 60.00

PIER 6
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.29

5.01 (1) Structure excavation to a depth not exceeding 200 mm


Cu.m 3.20 3.20 1.29 1.00 13.21

5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -

5.01 (3) Structure excavation at a depth greater than 400 mm


Cu.m 3.20 3.20 - 1.00 -

10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 2.05 0.47 1.00 1.45
Cu.m 1.50 2.05 0.75 1.00 2.31
Cu.m 1.50 2.05 0.20 1.00 0.62

Deduction Cu.m 1.75 1.20 0.47 1.00 (0.99)


Cu.m 0.40 0.35 0.15 2.00 (0.04)

Area (triangle)
Cu.m 1.50 0.06 1.00 (0.08)
Cu.m 3.26

10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 7.50 1.00 3.77
Total Cu.m 3.77

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 3.20 0.05 1.00 0.51
Total Cu.m 0.51

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to pier head (kg/m) Kg 3.26 218.0 709.59
Reinforcement bars to column (kg/m) Kg 3.77 179.0 674.81
Reinforcement bars to footing (kg/m) Kg 9.00 254.0 2,286.00
Total Kg 3,670.40

10.05 (1) Furnish Pretensioned Spun Concrete Pile D=50 cm


Ln.m 15.00 2.00 30.00
Ln.m 30.00

10.05 (2) Drive Pretensioned Spun Concrete Pile D=50 cm


Ln.m 15.00 2.00 30.00
Ln.m 30.00

PIER 7
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.01

5.01 (1) Structure excavation to a depth not exceeding 200 mm


Cu.m 3.20 3.20 1.01 1.00 10.34

5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -

5.01 (3) Structure excavation at a depth greater than 400 mm


Cu.m 3.20 3.20 - 1.00 -

10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 1.50 1.42 1.00 3.20

Deduction Cu.m 0.90 1.50 0.47 1.00 (0.63)


Cu.m 0.35 0.35 0.15 1.00 (0.02)
Cu.m 2.54

10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 5.00 1.00 2.51
Total Cu.m 2.51

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.

CALCULATION SHEET June, 20 2014, General Arranggement 501524-VIK-PB-5276 R1

Title : Pedestrian Bridge Sidolaju Sta. 70+029.469

Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity

(ln.m) (ln.m) (ln.m) (ln.m) (cu.m)


10.01(8) Structural Concrete Class E, fc' = 10 Mpa
Footing Cu.m 3.20 3.20 0.05 1.00 0.51
Total Cu.m 0.51

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to pier head (kg/m) Kg 2.54 218.0 554.18
Reinforcement bars to column (kg/m) Kg 2.51 179.0 449.88
Reinforcement bars to footing (kg/m) Kg 9.00 254.0 2,286.00
Total Kg 3,290.06

10.05 (1) Furnish Pretensioned Spun Concrete Pile D=50 cm


Ln.m 15.00 2.00 30.00
Ln.m 30.00

10.05 (2) Drive Pretensioned Spun Concrete Pile D=50 cm


Ln.m 15.00 2.00 30.00
Ln.m 30.00

PIER 8
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.24

5.01 (1) Structure excavation to a depth not exceeding 200 mm


Cu.m 3.20 3.20 1.24 1.00 12.70

5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -

5.01 (3) Structure excavation at a depth greater than 400 mm


Cu.m 3.20 3.20 - 1.00 -

10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 1.50 1.42 1.00 3.20

Deduction Cu.m 0.90 1.50 0.47 1.00 (0.63)


Cu.m 0.35 0.35 0.15 1.00 (0.02)
Cu.m 2.54

10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 3.00 1.00 1.51
Total Cu.m 1.51

10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00

10.01(8) Structural Concrete Class E, fc' = 10 Mpa


Footing Cu.m 3.20 3.20 0.05 1.00 0.51
Total Cu.m 0.51

10.02(2) Reinforcing Steel Deformed Bars BJTD-40


Reinforcement bars to pier head (kg/m) Kg 2.54 218.0 554.18
Reinforcement bars to column (kg/m) Kg 1.51 179.0 269.93
Reinforcement bars to footing (kg/m) Kg 9.00 254.0 2,286.00
Total Kg 3,110.11

10.05 (1) Furnish Pretensioned Spun Concrete Pile D=50 cm


Ln.m 15.00 2.00 30.00
Ln.m 30.00

10.05 (2) Drive Pretensioned Spun Concrete Pile D=50 cm


Ln.m 15.00 2.00 30.00
Ln.m 30.00

SUPER STRUCTURE
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
10.01(3) (Abutment 1 - Pier 1 - Pier 2 - Pier 3) & (Abutment 2 - Pier 8 - Pier 7 - Pier 6)
Parapet Cu.m 27.46 0.25 0.30 4.00 8.24
Slabs Cu.m 27.46 0.90 0.15 4.00 14.83

Area (Triangle)
Stair Cu.m 0.63 0.05 180.00 5.06

Beams Cu.m 27.46 0.80 0.71 2.00 31.19


Nail Cu.m 0.35 0.35 0.20 12.00 0.29

Bordes Cu.m
Parapet Cu.m 6.00 0.25 0.30 4.00 1.80
Slabs Cu.m 6.00 0.90 0.15 4.00 3.24
Beams Cu.m 6.00 0.80 0.71 1.00 3.41

(Pier 3 - Pier 4) & (Pier 5 -Pier 6)


Parapet Cu.m 3.76 0.25 0.30 4.00 1.13
Slabs Cu.m 3.76 0.90 0.15 4.00 2.03

Area (Triangle)
Stair Cu.m 0.63 0.05 60.00 1.69

Beams Cu.m 3.76 0.80 0.71 2.00 4.27


Nail Cu.m 0.20 0.35 0.35 2.00 0.05

Bordes Cu.m
Parapet Cu.m 1.15 0.25 0.30 4.00 0.35
Slabs Cu.m 1.15 0.90 0.15 4.00 0.62
Beams Cu.m 1.15 0.80 0.71 2.00 1.31

Pier 3 to Pier 4
Parapet Cu.m 35.80 0.25 0.30 2.00 5.37
Slabs (1) Cu.m 35.80 2.60 0.15 1.00 13.96

Area (triangle)
Slabs (2) Cu.m 35.80 0.01 2.00 0.57
Total Cu.m 99.41
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.

CALCULATION SHEET June, 20 2014, General Arranggement 501524-VIK-PB-5276 R1

Title : Pedestrian Bridge Sidolaju Sta. 70+029.469

Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity

(ln.m) (ln.m) (ln.m) (ln.m) (cu.m)


10.02(2) Reinforcing Steel Deformed Bars BJTD-40
Reinforcement bars to deck slabs (kg/m) Kg 99.41 136.00 13,519.61
Total Kg 13,519.61

10.03(5) PC-T Girder Nominal Span Length 35.00 m to 37.00 m.


Pier 3 to Pier 4 Each 1.00 1.00
Total Each 1.00

10.09 (3) Chainlink Fence, H=2,60 Ln.m


Pier 3 to Pier 4 Ln.m 35.80 2.00 71.60
Total Ln.m 71.60

10.09 (4) Railing Fence


(A1-P1) & (A2-P8) Ln.m 10.41 4.00 41.64
(Pier1 - Pier2) & (Pier8 - Pier7) Ln.m 8.58 4.00 34.32
(Pier2 - Pier3) & (Pier7 - Pier6) Ln.m 7.62 4.00 30.48
(Pier3 - Pier4) & (Pier6 - Pier5) Ln.m 5.46 4.00 21.84

Abutmnet 1 Ln.m 2.59 2.00 5.18


Abutmnet 2 Ln.m 2.59 2.00 5.18
Bordes Pier 1 Ln.m 1.40 2.00 2.80
Bordes Pier 2 Ln.m 1.40 2.00 2.80
Bordes Pier 3 Ln.m 4.55 1.00 4.55
Bordes Pier 6 Ln.m 4.55 1.00 4.55
Bordes Pier 7 Ln.m 1.40 2.00 2.80
Bordes Pier 8 Ln.m 1.40 2.00 2.80
Total Ln.m 158.94
PT. VIRAMA KARYA

CALCULATION SHEET June, 2

Title : Ped
PT. VIRAMA KARYA

CALCULATION SHEET June, 2

Title : Ped
PT. VIRAMA KARYA

CALCULATION SHEET June, 2

Title : Ped
PT. VIRAMA KARYA

CALCULATION SHEET June, 2

Title : Ped
PT. VIRAMA KARYA

CALCULATION SHEET June, 2

Title : Ped
PT. VIRAMA KARYA

CALCULATION SHEET June, 2

Title : Ped
PT. VIRAMA KARYA

CALCULATION SHEET June, 2

Title : Ped
PT. VIRAMA KARYA

CALCULATION SHEET June, 2

Title : Ped
PT. VIRAMA KARYA

CALCULATION SHEET June, 2

Title : Ped
PT. VIRAMA KARYA

CALCULATION SHEET June, 2

Title : Ped
PT. VIRAMA KARYA

CALCULATION SHEET June, 2

Title : Ped
PT. VIRAMA KARYA

CALCULATION SHEET June, 2

Title : Ped
PT. VIRAMA KARYA

CALCULATION SHEET June, 2

Title : Ped
PT. VIRAMA KARYA

CALCULATION SHEET June, 2

Title : Ped
PT. VIRAMA KARYA

CALCULATION SHEET June, 2

Title : Ped
Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June, 20 2014, General Arranggement 501524-VIK-PB-5276

Title : Pedestrian Bridge Sidolaju Sta. 70+029.469

SKETCH 1
Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June, 20 2014, General Arranggement 501524-VIK-PB-5276

Title : Pedestrian Bridge Sidolaju Sta. 70+029.469


Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June, 20 2014, General Arranggement 501524-VIK-PB-5276

Title : Pedestrian Bridge Sidolaju Sta. 70+029.469


Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June, 20 2014, General Arranggement 501524-VIK-PB-5276

Title : Pedestrian Bridge Sidolaju Sta. 70+029.469

SKETCH 2
Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June, 20 2014, General Arranggement 501524-VIK-PB-5276

Title : Pedestrian Bridge Sidolaju Sta. 70+029.469


Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June, 20 2014, General Arranggement 501524-VIK-PB-5276

Title : Pedestrian Bridge Sidolaju Sta. 70+029.469


Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June, 20 2014, General Arranggement 501524-VIK-PB-5276

Title : Pedestrian Bridge Sidolaju Sta. 70+029.469

SKETCH 3
Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June, 20 2014, General Arranggement 501524-VIK-PB-5276

Title : Pedestrian Bridge Sidolaju Sta. 70+029.469


Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June, 20 2014, General Arranggement 501524-VIK-PB-5276

Title : Pedestrian Bridge Sidolaju Sta. 70+029.469


Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June, 20 2014, General Arranggement 501524-VIK-PB-5276

Title : Pedestrian Bridge Sidolaju Sta. 70+029.469

SKETCH 4
Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June, 20 2014, General Arranggement 501524-VIK-PB-5276

Title : Pedestrian Bridge Sidolaju Sta. 70+029.469


Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June, 20 2014, General Arranggement 501524-VIK-PB-5276

Title : Pedestrian Bridge Sidolaju Sta. 70+029.469


Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June, 20 2014, General Arranggement 501524-VIK-PB-5276

Title : Pedestrian Bridge Sidolaju Sta. 70+029.469

SKETCH 5
Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June, 20 2014, General Arranggement 501524-VIK-PB-5276

Title : Pedestrian Bridge Sidolaju Sta. 70+029.469


Solo - Mantingan - Ngawi Toll Road Project

Date & Reference From Calculation Referred to Drawing No.

June, 20 2014, General Arranggement 501524-VIK-PB-5276

Title : Pedestrian Bridge Sidolaju Sta. 70+029.469


gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-5276 R1
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-5276 R1
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-5276 R1
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-5276 R1
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-5276 R1
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-5276 R1
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-5276 R1
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-5276 R1
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-5276 R1
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-5276 R1
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-5276 R1
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-5276 R1
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-5276 R1
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-5276 R1
gawi Toll Road Project

Calculation Referred to Drawing No. Rev.

501524-VIK-PB-5276 R1

You might also like