Pay Item Description Unit Unit Price (IDR) TOTAL PEDESTRIAN BRIDGE Title : Pedestrian Title : Pedestrian Title : Pedestrian Title : Pedestrian Title : Pedestrian Title : Pedestrian Title : Pedestrian
Bridge Acces Bridge Waru-4 Bridge Bridge Bridge Kauman-1 Bridge Bridge Sidolaju
Sragen Sta. Sta. 24+600 Singopadu Sta. Kebonromo Sta. Sta. 62+844.125 Widodaren Sta. Sta. 70+029.469
5+363.700 36+783.703 46+246.030 66+044.074
SECTION 1 GENERAL
TOTAL BID PRICE OF SECTION - -
(Move to Recapitulation)
SECTION 2 SITE CLEARING
TOTAL BID PRICE OF SECTION - -
(Move to Recapitulation)
SECTION 3 DEMOLITION
TOTAL BID PRICE OF SECTION - -
(Move to Recapitulation)
SECTION 4 ROAD EARTHWORK
TOTAL BID PRICE OF SECTION - -
(Move to Recapitulation)
SECTION 5 STRUCTURE EXAVATION
5.01 (1) Structure excavation to a depth not exceeding 200 mm Cu.m 109,880 886.3 97,391,833 0.68 121.1 136.4 141.0 113.6 133.8 104.9 135.6
5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm Cu.m 373,605 19.9 7,449,987 0.05 7.8 3.5 5.9 - 2.6 - 0.1
TOTAL BID PRICE OF SECTION 104,841,820 0.74
(Move to Recapitulation)
SECTION 6 DRAINAGE
TOTAL BID PRICE OF SECTION - -
(Move to Recapitulation)
SECTION 7 SUBGRADE
TOTAL BID PRICE OF SECTION - -
(Move to Recapitulation)
SECTION 8 SUB BASE
TOTAL BID PRICE OF SECTION - -
(Move to Recapitulation)
SECTION 9 PAVEMENTS
TOTAL BID PRICE OF SECTION - -
(Move to Recapitulation)
SECTION 10 CONCRETE STRUCTURES
10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames) Cu.m 2,247,400 150.0 337,048,105 2.36 20.2 20.2 25.3 20.2 20.2 18.7 25.3
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab ) Cu.m 2,019,833 740.1 1,494,945,794 10.48 81.7 106.4 120.0 107.4 106.4 96.4 121.8
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert) Cu.m 1,689,951 724.8 1,224,949,763 8.59 100.2 100.2 111.9 100.2 100.2 100.2 111.9
10.01(8) Structural Concrete Class E, fc' = 10 Mpa Cu.m 1,217,421 38.4 46,807,411 0.33 5.3 5.3 6.0 5.3 5.3 5.3 6.0
10.02(2) Reinforcing Steel Deformed Bars BJTD-40 Kg 15,861 279,729.3 4,436,894,874 31.12 35,453.2 38,897.8 45,023.4 39,077.7 38,897.8 37,041.2 45,338.3
10.03(1) PC-T Girder Nominal Span Length 16.00 m to 17.00 m Each 172,012,469 1.0 172,012,469 1.21 1.0 - - - - - -
10.03(5) PC-T Girder Nominal Span Length 35.00 m to 37.00 m. Each 419,536,452 6.0 2,517,218,711 17.65 - 1.0 1.0 1.0 1.0 1.0 1.0
10.05 (1) Furnish Pretensioned Spun Concrete Pile D=50 cm Ln.m 795,611 1,898.0 1,510,069,128 10.59 264.0 298.0 276.0 270.0 200.0 260.0 330.0
10.05 (2) Drive Pretensioned Spun Concrete Pile D=50 cm Ln.m 143,296 1,898.0 271,976,548 1.91 264.0 298.0 276.0 270.0 200.0 260.0 330.0
10.09 (3) Chainlink Fence, H=2,60 Ln.m Ln.m 1,959,163 463.2 907,484,251 6.36 33.6 71.6 71.6 71.6 71.6 71.6 71.6
10.09 (4) Railing Fence Ln.m 1,132,428 1,016.0 1,150,592,531 8.07 131.5 131.5 158.9 143.9 143.9 147.4 158.9
TOTAL BID PRICE OF SECTION 14,069,999,586 98.68
(Move to Recapitulation)
SECTION 11 STRUCTURAL STEEL WORK
TOTAL BID PRICE OF SECTION - -
(Move to Recapitulation)
SECTION 12 MISCELLANEOUS
12.02(3) Stone Masonry Cu.m 740,545 112.4 83,265,672 0.58 26.2 18.2 18.2 26.2 17.0 1.6 5.0
TOTAL BID PRICE OF SECTION 83,265,672 0.58
(Move to Recapitulation)
SECTION 13 UTILITIES
TOTAL BID PRICE OF SECTION - -
(Move to Recapitulation)
SECTION 14 TOLL PLAZAS
TOTAL BID PRICE OF SECTION - -
(Move to Recapitulation)
SECTION 15 DIVERSION AND PROTECTION OF EXISTING UTILITIES
TOTAL BID PRICE OF SECTION - -
(Move to Recapitulation)
SECTION 16 TOLL OFFICE AND FACILITIES
TOTAL BID PRICE OF SECTION - -
###
TOTAL BID PRICE 14,258,107,078 100.00
file:///var/www/apps/conversion/tmp/scratch_2/350197787.xlsx350197787.xlsxSummary
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.
Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Abutment
Parapet Cu.m 2.68 0.25 0.32 2.00 0.43
Stair
Seg. 1 Cu.m 0.63 0.20 0.15 2.00 0.04
Seg. 2 Cu.m 0.63 0.80 0.15 2.00 0.15
Seg. 3 Cu.m 0.63 1.40 0.15 2.00 0.26
Footing
Seg. 5 Cu.m 2.60 4.00 0.80 1.00 8.32
Deduction Cu.m 0.35 0.35 0.20 1.00 (0.02)
Seg. 6 Cu.m 3.00 4.50 0.50 1.00 6.75
Sub total Cu.m 16.35
ABUTMENT 2
Elev. Existing Ground Level (A) Ln. m -
Bottom Of Footing (B) Ln. m -
(A-B) Ln. m 0.46
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Abutment
Parapet Cu.m 2.68 0.25 0.32 2.00 0.43
Stair
Seg. 1 Cu.m 0.63 0.20 0.15 2.00 0.04
Seg. 2 Cu.m 0.63 0.80 0.15 2.00 0.15
Seg. 3 Cu.m 0.63 1.40 0.15 2.00 0.26
Footing
Seg. 5 Cu.m 2.60 4.00 0.80 1.00 8.32
Deduction Cu.m 0.35 0.35 0.20 1.00 (0.02)
Seg. 6 Cu.m 3.00 4.50 0.50 1.00 6.75
Sub total Cu.m 16.35
PIER 1
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.92
5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -
10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 1.50 1.42 1.00 3.20
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 3.00 1.00 1.51
Total Cu.m 1.51
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00
Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity
PIER 2
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 2.38
5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 0.38 1.00 3.89
10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 2.05 0.47 1.00 1.45
Cu.m 1.50 2.05 0.75 1.00 2.31
Cu.m 1.50 2.05 0.20 1.00 0.62
Area (triangle)
Cu.m 1.50 0.06 1.00 (0.08)
Cu.m 3.26
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 6.00 1.00 3.02
Total Cu.m 3.02
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00
PIER 3
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.23
5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 5.45 3.20 - 1.00 -
10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete (I)
Cu.m 1.50 1.50 2.18 1.00 4.91
Deduction
Seg.1 Cu.m 0.90 0.75 0.29 1.00 (0.20)
Seg.2 Cu.m 0.35 0.35 0.15 1.00 (0.02)
Area (triangle)
Seg.3 Cu.m 0.75 0.01 2.00 (0.02)
Area
Pier head concrete (II) Cu.m 1.38 0.50 1.00 0.69
Cu.m 4.29
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 5.00 1.00 2.51
Total Cu.m 2.51
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 5.25 1.00 1.00 15.75
15.75
Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity
PIER 4
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.15
5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 5.45 3.20 - 1.00 -
10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete (I)
Cu.m 1.50 1.50 2.18 1.00 4.91
Deduction
Seg.1 Cu.m 0.90 0.75 0.29 1.00 (0.20)
Seg.2 Cu.m 0.35 0.35 0.15 1.00 (0.02)
Area (triangle)
Seg.3 Cu.m 0.75 0.01 2.00 (0.02)
Area
Pier head concrete (II) Cu.m 1.38 0.50 1.00 0.69
Cu.m 4.29
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 5.00 1.00 2.51
Total Cu.m 2.51
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 5.25 1.00 1.00 15.75
15.75
PIER 5
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 2.38
5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 0.38 1.00 3.89
10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 2.05 0.47 1.00 1.45
Cu.m 1.50 2.05 0.75 1.00 2.31
Cu.m 1.50 2.05 0.20 1.00 0.62
Area (triangle)
Cu.m 1.50 0.06 1.00 (0.08)
Cu.m 3.26
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 6.00 1.00 3.02
Total Cu.m 3.02
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.
Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity
PIER 6
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.85
5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -
10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 1.50 1.42 1.00 3.20
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 3.00 1.00 1.51
Total Cu.m 1.51
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00
SUPER STRUCTURE
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
10.01(3) (Abutment 1 - Pier 1 - Pier 2) & (Abutment 2 - Pier 6 - Pier 5)
Parapet Cu.m 20.75 0.25 0.30 4.00 6.23
Slabs Cu.m 20.75 0.90 0.15 4.00 11.21
Area (Triangle)
Stair Cu.m 0.63 0.05 132.00 3.71
Bordes Cu.m
Parapet Cu.m 1.50 0.25 0.30 4.00 0.45
Slabs Cu.m 1.50 0.90 0.15 4.00 0.81
Beams Cu.m 1.50 0.80 0.71 2.00 1.70
Area (Triangle)
Stair Cu.m 0.63 0.05 24.00 0.68
Bordes Cu.m
Parapet Cu.m 1.15 0.25 0.30 4.00 0.35
Slabs Cu.m 1.15 0.90 0.15 4.00 0.62
Beams Cu.m 1.15 0.80 0.71 2.00 1.31
Pier 3 to Pier 4
Parapet Cu.m 16.80 0.25 0.30 2.00 2.52
Slabs (1) Cu.m 16.80 2.60 0.15 1.00 6.55
Area (triangle)
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.
Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity
Title : Pedes
PT. VIRAMA KARYA
Title : Pedes
PT. VIRAMA KARYA
Title : Pedes
SECTION 2
-
PT. VIRAMA KARYA
Title : Pedes
PT. VIRAMA KARYA
Title : Pedes
ABT2
AREA 3.9852 m2
PT. VIRAMA KARYA
ABT2
CALCULATION SHEET June ,2
Title : Pedes
AREA 3.9852 m2
PT. VIRAMA KARYA
Title : Pedes
0.20
0.60
0.65 0.80
PT. VIRAMA KARYA
0.47
0.40
PT. VIRAMA KARYA
Title : Pedes
PT. VIRAMA KARYA
Title : Pedes
0 .7 8
0 .2 5
2 .3 7
1 .2 5
0.46 0.92 0.30
1 .3 3
0 .3 3
0.58 1.33 0.58 0.92
2.92
PT. VIRAMA KARYA
Title : Pedes
PT. VIRAMA KARYA
Title : Pedes
PT. VIRAMA KARYA
Title : Pedes
1.50
0.75 0.75
0.35
0 .30
0 .35
0 .35
0 .80
0 .90
0 .35
0 .30
PLAN
0.75
0.75 0.35 0
0 .29
0.20 0.20
0 .15
.68
8
PLAN
0 .29
0.20 0.20
Title : Pedes
0 .15
1 .68
2 .18
1 .89
0 .50
0 .50
0.35 0.80 0.35 0
1.50
SECTION 1
PT. VIRAMA KARYA
Title : Pedes
Solo - Mantingan - Ngawi Toll Road Project
SKETCH 1
C PT 117
Solo - Mantingan - Ngawi Toll Road Project
5%
ELEVATION
2.00
Solo - Mantingan - Ngawi Toll Road Project
ON 2 SECTION 1
- -
Solo - Mantingan - Ngawi Toll Road Project
SKETCH 2
Solo - Mantingan - Ngawi Toll Road Project
ABT1
AREA 5.7751 m2
Solo - Mantingan - Ngawi Toll Road Project
AREA 5.7751 m2
Solo - Mantingan - Ngawi Toll Road Project
SKETCH 3
0.32
0.15
0.60
Solo - Mantingan - Ngawi Toll Road Project
0.15
0.60
Solo - Mantingan - Ngawi Toll Road Project
SKETCH 4
0 .7 8
0 .2 5
1 .2 5
30 0.56 0.24
1 .3 3
1.33
2.00
Solo - Mantingan - Ngawi Toll Road Project
SKETCH 5
0 .30
0 .35
0 .90
0 .30
0.30 0.90
.68
Solo - Mantingan - Ngawi Toll Road Project
0 .07
0 .29
0.30 0.90
Title : Pedestrian Bridge Acces Sragen Sta. 5+363.700
1 .68
1 .89
0 .50
0 .50
0 .50
0.35 0.80 0.35 0.35 0.80
1.50 1.50
SECTION 2 SECTION
Solo - Mantingan - Ngawi Toll Road Project
501524-VIK-PB-3176 R1
gawi Toll Road Project
501524-VIK-PB-3176 R1
2.00
gawi Toll Road Project
501524-VIK-PB-3176 R1
2.00
ECTION 1
-
gawi Toll Road Project
501524-VIK-PB-3176 R1
gawi Toll Road Project
501524-VIK-PB-3176 R1
ABT1
AREA 5.7751 m2
gawi Toll Road Project
ABT1
501524-VIK-PB-3176 R1
AREA 5.7751 m2
gawi Toll Road Project
501524-VIK-PB-3176 R1
gawi Toll Road Project
501524-VIK-PB-3176 R1
gawi Toll Road Project
501524-VIK-PB-3176 R1
gawi Toll Road Project
501524-VIK-PB-3176 R1
gawi Toll Road Project
501524-VIK-PB-3176 R1
gawi Toll Road Project
501524-VIK-PB-3176 R1
gawi Toll Road Project
501524-VIK-PB-3176 R1
1.50
0 .29
501524-VIK-PB-3176 1.50 R1
0 .29
0.30 0.90 0.30
0 .15
1 .89
0 .50
SECTION 3
gawi Toll Road Project
501524-VIK-PB-3176 R1
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.
Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Abutment
Parapet Cu.m 2.68 0.25 0.32 2.00 0.43
Stair
Seg. 1 Cu.m 0.63 0.20 0.15 2.00 0.04
Seg. 2 Cu.m 0.63 0.80 0.15 2.00 0.15
Seg. 3 Cu.m 0.63 1.40 0.15 2.00 0.26
Footing
Seg. 5 Cu.m 2.60 4.00 0.80 1.00 8.32
Deduction Cu.m 0.35 0.35 0.20 1.00 (0.02)
Seg. 6 Cu.m 3.00 4.50 0.50 1.00 6.75
Sub total Cu.m 16.35
ABUTMENT 2
Elev. Existing Ground Level (A) Ln. m -
Bottom Of Footing (B) Ln. m -
(A-B) Ln. m 0.24
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Abutment
Parapet Cu.m 2.68 0.25 0.32 2.00 0.43
Stair
Seg. 1 Cu.m 0.63 0.20 0.15 2.00 0.04
Seg. 2 Cu.m 0.63 0.80 0.15 2.00 0.15
Seg. 3 Cu.m 0.63 1.40 0.15 2.00 0.26
Footing
Seg. 5 Cu.m 2.60 4.00 0.80 1.00 8.32
Deduction Cu.m 0.35 0.35 0.20 1.00 (0.02)
Seg. 6 Cu.m 3.00 4.50 0.50 1.00 6.75
Sub total Cu.m 16.35
PIER 1
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.35
5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -
10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 1.50 1.42 1.00 3.20
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 3.00 1.00 1.51
Total Cu.m 1.51
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00
Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity
PIER 2
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.81
5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -
10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 2.05 0.47 1.00 1.45
Cu.m 1.50 2.05 0.75 1.00 2.31
Cu.m 1.50 2.05 0.20 1.00 0.62
Area (triangle)
Cu.m 1.50 0.06 1.00 (0.08)
Cu.m 3.26
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 6.00 1.00 3.02
Total Cu.m 3.02
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00
PIER 3
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 2.07
5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 5.45 3.20 0.07 1.00 1.22
10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete (I)
Cu.m 1.50 1.50 2.18 1.00 4.91
Deduction
Seg.1 Cu.m 0.90 0.75 0.29 1.00 (0.20)
Seg.2 Cu.m 0.35 0.35 0.15 1.00 (0.02)
Area (triangle)
Seg.3 Cu.m 0.75 0.01 2.00 (0.02)
Area
Pier head concrete (II) Cu.m 1.38 0.50 1.00 0.69
Cu.m 4.29
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 7.00 1.00 3.52
Total Cu.m 3.52
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 5.25 1.00 1.00 15.75
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.
Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity
PIER 4
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 2.13
5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 5.45 3.20 0.13 1.00 2.27
10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete (I)
Cu.m 1.50 1.50 2.18 1.00 4.91
Deduction
Seg.1 Cu.m 0.90 0.75 0.29 1.00 (0.20)
Seg.2 Cu.m 0.35 0.35 0.15 1.00 (0.02)
Area (triangle)
Seg.3 Cu.m 0.75 0.01 2.00 (0.02)
Area
Pier head concrete (II) Cu.m 1.38 0.50 1.00 0.69
Cu.m 4.29
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 7.00 1.00 3.52
Total Cu.m 3.52
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 5.25 1.00 1.00 15.75
15.75
PIER 5
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.89
5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -
10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 2.05 0.47 1.00 1.45
Cu.m 1.50 2.05 0.75 1.00 2.31
Cu.m 1.50 2.05 0.20 1.00 0.62
Area (triangle)
Cu.m 1.50 0.06 1.00 (0.08)
Cu.m 3.26
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.
Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00
PIER 6
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.46
5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -
10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 1.50 1.42 1.00 3.20
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 3.00 1.00 1.51
Total Cu.m 1.51
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00
SUPER STRUCTURE
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
10.01(3) (Abutment 1 - Pier 1 - Pier 2) & (Abutment 2 - Pier 6 - Pier 5)
Parapet Cu.m 20.75 0.25 0.30 4.00 6.23
Slabs Cu.m 20.75 0.90 0.15 4.00 11.21
Area (Triangle)
Stair Cu.m 0.63 0.05 132.00 3.71
Bordes Cu.m
Parapet Cu.m 1.50 0.25 0.30 4.00 0.45
Slabs Cu.m 1.50 0.90 0.15 4.00 0.81
Beams Cu.m 1.50 0.80 0.71 2.00 1.70
Area (Triangle)
Stair Cu.m 0.63 0.05 60.00 1.69
Bordes Cu.m
Parapet Cu.m 1.21 0.25 0.30 4.00 0.36
Slabs Cu.m 1.21 0.90 0.15 4.00 0.65
Beams Cu.m 1.21 0.80 0.71 2.00 1.37
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.
Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity
Area (triangle)
Slabs (2) Cu.m 35.80 0.01 2.00 0.57
Total Cu.m 90.32
Title : P
PT. VIRAMA KARYA
Title : P
-2%
PT. VIRAMA KARYA
Title : P
PT. VIRAMA KARYA
Title : P
PT. VIRAMA KARYA
Title : P
PT. VIRAMA KARYA
Title : P
PT. VIRAMA KARYA
Title : P
PT. VIRAMA KARYA
Title : P
PT. VIRAMA KARYA
Title : P
PT. VIRAMA KARYA
Title : P
PT. VIRAMA KARYA
Title : P
PT. VIRAMA KARYA
Title : P
PT. VIRAMA KARYA
Title : P
PLAN
PT. VIRAMA KARYA
Title : P
SECTION 1 SEC
PT. VIRAMA KARYA
Title : P
Solo - Mantingan - Ngawi Toll Road Project
SKETCH 1
Solo - Mantingan - Ngawi Toll Road Project
-2% -2%
Solo - Mantingan - Ngawi Toll Road Project
SKETCH 2
Solo - Mantingan - Ngawi Toll Road Project
SKETCH 3
P5
P2
Solo - Mantingan - Ngawi Toll Road Project
SKETCH 4
Solo - Mantingan - Ngawi Toll Road Project
SKETCH 5
SECTION 4
Solo - Mantingan - Ngawi Toll Road Project
SECTION 2 SECTION
Solo - Mantingan - Ngawi Toll Road Project
501524-VIK-PB-2251 R2
gawi Toll Road Project
501524-VIK-PB-2251 R2
%
gawi Toll Road Project
501524-VIK-PB-2251 R2
gawi Toll Road Project
501524-VIK-PB-2251 R2
gawi Toll Road Project
501524-VIK-PB-2251 R2
gawi Toll Road Project
501524-VIK-PB-2251 R2
gawi Toll Road Project
501524-VIK-PB-2251 R2
P5
P2
gawi Toll Road Project
501524-VIK-PB-2251 R2
gawi Toll Road Project
501524-VIK-PB-2251 R2
gawi Toll Road Project
501524-VIK-PB-2251 R2
gawi Toll Road Project
501524-VIK-PB-2251 R2
gawi Toll Road Project
501524-VIK-PB-2251 R2
gawi Toll Road Project
501524-VIK-PB-2251 R2
ON 4
gawi Toll Road Project
501524-VIK-PB-2251 R2
SECTION 3
gawi Toll Road Project
501524-VIK-PB-2251 R2
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.
Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Abutment
Parapet Cu.m 2.68 0.25 0.32 2.00 0.43
Stair
Seg. 1 Cu.m 0.63 0.20 0.15 2.00 0.04
Seg. 2 Cu.m 0.63 0.80 0.15 2.00 0.15
Seg. 3 Cu.m 0.63 1.40 0.15 2.00 0.26
Footing
Seg. 5 Cu.m 2.60 4.00 0.80 1.00 8.32
Deduction Cu.m 0.35 0.35 0.20 1.00 (0.02)
Seg. 6 Cu.m 3.00 4.50 0.50 1.00 6.75
Sub total Cu.m 16.35
ABUTMENT 2
Elev. Existing Ground Level (A) Ln. m -
Bottom Of Footing (B) Ln. m -
(A-B) Ln. m 0.45
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Abutment
Parapet Cu.m 2.68 0.25 0.32 2.00 0.43
Stair
Seg. 1 Cu.m 0.63 0.20 0.15 2.00 0.04
Seg. 2 Cu.m 0.63 0.80 0.15 2.00 0.15
Seg. 3 Cu.m 0.63 1.40 0.15 2.00 0.26
Footing
Seg. 5 Cu.m 2.60 4.00 0.80 1.00 8.32
Deduction Cu.m 0.35 0.35 0.20 1.00 (0.02)
Seg. 6 Cu.m 3.00 4.50 0.50 1.00 6.75
Sub total Cu.m 16.35
PIER 1
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.26
5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -
10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 1.50 1.42 1.00 3.20
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 2.00 1.00 1.01
Total Cu.m 1.01
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00
Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity
PIER 2
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.45
5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -
10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 1.50 1.42 1.00 3.20
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 4.50 1.00 2.26
Total Cu.m 2.26
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00
PIER 3
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.67
5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -
10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 2.05 0.47 1.00 1.45
Cu.m 1.50 2.05 0.75 1.00 2.31
Cu.m 1.50 2.05 0.20 1.00 0.62
Area (triangle)
Cu.m 1.50 0.06 1.00 (0.08)
Cu.m 3.26
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 7.00 1.00 3.52
Total Cu.m 3.52
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00
Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity
PIER 4
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 2.24
5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 4.40 3.20 0.24 1.00 3.38
10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete (I)
Cu.m 1.50 1.50 2.18 1.00 4.91
Deduction
Seg.1 Cu.m 0.90 0.75 0.29 1.00 (0.20)
Seg.2 Cu.m 0.35 0.35 0.15 1.00 (0.02)
Area (triangle)
Seg.3 Cu.m 0.75 0.01 2.00 (0.02)
Area
Pier head concrete (II) Cu.m 1.38 0.50 1.00 0.69
Cu.m 4.29
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 7.00 1.00 3.52
Total Cu.m 3.52
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 4.20 1.00 1.00 12.60
12.60
PIER 5
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 2.18
5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 4.40 3.20 0.18 1.00 2.53
10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete (I)
Cu.m 1.50 1.50 2.18 1.00 4.91
Deduction
Seg.1 Cu.m 0.90 0.75 0.29 1.00 (0.20)
Seg.2 Cu.m 0.35 0.35 0.15 1.00 (0.02)
Area (triangle)
Seg.3 Cu.m 0.75 0.01 2.00 (0.02)
Area
Pier head concrete (II) Cu.m 1.38 0.50 1.00 0.69
Cu.m 4.29
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 7.00 1.00 3.52
Total Cu.m 3.52
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.
Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity
PIER 6
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.49
5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -
10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 2.05 0.47 1.00 1.45
Cu.m 1.50 2.05 0.75 1.00 2.31
Cu.m 1.50 2.05 0.20 1.00 0.62
Area (triangle)
Cu.m 1.50 0.06 1.00 (0.08)
Cu.m 3.26
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 7.00 1.00 3.52
Total Cu.m 3.52
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00
PIER 7
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.32
5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -
10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 1.50 1.42 1.00 3.20
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 4.50 1.00 2.26
Total Cu.m 2.26
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.
Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity
PIER 8
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.08
5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -
10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 1.50 1.42 1.00 3.20
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 2.00 1.00 1.01
Total Cu.m 1.01
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00
SUPER STRUCTURE
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
10.01(3) (Abutment 1 - Pier 1 - Pier 2 - Pier 3) & (Abutment 2 - Pier 8 - Pier 7 - Pier 6)
Parapet Cu.m 27.46 0.25 0.30 4.00 8.24
Slabs Cu.m 27.46 0.90 0.15 4.00 14.83
Area (Triangle)
Stair Cu.m 0.63 0.05 180.00 5.06
Bordes Cu.m
Parapet Cu.m 6.00 0.25 0.30 4.00 1.80
Slabs Cu.m 6.00 0.90 0.15 4.00 3.24
Beams Cu.m 6.00 0.80 0.71 1.00 3.41
Area (Triangle)
Stair Cu.m 0.63 0.05 60.00 1.69
Bordes Cu.m
Parapet Cu.m 1.15 0.25 0.30 4.00 0.35
Slabs Cu.m 1.15 0.90 0.15 4.00 0.62
Beams Cu.m 1.15 0.80 0.71 2.00 1.31
Pier 3 to Pier 4
Parapet Cu.m 35.80 0.25 0.30 2.00 5.37
Slabs (1) Cu.m 35.80 2.60 0.15 1.00 13.96
Area (triangle)
Slabs (2) Cu.m 35.80 0.01 2.00 0.57
Total Cu.m 99.41
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.
Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity
Title : Pede
PT. VIRAMA KARYA
Title : Pede
PT. VIRAMA KARYA
Title : Pede
PT. VIRAMA KARYA
Title : Pede
PT. VIRAMA KARYA
Title : Pede
PT. VIRAMA KARYA
Title : Pede
PT. VIRAMA KARYA
Title : Pede
PT. VIRAMA KARYA
Title : Pede
PT. VIRAMA KARYA
Title : Pede
PT. VIRAMA KARYA
Title : Pede
PT. VIRAMA KARYA
Title : Pede
PT. VIRAMA KARYA
Title : Pede
PT. VIRAMA KARYA
Title : Pede
PT. VIRAMA KARYA
Title : Pede
PT. VIRAMA KARYA
Title : Pede
Solo - Mantingan - Ngawi Toll Road Project
SKETCH 1
Solo - Mantingan - Ngawi Toll Road Project
SKETCH 2
Solo - Mantingan - Ngawi Toll Road Project
SKETCH 3
Solo - Mantingan - Ngawi Toll Road Project
SKETCH 4
Solo - Mantingan - Ngawi Toll Road Project
SKETCH 5
Solo - Mantingan - Ngawi Toll Road Project
501524-VIK-PB-3301 R2
gawi Toll Road Project
501524-VIK-PB-3301 R2
gawi Toll Road Project
501524-VIK-PB-3301 R2
gawi Toll Road Project
501524-VIK-PB-3301 R2
gawi Toll Road Project
501524-VIK-PB-3301 R2
gawi Toll Road Project
501524-VIK-PB-3301 R2
gawi Toll Road Project
501524-VIK-PB-3301 R2
gawi Toll Road Project
501524-VIK-PB-3301 R2
gawi Toll Road Project
501524-VIK-PB-3301 R2
gawi Toll Road Project
501524-VIK-PB-3301 R2
gawi Toll Road Project
501524-VIK-PB-3301 R2
gawi Toll Road Project
501524-VIK-PB-3301 R2
gawi Toll Road Project
501524-VIK-PB-3301 R2
gawi Toll Road Project
501524-VIK-PB-3301 R2
gawi Toll Road Project
501524-VIK-PB-3301 R2
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.
Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Abutment
Parapet Cu.m 2.68 0.25 0.32 2.00 0.43
Stair
Seg. 1 Cu.m 0.63 0.20 0.15 2.00 0.04
Seg. 2 Cu.m 0.63 0.80 0.15 2.00 0.15
Seg. 3 Cu.m 0.63 1.40 0.15 2.00 0.26
Footing
Seg. 5 Cu.m 2.60 4.00 0.80 1.00 8.32
Deduction Cu.m 0.35 0.35 0.20 1.00 (0.02)
Seg. 6 Cu.m 3.00 4.50 0.50 1.00 6.75
Sub total Cu.m 16.35
ABUTMENT 2
Elev. Existing Ground Level (A) Ln. m -
Bottom Of Footing (B) Ln. m -
(A-B) Ln. m -
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Abutment
Parapet Cu.m 2.68 0.25 0.32 2.00 0.43
Stair
Seg. 1 Cu.m 0.63 0.20 0.15 2.00 0.04
Seg. 2 Cu.m 0.63 0.80 0.15 2.00 0.15
Seg. 3 Cu.m 0.63 1.40 0.15 2.00 0.26
Footing
Seg. 5 Cu.m 2.60 4.00 0.80 1.00 8.32
Deduction Cu.m 0.35 0.35 0.20 1.00 (0.02)
Seg. 6 Cu.m 3.00 4.50 0.50 1.00 6.75
Sub total Cu.m 16.35
PIER 1
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.74
5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -
10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 1.50 1.42 1.00 3.20
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 4.00 1.00 2.01
Total Cu.m 2.01
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00
Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity
PIER 2
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.23
5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -
10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 2.05 0.47 1.00 1.45
Cu.m 1.50 2.05 0.75 1.00 2.31
Cu.m 1.50 2.05 0.20 1.00 0.62
Area (triangle)
Cu.m 1.50 0.06 1.00 (0.08)
Cu.m 3.26
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 6.00 1.00 3.02
Total Cu.m 3.02
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00
PIER 3
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.45
5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 5.45 3.20 - 1.00 -
10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete (I)
Cu.m 1.50 1.50 2.18 1.00 4.91
Deduction
Seg.1 Cu.m 0.90 0.75 0.29 1.00 (0.20)
Seg.2 Cu.m 0.35 0.35 0.15 1.00 (0.02)
Area (triangle)
Seg.3 Cu.m 0.75 0.01 2.00 (0.02)
Area
Pier head concrete (II) Cu.m 1.38 0.50 1.00 0.69
Cu.m 4.29
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 7.00 1.00 3.52
Total Cu.m 3.52
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 5.25 1.00 1.00 15.75
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.
Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity
PIER 4
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.48
5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 5.45 3.20 - 1.00 -
10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete (I)
Cu.m 1.50 1.50 2.18 1.00 4.91
Deduction
Seg.1 Cu.m 0.90 0.75 0.29 1.00 (0.20)
Seg.2 Cu.m 0.35 0.35 0.15 1.00 (0.02)
Area (triangle)
Seg.3 Cu.m 0.75 0.01 2.00 (0.02)
Area
Pier head concrete (II) Cu.m 1.38 0.50 1.00 0.69
Cu.m 4.29
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 7.00 1.00 3.52
Total Cu.m 3.52
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 5.25 1.00 1.00 15.75
15.75
PIER 5
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.36
5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -
10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 2.05 0.47 1.00 1.45
Cu.m 1.50 2.05 0.75 1.00 2.31
Cu.m 1.50 2.05 0.20 1.00 0.62
Area (triangle)
Cu.m 1.50 0.06 1.00 (0.08)
Cu.m 3.26
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.
Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00
PIER 6
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.77
5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -
10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 1.50 1.42 1.00 3.20
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 4.00 1.00 2.01
Total Cu.m 2.01
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00
SUPER STRUCTURE
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
10.01(3) (Abutment 1 - Pier 1 - Pier 2) & (Abutment 2 - Pier 6 - Pier 5)
Parapet Cu.m 20.75 0.25 0.30 4.00 6.23
Slabs Cu.m 20.75 0.90 0.15 4.00 11.21
Area (Triangle)
Stair Cu.m 0.63 0.05 132.00 3.71
Bordes Cu.m
Parapet Cu.m 1.50 0.25 0.30 4.00 0.45
Slabs Cu.m 1.50 0.90 0.15 4.00 0.81
Beams Cu.m 1.50 0.80 0.71 2.00 1.70
Area (Triangle)
Stair Cu.m 0.63 0.05 60.00 1.69
Bordes Cu.m
Parapet Cu.m 1.21 0.25 0.30 4.00 0.36
Slabs Cu.m 1.21 0.90 0.15 4.00 0.65
Beams Cu.m 1.21 0.80 0.71 2.00 1.37
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.
Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity
Area (triangle)
Slabs (2) Cu.m 35.80 0.01 2.00 0.57
Total Cu.m 90.32
Title : Pedes
PT. VIRAMA KARYA
Title : Pedes
PT. VIRAMA KARYA
Title : Pedes
PT. VIRAMA KARYA
Title : Pedes
PT. VIRAMA KARYA
Title : Pedes
PT. VIRAMA KARYA
Title : Pedes
PT. VIRAMA KARYA
Title : Pedes
PT. VIRAMA KARYA
Title : Pedes
PT. VIRAMA KARYA
Title : Pedes
PT. VIRAMA KARYA
Title : Pedes
PT. VIRAMA KARYA
Title : Pedes
PT. VIRAMA KARYA
Title : Pedes
PT. VIRAMA KARYA
Title : Pedes
PT. VIRAMA KARYA
Title : Pedes
PT. VIRAMA KARYA
Title : Pedes
Solo - Mantingan - Ngawi Toll Road Project
SKETCH 1
Solo - Mantingan - Ngawi Toll Road Project
SKETCH 2
Solo - Mantingan - Ngawi Toll Road Project
SKETCH 3
Solo - Mantingan - Ngawi Toll Road Project
SKETCH 4
Solo - Mantingan - Ngawi Toll Road Project
SKETCH 5
Solo - Mantingan - Ngawi Toll Road Project
501524-VIK-PB-3951 R2
gawi Toll Road Project
501524-VIK-PB-3951 R2
gawi Toll Road Project
501524-VIK-PB-3951 R2
gawi Toll Road Project
501524-VIK-PB-3951 R2
gawi Toll Road Project
501524-VIK-PB-3951 R2
gawi Toll Road Project
501524-VIK-PB-3951 R2
gawi Toll Road Project
501524-VIK-PB-3951 R2
gawi Toll Road Project
501524-VIK-PB-3951 R2
gawi Toll Road Project
501524-VIK-PB-3951 R2
gawi Toll Road Project
501524-VIK-PB-3951 R2
gawi Toll Road Project
501524-VIK-PB-3951 R2
gawi Toll Road Project
501524-VIK-PB-3951 R2
gawi Toll Road Project
501524-VIK-PB-3951 R2
gawi Toll Road Project
501524-VIK-PB-3951 R2
gawi Toll Road Project
501524-VIK-PB-3951 R2
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.
Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Abutment
Parapet Cu.m 2.68 0.25 0.32 2.00 0.43
Stair
Seg. 1 Cu.m 0.63 0.20 0.15 2.00 0.04
Seg. 2 Cu.m 0.63 0.80 0.15 2.00 0.15
Seg. 3 Cu.m 0.63 1.40 0.15 2.00 0.26
Footing
Seg. 5 Cu.m 2.60 4.00 0.80 1.00 8.32
Deduction Cu.m 0.35 0.35 0.20 1.00 (0.02)
Seg. 6 Cu.m 3.00 4.50 0.50 1.00 6.75
Sub total Cu.m 16.35
ABUTMENT 2
Elev. Existing Ground Level (A) Ln. m -
Bottom Of Footing (B) Ln. m -
(A-B) Ln. m 0.05
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Abutment
Parapet Cu.m 2.68 0.25 0.32 2.00 0.43
Stair
Seg. 1 Cu.m 0.63 0.20 0.15 2.00 0.04
Seg. 2 Cu.m 0.63 0.80 0.15 2.00 0.15
Seg. 3 Cu.m 0.63 1.40 0.15 2.00 0.26
Footing
Seg. 5 Cu.m 2.60 4.00 0.80 1.00 8.32
Deduction Cu.m 0.35 0.35 0.20 1.00 (0.02)
Seg. 6 Cu.m 3.00 4.50 0.50 1.00 6.75
Sub total Cu.m 16.35
PIER 1
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.41
5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -
10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 1.50 1.42 1.00 3.20
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 3.00 1.00 1.51
Total Cu.m 1.51
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00
Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity
PIER 2
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.84
5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -
10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 2.05 0.47 1.00 1.45
Cu.m 1.50 2.05 0.75 1.00 2.31
Cu.m 1.50 2.05 0.20 1.00 0.62
Area (triangle)
Cu.m 1.50 0.06 1.00 (0.08)
Cu.m 3.26
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 6.00 1.00 3.02
Total Cu.m 3.02
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00
PIER 3
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 2.03
5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 5.45 3.20 0.03 1.00 0.52
10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete (I)
Cu.m 1.50 1.50 2.18 1.00 4.91
Deduction
Seg.1 Cu.m 0.90 0.75 0.29 1.00 (0.20)
Seg.2 Cu.m 0.35 0.35 0.15 1.00 (0.02)
Area (triangle)
Seg.3 Cu.m 0.75 0.01 2.00 (0.02)
Area
Pier head concrete (II) Cu.m 1.38 0.50 1.00 0.69
Cu.m 4.29
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 7.00 1.00 3.52
Total Cu.m 3.52
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 5.25 1.00 1.00 15.75
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.
Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity
PIER 4
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 2.12
5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 5.45 3.20 0.12 1.00 2.09
10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete (I)
Cu.m 1.50 1.50 2.18 1.00 4.91
Deduction
Seg.1 Cu.m 0.90 0.75 0.29 1.00 (0.20)
Seg.2 Cu.m 0.35 0.35 0.15 1.00 (0.02)
Area (triangle)
Seg.3 Cu.m 0.75 0.01 2.00 (0.02)
Area
Pier head concrete (II) Cu.m 1.38 0.50 1.00 0.69
Cu.m 4.29
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 7.00 1.00 3.52
Total Cu.m 3.52
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 5.25 1.00 1.00 15.75
15.75
PIER 5
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.72
5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -
10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 2.05 0.47 1.00 1.45
Cu.m 1.50 2.05 0.75 1.00 2.31
Cu.m 1.50 2.05 0.20 1.00 0.62
Area (triangle)
Cu.m 1.50 0.06 1.00 (0.08)
Cu.m 3.26
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.
Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00
PIER 6
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.28
5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -
10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 1.50 1.42 1.00 3.20
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 3.00 1.00 1.51
Total Cu.m 1.51
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00
SUPER STRUCTURE
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
10.01(3) (Abutment 1 - Pier 1 - Pier 2) & (Abutment 2 - Pier 6 - Pier 5)
Parapet Cu.m 20.75 0.25 0.30 4.00 6.23
Slabs Cu.m 20.75 0.90 0.15 4.00 11.21
Area (Triangle)
Stair Cu.m 0.63 0.05 132.00 3.71
Bordes Cu.m
Parapet Cu.m 1.50 0.25 0.30 4.00 0.45
Slabs Cu.m 1.50 0.90 0.15 4.00 0.81
Beams Cu.m 1.50 0.80 0.71 2.00 1.70
Area (Triangle)
Stair Cu.m 0.63 0.05 60.00 1.69
Bordes Cu.m
Parapet Cu.m 1.21 0.25 0.30 4.00 0.36
Slabs Cu.m 1.21 0.90 0.15 4.00 0.65
Beams Cu.m 1.21 0.80 0.71 2.00 1.37
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.
Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity
Area (triangle)
Slabs (2) Cu.m 35.80 0.01 2.00 0.57
Total Cu.m 90.32
Title : Pede
PT. VIRAMA KARYA
Title : Pede
PT. VIRAMA KARYA
Title : Pede
PT. VIRAMA KARYA
Title : Pede
PT. VIRAMA KARYA
Title : Pede
PT. VIRAMA KARYA
Title : Pede
PT. VIRAMA KARYA
Title : Pede
PT. VIRAMA KARYA
Title : Pede
PT. VIRAMA KARYA
Title : Pede
PT. VIRAMA KARYA
Title : Pede
PT. VIRAMA KARYA
Title : Pede
PT. VIRAMA KARYA
Title : Pede
PT. VIRAMA KARYA
Title : Pede
PT. VIRAMA KARYA
Title : Pede
PT. VIRAMA KARYA
Title : Pede
Solo - Mantingan - Ngawi Toll Road Project
SKETCH 1
Solo - Mantingan - Ngawi Toll Road Project
SKETCH 2
Solo - Mantingan - Ngawi Toll Road Project
SKETCH 3
Solo - Mantingan - Ngawi Toll Road Project
SKETCH 4
Solo - Mantingan - Ngawi Toll Road Project
SKETCH 5
Solo - Mantingan - Ngawi Toll Road Project
501524-VIK-PB-4901 R2
gawi Toll Road Project
501524-VIK-PB-4901 R2
gawi Toll Road Project
501524-VIK-PB-4901 R2
gawi Toll Road Project
501524-VIK-PB-4901 R2
gawi Toll Road Project
501524-VIK-PB-4901 R2
gawi Toll Road Project
501524-VIK-PB-4901 R2
gawi Toll Road Project
501524-VIK-PB-4901 R2
gawi Toll Road Project
501524-VIK-PB-4901 R2
gawi Toll Road Project
501524-VIK-PB-4901 R2
gawi Toll Road Project
501524-VIK-PB-4901 R2
gawi Toll Road Project
501524-VIK-PB-4901 R2
gawi Toll Road Project
501524-VIK-PB-4901 R2
gawi Toll Road Project
501524-VIK-PB-4901 R2
gawi Toll Road Project
501524-VIK-PB-4901 R2
gawi Toll Road Project
501524-VIK-PB-4901 R2
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.
Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Abutment
Parapet Cu.m 2.68 0.25 0.32 2.00 0.43
Stair
Seg. 1 Cu.m 0.63 0.20 0.15 2.00 0.04
Seg. 2 Cu.m 0.63 0.80 0.15 2.00 0.15
Seg. 3 Cu.m 0.63 1.40 0.15 2.00 0.26
Footing
Seg. 5 Cu.m 2.60 4.00 0.80 1.00 8.32
Deduction Cu.m 0.35 0.35 0.20 1.00 (0.02)
Seg. 6 Cu.m 3.00 4.50 0.50 1.00 6.75
Sub total Cu.m 16.35
ABUTMENT 2
Elev. Existing Ground Level (A) Ln. m -
Bottom Of Footing (B) Ln. m -
(A-B) Ln. m 1.27
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Abutment
Parapet Cu.m 2.68 0.25 0.32 2.00 0.43
Stair
Seg. 1 Cu.m 0.63 0.20 0.15 2.00 0.04
Seg. 2 Cu.m 0.63 0.80 0.15 2.00 0.15
Seg. 3 Cu.m 0.63 1.40 0.15 2.00 0.26
Footing
Seg. 5 Cu.m 2.60 4.00 0.80 1.00 8.32
Deduction Cu.m 0.35 0.35 0.20 1.00 (0.02)
Seg. 6 Cu.m 3.00 4.50 0.50 1.00 6.75
Sub total Cu.m 16.35
PIER 1
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.01
5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -
10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 1.50 1.42 1.00 3.20
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 2.00 1.00 1.01
Total Cu.m 1.01
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00
Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity
PIER 2
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.72
5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -
10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 1.50 1.42 1.00 3.20
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 5.00 1.00 2.51
Total Cu.m 2.51
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00
PIER 3
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.48
5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 5.45 3.20 - 1.00 -
10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete (I)
Cu.m 1.50 1.50 2.18 1.00 4.91
Deduction
Seg.1 Cu.m 0.90 0.75 0.29 1.00 (0.20)
Seg.2 Cu.m 0.35 0.35 0.15 1.00 (0.02)
Area (triangle)
Seg.3 Cu.m 0.75 0.01 2.00 (0.02)
Area
Pier head concrete (II) Cu.m 1.38 0.50 1.00 0.69
Cu.m 4.29
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 5.50 1.00 2.76
Total Cu.m 2.76
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 5.25 1.00 1.00 15.75
15.75
Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity
PIER 4
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.22
5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 5.45 3.20 - 1.00 -
10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete (I)
Cu.m 1.50 1.50 2.18 1.00 4.91
Deduction
Seg.1 Cu.m 0.90 0.75 0.29 1.00 (0.20)
Seg.2 Cu.m 0.35 0.35 0.15 1.00 (0.02)
Area (triangle)
Seg.3 Cu.m 0.75 0.01 2.00 (0.02)
Area
Pier head concrete (II) Cu.m 1.38 0.50 1.00 0.69
Cu.m 4.29
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 5.00 1.00 2.51
Total Cu.m 2.51
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 5.25 1.00 1.00 15.75
15.75
PIER 5
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.20
5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -
10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 1.50 1.42 1.00 3.20
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 4.00 1.00 2.01
Total Cu.m 2.01
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00
Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity
PIER 6
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.72
5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -
10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 1.50 1.42 1.00 3.20
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 2.00 1.00 1.01
Total Cu.m 1.01
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00
SUPER STRUCTURE
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
10.01(3) (Abutment 1 - Pier 1 - Pier 2 - Pier 3) & (Abutment 2 - Pier 6 - Pier 5 - Pier 4)
Parapet Cu.m 27.77 0.25 0.30 4.00 8.33
Slabs Cu.m 27.77 0.90 0.15 4.00 15.00
Area (Triangle)
Stair Cu.m 0.63 0.05 180.00 5.06
Bordes Cu.m
Parapet Cu.m 1.50 0.25 0.30 6.00 0.68
Slabs Cu.m 1.50 0.90 0.15 6.00 1.22
Beams Cu.m 1.50 0.80 0.71 3.00 2.56
Pier 3 to Pier 4
Parapet Cu.m 35.80 0.25 0.30 2.00 5.37
Slabs (1) Cu.m 35.80 2.60 0.15 1.00 13.96
Area (triangle)
Slabs (2) Cu.m 35.80 0.01 2.00 0.57
Total Cu.m 84.58
Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity
Title : Pede
PT. VIRAMA KARYA
Title : Pede
PT. VIRAMA KARYA
Title : Pede
PT. VIRAMA KARYA
Title : Pede
PT. VIRAMA KARYA
Title : Pede
PT. VIRAMA KARYA
Title : Pede
PT. VIRAMA KARYA
Title : Pede
PT. VIRAMA KARYA
Title : Pede
PT. VIRAMA KARYA
Title : Pede
PT. VIRAMA KARYA
Title : Pede
PT. VIRAMA KARYA
Title : Pede
PT. VIRAMA KARYA
Title : Pede
PT. VIRAMA KARYA
Title : Pede
PT. VIRAMA KARYA
Title : Pede
PT. VIRAMA KARYA
Title : Pede
Solo - Mantingan - Ngawi Toll Road Project
SKETCH 1
Solo - Mantingan - Ngawi Toll Road Project
SKETCH 2
Solo - Mantingan - Ngawi Toll Road Project
SKETCH 3
Solo - Mantingan - Ngawi Toll Road Project
SKETCH 4
Solo - Mantingan - Ngawi Toll Road Project
SKETCH 5
Solo - Mantingan - Ngawi Toll Road Project
501524-VIK-PB-5076 R1
gawi Toll Road Project
501524-VIK-PB-5076 R1
gawi Toll Road Project
501524-VIK-PB-5076 R1
gawi Toll Road Project
501524-VIK-PB-5076 R1
gawi Toll Road Project
501524-VIK-PB-5076 R1
gawi Toll Road Project
501524-VIK-PB-5076 R1
gawi Toll Road Project
501524-VIK-PB-5076 R1
gawi Toll Road Project
501524-VIK-PB-5076 R1
gawi Toll Road Project
501524-VIK-PB-5076 R1
gawi Toll Road Project
501524-VIK-PB-5076 R1
gawi Toll Road Project
501524-VIK-PB-5076 R1
gawi Toll Road Project
501524-VIK-PB-5076 R1
gawi Toll Road Project
501524-VIK-PB-5076 R1
gawi Toll Road Project
501524-VIK-PB-5076 R1
gawi Toll Road Project
501524-VIK-PB-5076 R1
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.
Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Abutment
Parapet Cu.m 2.68 0.25 0.32 2.00 0.43
Stair
Seg. 1 Cu.m 0.63 0.20 0.15 2.00 0.04
Seg. 2 Cu.m 0.63 0.80 0.15 2.00 0.15
Seg. 3 Cu.m 0.63 1.40 0.15 2.00 0.26
Footing
Seg. 5 Cu.m 2.60 4.00 0.80 1.00 8.32
Deduction Cu.m 0.35 0.35 0.20 1.00 (0.02)
Seg. 6 Cu.m 3.00 4.50 0.50 1.00 6.75
Sub total Cu.m 16.35
ABUTMENT 2
Elev. Existing Ground Level (A) Ln. m -
Bottom Of Footing (B) Ln. m -
(A-B) Ln. m 0.30
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Abutment
Parapet Cu.m 2.68 0.25 0.32 2.00 0.43
Stair
Seg. 1 Cu.m 0.63 0.20 0.15 2.00 0.04
Seg. 2 Cu.m 0.63 0.80 0.15 2.00 0.15
Seg. 3 Cu.m 0.63 1.40 0.15 2.00 0.26
Footing
Seg. 5 Cu.m 2.60 4.00 0.80 1.00 8.32
Deduction Cu.m 0.35 0.35 0.20 1.00 (0.02)
Seg. 6 Cu.m 3.00 4.50 0.50 1.00 6.75
Sub total Cu.m 16.35
PIER 1
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.84
5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -
10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 1.50 1.42 1.00 3.20
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 3.00 1.00 1.51
Total Cu.m 1.51
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00
Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity
PIER 2
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.63
5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -
10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 1.50 1.42 1.00 3.20
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 5.00 1.00 2.51
Total Cu.m 2.51
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00
PIER 3
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.39
5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -
10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 2.05 0.47 1.00 1.45
Cu.m 1.50 2.05 0.75 1.00 2.31
Cu.m 1.50 2.05 0.20 1.00 0.62
Area (triangle)
Cu.m 1.50 0.06 1.00 (0.08)
Cu.m 3.26
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 7.00 1.00 3.52
Total Cu.m 3.52
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00
Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity
PIER 4
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 2.01
5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 4.40 3.20 0.01 1.00 0.14
10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete (I)
Cu.m 1.50 1.50 2.18 1.00 4.91
Deduction
Seg.1 Cu.m 0.90 0.75 0.29 1.00 (0.20)
Seg.2 Cu.m 0.35 0.35 0.15 1.00 (0.02)
Area (triangle)
Seg.3 Cu.m 0.75 0.01 2.00 (0.02)
Area
Pier head concrete (II) Cu.m 1.38 0.50 1.00 0.69
Cu.m 4.29
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 7.00 1.00 3.52
Total Cu.m 3.52
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 4.20 1.00 1.00 12.60
12.60
PIER 5
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.52
5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 4.40 3.20 - 1.00 -
10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete (I)
Cu.m 1.50 1.50 2.18 1.00 4.91
Deduction
Seg.1 Cu.m 0.90 0.75 0.29 1.00 (0.20)
Seg.2 Cu.m 0.35 0.35 0.15 1.00 (0.02)
Area (triangle)
Seg.3 Cu.m 0.75 0.01 2.00 (0.02)
Area
Pier head concrete (II) Cu.m 1.38 0.50 1.00 0.69
Cu.m 4.29
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 7.00 1.00 3.52
Total Cu.m 3.52
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.
Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity
PIER 6
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.29
5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -
10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 2.05 0.47 1.00 1.45
Cu.m 1.50 2.05 0.75 1.00 2.31
Cu.m 1.50 2.05 0.20 1.00 0.62
Area (triangle)
Cu.m 1.50 0.06 1.00 (0.08)
Cu.m 3.26
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 7.50 1.00 3.77
Total Cu.m 3.77
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00
PIER 7
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.01
5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -
10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 1.50 1.42 1.00 3.20
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 5.00 1.00 2.51
Total Cu.m 2.51
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.
Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity
PIER 8
Elev. Natural Ground Level Ln. m -
Bottom Of Footing Ln. m -
Ln. m 1.24
5.01 (2) Structure excavation to a depth greater than 200 mm, but not exceeding 400 mm
Cu.m 3.20 3.20 - 1.00 -
10.01(2) Structural Concrete Class B-1, fc' = 30 Mpa ( Pier Head, Diafragma, Portal Frames)
Pier head concrete
Cu.m 1.50 1.50 1.42 1.00 3.20
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
Column concrete Area (sq.m)
Cu.m 0.50 3.00 1.00 1.51
Total Cu.m 1.51
10.01(4) Structural Concrete Class B-1, fc' = 30 Mpa ( Abutment, Footing, Box Culvert)
Footing pier concrete
Cu.m 3.00 3.00 1.00 1.00 9.00
9.00
SUPER STRUCTURE
10.01(3) Structural Concrete Class B-1, fc' = 30 Mpa ( Pilar, Column, Slab )
10.01(3) (Abutment 1 - Pier 1 - Pier 2 - Pier 3) & (Abutment 2 - Pier 8 - Pier 7 - Pier 6)
Parapet Cu.m 27.46 0.25 0.30 4.00 8.24
Slabs Cu.m 27.46 0.90 0.15 4.00 14.83
Area (Triangle)
Stair Cu.m 0.63 0.05 180.00 5.06
Bordes Cu.m
Parapet Cu.m 6.00 0.25 0.30 4.00 1.80
Slabs Cu.m 6.00 0.90 0.15 4.00 3.24
Beams Cu.m 6.00 0.80 0.71 1.00 3.41
Area (Triangle)
Stair Cu.m 0.63 0.05 60.00 1.69
Bordes Cu.m
Parapet Cu.m 1.15 0.25 0.30 4.00 0.35
Slabs Cu.m 1.15 0.90 0.15 4.00 0.62
Beams Cu.m 1.15 0.80 0.71 2.00 1.31
Pier 3 to Pier 4
Parapet Cu.m 35.80 0.25 0.30 2.00 5.37
Slabs (1) Cu.m 35.80 2.60 0.15 1.00 13.96
Area (triangle)
Slabs (2) Cu.m 35.80 0.01 2.00 0.57
Total Cu.m 99.41
Solo - Mantingan - Ngawi Toll Road Project
PT. VIRAMA KARYA
Date & Reference From Calculation Referred to Drawing No. Rev.
Pay Item Work Item Unit Length Wide Thick/Depth Height Concrete Work Ratio Number Quantity
Title : Ped
PT. VIRAMA KARYA
Title : Ped
PT. VIRAMA KARYA
Title : Ped
PT. VIRAMA KARYA
Title : Ped
PT. VIRAMA KARYA
Title : Ped
PT. VIRAMA KARYA
Title : Ped
PT. VIRAMA KARYA
Title : Ped
PT. VIRAMA KARYA
Title : Ped
PT. VIRAMA KARYA
Title : Ped
PT. VIRAMA KARYA
Title : Ped
PT. VIRAMA KARYA
Title : Ped
PT. VIRAMA KARYA
Title : Ped
PT. VIRAMA KARYA
Title : Ped
PT. VIRAMA KARYA
Title : Ped
PT. VIRAMA KARYA
Title : Ped
Solo - Mantingan - Ngawi Toll Road Project
SKETCH 1
Solo - Mantingan - Ngawi Toll Road Project
SKETCH 2
Solo - Mantingan - Ngawi Toll Road Project
SKETCH 3
Solo - Mantingan - Ngawi Toll Road Project
SKETCH 4
Solo - Mantingan - Ngawi Toll Road Project
SKETCH 5
Solo - Mantingan - Ngawi Toll Road Project
501524-VIK-PB-5276 R1
gawi Toll Road Project
501524-VIK-PB-5276 R1
gawi Toll Road Project
501524-VIK-PB-5276 R1
gawi Toll Road Project
501524-VIK-PB-5276 R1
gawi Toll Road Project
501524-VIK-PB-5276 R1
gawi Toll Road Project
501524-VIK-PB-5276 R1
gawi Toll Road Project
501524-VIK-PB-5276 R1
gawi Toll Road Project
501524-VIK-PB-5276 R1
gawi Toll Road Project
501524-VIK-PB-5276 R1
gawi Toll Road Project
501524-VIK-PB-5276 R1
gawi Toll Road Project
501524-VIK-PB-5276 R1
gawi Toll Road Project
501524-VIK-PB-5276 R1
gawi Toll Road Project
501524-VIK-PB-5276 R1
gawi Toll Road Project
501524-VIK-PB-5276 R1
gawi Toll Road Project
501524-VIK-PB-5276 R1