You are on page 1of 1

1.

STAAD PLANE JACKING CONDITION


2. START JOB INFORMATION
3. ENGINEER DATE 26-DEC-06
4. END JOB INFORMATION
5. INPUT WIDTH 79
6. UNIT METER MTON
7. JOINT COORDINATES
8. 100 0; 2 0.6 0 0; 3 1.78 0 0; 4 2.98 0 0; 5 4.16 0 0; 6 5.36 0 0; 7 6.54
9. 8 7.14 0 0
10. MEMBER INCIDENCES
11. 1 1 2; 2 2 3; 3 3 4; 4 4 5; 5 5 6; 6 6 7; 7 7 8
12. DEFINE MATERIAL START
13. ISOTROPIC CONCRETE
14. E 2.21467E+006
15. POISSON 0.17
16. DENSITY 2.40262
17. ALPHA 5.5E-006
18. DAMP 0.05
19. END DEFINE MATERIAL
20. CONSTANTS
21. MATERIAL CONCRETE MEMB 1 TO 7
22. MEMBER PROPERTY AMERICAN
23. 1 TO 7 PRIS YD 1.25 ZD 1
24. SUPPORTS
25. 2 PINNED
26. 3 TO 7 FIXED BUT FX MZ
27. LOAD 1 SELFWEIGHT
28. JOINT LOAD
29. 1 8 FY -134.5
30. MEMBER LOAD
31. 3 5 CON GY -134.5 0.6
32. LOAD 2 SDL
33. JOINT LOAD
34. 1 8 FY -25.8
35. MEMBER LOAD
36. 3 5 CON GY -25.8 0.6
37. LOAD COMBINATION 11
38. 1 1.0 2 1.0
39. PERFORM ANALYSIS